This is an Amendment of Solicitation/Modification of Contract (Standard Form 30) for IFB 140A1626B0001, the Bannock Pumping Plant Rehabilitation project issued by BIA CENTRAL (Bureau of Indian Affairs) located in Reston, Virginia. The amendment is effective May 7, 2026, and includes several substantive updates to the original solicitation.
Key contractual updates include: the NAICS code is 237990 (general construction) with a small business size standard of $39.5 million; the bid guarantee is 20 percent of the bid price or $3,000,000, whichever is less; and Wage Determination ID72 has been updated to revision 2 dated May 18, 2026. Two new technical attachments have been added: Attachment 12 (Electrical Service Revision) and Attachment 13 (Steel Pipes Memo). Bids must be submitted electronically to kurt.egner@bia.gov and jessica.kidd@bia.gov with the subject line "Sealed Bid – Bannock Pumping Plant," and the bid opening will be conducted as a virtual MS Teams webinar with public registration available. The document includes a comprehensive Questions and Answers log addressing 57 submitted inquiries covering technical specifications, equipment substitutions, structural details, HVAC controls, coatings requirements, hazardous materials assessment, small business subcontracting regulations (FAR 52.219-14), and delegated design procedures. The project involves significant infrastructure work including pumping plant modernization, flap gate rehabilitation, concrete improvements, electrical upgrades, and HVAC system installation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B08_Attachment_14_As_Constructed_Crane_Rail_Supports_0005.pdf | ||
| Sol_140A1626B0001_Amd_0005.pdf | ||
| B08_Attachment_13_Steel_Pipes_Memo_0004.pdf | ||
| B08_Attachment_12_Electrical_Service_Revision_0004.pdf | ||
| B08_Attachment_11_WD_ID20260072-02_05182026_0004.pdf | ||
| Sol_140A1626B0001_Amd_0003.pdf | ||
| Sol_140A1626B0001_Amd_0002.pdf | ||
| Sol_140A1626B0001_Amd_0001.pdf | ||
| Sol_140A1626B0001.pdf | ||
| Geotechnical_Report.pdf | ||
| Attachment_10_Pre_Bid_Site_Visit_Agenda.pdf | ||
| SF-25_Performance_Bond_Form.pdf | ||
| SF-25A_Payment_Bond_Form.pdf | ||
| Wage_Determination_ID20260072-01_01302026.pdf | ||
| Drawings.pdf | ||
| SF-24_Bid_Bond_Form.pdf | ||
| Technical_Specifications.pdf | ||
| IEE_Reps.pdf | ||
| SF-1413_Statement_and_Acknowledgement_Form_(Subcontracting).pdf | ||
| Scope_of_Work.pdf |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: is not is required copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7.ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
PAGESOF
Contractor
The hour and date specified for receipt of Offers to sign this document and return
See continuation page
BIA CENTRAL 00016
12201 Sunrise Valley Drive Contracting Office Mail Stop-244 Reston VA 20192
A16
140A1626B0001
05/07/2026
05/07/2026
1 11
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C)
NSN 7540-01-152-8067
140A1626B0001/0004
1. 140A1626B0001 is amended to include additional answers to submitted questions.
Please see the question-and-answer sheet attached to this amendment.
2. The site visit attendance sheet is attached.
3. 52.204-8(a)(1) and (2) are updated to:
(1) The North American Industry Classification
System (NAICS) code for this acquisition is
237990.
(2) The small business size standard is$39.5
Million.
4. 52.228-1(c) is updated to : (c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000.00 whichever is less.
5. Attachment 11, Wage Determination ID72 Has been updated to revision 2, dated 05/18/2026.
6. Attachments 12 (Electrical Service Revision) and 13 (Steel Pipes Memo) have been added.
Bid Submission
All bids must be submitted electronically via e-mail to kurt.egner@bia.gov AND jessica.kidd@bia.gov.
Bid e-mails should include the subject line “Sealed Bid – Bannock Pumping Plant”. Bids that are not correctly labeled may be mis-identified and may be opened prior to the bid opening and addressed in accordance with FAR 14.401(b). In lieu of marking envelopes, the Government will include memos to the file.
Bid Opening
All correctly labeled bids received before the bid opening time will be held, unopened in subfolders of the e-mail inboxes of the Contracting Officer and Contract Specialist until the bid opening time. All correctly labeled bids received before the bid opening time along with any mis-labeled bids that have been identified will be opened at the virtual bid opening.
The Bid Opening Official will share her screen and open the bids in the order received. She will read the bid amounts and review the scanned copies of the bid bonds
The bid opening will be conducted as MS Teams webinar. This webinar is open to the public and anyone can register to attend. However, to attend you must register. The registration list and number of registrants will only be available to the Contracting Officer and Contract Specialist and will not be disclosed to any other party. All requirements to contact the Contracting Officer and Contract Specialist to arrange attendance at the bid opening are hereby removed. All you need to do to attend the bid opening is register for the webinar.
The webinar registration link is here:
https://events.gcc.teams.microsoft.com/event/e5dbb669-9661-438e-beab- 7fdb2c3936da@0693b5ba-4b18-4d7b-9341-f32f400a5494
After registration, registered attendees will receive an e-mail will the link to access the webinar.
Bid opening attendee names will be visible in the bid opening webinar. The webinar will begin approximately 15 minutes prior to the bid opening time to allow the public and government to enter the virtual room. Attendees may enter the room after the bid opening begins.
Attendance at the bid opening is not mandatory to submit a bid or receive contract award.
https://events.gcc.teams.microsoft.com/event/e5dbb669-9661-438e-beab-7fdb2c3936da@0693b5ba-4b18-4d7b-9341-f32f400a5494 https://events.gcc.teams.microsoft.com/event/e5dbb669-9661-438e-beab-7fdb2c3936da@0693b5ba-4b18-4d7b-9341-f32f400a5494
The following companies signed the sign in sheet at the site visit on 03 June 2026:
Tepa
QGS
Rivers West Construction
COP Construction
American West
Cabin Creek Services
BODEC
MARCON
GSE Construction
Siemens
Awalix
AHS Construction
Ames 1 LLC
Syblion Reid
Number Question Answer
In regards to PART 2 – PRODUCTS, 2.1 MANUFACTURERS, A.
Subject to compliance with the Contract Documents, the following manufacturers are acceptable:
1. Steel rolling overhead doors:
a. CornellCookson.
b. Wayne Dalton.
c. Overhead Door Corporation.
d. Raynor Garage Doors.
Would C.H.I. be an acceptable manufacture based on their specifications? Thank you.
C.H.I can be acceptable if the manufacturer provides an equal or better product and complies with the requirements of Section 08 33 23 – Steel Overhead Rolling Doors.
I am reaching out about the BIA - Bannock Pumping Plant Modernization project CSIA certification requirement. Would an Inductive Automation's Ignition Gold or Premier Certification be an approved equal?
A Control Systems Integrators Association (CSIA) Certification is required for the Bannock Pumping Plant Modernization Project.
Questions and Answers Log for IFB 140A1626B0001 Bannock Pumping Plant Rehab
RE: HARD-CEM ADMIXTURE. This question falls under 03 35 00 - 7
2.2 Materials
B. Chemical Sealer CS-2:
1. Water based chemical solution containing a blend of silicate and siliconate polymers designed to seal, harden and dustproof concrete floors.
2. VOC Content: 0 G/L.
3. Performance of treated concrete floor:
a. Coefficient of Friction:
1) Dry: 0.81.
2) Wet: 0.72.
b. Liquid repellency, RILEM Method 11.4:
1) ≥ 1 mL.
4. Euclid Chemical Euco Diamond Hard.
Would ownership be interested in considering an integral abrasion resistant concrete admixture called Hard-cem as an alternative to a dry shake hardener for long term abrasion resistance.
Adding this product to the concrete does reduce the finishing schedule, reduces risks for the contractor(s) and benefits the ownership by reducing future maintenance and resurfacing costs.
Hard-cem admixture is currently not an approved admixture.
DWG D-104 and D-105 Has there been any thickness testing on the existing 20” PIRR where connections will be made?
No. Unverified as-constructed drawings indicate 20-inch O.D. Steel Pipe - 3/8-inch thickness. An observation of the external pipe near the connection point was conducted in 2024. Only minor external pitting was observed.
DWG C-102 Do you have as builds of the #1 Concrete Tower and Flap Gates to determine feasibility of flange facing vs attempting to grind to within +- 1/64th”?
No As-Constructed Drawings exist for the low-lift tower or associated flap gates.
DWG C-102 #2 Please specify whether coatings will be required on the 12” vent pipes?
Bid as shown. No coating required.
Spec 01 75 00 3.2 C 3A,3B can the DOR provide guidance for the required recirculation systems?
The water discharged from the low and high-lift pumps during the pre-demonstration period must be returned to the south main canal. The means and methods employed to accomplish this is the responsibility of the Contractor.
Is there a Hazardous Material report or will the GC have to have one performed?
No existing Hazardous Material Report Available. Include hazmat survey costs to determine appropriate protection of employees from hazards in accordance with OSHA standards for construction for asbestos and lead-based paint provided within Section 02 26 00 - Hazard Materials Assessment. If found necessary for removal and disposal, notify BIA.
Spec 02 26 00 1.2 B and C states that asbestos assumed present as well as lead paint. 02 26 00 Part 3 Execution (Not Used) states contractors to demo per state and federal laws.
Is the contractor to include abatement of lead paint and asbestos containing materials in the base bid?
Include hazmat survey costs to determine appropriate protection of employees from hazards in accordance with OSHA standards for construction for asbestos and lead-based paint provided within Section 02 26 00 - Hazard Materials Assessment. If found necessary for removal and disposal, notify BIA. Do not include abatement costs in the base bid.
Please confirm the following subsection of FAR 52.219-14 is applicable to this project: (3) General construction, it will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 85 percent subcontract amount that cannot be exceeded.
- Meaning the prime contractor is required to self-perform a MINIMUM of 15% of the work performed on site?
FAR 52.219-14 (OCT 2022) is applicable in its entirety. This is a contract for general construction.
8. Due to the discrepancy between the drawings and the specs, can you please confirm/clarify Owner Provided XMFR from 01 64 00 is indeed XFMR-01 from the one-line diagram.
The delineating line between utility and contractor makes it questionable.
Confirmed. Please see Attachment 12 - Electrical Service Revision
Please reference Detail 1/C-501 Regarding the Trash racks:
- Drawing indicates that there are three trash racks 4.5’ wide x 9’-10 ¾” long and three trash racks 6’ wide x 9’-10 ¾” long, please confirm.
- What is the angle of the trash racks? Drawing indicates a 3H:8V slope = 69.4 degrees, please confirm.
- What is the required clear space between each trash rack blade?
- What is the average and high water elevations? Our trash racks are designed to handle full head differential loading.
- What is the typical approach velocity?
- What is the expected debris type to be encountered?
- Please provide a 3D model of the intake area if available.
- Is there information about the frame holding the existing metal trash racks?
We would need this information to make sure HDPE trash racks will be efficiently supported.
See Section 01 35 73 - Delegated Design Procedures. Contractor to verify all information. See Note 4, Detail 1, Sheet C-501
Drawing C-102 shows the air vent piping, but there are no overall dimension for the piping. Do you know how far the air vent pipes penetrate the ground? Is there any primer or paint requirements for the air vents.
No coatings required. Pipes terminate in concrete at existing ground surface.
Drawing C-102 shows the Heavy Flap Gates. We would like to know the manufacturer of the flap gates. We may need to buy new hinge pins for the gates. The flatness requirement of+/- 1/64” is a machine flat finish and would be very difficult to complete by hand. We would like to ship the flap gates back to the manufacturer to have them checked for flatness and repaired if required. Can this be accomplished?
Manufacture of flap gates is unknown. Hinge pins and flaps can be removed per Note 2, Detail 1, Sheet C-102
Drawing CX102 shows that we have to remove steel canal ladders, but no length is specified for the ladders (two). The water depth elevations for the forebay are provided, shall we assume that the height to be 10’. Please clarify ladder dimension.
All available information has been provided. Bid as shown.
05 50 00-10, B. BOllards call for 8” extra strength steel pipe, Sheet C-501 detail 3 & 4 they call out 5" and 6” steel bollards.
Please clarify.
Diameter of Bollard per Sheet C-501, Detail 3 and 4.
M-501 detail 5 – Please provide a Control Diagram reflecting an accurate sequence of operations for EF-1 thru EF-5.
The sequence of operation for the HVAC equipment is defined on sheet M 602. The contractor is responsible for providing the required diagrams as specified in Section 1.4 of Specification 23 09 00 and for connecting all control devices to perform the functions indicated in the sequence of operation as stated in Section 3.1.
M-602 – Control Damper Schedule notes “manual operation” of the adjustable dampers (CD-1, CD-2 and CD-3) combined with the Intake Louvers (L-1, L-2 and L-3). Historically, Intake louvers installed in low temperature zones require a motorized damper interlocked with exhaust fan operation.
Reason is that cold and sub-zero temperatures occur and manually operated dampers will be inadequate. See CD-4 is a Motorized Damper and interlocked with EF-6 (Louver L-4) and the Gravity Relief Hood (GRH-1) also has a Motorized Damper interlocked with AC-1.
Bid as shown. The dampers (CD-1, CD-2, and CD-3) behind the intake louvers (L1, L-2, and L-3) shall remain manually operated, as requested by the owner during the design phase. The dampers (CD-1, CD-2, and CD-3) will be manually shut when the plant is closed during the winter months
M-602 – Sequence of Operation – Dependent upon the result of the previous RFI regarding motorized damper interlock.
Please provide an accurate SOO reflecting the interlocking operations. Including power failure open or closed and upon temperature rise like “Motorized Damper shall open upon activation of Exhaust fan…..etc.”
See above. The dampers (CD-1, CD-2, and CD-3) behind the intake louvers (L1, L-2, and L-3) shall remain manually operated, For control damper CD-4, damper shall open upon power failure. The motorized damper behind gravity relief hood (jGRH-1) shall also open upon power failure.
M-602 – Diffuser, Register and Grille Schedule – Finish WHITE.
Specification 23-31-00-7 Part 3 – Execution / 3.1 Installation – E.2 – “Install prime painted grilles and registers in areas where duct work is concealed.” “a. Field paint to match adjacent surface finish.” Please Advise
Section 3.1.E.2 regarding field painting is not required
M-101 – The Exhaust Fan EF-6 is exhausting transfer air thru the CD-4 Control Damper. L-4 is the associated louver for the exhaust air. In consideration of the regional low temperature location would a Motorized damper be valuable for protecting this room from low temperature infiltration. And if so, might this sheetmetal transition need to be insulated to provide condensation protection ?
The plant shuts down during the winter months. The motorized damper behind louver L
4 is not necessary to protect the room from low temperature infiltration. The dampers (CD
1, CD
2, and CD
3) will be manually shut when the plant is closed during the winter months. The motorized damper behind louver L
4 is therefore not required for freeze protection.
M-101 – L-1, L-2 and L-3 noted to be Manual Control Damper behind wall louver – See 23-09-00-3 – 2.2 Equipment – This specification below contradicts sheet M-101 while referencing a “sequence of controls”. Please advise where the sequence of controls is located in the Documents.
Refer to Sheet M
602 for the control sequences associated with control damper CD
4 and motorized damper GRD
1.
Is the Pumping plant a rated class 1 div 1 for explosion protection ?
This building is not rated. NEMA 1 closure acceptable. There are no pneumatic operators proposed for the HVAC system.
Are “Modulating dampers” really required ?
Control damper CD-4 may operate in open/closed position; full modulation (0 to 100%) is not required for this damper. Motorized damper (GRD-1) behind gravity relief hood shall be two position as stated in the sequence on sheet M-602.
47 And are Pneumatic operators really being considered? There are no pneumatic operators proposed for the HVAC system.
M-111 – Concrete Curb noted for AC-1. Please provide reference to the structural drawing indicating the proposed concrete curb to accommodate the 2,300-pound unit.
Height is indicated at 36” tall.
See Structural Drawing S-112, Detail 2
M-111 – The exposed ductwork. In referencing specification 23-31-00 HVAC- Ductwork we are unable to locate an insulation requirement for the exposed ductwork.
Historically this application might require a 3” Duct Liner. Or Double Wall with 3” Liner. Or a 3” WRAP with a light gauge Aluminum cover. Please Advise.
Refer to speification 40 42 00 for ductwork insulation.
Please clarify the "required engineer certification supporting data" needed for: bar grating, ladders, metal deck, access hatch, anchorage and bracing of interior MEP Equipment, pre-fab metal stairs , platform, walkways, landings, Architectural metals, access ladders, handrails, guardrails and fall arrest systems, cold form steel walls , roof curbs, soil improvements, formwork shoring and backshoring, pedestrian bridge, traveling screen per DS2 of S-001
See Section 01 35 73 - Delegated Design Procedures.
Please clarify spec 09 96 00 high performance coatings with a coating schedule. It is unclear from this spec, the drawings, and subsequent specs which items are expected to receive coatings.
Items and substrates requiring coatings are noted throughout the project technical specifications.
We would like to request your approval of the Siemens Model FMS500/FMT020 magnetic flow meter as an acceptable product for bidding on this project.
Siemens Model FMS500/FMT020 magnetic flow meter as an acceptable product.
53 Request for all docs and specifically sign in sheet. The documents are now available via SAM.gov.
54 Sign in sheet request. The documents are now available via SAM.gov.
55 Correct 52.204-8 This clause has been amended.
56 Clarify submission requirements. See Bid Opening Info included in amendment.
57 Clarify Bid Bond information at 52.228-1. This clause has been amended.
| Amendment of solicitation/modification of contract |
| Contract ID code |
| Amendment/modification number |
| Effective date |
| Requisition/purchase requisition number |
| Project number |
| Issued by |
| Code |
| Administered by |
| Code |
| Name and address of contractor |
| Code |
| Facility code |
| Amendment of solicitation number |
| Dated |
| Modification of contract/order number |
| Dated |
| This item only applies to amendments of solicitations |
| Accounting and appropriation data |
| This item applies only to modifications of contracts/orders. |
| This change order is issued pursuant to: |
| The above numbered contract/order is modified to reflect the administrative changes |
| This supplemental agreement is entered into pursuant to authority of: |
| Other |
| Important: |
| Description of amendment/modification |
| Name and title of signer |
| Contractor/offeror |
| Date signed |
| Name and title of contracting officer |
| Signature of Contracting Officer |
| Date signed |
| Previous edition unusable |
| Standard form 30 (rev. 11/2016) |
| Continuation sheet |
| Reference Number |
| Name of Offeror or Contractor |
| OPTIONAL FORM 336 (4-86)) |
Sponsored by GSA FAR (48 CFR) 53.110
| 140A1626B0001 0004 Questions and Answers Log.pdf |
| Sheet1 |
File details come from the government source that posted it. Updated .