Attach_19_B08_Sol_Prov_and_Clauses_Rev_1_-_2_10_26_0002.pdf
PDF 448 KB Posted
- Solicitation number
- 140A1626R0002
About this file
This document is a Request for Proposal (RFP) for Design Build Construction Facilities Improvement & Repair (FI&R) services at the Mescalero Adult Detention Center located at 386 Sawmill Dr., Mescalero, NM 88340 on the Mescalero Apache Reservation. The solicitation is issued by the Bureau of Indian Affairs and requires contractors to provide all labor, equipment, and materials to complete four specific construction line items within a 120 calendar-day performance period: (1) providing and installing thermostat guards in inmate-occupied spaces (CLIN 0010); (2) designing, constructing, and installing millwork in the Processing Room (CLIN 0020); (3) providing and installing conduit with wire pulls and termination boxes for inmate communications equipment (CLIN 0030); and (4) demolition and reconfiguration of wing walls in holding cells 172, 176, 185, and 186 (CLIN 0040). Each line item is priced as a single job with offerors required to submit unit prices and total prices, including general conditions costs (bonding, insurance, other taxes) and TERO costs where applicable.
The solicitation employs an Economical Lowest Price Technically Acceptable evaluation methodology, whereby price is evaluated first and only the lowest-priced proposal is reviewed for technical acceptability. Technical proposals, limited to 20 pages, must address construction approach, risk management, environmental compliance, safety, quality control, key project personnel qualifications, and a detailed project schedule demonstrating completion within 120 calendar days or sooner. Proposals must be submitted electronically in two separate volumes (Price Proposal and Technical Proposal) and include FAR representations and certifications, completed Indian Economic Enterprise Representation Forms, and bid/performance/payment bonds. An organized site visit is scheduled for January 27, 2026 at 11:00 AM MST at the detention center facility. The contract includes numerous FAR clauses addressing labor standards, insurance requirements (minimum $500,000 general liability per occurrence), construction wage rates, TERO coordination, VOC compliance plans, contractor security requirements, and other federal contracting requirements. Award will be made to the responsible offeror whose technically acceptable proposal provides the lowest total firm fixed price.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bureau of Indian Affairs Mescalero Adult Detention Center
Design Build Construction Facilities Improvement & Repair (FI&R)
SECTION B – PRICE SCHEDULE
B.1. REQUIRED WORK
Provide all labor, equipment, and materials necessary to manage and accomplish the FI&R activities outlined within the Mescalero Adult Detention Center Design Build Construction FI&R Statement of Work (SOW). See the SOW for details.
Period of Performance: 120 Calendar days from the issuance of the Notice to Proceed.
B.2. PROJECT LOCATION:
The Mescalero Adult Detention Center is located at 386 Sawmill Dr., Mescalero, NM 88340 in the Southwest Region on the Mescalero Apache Reservation.
B.3. OFFEROR’S PRICE SCHEDULE
PRICE SCHEDULE
Propose your best price for each element of work below in accordance with the Statement of Work (SOW) and attachments.
CLIN DESCRIPTION UNIT UNIT PRICE TOTAL PRICE
Provide and install guards to prevent detainees from accessing/controlling thermostats in all inmates occupied spaces IAW the SOW.
1 Job $ $_____________
Design, construct, and install millwork in the Processing Room IAW the SOW.
1 Job $____________ $_____________
Provide and install conduit with wire pulls and termination boxes for the inmate communications equipment IAW the SOW.
1 Job $____________ $_____________
Demolition and re-configuration of wing walls in group and individual holding cells 172, 176, 185, and 186 IAW the SOW.
1 Job $____________ $_____________
Subtotal $_____________
General Conditions (Bonding, Ins., other Taxes) $_____________
TERO (if applicable) $_____________
Total Firm Fixed Price $_____________
Insert TOTAL FIRM FIXED PRICE ABOVE on SF-1442 Block 17
Miscellaneous Work: The contractor shall not perform any of contingent sum work, until the Contracting Officer issues a contract modification authorizing performance of work in accordance with FAR Clause 52.243-04, Changes, and FAR Clause 52.243-05, Changes and Changed Conditions; and subject to availability of funds, FAR Clause 52.232-18, Availability of Funds.
The Contractor shall promptly notify the Contracting Officer, in writing, of subsurface or any physical conditions different from those indicated in this contract or unknown unusual physical conditions at the site before proceeding with the work.
The change orders request shall be forwarded to the Contracting Officer by memorandum outlining the need and a justification for the change order. Upon receipt of a change order request, the Contracting Officer will request a cost proposal from the Contractor. All cost proposals shall be in detail and itemized, showing price breakdown in sufficient detail to permit an analysis of cost for material, labor, equipment, hours, taxes, insurance, bonds, overhead costs, profit, and complete description of work involved in the change order, including any time extension.
In an emergency, a telephone approval may be granted by the Contracting Officer, and immediately the Contractor shall follow through by submitting a written cost proposal to the Contracting Officer. The Contracting Office will issue a contract modification to authorize the work for the "emergency".
END OF SECTION B – PRICE SCHEDULE
SECTION C – STATEMENT OF WORK
See Attachment 1 for the Statement of Work and Solicitation Section J for list of attachments.
SECTION D – PACKAGING AND MARKING
D.1. PACKAGING AND MARKING
A. All shipments of materials, equipment and/or supplies to the project site shall be addressed to the Contractor and not the Government. Preservation, packaging, and packing shall be in accordance with standard practices for commercial packaging.
B. Government personnel are not authorized to accept deliveries for the contractor, nor are they responsible for off-loading shipments. A contractor representative must be present to accept deliveries.
END OF SECTION D – PACKAGING AND MARKING
SECTION E – INSPECTION AND ACCEPTANCE
E.1 52.246-12 INSPECTION OF CONSTRUCTION AUGUST 1996
(a) Definition. "Work" includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.
(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.
(c) Government inspections and tests are for the sole benefit of the Government and do not--
(1) Relieve the Contractor of responsibility for providing adequate quality control measures;
(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;
(3) Constitute or imply acceptance; or
(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) of this section.
(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer's written authorization.
(e) The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.
(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.
(g) If the Contractor does not promptly replace or correct rejected work, the Government may--
(1) by contract or otherwise, replace or correct the work and charge the cost to the Contractor; or
(2) terminate for default the Contractor's right to proceed.
(g) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.
(h) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately.
Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government's rights under any warranty or guarantee.
(End of Clause)
E.2. DAILY REPORTING REQUIREMENT
A. The Contractor shall prepare and file a "Contractor's Daily Report", for each day of contract performance. Description must include contract number and work being performed.
These reports shall be delivered to, or if directed, mailed to the Contracting Officer’s Representative on Fridays. The daily report shall include the name of Contractors and Subcontractors on-site, the number of workers and their labor categories employed on-site, the work being performed, the type of equipment on-site, any change order work being performed, and whether the work being performed is on schedule. Reports shall be numbered, dated and signed by the Contractor or his Project Manager. Failure to submit the daily reports could result in payments being withheld until such time as all daily reports are current.
E.3. FINAL INSPECTION
A. Contractor Self-Inspection. Prior to the completion date, the Contractor’s Quality Control Manager shall conduct a self-inspection of the site and document all items needing correction by means of a punch list. The corrected punch list shall be provided to the Contracting Officer’s Representative at the same time the pre-final inspection is requested. All punch list items must be corrected prior to requesting the pre-final inspection.
B. The Contractor and the Contracting Officer’s Representative will jointly conduct a pre-final inspection prior to requesting a final inspection. Any item needing correction shall be noted on the Pre-Final Inspection Punch List. Any discrepancies noted will be corrected prior to any final inspection. The Contracting Officer Representative may schedule more than one pre-final inspection if he determines it necessary.
C. When the Contractor is ready for final inspection, he will request final inspection in writing to the Contracting Officer and Contracting Officer’s Representative (COR). A copy of the Pre-Final Punch List shall be attached to this request with the corrective action taken noted.
The final inspection will be requested at least 48 hours before the desired date.
D. The final inspection shall be performed with the Contractor by the COR, Contracting Officer, Safety Officer, and representatives of the using activity. Any discrepancies noted will be corrected within the time specified in the contract for the completion of work.
1. Prior to close-out and final payment of the contract, the following are required:
2. All submittals; to be submitted as required by the contract and may include product submittals, as-built drawings, manuals, etc.
3. All warranties; to be submitted with the request for Final Inspection.
4. Contractor’s Release; to be submitted with the Contractor’s final invoice
END OF SECTION E – INSPECTION AND ACCEPTANCE
SECTION F -- DELIVERIES OR PERFORMANCE
F.1. 52.211-10 COMMENCEMENT, PROSECUTION, AND
COMPLETION OF WORK
APRIL
The Contractor shall be required to (a) commence work under this contract receipt of the award,
(b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 120 (one hundred twenty) calendar days. The time stated for completion shall include final cleanup of the premises.
F.2. 52.236-15 SCHEDULES FOR CONSTRUCTION CONTRACTS APRIL
(a) The Contractor shall, within five days after the work commences on the contract or another period of time determined by the Contracting Officer, prepare and submit to the Contracting Officer for approval three copies of a practicable schedule showing the order in which the Contractor proposes to perform the work, and the dates on which the Contractor contemplates starting and completing the several salient features of the work (including acquiring materials, plant, and equipment). The schedule shall be in the form of a progress chart of suitable scale to indicate appropriately the percentage of work scheduled for completion by any given date during the period. If the Contractor fails to submit a schedule within the time prescribed, the Contracting Officer may withhold approval of progress payments until the Contractor submits the required schedule.
(b) The Contractor shall enter the actual progress on the chart as directed by the Contracting Officer, and upon doing so shall immediately deliver three copies of the annotated schedule to the Contracting Officer. If, in the opinion of the Contracting Officer, the Contractor falls behind the approved schedule, the Contractor shall take steps necessary to improve its progress, including those that may be required by the Contracting Officer, without additional cost to the Government. In this circumstance, the Contracting Officer may require the Contractor to increase the number of shifts, overtime operations, days of work, and/or the amount of construction plant, and to submit for approval any supplementary schedule or schedules in chart form as the Contracting Officer deems necessary to demonstrate how the approved rate of progress will be regained.
(c) Failure of the Contractor to comply with the requirements of the Contracting Officer under this clause shall be grounds for a determination by the Contracting Officer that the Contractor is not prosecuting the work with sufficient diligence to ensure completion within the time specified in the contract. Upon making this determination, the Contracting Officer may terminate the Contractor's right to proceed with the work, or any separable part of it, in accordance with the default terms of this contract.
(End of Clause)
F.3. 52.242-14 SUSPENSION OF WORK APRIL
(a) The Contracting Officer may order the Contractor, in writing, to suspend, delay, or interrupt all or any part of the work of this contract for the period of time that the Contracting Officer determines appropriate for the convenience of the Government.
(b) If the performance of all or any part of the work is, for an unreasonable period of time, suspended, delayed, or interrupted (1) by an act of the Contracting Officer in the administration of this contract, or (2) by the Contracting Officer's failure to act within the time specified in this contract (or within a reasonable time if not specified), an adjustment shall be made for any increase in the cost of performance of this contract (excluding profit) necessarily caused by the unreasonable suspension, delay, or interruption, and the contract modified in writing accordingly. However, no adjustment shall be made under this clause for any suspension, delay, or interruption to the extent that performance would have been so suspended, delayed, or interrupted by any other cause, including the fault or negligence of the Contractor, or for which an equitable adjustment is provided for or excluded under any other term or condition of this contract.
(c) A claim under this clause shall not be allowed--
(1) For any costs incurred more than 20 days before the Contractor shall have notified the Contracting Officer in writing of the act or failure to act involved (but this requirement shall not apply as to a claim resulting from a suspension order); and
(2) Unless the claim, in an amount stated, is asserted in writing as soon as practicable after the termination of the suspension, delay, or interruption, but not later than the date of final payment under the contract.
(End of Clause)
F.4. CONTINUITY OF FACILITIES OPERATION
Schedule work to minimize interference with any on-site housing residents and the facilities normal operations. Notify the Contracting Officer and Project Manager 24 hours in advance of any shutdowns. Perform all on-site work between the hours of 7:00 AM and 5:00 PM, Monday through Friday (Federal Holidays excluded), unless otherwise approved by the Contracting Officer.
(End of Local Clause)
F.5. RECYCLING AND DISPOSAL OF REFUSE
With the exception of materials specifically indicated or specified to be salvaged for reuse in construction, or turned over to the Government, all refuse, excess or waste materials resulting from construction operations shall become the property of the Contractor and shall be recycled and/or disposed of off Government property. All disposal shall be done in accordance with federal, state, and local laws and regulations.
END OF SECTION F – DELIVERIES OR PERFORMANCE
SECTION G – CONTRACT ADMINISTATION DATA
G.1. 1452.201-70 AUTHORITIES AND DELEGATIONS (SEP 2011)
(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.
(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award. The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor. Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.
(c) The COR is not authorized to perform, formally or informally, any of the following actions:
(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;
(2) Waive or agree to modification of the delivery schedule;
(3) Make any final decision on any contract matter subject to the Disputes Clause;
(4) Terminate, for any reason, the Contractor's right to proceed;
(5) Obligate in any way, the payment of money by the Government.
(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph
(c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.
(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.
(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR.
(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the
Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor's risk.
(End of clause)
G.2. CONTRACTING OFFICER'S REPRESENTATIVE
(a) The Contracting Officer shall designate a Contracting Officer's Representative (COR) who will represent the Contracting Officer in the technical phase of the work. The COR's duties, responsibilities, and limitations of authority will be set forth in a written COR designation letter. A copy of the COR designation letter will be made available to the Contractor.
(b) The COR is not authorized to make any changes to the terms and conditions of this contract. Only the Contracting Officer is authorized to make any changes to the contract by a properly written signed modification to the contract.
(c) The Contracting Officer is the only official who can legally commit or obligate the Government for expenditure of public funds.
(End of Local Clause)
G.3. INVOICE AND PAYMENT
Electronic Invoicing and Payment Requirements- Invoice Processing Platform (IPP) (April 2013)
Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).
"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp .gov.
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:
- A copy of the contractor’s invoice shall be included with the IPP invoice. If no invoice is attached, the Invoice will be rejected.
The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) prior to the contract award date, but no more than 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production
Helpdesk via email ippgroup@bos .frb.org or phone (866) 973-3131.
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
G.4. INSTRUCTIONS FOR SUBMITTING MATERIAL APPROVALS
Submittals must be provided in sufficient time and in such sequence to avoid delays in the work.
Test reports and certifications shall be submitted and approved prior to payment for the applicable item. Materials, samples, drawings, etc., shall be submitted on the Government provided form.
END OF SECTION G – CONTRACT ADMINISTATION DATA
SECTION H -- SPECIAL CONTRACT REQUIREMENTS
H.1 WORK OUTSIDE REGULAR WORK HOURS
If the contractor desires to perform work under this contract outside regular work hours or on Saturdays, Sundays or holidays, he shall apply, in writing, to the Contracting Officer no less than 10 calendar days prior to the planned start of such work. Regular work hours are, for the purpose of this clause, those hours the activity or Command where the work is to be performed normally works on a day-by-day basis. Application by the Contractor does not imply consent by the Government. Each application will be considered, and a decision made, on the potential benefit of permitting such work. Approval of a Contractor's application under this clause will be, unless otherwise agreed in writing, at no additional cost to the Government.
H.2 DRAWINGS AND OTHER DATA TO BECOME PROPERTY OF GOVERNMENT
All designs, drawings, specifications, notes and other works developed in the performance of this contract shall become the sole property of the Government and may be used on any other design or construction without additional compensation to the Contractor. The Government shall be considered the "person for whom the work was prepared" for the purpose of authorship in any copyrightable work under 17 U.S.C. 201(b). With respect thereto, the Contractor agrees not to assert or authorize others to assert any rights nor establish any claim under the design patent or copyright laws.
H.3 REQUIRED INSURANCE
The contractor shall procure and maintain insurance for each task order during the entire period of performance consistent with FAR 52.228-5, DIAR 1452.228-70, and FAR 28.307, which states the following minimum amounts of liability:
(a) Workers’ Compensation and Employer’s Liability. Contractors are required to comply with applicable Federal and State worker’s compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer’s liability section of the insurance policy, except when contract operations are so commingled with a contractor’s commercial operations that it would not be practical to require this coverage. Employer’s liability coverage of at least $100,000 shall be required, except in States with exclusive or monopolistic funds that do not permit workers’ compensation to be written by private carriers. (See 28.305(c) for treatment of contracts subject to the Defense Base Act.)
(b) General Liability. (1) The contracting officer shall require bodily injury liability insurance coverage written on the comprehensive form of policy of at least $500,000 per occurrence.
(c) Property damage liability insurance shall be required only in special circumstances as determined by the agency.
(d) Automobile Liability. The Contracting Officer shall require automobile liability insurance written on the comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract. Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage. The amount of liability coverage on other policies shall be commensurate with any legal requirements of the locality and sufficient to meet normal and customary claims.
H.4 TRIBAL TAXES, REQUIREMENTS AND/OR RESTRICTIONS
(a) Special attention is called to FAR Clause 52.236-7, Permits and Responsibilities and FAR Clause 52.229-3, Federal, State, and Local Taxes. Offerors are responsible for contacting the tax authorities and tribe or tribal organization involved with regard to any requirements regarding state taxes, tribal taxes, royalties and/or other applicable tribal laws or ordinances. Any costs associated with this section shall be included in the contractor’s proposal.
(b) Contractor is responsible for contacting the appropriate TERO office for coordination and approvals.
H.5 VOLATILE ORGANIC COMPOUNDS (VOC) COMPLIANCE PLAN
(a) Contractors are required to comply with local VOC laws and regulations and shall have an acceptable VOC compliance plan. The plan shall demonstrate that the use of paints, solvents, adhesives and cleaners comply with local VOC laws and regulations governing VOC materials, and that all required permits have been obtained or will be obtained prior to starting work involving VOC's, in the air quality district in which the work will be performed.
(b) The compliance plan shall be submitted by the Contractor to the Contracting Officer within five (5) calendar days after receipt of contract, and prior to the use of any "VOC" materials on the project site. The Government will approve or disapprove the Contractor's compliance plan within five calendar days after receipt. Should the Government reject the compliance plan, the Contractor shall resubmit a revised compliance plan within three calendar days after receipt of the rejection notification. Failure on the part of the Contractor to submit an acceptable "VOC" plan, shall not be grounds for a time extension to the performance period.
(c) An acceptable compliance plan shall contain, as a minimum:
(i) A listing of each material subject to restrictions in the air quality management district in question;
(ii) The rule governing its use;
(iii) A description of the actions which the Contractor will use to comply with the laws and regulations and plans to report to the Contracting Officer any changes in the status of compliance during the life of the contract.
(iv) Alternatively, if no materials are subject to the restrictions in the air quality management district where the work will be performed, or if there are no restrictions, the compliance plan shall so state.
H.6 WAGE RATES
Applicable Construction Wage Rate Requirements are in effect at the time of contract and will apply. Contractors will be provided with the wage determination for pricing purposes.
If crafts or trades are required in the performance of this project for which no wage is listed in the Department of Labor Wage Decision, the Contracting Officer shall be notified in writing.
H.7 CERTIFICATION OF PAYMENTS-RELEASE OF CLAIM
The Contractor, prior to receiving a progress or final payment under this contract, shall submit to the Contracting Officer a certification that the Contractor has made payment from proceeds of prior payments, or that he will make timely payment from the proceeds of the progress or final payment then due him, to his subcontractors and suppliers in accordance with his contractual arrangements. The Contractor shall submit to the Contracting Officer, together with his request for final payment, a properly executed Contractor's Release form.
Failure to submit this completed release shall result in delay of final payment.
H.8 SUBCONTRACT DATA
The Contractor shall submit an executed Statement and Acknowledgment Standard Form 1413, to the Contracting Officer for every subcontractor (including every subcontractor of the second or lower tier) that will be performing work at the construction site. This shall be done before the subcontractor begins work. This form provides an acknowledgment by the subcontractor that mandatory "flow-down" contract clauses have been included in his contract in accordance with FAR Clause 52.222-11. The Prime Contractors will be given copies of Form SF 1413 after award of a contract. Completing this form creates no contractual relationship between subcontractors and the Government.
H.9 CONTRACTOR SECURITY REQUIREMENTS
At the Pre-construction Conference [or prior to beginning work on the contract], the Contractor shall provide a list of all on-site personnel, including sub-contractors (including second and third-tier subcontractors) and suppliers, to the Contracting Officer. The contractor shall update this list when changes occur. Contractor personnel not listed may be denied access to the Mescalero Adult Detention Center facility. Contractor personnel will be restricted to designated working areas. Any personnel violating this policy may lose access to the facility. Contractor personnel shall have photo identification at all times while working on BIA facilities. Contractors shall provide the COR with 24 hours of advance notice of every delivery to the site (e.g., concrete, lumber, etc...) and provide the company name, delivery person, and phone number of the firm(s) making deliveries.
Otherwise access to the BIA facility may be denied. Employees may be required to submit to a background check and be United States citizens.
H.10 REAL ID ACT OF 2005
The Real ID Act of 2005 established minimum security standards for license issuance and production and prohibits Federal agencies from accepting for certain purposes driver's licenses and identification cards from states not meeting the Act's minimum standards. To this purpose there are five states that are not in compliance with the Act nor have they received an extension to come into compliance with the act. Those states are Illinois, Minnesota, Missouri, New Mexico and Washington State. Anyone under this contract, to include subcontractors, who holds a driver's license from any of these states without approved licenses and require access to a BIA facility will be required to provide identification other than a driver's license to gain access. It is the responsibility of the Contractor to ensure that they are in accordance with the Real ID Act and any other requirements for BIA access. For the states of Washington and Minnesota an enhanced driver's license is acceptable to gain access. Other forms of identification that are acceptable for BIA facility access are included as an attachment to this modification.
Further information on the Real ID Act can be found here: http://www.dhs.gov/real-id-enforcement-brief#
H.11 TEMPORARY FACILITIES
(a) STORAGE: The location for exterior stock piling of materials shall be arranged by the COR and Project Manager. The Contractor shall be responsible for protecting materials stockpiled against weather, damage, theft, and other risks of loss. The BIA assumes no responsibility for material or equipment left in the storage area.
(b) SANITARY FACILITIES: Toilet facilities may be available for Contractor use. The Contractor shall ensure the facilities remain clean. Contractors may be required to provide http://www.dhs.gov/real-id-enforcement-brief toilet facilities at some sites.
(c) WATER AND ELECTRICITY: Water and 120V electricity may be available at no cost to the Contractor. Should water and electricity be available, the Contractor will bear connection costs. Cost of these utility connections and disconnections is the responsibility of the Contractor.
H.12 EXISTING UTILITIES
Utility locations when shown are approximate. The contractor shall field verify all utility locations before digging or trenching. This shall include but not be limited to the use of sonic, electronic, or magnetic detection devices, by noting pull box and utility box locations at the surface, and by potholing. Contractor shall be responsible for repairing any utilities damaged during construction at no additional cost to the Government.
H.13. BACKGROUND INVESTIGATION
No background investigation is required in connection with this contract.
END OF SECTION H – SPECIAL CONTRACT REQUIREMENTS
SECTION I – CONTRACT CLAUSES
I.1. Federal Acquisition Regulation (FAR) Clauses/Provisions Incorporated by Reference
• FAR 52.203-3 Gratuities (April 1984)
• FAR 52.203-5 Covenant Against Contingent Fees (May 2014)
• FAR 52.203-7 Anti-Kickback Procedures (June 2020)
• FAR 52.203-8 Cancellation, Recission, and Recovery of Funds for Illegal or Improper
Activity (May 2014)
• FAR 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (May 2014)
• FAR 52.203-12 Limitation on Payments to Influence Certain Federal Transactions
(June 2020)
• FAR 52.203-17 Contractor Employee Whistleblower Rights and Requirement To
Inform Employees of Whistleblower Rights (November 2023)
• FAR 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards
(June 2020)
• FAR 52.204-13 System for Award Management Maintenance (October 2018)
• FAR 52.204-14 Service Contract Reporting Requirements (October 2016)
• FAR 52.204-18 Commercial and Government Entity Code Maintenance (Aug 2020)
• FAR 52.204-19 Incorporation by Reference of Representations and Certifications
(December 2014)
• FAR 52.204-23 Prohibition on Contracting for Hardware, Software, and Services
Developed or Provided by Kaspersky Lab and Other Covered Entities (December 2023)
• FAR 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video
Surveillance Services or Equipment (November 2021)
• FAR 52.204-27 Prohibition on a ByteDance Covered Application (June 2023)
• FAR 52.209-6 Protecting the Government’s Interest When Subcontracting with
Contractors Debarred, Suspended, or Proposed for Debarment (January 2025)
• FAR 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations
(November 2015)
• FAR 52.215-2 Audit and Records-Negotiation (June 2020)
• FAR 52.215-8 Order of Precedence-Uniform Contract Format (Oct 1997)
• FAR 52.219-6 Notice of Total Small Business Set-Aside (Nov 2020)
• FAR 52.219-8 Utilization of Small Business Concerns (Jan 2025)
• FAR 52.219-14 Limitations on Subcontracting (Oct 2022)
• FAR 52.222-3 Convict Labor (June 2003)
• FAR 52.222-4 Contract Work Hours and Safety Standards-Overtime Compensation
(May 2018)
• FAR 52.222-6 Construction Wage Rate Requirements (August 2018)
• FAR 52.222-7 Withholding of Funds (May 2014)
• FAR 52.222-8 Payrolls and Basic Records (July 2021)
• FAR 52.222-9 Apprentices and Trainees (July 2005) (DEVIATION FEB 2025)
• FAR 52.222-10 Compliance with Copeland Act Requirements (February 1988)
• FAR 52.222-11 Subcontracts (Labor Standards) (May 2014)
• FAR 52.222-12 Contract Termination-Debarment (May 2014)
• FAR 52.222-13 Compliance with Construction Wage Rate Requirements and Related
Regulations (May 2014)
• FAR 52.222-14 Disputes Concerning Labor Standards (February 1988)
• FAR 52.222-15 Certification of Eligibility (May 2014)
• FAR 52.222-20 Contracts for Materials, Supplies, Articles, and Equipment (Jun 2020)
• FAR 52.222-37 Employment Reports on Veterans (June 2020)
• FAR 52.222-40 Notification of Employee Rights under the National Labor Relations
Act (December 2010)
• FAR 52.222-50 Combating Trafficking in Persons (November 2021)
• FAR 52.222-54 Employment Eligibility Verification (November 2021)
• FAR 52.222-55 Minimum Wages Under Executive Order 13658 (November 2020)
• FAR 52.222-62 Paid Sick Leave Under Executive Order 13706 (January 2017)
• FAR 52.223-5 Pollution Prevention and Right-to-Know Information (May 2011)
• Alternate II (May 2024)
• FAR 52.225-9 Buy American-Construction Materials (Oct 2022)
• FAR 52.225-13 Restrictions on Certain Foreign Purchases (February 2021)
• FAR 52.226-1 Utilization of Indian Organizations and Indian-Owned Economic
Enterprises (June 2000)
• FAR 52.226-7 Drug-Free Workplace (May 2024)
• FAR 52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving
(May 2024)
• FAR 52.227-1 Authorization and Consent (Jun 2020)
• FAR 52.227-4 Patent Indemnity-Construction Contracts (Dec 2007)
• FAR 52.227-11 Patent Rights-Ownership by the Contractor (May 2014)
• FAR 52.228-2 Additional Bond Security (Oct 1997)
• FAR 52.228-5 Insurance-Work on a Government Installation (January 1997)
• FAR 52.228-11 Individual Surety—Pledge of Assets (February 2021)
• FAR 52.228-12 Prospective Subcontractor Requests for Bonds (Dec 2022)
• FAR 52.228-14 Irrevocable Letter of Credit (November 2014)
• FAR 52.228-15 Performance and Payment Bonds-Construction (June 2020)
• FAR 52.229-3 Federal, State, and Local Taxes (February 2013)
• FAR 52.229-11 Tax on Certain Foreign Procurements at Notice and Representation
(June 2020)
• FAR 52.232-5 Payments under Fixed-Price Construction Contracts (May 2014)
• FAR 52.232-17 Interest (May 2014)
• FAR 52.232-23 Assignment of Claims (May 2014)
• FAR 52.232-27 Prompt Payment for Construction Contracts (January 2017)
• FAR 52.232-33 Payment by Electronic Funds Transfer-System for Award Management
(October 2018)
• FAR 52.232-39 Unenforceability of Unauthorized Obligations (June 2013)
• FAR 52.232-40 Providing Accelerated Payments to Small Business Subcontractors
(Mar 2023)
• FAR 52.233-1 Disputes (May 2014)
Alternate I (December 1991)
• FAR 52.233-3 Protest after Award (August 1996)
• FAR 52.233-4 Applicable Law for Breach of Contract Claim (October 2004)
• FAR 52.236-2 Differing Site Conditions (April 1984)
• FAR 52.236-3 Site Investigation and Conditions Affecting the Work (April 1984)
• FAR 52.236-5 Material and Workmanship (April 1984)
• FAR 52.236-6 Superintendence by the Contractor (April 1984)
• FAR 52.236-7 Permits and Responsibilities (Nov 1991)
• FAR 52.236-8 Other Contracts (April 1984)
• FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and
Improvements (April 1984)
• FAR 52.236-10 Operations and Storage Areas (April 1984)
• FAR 52.236-11 Use and Possession Prior to Completion (April 1984)
• FAR 52.236-12 Cleaning Up (April 1984)
• FAR 52.236-13 Accident Prevention (November 1991)
• FAR 52.236-14 Availability and Use of Utility Services (April 1984)
• FAR 52.236-17 Layout of Work (April 1984)
• FAR 52.236-21 Specifications and Drawings for Construction (Feb 1997) Alt. I (Apr
1984)
• FAR 52.236-26 Preconstruction Conference (Feb 1995)
• FAR 52.240-1 Prohibition on Unmanned Aircraft Systems Manufactured or Assembled by American Security Drone Act-Covered Foreign Entities (Nov 2024)
• FAR 52.242-13 Bankruptcy (July 1995)
• FAR 52.243-4 Changes (June 2007)
• FAR 52.244-6 Subcontracts for Commercial Products and Commercial Services (Oct
2025)
• FAR 52.246-21 Warranty of Construction (Mar 1994)
• FAR 52.248-3 Value Engineering-Construction (Oct 2025)
• FAR 52.249-10 Default (Fixed-Price Construction) (Apr 1984) Alternate I (Apr 1984)
• FAR 52.253-1 Computer Generated Forms (Jan 1991)
I.2. Federal Acquisition Regulation (FAR) Clauses/Provisions Incorporated by Full Text
• FAR 52.252-2 Clauses Incorporated By Reference (February 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this address:
https://www.acquisition.gov/content/regulations
CLAUSES INCORPORATED BY FULL TEXT
52.204-30, Federal Acquisitoin Supply Chain Security Act Orders – Prohibition (Dec 2023)
(a) Definitions. As used in this clause— Covered article, as defined in 41 U.S.C. 4713(k), means—
(1) Information technology, as defined in 40 U.S.C. 11101, including cloud computing services of all types;
(2) Telecommunications equipment or telecommunications service, as those terms are defined in section 3 of the Communications Act of 1934 ( 47 U.S.C. 153);
(3) The processing of information on a Federal or non-Federal information system, subject to the requirements of the Controlled Unclassified Information program (see 32 CFR part 2002); or
(4) Hardware, systems, devices, software, or services that include embedded or incidental information technology.
FASCSA order means any of the following orders issued under the Federal Acquisition Supply Chain Security Act (FASCSA) requiring the removal of covered articles from executive agency information systems or the exclusion of one or more named sources or named covered articles from executive agency procurement actions, as described in 41 CFR 201–1.303(d) and (e):
(1) The Secretary of Homeland Security may issue FASCSA orders applicable to civilian agencies, to the extent not covered by paragraph (2) or (3) of this definition. This type of FASCSA order may be referred to as a Department of Homeland Security (DHS) FASCSA order.
(2) The Secretary of Defense may issue FASCSA orders applicable to the Department of Defense (DoD) and national security systems other than sensitive compartmented information systems. This type of FASCSA order may be referred to as a DoD FASCSA order.
https://www.acquisition.gov/content/regulations https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title41-section4713&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title40-section11101&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title47-section153&num=0&edition=prelim https://www.ecfr.gov/current/title-32/part-2002 https://www.ecfr.gov/current/title-32/part-2002 https://www.ecfr.gov/current/title-41/section-201-1.303#p-201-1.303(d) https://www.ecfr.gov/current/title-41/section-201-1.303#p-201-1.303(e)
(3) The Director of National Intelligence (DNI) may issue FASCSA orders applicable to the intelligence community and sensitive compartmented information systems, to the extent not covered by paragraph (2) of this definition. This type of FASCSA order may be referred to as a DNI FASCSA order.
Intelligence community, as defined by 50 U.S.C. 3003(4), means the following—
(1) The Office of the Director of National Intelligence;
(2) The Central Intelligence Agency;
(3) The National Security Agency;
(4) The Defense Intelligence Agency;
(5) The National Geospatial-Intelligence Agency;
(6) The National Reconnaissance Office;
(7) Other offices within the Department of Defense for the collection of specialized national intelligence through reconnaissance programs;
(8) The intelligence elements of the Army, the Navy, the Air Force, the Marine Corps, the Coast
Guard, the Federal Bureau of Investigation, the Drug Enforcement Administration, and the Department of Energy;
(9) The Bureau of Intelligence and Research of the Department of State;
(10) The Office of Intelligence and Analysis of the Department of the Treasury;
(11) The Office of Intelligence and Analysis of the Department of Homeland Security; or
(12) Such other elements of any department or agency as may be designated by the President, or designated jointly by the Director of National Intelligence and the head of the department or agency concerned, as an element of the intelligence community.
National security system, as defined in 44 U.S.C. 3552, means any information system (including any telecommunications system) used or operated by an agency or by a contractor of an agency, or other organization on behalf of an agency—
(1) The function, operation, or use of which involves intelligence activities; involves cryptologic activities related to national security; involves command and control of military forces;
involves equipment that is an integral part of a weapon or weapons system; or is critical to the direct fulfillment of military or intelligence missions, but does not include a system that is to be used for routine administrative and business applications (including payroll, finance, logistics, and personnel management applications); or
(2) Is protected at all times by procedures established for information that have been specifically authorized under criteria established by an Executive order or an Act of Congress to be kept classified in the interest of national defense or foreign policy.
Reasonable inquiry means an inquiry designed to uncover any information in the entity's possession about the identity of any covered articles, or any products or services produced or provided by a source. This applies when the covered article or the source is subject to an applicable FASCSA order. A reasonable inquiry excludes the need to include an internal or third-party audit.
Sensitive compartmented information means classified information concerning or derived from intelligence sources, methods, or analytical processes, which is required to be handled within formal access control systems established by the Director of National Intelligence.
Sensitive compartmented information system means a national security system authorized to process or store sensitive compartmented information.
Source means a non-Federal supplier, or potential supplier, of products or services, at any tier.
https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title50-section3003&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title44-section3552&num=0&edition=prelim
(b) Prohibition.
(1) Unless an applicable waiver has been issued by the issuing official, Contractors shall not provide or use as part of the performance of the contract any covered article, or any products or services produced or provided by a source, if the covered article or the source is prohibited by an applicable FASCSA orders as follows:
(i) For solicitations and contracts awarded by a Department of Defense contracting office, DoD FASCSA orders apply.
(ii) For all other solicitations and contracts DHS FASCSA orders apply.
(2) The Contractor shall search for the phrase “FASCSA order” in the System for Award
Management (SAM) at https://www.sam.gov to locate applicable FASCSA orders identified in paragraph (b)(1).
(3) The Government may identify in the solicitation additional FASCSA orders that are not in SAM, which are effective and apply to the solicitation and resultant contract.
(4) A FASCSA order issued after the date of solicitation applies to this contract only if added by an amendment to the solicitation or modification to the contract (see FAR 4.2304(c)).
However, see paragraph (c) of this clause.
(5)
(i) If the contractor wishes to ask for a waiver of the requirements of a new FASCSA order being applied through modification, then the Contractor shall disclose the following:
(A) Name of the product or service provided to the Government;
(B) Name of the covered article or source subject to a FASCSA order;
(C) If applicable, name of the vendor, including the Commercial and Government Entity code and unique entity identifier (if known), that supplied or supplies the covered article or the product or service to the Offeror;
(D) Brand;
(E) Model number (original equipment manufacturer number, manufacturer part number, or wholesaler number);
(F) Item description;
(G) Reason why the applicable covered article or the product or service is being provided or used;
(ii) Executive agency review of disclosures. The contracting officer will review disclosures provided in paragraph (b)(5)(i) to determine if any waiver is warranted. A contracting officer may choose not to pursue a waiver for covered articles or sources otherwise covered by a FASCSA order and to instead pursue other appropriate action.
(c) Notice and reporting requirement.
(1) During contract performance, the Contractor shall review SAM.gov at least once every three months, or as advised by the Contracting Officer, to check for covered articles subject to FASCSA order(s), or for products or services produced by a source subject to FASCSA order(s) not currently identified under paragraph (b) of this clause.
(2) If the Contractor identifies a new FASCSA order(s) that could impact their supply chain, then the Contractor shall conduct a reasonable inquiry to identify whether a covered article or product or service produced or provided by a source subject to the FASCSA order(s) was provided to the Government or used during contract performance.
(3)
(i) The Contractor shall submit a report to the contracting office as identified in paragraph
(c)(3)(ii) of this clause, if the Contractor identifies, including through any notification https://www.sam.gov/ https://www.acquisition.gov/far/4.2304#FAR_4_2304 by a subcontractor at any tier, that a covered article or product or service produced or provided by a source was provided to the Government or used during contract performance and is subject to a FASCSA order(s) identified in paragraph (b) of this clause, or a new FASCSA order identified in paragraph (c)(2) of this clause. For indefinite delivery contracts, the Contractor shall report to both the contracting office for the indefinite delivery contract and the contracting office for any affected order.
(ii) If a report is required to be submitted to a contracting office under (c)(3)(i) of this clause, the Contractor shall submit the report as follows:
(A) If a Department of Defense contracting office, the Contractor shall report to the website at https://dibnet.dod.mil.
(B) For all other contracting offices, the…
This is the start of the file's text. The full file is on GovTribe.