14-BPS 97 FP201 - FIRE PUMP ROOM - NEW WORK PLAN.pdf
PDF 422 KB Posted
- Attached to
- FIRE PUMP REPLACEMENT AT BPS 97
- Solicitation number
- 27-0627-025
- Issued by
- Erie County, New York
About this file
This is an architectural drawing set for fire pump room installation prepared by Buffalo Engineering, P.C. for the Buffalo Public Schools district in New York, specifically addressing fire pump replacement at two facilities: Buffalo PS 99 – Stanley M Makowski Early Childhood Center (1095 Jefferson Avenue, Buffalo, NY 14208) and Buffalo PS 97 – Harvey Austin Elementary School (1405 Sycamore Street, Buffalo, NY 14211). The work plan, dated August 29, 2025, details the installation of new fire protection equipment including a fire pump, fire pump controller, automatic transfer switch, jockey pump, and associated controls. The drawing sheet FP201 provides both a partial basement plan and fire pump elevation at a scale of 1/2" = 1'-0", illustrating the integration of new equipment with existing fire protection piping systems, including connections to existing alarm valves and double check valves. The project requires coordination with electrical service entrance and emergency power systems, with all installations and testing to comply with NFPA 20 requirements and local Authority Having Jurisdiction (AHJ) standards.
The contractor is responsible for pre-demolition testing, adjustment, and balancing of all existing mechanical equipment, with documentation to be provided to the engineer prior to demolition. Additional contractor responsibilities include verification of existing pipe routing in the field, provision of fire stopping for all rated floor and wall penetrations, removal and reinstallation of ceilings with replacement of damaged tiles to match existing conditions, and protection of existing finishes in non-contract areas. All new equipment must be properly supported with vibration isolation and accessories as required, and the system must be tested to ensure full operational functionality. The drawings are the proprietary property of Buffalo Engineering, P.C. and are issued specifically for this project; reproduction, revision, or modification without express written consent is prohibited under New York State Education Law Section 7209.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FP201
Drawn By:
Checked By:
Date:
Scale:
DWG. No.
RevisionsNo.
STAMP
Date
BU
FF
A
LO
E N
G
IN
EE
RI
N G
, P .C
Th es e do cu m en ts a nd th ei r c on te nt s ar e th e pr op er ty o f B uf fa lo E ng in ee ri ng , P
C a nd a re is su ed o nl y fo r t he s pe ci fic p ro je ct n ot ed o n th es e dr aw in gs
. A ny re pr od uc tio ns
, r ev is io ns , o r m od ifi ca tio ns o f t he se d oc um en ts w ith ou t t he e xp re ss w ri tte n co ns en t o f B uf fa lo
E ng in ee ri ng
, P C is p ro hi bi te d by la w
AS NOTED
8/29/2025
BUFFALO PUBLIC SCHOOLS
FIRE PUMP REPLACEMENT
BUFFALO PS 99 -
STANLEY M MAKOWSKI EARLY
CHILDHOOD CENTER
1095 JEFFERSON AVE,
BUFFALO, NY 14208
SED #: 140600010050012
BUFFALO PS 97 -
HARVEY AUSTIN ELEMENTARY
SCHOOL
1405 SYCAMORE ST,
BUFFALO, NY 14211
SED #: 140600010302031
CONSULTANTS
2025 BUFFALO ENGINEERING, PC
UNAUTHORIZED REPRODUCTION, ALTERATION OR ADDITION TO ANY
DRAWING, DESIGN, SPECIFICATION, PLAN OR REPORT IN WHOLE OR IN
PART WITHOUT THE EXPRESS WRITTEN AUTHORIZATION IS PROHIBITED
BY SECTION 7209, PROVISION 2 OF THE NEW YORK STATE EDUCATION
LAW UNLESS OTHERWISE ACTING UNDER THE DIRECTION OF A LICENSED
ARCHITECT OR ENGINEER FOR WHICH THE SEAL OF A LICENSED
ARCHITECT OR ENGINEER IS APPLIED.
COPYRIGHT
SHEET TITLE
LICENSE EXPIRATION DATE: 8/31/2026
FIRM AUTHORIZATION NUMBER: 020076
FP201
FIRE PUMP ROOM -
NEW WORK PLAN
AutoCAD SHX Text
DOUBLE CHECK VALVE
AutoCAD SHX Text
GATE VALVE (TYP.)
AutoCAD SHX Text
EX.FD
AutoCAD SHX Text
JP-1
AutoCAD SHX Text
JPC-1
AutoCAD SHX Text
FPC-1
AutoCAD SHX Text
FP-1
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
EX.8" ALARM VALVE
AutoCAD SHX Text
EX.DCV
AutoCAD SHX Text
FP-1
AutoCAD SHX Text
TO JOCKEY PUMP
AutoCAD SHX Text
TO JOCKEY PUMP
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
PARTIAL BASEMENT PLAN - FIRE PROTECTION
AutoCAD SHX Text 1/2" = 1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
FIRE PUMP ELEVATION
AutoCAD SHX Text 1/2" = 1'-0"
AutoCAD SHX Text
AutoCAD SHX Text GENERAL NOTES: A. CONTRACTOR SHALL TAKE CARE NOT TO DAMAGE EXISTING CONTRACTOR SHALL TAKE CARE NOT TO DAMAGE EXISTING FINISHES ASSOCIATED IN AREAS NOT IN CONTRACT. B. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING EXISTING CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING EXISTING PIPE ROUTING IN FIELD PRIOR TO DEMOLITION AND INSTALLATIONS. C. PROVIDE FIRE STOPPING FOR ALL RATED FLOOR AND WALL PROVIDE FIRE STOPPING FOR ALL RATED FLOOR AND WALL PENETRATIONS. D. CONTRACTOR SHALL PERFORM PRE-DEMOLITION TESTING CONTRACTOR SHALL PERFORM PRE-DEMOLITION TESTING ADJUSTING AND BALANCING OF ALL EXISTING MECHANICAL EQUIPMENT INCLUDING EQUIPMENT NOTED FOR REMOVAL. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION. PROVIDE PRE-DEMOLITION TAB REPORT TO ENGINEER FOR REVIEW PRIOR TO DEMOLITION. E. CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL, STORAGE, CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL, STORAGE, AND REINSTALLATION OF CEILINGS UNLESS NOTED OTHERWISE. CONTRACTOR SHALL REPLACE ALL SOILED AND DAMAGED CEILING TILES TO MATCH EXISTING.
AutoCAD SHX Text
AutoCAD SHX Text DRAWING NOTES : 1. PROVIDE AND INSTALL NEW FIRE PUMP, FIRE PUMP PROVIDE AND INSTALL NEW FIRE PUMP, FIRE PUMP CONTROLLER, AND AUTOMATIC TRANSFER SWITCH AS SCHEDULED. COORDINATE INSTALLATION WITH ELECTRICAL SERVICE ENTRANCE AND EMERGENCY POWER SYSTEM. CONNECT TO EXISTING OR NEW FIRE PROTECTION PIPING AND TEST IN ACCORDANCE WITH NFPA 20 REQUIREMENTS. PROVIDE ALL NECESSARY SUPPORTS, VIBRATION ISOLATION, AND ACCESSORIES REQUIRED FOR INSTALLATION. 2. PROVIDE AND INSTALL NEW JOCKEY PUMP AND PROVIDE AND INSTALL NEW JOCKEY PUMP AND ASSOCIATED CONTROLLER. CONNECT TO FIRE PROTECTION PIPING AS REQUIRED AND INTEGRATE WITH NEW FIRE PUMP CONTROLS. PROVIDE ALL NECESSARY WIRING, PIPING, SUPPORTS, AND ACCESSORIES. TEST SYSTEM OPERATION AND ENSURE FULL FUNCTIONALITY PER NFPA 20 AND LOCAL AHJ REQUIREMENTS.
| Sheets and Views |
| FP201 |
File details come from the government source that posted it. Updated .