13-BPS 97 FP101 - FIRE PUMP ROOM - DEMOLITION PLAN.pdf
PDF 430 KB Posted
- Attached to
- FIRE PUMP REPLACEMENT AT BPS 97
- Solicitation number
- 27-0627-025
- Issued by
- Erie County, New York
About this file
This is a fire pump room demolition plan prepared by Buffalo Engineering, P.C. for Buffalo Public Schools, specifically addressing the removal of existing fire protection equipment at two facilities: Buffalo PS 99 - Stanley M. Makowski Early Childhood Center (1095 Jefferson Ave, Buffalo, NY 14208) and Buffalo PS 97 - Harvey Austin Elementary School (1405 Sycamore St, Buffalo, NY 14211). The plan document includes detailed architectural drawings showing the partial basement plan and fire pump elevation views at a scale of 1/2" = 1'-0", with specific demolition instructions for the removal of existing fire pump systems, controllers, and associated equipment.
The demolition scope requires the contractor to disconnect and remove the existing fire pump, fire pump controller, automatic power transfer switch, jockey pump, and jockey pump controller, along with all associated wiring, conduit, piping, supports, and accessories. Work must be coordinated with facility staff and the fire protection contractor, with electrical shutdown and system draining performed in compliance with NFPA standards and local Authority Having Jurisdiction (AHJ) requirements. The contractor is responsible for verification of existing pipe routing prior to demolition, provision of fire stopping for all rated floor and wall penetrations, pre-demolition testing and balancing of all mechanical equipment with a report submitted to the engineer, removal and reinstallation of ceilings with replacement of damaged tiles to match existing, and care to avoid damage to surrounding finishes and areas not included in the contract scope.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FP101
Drawn By:
Checked By:
Date:
Scale:
DWG. No.
RevisionsNo.
STAMP
Date
BU
FF
A
LO
E N
G
IN
EE
RI
N G
, P .C
Th es e do cu m en ts a nd th ei r c on te nt s ar e th e pr op er ty o f B uf fa lo E ng in ee ri ng , P
C a nd a re is su ed o nl y fo r t he s pe ci fic p ro je ct n ot ed o n th es e dr aw in gs
. A ny re pr od uc tio ns
, r ev is io ns , o r m od ifi ca tio ns o f t he se d oc um en ts w ith ou t t he e xp re ss w ri tte n co ns en t o f B uf fa lo
E ng in ee ri ng
, P C is p ro hi bi te d by la w
AS NOTED
8/29/2025
BUFFALO PUBLIC SCHOOLS
FIRE PUMP REPLACEMENT
BUFFALO PS 99 -
STANLEY M MAKOWSKI EARLY
CHILDHOOD CENTER
1095 JEFFERSON AVE,
BUFFALO, NY 14208
SED #: 140600010050012
BUFFALO PS 97 -
HARVEY AUSTIN ELEMENTARY
SCHOOL
1405 SYCAMORE ST,
BUFFALO, NY 14211
SED #: 140600010302031
CONSULTANTS
2025 BUFFALO ENGINEERING, PC
UNAUTHORIZED REPRODUCTION, ALTERATION OR ADDITION TO ANY
DRAWING, DESIGN, SPECIFICATION, PLAN OR REPORT IN WHOLE OR IN
PART WITHOUT THE EXPRESS WRITTEN AUTHORIZATION IS PROHIBITED
BY SECTION 7209, PROVISION 2 OF THE NEW YORK STATE EDUCATION
LAW UNLESS OTHERWISE ACTING UNDER THE DIRECTION OF A LICENSED
ARCHITECT OR ENGINEER FOR WHICH THE SEAL OF A LICENSED
ARCHITECT OR ENGINEER IS APPLIED.
COPYRIGHT
SHEET TITLE
LICENSE EXPIRATION DATE: 8/31/2026
FIRM AUTHORIZATION NUMBER: 020076
FP101
FIRE PUMP ROOM -
DEMOLITION PLAN
AutoCAD SHX Text
DOUBLE CHECK VALVE
AutoCAD SHX Text
GATE VALVE (TYP.)
AutoCAD SHX Text
EX.FIRE PUMP AND MOTOR
AutoCAD SHX Text
EX.FD
AutoCAD SHX Text
EX.JOCKEY PUMP
AutoCAD SHX Text
EX.JOCKEY PUMP CONTROLLER
AutoCAD SHX Text
EX. POWER TRANSFER SWITCH
AutoCAD SHX Text
EX.FIRE PUMP CONTROLLER
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
EX.8" ALARM VALVE
AutoCAD SHX Text
EX.FIRE PUMP AND MOTOR
AutoCAD SHX Text
EX.DCV
AutoCAD SHX Text
TO JOCKEY PUMP
AutoCAD SHX Text
TO JOCKEY PUMP
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
PARTIAL BASEMENT PLAN - FIRE PROTECTION DEMOLITION PLAN
AutoCAD SHX Text 1/2" = 1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
FIRE PUMP ELEVATION - DEMOLITION PLAN
AutoCAD SHX Text 1/2" = 1'-0"
AutoCAD SHX Text
AutoCAD SHX Text DEMOLITION NOTES : 1. DISCONNECT AND REMOVE EXISTING FIRE PUMP, FIRE DISCONNECT AND REMOVE EXISTING FIRE PUMP, FIRE PUMP CONTROLLER, AND AUTOMATIC POWER TRANSFER SWITCH. COORDINATE ELECTRICAL SHUTDOWN AND SYSTEM DRAINING WITH FACILITY STAFF AND FIRE PROTECTION CONTRACTOR. REMOVE ALL ASSOCIATED WIRING, CONDUIT, PIPING, SUPPORTS, AND ACCESSORIES BACK TO POINTS OF REUSE OR TERMINATION. CAP PIPING AS REQUIRED AND LABEL FOR FUTURE RECONNECTION IF APPLICABLE. CONFIRM SYSTEM IS FULLY OFFLINE AND SAFE FOR REMOVAL BEFORE PROCEEDING. 2. DISCONNECT AND REMOVE JOCKEY PUMP AND DISCONNECT AND REMOVE JOCKEY PUMP AND ASSOCIATED PUMP CONTROLLER. REMOVE ASSOCIATED PIPING, CONDUIT, WIRING, AND SUPPORTS BACK TO SOURCE OR TERMINATION POINT. COORDINATE WITH FIRE PROTECTION CONTRACTOR AND VERIFY THAT ALL WORK COMPLIES WITH NFPA AND LOCAL AHJ REQUIREMENTS.
AutoCAD SHX Text
AutoCAD SHX Text GENERAL NOTES: A. CONTRACTOR SHALL TAKE CARE NOT TO DAMAGE EXISTING CONTRACTOR SHALL TAKE CARE NOT TO DAMAGE EXISTING FINISHES ASSOCIATED IN AREAS NOT IN CONTRACT. B. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING EXISTING CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING EXISTING PIPE ROUTING IN FIELD PRIOR TO DEMOLITION AND INSTALLATIONS. C. PROVIDE FIRE STOPPING FOR ALL RATED FLOOR AND WALL PROVIDE FIRE STOPPING FOR ALL RATED FLOOR AND WALL PENETRATIONS. D. CONTRACTOR SHALL PERFORM PRE-DEMOLITION TESTING CONTRACTOR SHALL PERFORM PRE-DEMOLITION TESTING ADJUSTING AND BALANCING OF ALL EXISTING MECHANICAL EQUIPMENT INCLUDING EQUIPMENT NOTED FOR REMOVAL. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION. PROVIDE PRE-DEMOLITION TAB REPORT TO ENGINEER FOR REVIEW PRIOR TO DEMOLITION. E. CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL, STORAGE, CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL, STORAGE, AND REINSTALLATION OF CEILINGS UNLESS NOTED OTHERWISE. CONTRACTOR SHALL REPLACE ALL SOILED AND DAMAGED CEILING TILES TO MATCH EXISTING.