14-2411.1 Gallatin 2 CD2 BID.pdf
PDF 8 MB Posted
- Solicitation number
- Not on record
- Issued by
- Fayette County, Pennsylvania
About this file
This document is a comprehensive bid package for the Gallatin School Renovations project, prepared by Lee CALISTI architecture+design for City Mission Living Stones in Uniontown, Pennsylvania. The project involves Phase 2 renovations of the historic Gallatin School building, with work including window replacements, concrete and masonry restoration, railing installations, site improvements, and landscaping. The renovation is partially financed by the Redevelopment Assistance Capital Program (RACP) in cooperation with the City of Uniontown Redevelopment Authority, with a bid issue date of September 26, 2025.
The project has specific funding requirements, including compliance with Pennsylvania prevailing wage regulations, labor standards, and non-discrimination guidelines. The renovation involves replacing windows, restoring concrete and masonry surfaces, installing new aluminum railings, improving site accessibility, and landscaping with a $60,000 design-build landscaping allowance. An additional $35,000 is allocated for campus signage. The project requires contractors to be lead-safe certified, follow specific restoration processes, and adhere to strict accessibility and historical preservation guidelines. The work must be coordinated with the existing building's occupants, with careful attention to minimizing disruption and maintaining building security throughout the renovation process.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CVR
cover sheet
26 september 2025 drawing no.project directory
No. Date Issue Notes gallatin school renovations city mission living stones
155 n gallatin ave uniontown pa 15401
155 n gallatin ave uniontown pa 15401 renovations phase 2 (revised/rebid)
© copyright 2025 lee CALISTI architecture+design all rights reserved this drawing is an instrument of service and is not to be reproduced or used without prior expressed written consent of lee CALISTI architecture+design.
leecalisti.com
24 cypress avenue greensburg pa 15601
724 832 7030 lee@leecalisti.comlee CALISTI architecture+design
2411.1project no.
THESE DRAWINGS AND THE INCLUDED SPECIFICATIONS ARE PART OF A COMPLETE SET OF DOCUMENTS. THE BREAKDOWN OF DRAWINGS AND SPECIFICATIONS INTO INDIVIDUAL SHEETS AND SECTIONS SHALL NOT DETERMINE THE RESPONSIBILITY FOR THE WORK OF INDIVIDUAL CONTRACTORS. ALL CONTRACTORS (GENERAL CONTRACTOR, SUB-CONTRACTORS, TRADESPERSONS) MUST REVIEW ALL PARTS OF THE DRAWINGS AND SPECIFICATIONS TO CONFIRM THE FULL SCOPE OF WORK.
SUB-CONTRACTORS ARE RESPONSIBLE FOR THEIR RESPECTIVE SCOPES OF WORK REGARDLESS OF WHICH PAGE OF THIS SET THE WORK MAY APPEAR. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR DISTRIBUTING FULL SETS OF DRAWINGS TO ALL THE SUB-CONTRACTORS.
THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING THE LIMIT OR EXTENT OF THE WORK OF INDIVIDUAL TRADES AND SHALL FULLY
COORDINATE ALL THEIR ACTIVITY AND INFORM THE SUB-CONTRACTORS.
LEE CALISTI RA - 014425-X
RE
GISTERED ARCHITECT
PENNSYLVANIA
Issued for BID (Combined Projects A + B)9/26/2025A north drawing list
Dwg No Dwg Name 1 Dwg Name 2 Issue No Latest
Issue Date
ARCHITECTURAL
CVR cover sheet project directory A 26 september 2025
C1 survey reference only A 26 september 2025
LS legends symbols abbreviations A 26 september 2025
A001 specifications divisions 01 - 02 A 26 september 2025
A002 specifications divisions 03 - 08 A 26 september 2025
A100 site plan key notes A 26 september 2025
A101 site details railing detailsrailing elevations A 26 september 2025
A200 floor plans key plans key plan notes drywall + paint specs A 26 september 2025
A300 elevations window replacement A 26 september 2025
A400 window details window elevation keys A 26 september 2025
GENERAL BUILDING OPERATION NOTES
1.
2.
3.
4.
5.
THE OWNER IS CURRENTLY OCCUPYING THE BUILDING AND WILL CONTINUE TO DO SO
THROUGHOUT THE RENOVATIONS. BASED ON GC’S CONSTRUCTION SCHEDULE, THE
OWNER WILL GRANT ACCESS TO INDIVIDUAL APARTMENTS SO THAT THE GC CAN
COMPLETE THE RENOVATIONS TO THAT AREA. SUBMIT AN INITIAL CONSTRUCTION
SCHEDULE ALONG WITH THEIR PROJECT BID.
NO UNUSUAL, INVASIVE, OR EXCEPTIONALLY NOISY WORK OR CONSTRUCTION
OPERATIONS ARE PERMITTED BETWEEN THE HOURS OF 9:00 AM AND 4:00 PM.
COORDINATE ALL NECESSARY INSTALLATIONS AND PROCESSES THAT EMIT LOUD
NOISE OUTSIDE OF THIS TIME FRAME. COORDINATE ANY SPECIAL CIRCUMSTANCES
WITH LANDLORD/OWNER.
TAKE MEASURES NOT TO INCONVENIENCE ANY RESIDENT OR NORMAL OCCUPANTS.
PERMIT OCCUPANTS PRIORITY IN USING ELEVATORS, STAIRS AND ACCESS IN AND
OUT OF BUILDING.
THIS IS A NON-SMOKING BUILDING AND NON-SMOKING SITE. NO SMOKING IS
PERMITTED ANYWHERE ON THE PROPERTY.
DUMPSTER - COORDINATE PLACEMENT OF DUMPSTER WITH THE OWNER IN FIELD.
gallatin school - phase 2 renovations architect lee CALISTI architecture+design lee calisti, aia
24 cypress avenue greensburg, pa 15601
724.832.7030 lee@leecalisti.com project directory owner city mission living stones irmi gaut
155 north gallatin avenue uniontown, pa 15401
724.439.0201 igaut@citymissionfayette.org leecalisti.com citymissionfayette.org
SITE
THIS PROJECT IS FINANCED IN PART BY A GRANT FROM THE REDEVELOPMENT ASSISTANCE CAPITAL PROGRAM (RACP IN COOPERATION WITH THE CITY OF UNIONTOWN, REDEVELOPMENT AUTHORITY, AND IS SUBJECT TO ALL RELATED RACP REGULATIONS. THE PENNSYLVANIA PREVAILING WAGE ACT WILL APPLY TO
THIS CONTRACT. THE CONTRACT DOCUMENTS CONTAIN REQUIREMENTS ADDRESSING LABOR WAGE
RATES, LABOR STANDARDS, NONDISCRIMINATION IN HIRING PRACTICES, GOALS FOR MINORITY AND FEMALE PARTICIPATION, MBE AND WBE PARTICIPATION, PARTICIPATION BY SECTION 3 RESIDENTS AND
BUSINESSES, PROHIBITION ON EMPLOYING ILLEGAL ALIENS, AND RELATED MATTERS.
ALL CONTRACTORS AND SUBCONTRACTORS WORKING ON THIS PROJECT WILL BE REQUIRED TO COMPLY WITH THE PENNSYLVANIA HUMAN RELATIONS ACT (NO. 222, PA), THE STEEL PRODUCTS PROCUREMENT ACT, THE TRADE PRACTICES ACT, AND THE AMERICANS WITH DISABILITIES ACT. THEY MUST MEET GUIDELINES AND PRACTICES ESTABLISHED BY THE REDEVELOPMENT AUTHORITY AND CITY MISSION AND ALL OTHER APPROPRIATE REGULATIONS, INCLUDING: 1) EXECUTIVE ORDER 11246, 2) SECTION 3 OF THE HOUSING AND COMMUNITY DEVELOPMENT ACT OF 1968, AS AMENDED. BIDDERS SHALL CERTIFY THAT
THEY ARE NOT DEBARRED FROM PARTICIPATING IN STATE-FUNDED CONTRACTS.
THE REDEVELOPMENT AUTHORITY AND THE CITY MISSION DO NOT DISCRIMINATE REGARDING RACE, COLOR, RELIGION, SEX, ANCESTRY, MARITAL STATUS, DISABILITY OR THE USE OF A GUIDE OR SUPPORT ANIMAL BECAUSE OF PHYSICAL HANDICAP, OR AGE, IN THE PROVISION, ADMISSION, EMPLOYMENT, SEXUAL ORIENTATION, NATIONAL ORIGIN, GENDER IDENTITY OR EXPRESSION, FAMILY RESPONSIBILITY OR FAMILIAL
STATUS.
https://www.leecalisti.com/ https://www.citymissionfayette.org
C1 survey
26 september 2025 drawing no.reference only
No. Date Issue Notes gallatin school renovations city mission living stones
155 n gallatin ave uniontown pa 15401
155 n gallatin ave uniontown pa 15401 renovations phase 2 (revised/rebid)
© copyright 2025 lee CALISTI architecture+design all rights reserved this drawing is an instrument of service and is not to be reproduced or used without prior expressed written consent of lee CALISTI architecture+design.
leecalisti.com
24 cypress avenue greensburg pa 15601
724 832 7030 lee@leecalisti.comlee CALISTI architecture+design
2411.1project no.
THESE DRAWINGS AND THE INCLUDED SPECIFICATIONS ARE PART OF A COMPLETE SET OF DOCUMENTS. THE BREAKDOWN OF DRAWINGS AND SPECIFICATIONS INTO INDIVIDUAL SHEETS AND SECTIONS SHALL NOT DETERMINE THE RESPONSIBILITY FOR THE WORK OF INDIVIDUAL CONTRACTORS. ALL CONTRACTORS (GENERAL CONTRACTOR, SUB-CONTRACTORS, TRADESPERSONS) MUST REVIEW ALL PARTS OF THE DRAWINGS AND SPECIFICATIONS TO CONFIRM THE FULL SCOPE OF WORK.
SUB-CONTRACTORS ARE RESPONSIBLE FOR THEIR RESPECTIVE SCOPES OF WORK REGARDLESS OF WHICH PAGE OF THIS SET THE WORK MAY APPEAR. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR DISTRIBUTING FULL SETS OF DRAWINGS TO ALL THE SUB-CONTRACTORS.
THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING THE LIMIT OR EXTENT OF THE WORK OF INDIVIDUAL TRADES AND SHALL FULLY
COORDINATE ALL THEIR ACTIVITY AND INFORM THE SUB-CONTRACTORS.
LEE CALISTI RA - 014425-X
RE
GISTERED ARCHITECT
PENNSYLVANIA
Issued for BID (Combined Projects A + B)9/26/2025A
X X
XXX
XX
CO
NC
. W
AL
K
CR
OW
A
VE
NU
E
(B
IT
UM
IN
OU
S)
X
X X
X X
NO
RT
H
GA
LL
AT
IN
A
VE
NU
E (B
IT
UM
IN
OU
S)
MILLVIEW STREET
(BITUMINOUS)
N65° 21' 45"W 90.00'90.00'
N24° 37' 06"E
76.29'
S65° 21' 45"E 90.00'
N2 4°
8'
5"
E
.8
6'
S65° 23' 52"E 118.80'
N2 4°
8'
5"
E
.0
6'
75.39' S65° 21' 45"E
73.00'
S24° 37' 06"W
107.92'
S2 4°
7'
6"
W
.2
9'
N2 4°
7'
6"
E
.2 9'
N65° 21' 45"W 73.00'
N65° 21' 45"W 83.43' N24º 37' 06"E
107.95'
LOT 3
CITY MISSION PLAN OF LOTS
6,866 SQ. FT.
0.16 ACRE
P.B. 109 PG. 15
TAX PARCEL 38-04-0304
RBV 3482 PG 522
LOT 4
CITY MISSION PLAN OF LOTS
6,866 SQ. FT.
0.16 ACRE
P.B. 109 PG. 15
TAX PARCEL 38-04-0303
RBV 3482 PG 522
LOT 2
CITY MISSION PLAN OF LOTS
8,809 SQ. FT.
0.20 ACRE
P.B. 109 PG. 15
TAX PARCEL 38-01-0086
RBV 3413 PG 570
LOT 1
CITY MISSION PLAN OF LOTS
7,878 SQ. FT.
0.18 ACRE
P.B. 109 PG. 15
TAX PARCEL 38-01-0085
RBV 3413 PG 570
N/F
CITY MISSION
TAX ID: 38-01-0087
RB. 2920 P. 806
8.28%
979.2 X
ALLEY
SS
EX
. B
LO
CK
W
AL
L
EX ASPHALT WEDGE CURB
CO
NC
. W
AL
K
0.129 acres 38-01-0087
187 N GALLATIN AVE
140'0" N 64°00'00" W
'0
N
°0
0'
E
140'0" S 64°00'00" E
'0
S
°0
0'
W
140'0" N 64°00'00" W
PHASE 3
MISSION PLACE BLDG. 3
FF = 978.70'
974.00
973.50
975.06
973.28
975.70
975.07
973.03 971.66
972.72
972.78
978.51
978.53
978.16 978.34
978.68
978.91
977.75 977.07
977.84
978.14
979.09978.51
985.45 983.48
979.33
978.76
984.27
987.49
982.84
988.81 988.00
984.63
984.35 985.52
985.56
984.61
980.88
979.44
979.94
980.34
981.32
985.15
980.79
979.52
980.76
TOP OF WALL
EL.=978.66
9 SPACES
9 SPACES
9 SPACES
9 SPACES
8 SPACES
DO
UB
LE
Y
EL
LO
W L
IN
E
R I
GH
T-
OF
-W
AY
EX BITUMINOUS PARKING LOT
NORTH GALLATIN AVENUE
(BITUMINOUS)
CITY MISSION LIVING STONES, INC
TAX ID: 38-01-0326-01
P.B. 109 PG. 15
ALLEY
N/F
KOVAL RENTALS
TAX ID: 38-01-0082
RB. 3353 P. 1648
N/F
INDUSTRIAL REALTY, INC.
TAX ID: 38-04-0296
RB. 1323 P. 241
CONC. WALK
CONC. WALK
EX CONC. WALK
MB
EX ASPHALT DRIVE
EDGE OF EX.
BITUMINOUS
PAVEMENT
EX
. B
LO
CK
W
AL
L
FF ELEV: 992.86
(OUTSIDE)
N/F
CITY MISSION LIVING STONES, INC.
TAX ID: 38-01-0326
RB. 3482 P. 522
AREA: 9406 SQ. FT.; 0.22 ACRES
EX. BLOCK
WALL
EX
. W
AL
L
WALL CONTINUES IN
SOUTHERLY DIRECTION
EX ASPHALT WEDGE CURB
118.82' N64° 11' 46"W
EX ASPHALT DRIVE
MISSION PLACE BLDG. 1
FF: 987.3
MISSION PLACE BLDG. 2
FF: 990.5
CONDUIT
CONDUIT
N65° 21' 45"W 90.00'90.00'
GALLATIN SCHOOL
CITY MISSION PLAN OF LOTS
41,708 SQ. FT.
0.96 ACRE
P.B. 109 PG. 15
TAX PARCEL 38-04-0302
RBV 3329 PG 1829
RI
GH
T-
OF
-W
AY
EXISTING
TRANSFORMER
BU
S
ST
OP
SH
ED
EX.CONC. WALK
N/F ROBERT E. RAFAIL
DV 1095 PG 133
TAX PARCEL 38-04-0301
ARTIS FAMILY ONE LLC
RBV 528 PG 1326
TAX PARCEL 38-04-0297
EX GENERATOR
SURVEY EX - GALLATIN SCHOOL
Scale: 1/16" = 1'-0"
C1
PROJECT SITE
GENERAL SITE NOTES
A.
B.
C.
ALL SURVEY INFORMATION IS BASED ON A SURVEY TITLED "UNIONTOWN CITY MISSION, OVERALL EXISTING CONDITIONS PLAN" CITY OF UNIONTOWN, FAYETTE COUNTY, PA, DATED 03/25/2025 BY HARSHMAN CE GROUP LLC, 100 COURSON HILL ROAD, WASHINGTON PA 15301 (724) 503-4125, PROJECT NO. 23.032.01 / DRAWING NO 23.032-C01 (SHEET NUMBER 2 OF 9)
PLAT IS ZONED C-1 LOCAL BUSINESS DISTRICT / BUILDING SETBACKS (PER VARIANCE) - REFER TO
APPROVED LAND DEVELOPMENT PLAN - AVAILABLE UPON REQUEST
FIELD VERIFY ALL PERTINENT SITE FEATURES IS RECOMMENDED. CONFIRM ALL TOPOGRAPHIC BENCH
MARKS WITH SURVEYOR IN FIELD AND NOTIFY ARCHITECT IMMEDIATELY OF ANY AND ALL
DISCREPANCIES.
LS
legends symbols
26 september 2025 drawing no.abbreviations
No. Date Issue Notes gallatin school renovations city mission living stones
155 n gallatin ave uniontown pa 15401
155 n gallatin ave uniontown pa 15401 renovations phase 2 (revised/rebid)
© copyright 2025 lee CALISTI architecture+design all rights reserved this drawing is an instrument of service and is not to be reproduced or used without prior expressed written consent of lee CALISTI architecture+design.
leecalisti.com
24 cypress avenue greensburg pa 15601
724 832 7030 lee@leecalisti.comlee CALISTI architecture+design
2411.1project no.
THESE DRAWINGS AND THE INCLUDED SPECIFICATIONS ARE PART OF A COMPLETE SET OF DOCUMENTS. THE BREAKDOWN OF DRAWINGS AND SPECIFICATIONS INTO INDIVIDUAL SHEETS AND SECTIONS SHALL NOT DETERMINE THE RESPONSIBILITY FOR THE WORK OF INDIVIDUAL CONTRACTORS. ALL CONTRACTORS (GENERAL CONTRACTOR, SUB-CONTRACTORS, TRADESPERSONS) MUST REVIEW ALL PARTS OF THE DRAWINGS AND SPECIFICATIONS TO CONFIRM THE FULL SCOPE OF WORK.
SUB-CONTRACTORS ARE RESPONSIBLE FOR THEIR RESPECTIVE SCOPES OF WORK REGARDLESS OF WHICH PAGE OF THIS SET THE WORK MAY APPEAR. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR DISTRIBUTING FULL SETS OF DRAWINGS TO ALL THE SUB-CONTRACTORS.
THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING THE LIMIT OR EXTENT OF THE WORK OF INDIVIDUAL TRADES AND SHALL FULLY
COORDINATE ALL THEIR ACTIVITY AND INFORM THE SUB-CONTRACTORS.
LEE CALISTI RA - 014425-X
RE
GISTERED ARCHITECT
PENNSYLVANIA
Issued for BID (Combined Projects A + B)9/26/2025A m in
A B B R E V I A T I O N S AFF above finished floor DL dead load ID inside diameter PNT paint (ed) TEL telephone AC acoustical DEMO demolish, demolition INSUL insulate (d), (ion) PNL panel TV television ACT acoustical tile DTL detail INT interior PART partition THK thick (ness) ADD addendum DIAG diagonal INV invert PVMT pavement TLT toilet ADJ adjacent DIA diameter PERF perforate (d) TOL tolerance ADJUST adjustable DIM dimension PLAS plaster T&G tongue and groove AGG aggregate DS downspout JT joint PLAM plastic laminate T.O.M. top of masonry A/C air conditioning DWG drawing PLWD plywood T.O.S. top of steel ALT alternate DF drinking fountain KIT kitchen PT point T.O.W. top of wall ALUM aluminum DW dishwasher KO knockout PVC polyvinyl chloride TYP typical AB anchor bolt PCF pounds per cubic foot ANOD anodized E east LBL label PLF pounds per lineal foot UR urinal APPROX approximate ELEC electrical LAM laminate (d) PSI pounds per square inch UON unless otherwise noted ARCH architect(ural) ELEV elevation LAV lavatory PSL parallel strand lumber UNO unless noted otherwise ASB asbestos EMER emergency LH left hand ASPH asphalt EQ equal LT light QT quarry tile VB vapor barrier AUTO automatic EQUIV equivalent LSL laminated strand lumber QTY quantity VCB vinyl cove base
EQUIP equipment LL live load VCT vinyl composite tile B.B. back to back EXH exhaust LVL laminated veneer lumber RAD radius VERT vertical BSMT basement EX / EXIST existing RWC rainwater conductor VIF verify in field BRNG bearing EF each face MH manhole/maintenance hole REF reference VIN vinyl BPL bearing plate EXT exterior MFR manufacture (r) RET return VNR veneer BM bench mark EW (B) each way (bottom) MAS masonry RA return air VSB vinyl straight base BET between MO masonry opening REV revision (s), revised BIT bituminous FIN finish (ed) MATL material (s) RH right hand WH wall hung BLKG blocking FF+E fixtures, furnishings & equipment MECH mechanic (al) ROW right of way WC water closet BD board FFL finished floor line MED medium R riser WP waterproofing BS both sides FE fire extinguisher MT metal threshold RD roof drain WWF welded wire fabric BW both ways FP fireproof M meter (s) RO rough opening W west BOT bottom FRT fire-retardant treated MM millimeter (s) Ø round (diameter) WDW window BLDG building FLR floor (ings) MIN minimum RCB rubber cove base WM wire mesh BUR built up roofing FD floor drain MISC miscellaneous RSB rubber straight base W/O without BLKHD bulkhead FTG footing MOD modular WD wood B.O. by others FND foundation SCH schedule WPT working point
FUT future NR noise reduction SKYLT skylight CABT cabinet NRC noise reduction coefficient CI cast iron GA gage, gauge NOM nominal SC solid core CIPC cast-in-place concrete GALV galvanized NMT nonmetallic S south CB catch basin GC general contractor N north SPKR speaker CLG ceiling GF ground face NIC not in contract SPEC specification (s) CTR center GWB gypsum wall board NTS not to scale SQ square CT ceramic tile SST stainless steel CLR clear(ance) HDWE hardware OH overhead STD standard COL column HDR header OC on center (s) STL steel COMP compress (ed), (ion), (ible) HVAC heating, ventilating, air conditioning OPNG opening STOR storage CONC concrete HM hollow metal OPP opposite SD storm drain CMU concrete masonry unit HOR horizontal OPH opposite hand STRUCT structural CONST construction HB hose bibb OD outside diameter SUSP suspended CONT continuous or continue OA overall SYM symmetry (ical) CORR corrugated SECT section CNTR counter
W1
A
NORTH ARROW
SECTION REFERENCE
ELEVATION MARKS ROOM TITLE/NUMBER
COLUMN LINEDETAIL REFERENCE
DOOR AND DOOR NUMBER
BUILDING SECTION
WINDOW REFERENCE
PARTITION TYPE
ELEVATION REFERENCE
EXISTING CONTOURS
ELEVATIONS NOTED ON HIGH SIDE
NEW CONTOURS
ELEVATIONS NOTED ON HIGH SIDE
TEST BORING
REVISION
TB-1
COMPACTED EARTH/SOIL
FINISH WOOD
POROUS FILL/GRAVEL
CONTINUOUS ROUGH FRAMING
CERAMIC TILE (OR ACOUSTICAL TILE)
BLOCKING
CONCRETE
BRICK PLYWOOD (SMALL SCALE)
CMU
PLYWOOD (LARGE SCALE) GWB OR CEMENT BOARD
STEEL
RIGID INSULATION
BATT INSULATION
CONCRETE MASONRY
DRAWING REFERENCES + SYMBOLS + MATERIAL HATCHES
LOWER LEVEL
EL. 0'-0"
OFFICE
101.5
PROPERTY LINES SET BACK LINES
W1
P1
A403
AA-A400 AA-A4003-A403 3-A403
3'0 " x
7' 0"
EL. 1'8"
no rth
A1
A403
A403
P1
100-1
A403
DRAWING REFERENCES + SYMBOLS
Scale: 1/4" = 1'-0"
LS
Figure 404.2.3.2 Maneuvering Clearance at Manual Swinging Doors m ax m in
Fig. 308.2.1 Unobstructed Forward Reach
Fig. 308.2.2 Obstructed High Forward Reach
Fig. 308.3.1 Unobstructed Side Reach
Fig. 308.3.2 Obstructed High Side Reach m ax m ax
>20-25 max20 max
(a) (b) ax
10 max m in m ax m ax
10 max > 10-24 max
(a) (b) m ax ax
60" min 67" new construction m in
24 min in
36 min
12 min 12 min
" n ew co ns tru cti on
(b) T-shaped
Fig. 304.3 Size of Turning Space
(a) Circular
60" min 67" min new construction
48 min 54 new construction in
Fig. 305.3 Size of Clear Floor Space
Figure 703.4.4 / 703.4.5 Position of Braille
(For raised character mounting heights see Section 703.3.10)
AREA OF
REFUGE
3/8 min
3/8 min
Figure 703.3.5 Height of Raised Characters
5/ 8"
2"
LIBRARY
17-25
Figure 306.2 Toe Clearance
6 max in
(a) elevation
(b) plan
11 min
8 min
9 min
(a) elevation
(b) plan
25 max
Figure 306.3 Knee Clearance m
in. 60 m ax
17" MIN
17" TO 19"
8" MIN. 6" MAX.
9" M
IN
" M
IN
" M
AX
" S
TA
ND
IN
G
EQUIPMENT PERMITTED IN SHADED AREA
SPOUT HEIGHT AND KNEE CLEARANCE
CLEAR FLOOR SPACE
" M
IN
48" MIN.
Figure C602.2(a) Figure C602.2(b)
X < 24 m in.
NUMBER
SIGN NAME
SIGN NAME
NUMBER
m ax
Figure 703.3.10 Height of Tactile Characters Above Floor or Ground
COORDINATE WITH
703.4.5
Figure 703.3.11 Location of Tactile Signs at Doors
18 min centered on tactile charactersLC
Figure 604.3 Size of Clearance at Water Closets
" m in.
60" min.
Other Fixtures Not Allowed Within This Area
16"-18"
17"-19"
(a) wheelchair accessible water closets
(b) ambulatory accessible water closets
LC
LC
Figure 604.2 Water Closet Location
Figure 608.2.1 Transfer Type Shower Compartment
Size and Clearance
36 mi n.
48 min.
control wall seat wall back wall
Note: inside finished dimensions measured at the center points of opposing sides
15-16
22 - 23
1- 1/2
" m ax
2-1/2" max
FOLD
DOWN
SEAT
SEAT
SIZE
DISTANCE
FROM WALL
Figure 610.3.2 L-shaped Shower Seat
Figure 608.3.1 Grab Bars for
Transfer-Type Showers seat wall back wall
Figure 608.4.1 Transfer-Type Shower
Compartment Controls and Hand Shower Location in m ax side wall control wall
15 max
36 min 60 m in
FIG. 404.2.3.2 (D)
hinge approach, pull side m in
FIG. 404.2.3.2 (E)
hinge approach, pull side
42 min m
FIG. 404.2.3.2(A) Front Approach, Pull Side
12 min if both a closer and latch are provided
2" m in m in
(E X bl dg s)
FIG. 404.2.3.2 (B) Front Approach Push Side FIG. 404.2.3.2 (C) Front Approach Push Side EX Bldgs
FIG. 404.2.3.2 (F) hinge approach, push side m
22 min
12 min* m in
* if both closer and latch are provided
* 48 in. min. if both closer and latch are provided m in m in w
/c lo se r
24 min
FIG. 404.2.3.2 (G) Latch Approach, Pull Side
FIG. 404.2.3.2 (H) Latch Approach, Push Side
24 min m in m in if door is provided with a closer elec receptacles, comm, devices (center) 1'-6" top of wall mtd.access. tele outlets 3'-6" light switches (center) 3'-10" top of disc.switches, starters, contactors 6'-0" top of panelboards 6'-6" mounting heights detail (confirm with reach range diagrams)
6'- 6"
6'- 0"
3'-
3'- 6"
1'- 6"
48 min
24 min
24 min
This Drawing Produced by the U.S. Access Board
Figure 406.10 Diagonal or Corner Type Curb Ramps
FLARED SIDES
1:10 MAX SLOPE
SLOPE
SLOPE
RAMP SLOPE
1:12 MAX SLOPE
PROVIDE DETECTABLE
WARNINGS PER 406.12
A B B R E V I A T I O N S AFF above finished floor DL dead load ID inside diameter PNT paint (ed) TEL telephone AC acoustical DEMO demolish, demolition INSUL insulate (d), (ion) PNL panel TV television ACT acoustical tile DTL detail INT interior PART partition THK thick (ness) ADD addendum DIAG diagonal INV invert PVMT pavement TLT toilet ADJ adjacent DIA diameter PERF perforate (d) TOL tolerance ADJUST adjustable DIM dimension PLAS plaster T&G tongue and groove AGG aggregate DS downspout JT joint PLAM plastic laminate T.O.M. top of masonry A/C air conditioning DWG drawing PLWD plywood T.O.S. top of steel ALT alternate DF drinking fountain KIT kitchen PT point T.O.W. top of wall ALUM aluminum DW dishwasher KO knockout PVC polyvinyl chloride TYP typical AB anchor bolt PCF pounds per cubic foot ANOD anodized E east LBL label PLF pounds per lineal foot UR urinal APPROX approximate ELEC electrical LAM laminate (d) PSI pounds per square inch UON unless otherwise noted ARCH architect(ural) ELEV elevation LAV lavatory PSL parallel strand lumber UNO unless noted otherwise ASB asbestos EMER emergency LH left hand ASPH asphalt EQ equal LT light QT quarry tile VB vapor barrier AUTO automatic EQUIV equivalent LSL laminated strand lumber QTY quantity VCB vinyl cove base
EQUIP equipment LL live load VCT vinyl composite tile B.B. back to back EXH exhaust LVL laminated veneer lumber RAD radius VERT vertical BSMT basement EX / EXIST existing RWC rainwater conductor VIF verify in field BRNG bearing EF each face MH manhole/maintenance hole REF reference VIN vinyl BPL bearing plate EXT exterior MFR manufacture (r) RET return VNR veneer BM bench mark EW (B) each way (bottom) MAS masonry RA return air VSB vinyl straight base BET between MO masonry opening REV revision (s), revised BIT bituminous FIN finish (ed) MATL material (s) RH right hand WH wall hung BLKG blocking FF+E fixtures, furnishings & equipment MECH mechanic (al) ROW right of way WC water closet BD board FFL finished floor line MED medium R riser WP waterproofing BS both sides FE fire extinguisher MT metal threshold RD roof drain WWF welded wire fabric BW both ways FP fireproof M meter (s) RO rough opening W west BOT bottom FRT fire-retardant treated MM millimeter (s) Ø round (diameter) WDW window BLDG building FLR floor (ings) MIN minimum RCB rubber cove base WM wire mesh BUR built up roofing FD floor drain MISC miscellaneous RSB rubber straight base W/O without BLKHD bulkhead FTG footing MOD modular WD wood B.O. by others FND foundation SCH schedule WPT working point
FUT future NR noise reduction SKYLT skylight CABT cabinet NRC noise reduction coefficient CI cast iron GA gage, gauge NOM nominal SC solid core CIPC cast-in-place concrete GALV galvanized NMT nonmetallic S south CB catch basin GC general contractor N north SPKR speaker CLG ceiling GF ground face NIC not in contract SPEC specification (s) CTR center GWB gypsum wall board NTS not to scale SQ square CT ceramic tile SST stainless steel CLR clear(ance) HDWE hardware OH overhead STD standard COL column HDR header OC on center (s) STL steel COMP compress (ed), (ion), (ible) HVAC heating, ventilating, air conditioning OPNG opening STOR storage CONC concrete HM hollow metal OPP opposite SD storm drain CMU concrete masonry unit HOR horizontal OPH opposite hand STRUCT structural CONST construction HB hose bibb OD outside diameter SUSP suspended CONT continuous or continue OA overall SYM symmetry (ical) CORR corrugated SECT section CNTR counter
WINDOW REFERENCE
ACCESSIBILITY GUIDELINES
Scale: 1/4" = 1'-0"
LS
A001 specifications
26 september 2025 drawing no.divisions 01 - 02
No. Date Issue Notes gallatin school renovations city mission living stones
155 n gallatin ave uniontown pa 15401
155 n gallatin ave uniontown pa 15401 renovations phase 2 (revised/rebid)
© copyright 2025 lee CALISTI architecture+design all rights reserved this drawing is an instrument of service and is not to be reproduced or used without prior expressed written consent of lee CALISTI architecture+design.
leecalisti.com
24 cypress avenue greensburg pa 15601
724 832 7030 lee@leecalisti.comlee CALISTI architecture+design
2411.1project no.
THESE DRAWINGS AND THE INCLUDED SPECIFICATIONS ARE PART OF A COMPLETE SET OF DOCUMENTS. THE BREAKDOWN OF DRAWINGS AND SPECIFICATIONS INTO INDIVIDUAL SHEETS AND SECTIONS SHALL NOT DETERMINE THE RESPONSIBILITY FOR THE WORK OF INDIVIDUAL CONTRACTORS. ALL CONTRACTORS (GENERAL CONTRACTOR, SUB-CONTRACTORS, TRADESPERSONS) MUST REVIEW ALL PARTS OF THE DRAWINGS AND SPECIFICATIONS TO CONFIRM THE FULL SCOPE OF WORK.
SUB-CONTRACTORS ARE RESPONSIBLE FOR THEIR RESPECTIVE SCOPES OF WORK REGARDLESS OF WHICH PAGE OF THIS SET THE WORK MAY APPEAR. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR DISTRIBUTING FULL SETS OF DRAWINGS TO ALL THE SUB-CONTRACTORS.
THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING THE LIMIT OR EXTENT OF THE WORK OF INDIVIDUAL TRADES AND SHALL FULLY
COORDINATE ALL THEIR ACTIVITY AND INFORM THE SUB-CONTRACTORS.
LEE CALISTI RA - 014425-X
RE
GISTERED ARCHITECT
PENNSYLVANIA
Issued for BID (Combined Projects A + B)9/26/2025A north
01000 - GENERAL CONDITIONS
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
ALL REFERENCES TO RELEVANT PARTIES SHALL BE AS INDICATED:
ARCHITECT: LEE CALISTI ARCHITECTURE+DESIGN
OWNER: CITY MISSION LIVING STONES
IF ANY DISCREPANCY OR UNCERTAINTY ARISES AS TO THE RESPONSIBLE PARTY INVOLVED,
CONTACT THE ARCHITECT AND OWNER AND SEEK DIRECTION.
IMPORTANT - CALL BEFORE YOU DIG - PENNSYLVANIA ONE CALL SYSTEM, INC. CALL 3 BUSINESS
DAYS BEFORE YOU DIG! 1-800-242-1776 OR 8-1-1.
THESE DRAWINGS AND THE SPECIFICATIONS ARE PART OF A COMPLETE SET OF DOCUMENTS.
THE BREAKDOWN OF DRAWINGS AND SPECIFICATIONS INTO INDIVIDUAL SHEETS AND SECTIONS
SHALL NOT DETERMINE THE RESPONSIBILITY FOR THE WORK OF INDIVIDUAL CONTRACTORS.
ALL CONTRACTORS MUST REVIEW ALL PARTS OF THE DRAWINGS AND SPECIFICATIONS. THE
GENERAL CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR DETERMINING THE LIMIT OR
EXTENT OF THE WORK OF INDIVIDUAL TRADES AND SHALL FULLY COORDINATE ALL THEIR
ACTIVITY.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLETELY CHECKING AND VERIFYING ALL
EXISTING CONDITIONS AFFECTING THEIR PERFORMANCE OF THE DESIGNATED WORK. SHOULD
THE CONTRACTOR ENCOUNTER A DISCREPANCY AFFECTING HIS PERFORMANCE, THEY SHALL
NOTIFY THE OWNER AND ARCHITECT IMMEDIATELY AND SEEK DIRECTION. DO NOT PROCEED
UNTIL THE DISCREPANCY IS RESOLVED.
ALL WORK SHALL BE IN ACCORDANCE WITH ALL KNOWN APPLICABLE CODES, RULES AND
REGULATIONS OF THE AGENCIES HAVING JURISDICTION. CONTRACTOR SHALL SECURE AND PAY
FOR ALL PERMITS, LICENSES, CERTIFICATES, INSPECTIONS, AND OTHER LEGAL FEES REQUIRED, AND ALL APPLICABLE TAXES.
LEE CALISTI ARCHITECTURE+DESIGN EXPRESSLY RESERVES ITS COMMON LAW COPYRIGHT AND
OTHER RIGHTS IN THESE PLANS. THESE PLANS ARE NOT TO BE REPRODUCED, CHANGED OR
MANIPULATED IN ANY FORM OR MANNER WHATSOEVER NOR ARE THEY TO BE ASSIGNED TO ANY
THIRD PARTY WITHOUT PERMISSION AND CONSENT OF LEE CALISTI ARCHITECTURE+DESIGN.
THE ARCHITECT ACCEPTS NO RESPONSIBILITY FOR ANY CHANGES IN DESIGN PLANS UNLESS
WRITTEN CONSENT IS GIVEN BY THE ARCHITECT. THE CONTRACTOR AND/OR OWNER WILL BE
HELD RESPONSIBLE FOR ANY FIELD MODIFICATIONS MADE WITHOUT THE WRITTEN CONSENT OF
THE ARCHITECT AND NECESSARY APPROVALS BY PERMITTING AGENCIES.
CONTRACTOR IS SOLELY RESPONSIBLE FOR THE CONSTRUCTION MEANS AND METHODS
INCLUDING WORKMANSHIP. IT IS IMPLIED [AND REQUIRED] THAT INDICATED WORK, WHICH IS NOT
FULLY SPECIFIED [IN DETAIL] SHALL COMPLY WITH APPLICABLE RECOGNIZED STANDARDS OF
THE CONSTRUCTION INDUSTRY, FOR THE INTENDED USE OF THE WORK.
THE SCOPE OF WORK OUTLINED IN THESE DRAWINGS IS BASED ON PROGRAM DATA PROVIDED
BY THE OWNER. WHILE THESE ARE IN GENERAL ACCORDANCE WITH THE LAYOUT OF THE
BUILDING, BASED ON PRELIMINARY FIELD VERIFICATIONS, CERTAIN ELEMENTS ON THE
DRAWINGS MAY VARY IN SIZE AND/OR PLACEMENT FROM THE CONDITIONS ACTUALLY PRESENT.
HOWEVER, THE CONTRACTOR SHALL FULLY AQUAINT THEMSELVES WITH THE WORK AREAS AND
VERIFY ALL DIMENSIONS AND CONDITIONS IN THE FIELD NECESSARY TO THE PREPARATION OF
BIDS. THE CONTRACTOR WILL MAKE PROVISIONS IN THEIR PROPOSALS TO ACCOUNT FOR THE
COST OF ANY VARIANCES IN QUANTITY OR POSITION WITHOUT ANY ADDITIONAL EXPENSE TO
THE OWNER.
SUBSTITUTIONS: BIDDING AND CONTRACTOR AWARD
A. THE BASE BID PROPOSED BY THE CONTRACTOR IS STRICTLY AND EXCLUSIVELY FOR THE
WORK AS PER THE CONTRACT DOCUMENTS.
B. ANY SUBSTITUTIONS MUST BE SUBMITTED WITH COST AND SUPPORT DATA FOR APPROVAL
DURING THE BID PERIOD
C. THE OWNER’S AND ARCHITECT'S DECISION OF APPROVAL OR DISAPPROVAL OF A PROPOSED
SUBSTITUTION SHALL BE FINAL.
D. NO SUBSTITUTION SHALL BE ACCEPTED WITHOUT A SUBSTANTIAL CREDIT GIVEN BACK TO THE
OWNER.
DO NOT SCALE FROM THE DRAWINGS. ALL DIMENSIONS LISTED IN THESE DRAWINGS ARE BASED
ON FIELD DIMENSIONS, THE CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLETELY CHECKING
AND FIELD VERIFYING ALL EXISTING CONDITIONS AND DIMENSIONS AFFECTING THEIR
PERFORMANCE OF THE DESIGNATED WORK. SHOULD THE CONTRACTOR ENCOUNTER A
DISCREPANCY AFFECTING HIS PERFORMANCE, HE SHALL NOTIFY THE OWNER AND ARCHITECT
IMMEDIATELY AND SEEK DIRECTION. DO NOT PROCEED UNTIL THE DISCREPANCY IS RESOLVED
BY THE OWNER AND ARCHITECT.
ALL MATERIALS SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE MANUFACTURER'S
INSTRUCTIONS. MATERIALS UNLESS OTHERWISE NOTED, TO BE IN NEW AND PERFECT
CONDITION WHEN INSTALLED AND PROTECTED UNTIL ACCEPTED.
NO CUTTING, BLOW TORCHES, OR OPEN FLAME TOOLS ARE PERMITTED IN THE WORK AREAS
WITHOUT THE EXPRESS PRIOR APPROVAL OF THE ARCHITECT AND OWNER. IF USE IS
PERMITTED, AN EXTINGUISHER MUST BE PROVIDED AND PLACED IN IMMEDIATE PROXIMITY TO
THE WORK. ALL CUTTING WORK SHALL BE COMPLETED AND INSPECTED BY THE CONTRACTOR'S
SUPERVISING PERSONNEL AT LEAST ONE HOUR BEFORE THE WORK AREA IS VACATED FOR THE
DAY.
USE THE MEANS NECESSARY TO PREVENT DUST FROM BECOMING A NUISANCE TO THE PUBLIC,
THE ADJACENT PROPERTIES OR TO NEIGHBORING AREAS OF THE SITE. UPON COMPLETION OF
ALL WORK, REMOVE TOOLS, EQUIPMENT, AND DEMOLISHED MATERIALS FROM SITE. REMOVE
PROTECTIONS..
NOTIFY THE OWNER'S REPRESENTATIVE IN ADVANCE REGARDING ANY REQUIRED UTILITY
SHUT-DOWNS AFFECTING OTHER AREAS OF THE SITE OUTSIDE OF THE CONTRACT LIMITS.
ARRANGE AND PAY FOR DISCONNECTING, REMOVING AND CAPPING UTILITY SERVICES WITHIN
AREAS OF DEMOLITION OR SITE WORK. DISCONNECT AND STUB OFF. NOTIFY THE AFFECTED
UTILITY COMPANY AND BUILDING MANAGER IN ADVANCE AND OBTAIN APPROVAL BEFORE
STARTING THE WORK. PLACE MARKERS TO INDICATE LOCATION OF DISCONNECTED SERVICES.
IDENTIFY SERVICE LINES AND CAPPING LOCATIONS ON PROJECT RECORD DOCUMENTS. SHUT
OFF, CAP, ABANDON OR OTHERWISE PROTECT EXISTING UTILITY LINES WHERE AFFECTED BY
DEMOLITION OPERATIONS IN ACCORDANCE WITH GOOD PRACTICE, CODES, OR WITH THE
REQUIREMENTS OF THE AGENCY OR UTILITY HAVING JURISDICTION.
MISCELLANEOUS DEFINITIONS:
A. THE TERM "PRODUCT" INCLUDES MATERIALS, SYSTEMS, AND EQUIPMENT.
B. THE TERM "FURNISH" INDICATES OBTAINING AND DELIVERING A PRODUCT TO THE SITE, FOR
INSTALLATION BY OTHERS.
C. THE TERM "INSTALL" INDICATES SETTING IN PLACE, CONNECTING, TESTING AND PLACING IN
FULL OPERATING CONDITION MATERIALS, WHICH ARE FURNISHED BY OTHERS.
D.THE TERM "PROVIDE" INDICATES FURNISHING AND INSTALLING MATERIALS.
E. THE TERM "BUILDING CODE," AND THE TERM "CODE," REFER TO REGULATIONS OF
GOVERNMENTAL AGENCIES HAVING JURISDICTION.
F. THE TERMS "APPROVED," "REQUIRED," AND "AS DIRECTED," INDICATE THE WORK OR
MATERIALS THAT MAY BE APPROVED, REQUIRED, OR DIRECTED BY THE ARCHITECT ACTING AS
THE AGENT OF THE OWNER.
G. THE TERM "SIMILAR" IS USED IN ITS GENERAL SENSE, AND DOES NOT NECESSARILY INDICATE
IDENTICAL.
H. THE TERMS "SHOWN," "INDICATED," "DETAILED," "NOTED," "SCHEDULED," AND TERMS OF
SIMILAR IMPORT, REFER TO REQUIREMENTS CONTAINED IN THE CONTRACT DOCUMENTS.
PUBLICATIONS AND SIGNS: PROVIDE A PROJECT SIGN AS DIRECTED BY THE OWNER AND PER
RACU AND RACP FUNDING REQUIREMENTS. COMMONWEALTH FINANCIAL ASSISTANCE IN THIS
PROJECT WILL BE ACKNOWLEDGED BY SIGNS ERECTED IN THE PROJECT AREA AS SOON AS
POSSIBLE AFTER THE EFFECTIVE DATE OF THIS CONTRACT STATING “FINANCIAL ASSISTANCE
PROVIDED BY THE COMMONWEALTH OF PENNSYLVANIA, HONORABLE [NAME OF CURRENT
GOVERNOR], GOVERNOR” OR IN SUCH OTHER MANNER DESIGNATED BY OFFICE OF BUDGET. ANY
PUBLICATION CONCERNING THE PROJECT SHALL ALSO ACKNOWLEDGE COMMONWEALTH
FINANCIAL ASSISTANCE IN THE SAME MANNER.
ACKNOWLEDGEMENT OF COMMONWEALTH FINANCIAL ASSISTANCE MAY BE COMBINED WITH AN
ACKNOWLEDGEMENT OF OTHER FUNDING SOURCES ON PROJECT SIGNS AND IN PROJECT
PUBLICATIONS, PROVIDED THAT THE ACKNOWLEDGEMENT OF COMMONWEALTH ASSISTANCE
SHALL BE LISTED FIRST AND NO LESS PROMINENTLY THAN ANY OTHER SOURCE.
02100 - SITE CLEARING AND PREPARATION
1.
2.
3.
4.
5.
CLEAR SECTIONS OF EXISTING PAVING SURFACES AS REQUIRED BY THIS CONSTRUCTION.
REMOVE ALL BUSHES, TREES AND ROOTS, TREES ALONG THE SITE BOUNDARIES AS CALLED
OUT OR AS REQUIRED BY THIS CONSTRUCTION AND ANY MISCELLANEOUS JUNK
ACCUMULATED ON THE PROPERTY.
CONFIRM ALL TREES (4" CALIPER OR GREATER) REQUIRED OR SCHEDULED FOR REMOVAL
WITH OWNER PRIOR TO REMOVAL. DISPOSE IN LEGAL FASHION.
IF REQUIRED BY THE PROJECT PARAMETERS, RETAIN AND PAY FOR A REGISTERED
PROFESSIONAL LAND SURVEYOR OR REGISTERED CIVIL ENGINEER TO LOCATE THE
EXISTING PROPERTY LINES AND CORNERS AND REESTABLISH TOPOGRAPHIC ELEVATIONS
BASED ON THE SUBMITTED SURVEY. ESTABLISH APPROPRIATE AND ACCURATE
BENCHMARKS IN THE FIELD THAT WILL BE USED BY ALL TRADES AS REQUIRED TO
ESTABLISH AND CONFIRM ELEVATIONS PER THE DRAWINGS.
ESTABLISH AND COMMUNICATE A CONSTRUCTION ENTRANCE PATH TO THE SITE AND AS
APPROVED BY THE OWNER AND ARCHITECT TO ALL WORKERS, SUB-CONTRACTORS AND
TRADESPERSONS FOR USE THROUGHOUT THE CONSTRUCTION. COORDINATE THIS ZONE
WITH NEW UNDERGROUND UTILITIES AND PREVENT DAMAGE TO ALL MUNICIPAL AND
NEIGHBORING PROPERTIES.
02200 - EARTHWORK
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
GENERAL:
A. EXCAVATE, BACKFILL, COMPACT, AND GRADE THE SITE TO THE ELEVATIONS SHOWN ON THE
DRAWINGS, AS SPECIFIED HEREIN, AND AS NEEDED TO MEET THE REQUIREMENTS OF THE
CONSTRUCTION SHOWN IN THE CONTRACT DOCUMENTS.
B. COORDINATE WITH PA ONE-CALL, UTILITY COMPANIES AND AGENCIES AS REQUIRED.
C. FOLLOW ALL CITY AND COUNTY PROCEDURES EROSION AND SEDIMENTATION CONTROL.
D. TREAT THE GROUND WITH A FIPRONIL-BASED GROUND TREATMENT - TERMIDOR OR
EQUIVALENT. (SEE PLACING AND COMPACTING BELOW)
EXCAVATING: PERFORM EXCAVATING OF EVERY TYPE OF MATERIAL ENCOUNTERED WITHIN THE
LIMITS OF THE WORK TO THE LINES, GRADES, AND ELEVATIONS INDICATED AND SPECIFIED
HEREIN. TRANSPORT TO, AND PLACE IN, FILL OR EMBANKMENT AREAS WITHIN THE LIMITS OF THE
WORK.
SURPLUS MATERIALS: DISPOSE OF CLEAN EXCAVATED MATERIALS ON SITE AS DIRECTED BY
OWNER. GRADING PLAN ON DRAWINGS DOES NOT NECESSARILY INDICATE DISTRIBUTION OF
EXCESS MATERIAL BUT HAS BEEN DESIGNED TO BALANCE CUT AND FILL AS CLOSELY AS
POSSIBLE.
EXCAVATION OF ROCK:
A. WHERE ROCKS, BOULDERS, GRANITE, SHALE, OR SIMILAR MATERIAL IS ENCOUNTERED, AND
WHERE SUCH MATERIAL CANNOT BE REMOVED OR EXCAVATED BY CONVENTIONAL EARTH
MOVING OR RIPPING EQUIPMENT, CONTACT THE ARCHITECT AND SEEK DIRECTION FOR
ESTABLISHING AN APPROVED ADDITIONAL COST.
B. UPON ACCEPTANCE OF THE ADDITIONAL COST, TAKE REQUIRED STEPS TO PROCEED WITH
THE GENERAL GRADING OPERATIONS OF THE WORK, AND REMOVE OR EXCAVATE SUCH
MATERIAL BY MEANS WHICH WILL NOT ENDANGER BUILDINGS OR STRUCTURES WHETHER ON OR
OFF THE SITE.
C. DO NOT USE EXPLOSIVES WITHOUT WRITTEN PERMISSION FROM THE ARCHITECT.
STABILITY OF EXCAVATIONS:
A. SLOPE SIDES OF EXCAVATIONS TO 1:1 OR FLATTER, UNLESS OTHERWISE DIRECTED BY THE
ARCHITECT.
B. SHORE AND BRACE WHERE SLOPING IS NOT POSSIBLE BECAUSE OF SPACE RESTRICTIONS OR
STABILITY OF THE MATERIALS BEING EXCAVATED.
C. MAINTAIN SIDES AND SLOPES OF EXCAVATIONS IN A SAFE CONDITION UNTIL COMPLETION OF
BACKFILLING.
EXCAVATE, BACKFILL AND COMPACT WORK PROVIDED AND INSTALLED BY ELECTRICAL AND
PLUMBING CONTRACTORS.
SOIL MATERIALS: FILL AND BACKFILL MATERIALS:
A. SOIL: PROVIDE SOIL MATERIALS FREE FROM SNOW, ICE, FROZEN MATERIALS, ORGANIC
MATTER AND DELETERIOUS SUBSTANCES, CONTAINING NO ROCKS OR LUMPS OVER 6" IN
GREATEST DIMENSION, AND WITH NOT MORE THAN 15% OF THE ROCKS OR LUMPS LARGER THAN
2-3/8" IN THEIR GREATEST DIMENSION.
B. COMPACTED GRANULAR FILL (AGGREGATE): PENNSYLVANIA DEPARTMENT OF
TRANSPORTATION DESIGNATION COARSE AGGREGATE 2A.
C. DO NOT PERMIT ROCKS HAVING A DIMENSION GREATER THAN 1" IN THE UPPER 12" OF FILL OR
EMBANKMENT.
D. COHESIONLESS MATERIAL IS USED FOR STRUCTURAL BACKFILL: PROVIDE SAND FREE FROM
ORGANIC MATERIAL AND OTHER FOREIGN MATTER, AND AS APPROVED BY A GEOTECHNICAL
ENGINEER.
PLACING AND COMPACTING:
A. PLACE BACKFILL AND FILL MATERIALS IN LAYERS NOT MORE THAN 8" IN LOOSE DEPTH FOR
MATERIALS TO BE COMPACTED BY HEAVY EQUIPMENT. ALL FILL MATERIAL COMPACTED WITH
LIGHTWEIGHT COMPACTION EQUIPMENT, SUCH AS HAND-OPERATED TAMPERS OR WALK BEHIND
ROLLERS, SHOULD BE PLACED IN LOOSE LAYERS NOT EXCEEDING 6" THICK.
B. BEFORE COMPACTING, MOISTEN OR AERATE EACH LAYER AS NECESSARY TO PROVIDE THE
OPTIMUM MOISTURE CONTENT.
C. COMPACT EACH LAYER TO REQUIRED PERCENTAGE OF MAXIMUM DENSITY FOR AREA.
D. DO NOT PLACE BACKFILL OR FILL MATERIAL ON SURFACES THAT ARE MUDDY, FROZEN, OR
CONTAINING FROST OR ICE.
E. TAKE CARE TO PREVENT WEDGING ACTION OF BACKFILL AGAINST STRUCTURES BY CARRYING
THE MATERIALS UNIFORMLY AROUND THE STRUCTURE TO APPROXIMATELY THE SAME
ELEVATION IN EACH.
F. ALL GROUND AREA UNDER INTERIOR SLABS SHALL BE COVERED WITH A PENNSYLVANIA
APPROVED TERMITE CONTROL APPLICATION WITH A FIVE YEAR GUARANTEE. THE FINISH GRADE
AROUND THE STRUCTURE SHALL BE SIMILARLY TREATED. GIVE FIVE YEARS WARRANTY TO
OWNER.
COMPACTING:
A. CONTROL SOIL COMPACTION DURING CONSTRUCTION TO PROVIDE THE MINIMUM
PERCENTAGE OF DENSITY SPECIFIED FOR EACH AREA AS DETERMINED ACCORDING TO ASTM D
1557.
B. PROVIDE NOT LESS THAN THE FOLLOWING MAXIMUM DENSITY OF SOIL MATERIAL COMPACTED AT OPTIMUM MOISTURE CONTENT FOR THE ACTUAL DENSITY OF EACH LAYER OF SOIL MATERIAL
IN PLACE, AND AS APPROVED BY THE PROJECT GEOTECHNICAL ENGINEER (SEE ABOVE).
1). THE UPPER ONE (1) FOOT OF FILL REQUIRED TO ACHIEVE SUBGRADE LEVELS WITHIN THE
DESIGNATED FUTURE PAVEMENT AREAS SHOULD BE COMPACTED TO AT LEAST 100% OF THE
LABORATORY MAXIMUM DRY DENSITY, ± 3% OF THE OPTIMUM MOISTURE CONTENT AS
DETERMINED BY THE STANDARD PROCEDURE METHOD (ASTM D 1557).
2). PLACE ALL OTHER FILLS AND BACKFILLS IN LEVEL, LOOSE LIFTS HAVING A MAXIMUM
THICKNESS AS LIMITED ABOVE AND COMPACT TO AT LEAST 95% OF THE MAXIMUM DRY DENSITY, WITHIN ± 3% OF THE OPTIMUM MOISTURE CONTENT, AS DETERMINED BY THE STANDARD
PROCEDURE METHOD (ASTM D 1557).
MOISTURE CONTROL:
A. WHERE SUBGRADE OR LAYER OF SOIL MATERIAL MUST BE MOISTURE CONDITIONED BEFORE
COMPACTING, UNIFORMLY APPLY WATER TO SURFACE OF SUBGRADE OR LAYER OF SOIL
MATERIAL TO PREVENT FREE WATER APPEARING ON SURFACE DURING OR SUBSEQUENT TO
COMPACTING OPERATIONS.
B. REMOVE AND REPLACE, OR SCARIFY AND AIR DRY, SOIL MATERIAL THAT IS TOO WET TO
PERMIT COMPACTING TO THE SPECIFIED DENSITY.
C. SOIL MATERIAL THAT HAS BEEN REMOVED BECAUSE IT IS TOO WET TO PERMIT COMPACTING
MAY BE STOCKPILED OR SPREAD AND ALLOWED TO DRY. ASSIST DRYING BY DISCING,
HARROWING, OR PULVERIZING UNTIL MOISTURE CONTENT IS REDUCED TO A SATISFACTORY
VALUE AS DETERMINED BY MOISTURE DENSITY RELATION TESTS APPROVED BY THE
GEOTECHNICAL ENGINEER.
MAINTENANCE:
A. PROTECTION OF NEWLY GRADED AREAS. PROTECT NEWLY GRADED AREAS FROM TRAFFIC
AND EROSION, AND KEEP FREE FROM TRASH AND WEEDS;
B. REPAIR AND REESTABLISH GRADES IN SETTLED, ERODED, AND RUTTED AREAS TO THE
SPECIFIED TOLERANCES.
01030 - ALTERNATES
1.
2.
PROVIDE ALTERNATIVE BID PROPOSALS AS DESCRIBED IN THIS SECTION AND/OR AS ARE
INDICATED ON THE DRAWINGS.
PROCEDURES:
A. PROVIDE ALTERNATIVE BIDS TO BE ADDED TO OR DEDUCTED FROM THE AMOUNT OF THE
BASE BID IF THE CORRESPONDING CHANGE IN SCOPE IS ACCEPTED BY THE OWNER.
B. INCLUDE WITHIN THE ALTERNATIVE BID PRICES ALL COSTS, INCLUDING PROVIDING ALL
MATERIALS, INSTALLATION, AND FEES TO COMPLETE THE INTENDED WORK.
C. SHOW THE PROPOSED ALTERNATIVE AMOUNTS OPPOSITE THEIR PROPER DESCRIPTION
ON THE BID FORM.
01152 - APPLICATION FOR PAYMENT
1.
2.
3.
4.
5.
6.
7.
8.
COMPLY WITH PROCEDURES DESCRIBED IN THIS SECTION (AND THE BID INVITATION) WHEN
APPLYING FOR PROGRESS PAYMENT AND FINAL PAYMENT UNDER THE CONTRACT.
SUBMIT APPLICATION OF PAYMENT ON AIA DOCUMENT G702, LATEST VERSION, WITH G703
CONTINUATION SHEET.
ELECTRONIC SUBMISSION (PDF) TO THE ARCHITECT OF THE ORIGINAL DOCUMENT IS
PERMISSABLE.
THE ARCHITECT'S APPROVAL OF APPLICATIONS FOR PROGRESS PAYMENT AND FINAL
PAYMENT MAY BE CONTINGENT UPON THE ARCHITECT'S APPROVAL OF STATUS OF PROJECT
RECORD DOCUMENTS AS DESCRIBED IN SECTION 01000 OF THESE SPECIFICATIONS.
PRIOR TO START OF CONSTRUCTION, SECURE THE ARCHITECT'S APPROVAL OF THE
SCHEDULE OF VALUES REQUIRED TO BE SUBMITTED UNDER THE GENERAL CONDITIONS,
DURING PROGRESS OF THE WORK, MODIFY THE SCHEDULE OF VALUES AS APPROVED BY
THE ARCHITECT TO REFLECT CHANGES IN THE CONTRACT SUM DUE TO CHANGE ORDER OR
OTHER MODIFICATIONS OF THE CONTRACT.
BASE REQUESTS FOR PAYMENT ON THE APPROVED SCHEDULE OF VALUES AS APPROVED
BY THE ARCHITECT.
SIGN AND NOTARIZE THE APPLICATION AND CERTIFICATE FOR PAYMENT.
01610 - SUBSTITUTIONS
1.
2.
3.
4.
5.
6.
SUBSTITUTIONS - PRIOR TO RECEIPT OF BID - ARE SPECIFIED IN THE INSTRUCTIONS TO
BIDDERS AND ON THE BID FORM.
AVAILABILITY OF SPECIFIED ITEMS:
A. VERIFY PRIOR TO SUBMITTAL THAT SPECIFIED ITEMS WILL BE AVAILABLE IN TIME FOR
INSTALLATION DURING ORDERLY AND TIMELY PROGRESS OF THE WORK. IF ITEMS
SPECIFIED WILL NOT BE SO AVAILABLE, NOTIFY THE ARCHITECT IMMEDIATELY.
B. SUBCONTRACTORS AND SUPPLIERS SHALL MAKE ALL REQUESTS FOR APPROVAL
THROUGH THE CONTRACTOR.
C. CONTRACTOR SHALL ARRANGE FOR THE ORDERING OF MATERIALS (AFTER APPROVED
SUBMITTALS) IN SUCH A MANNER TO AVOID KNOWN DELAYS - EVEN IF IT REQUIRES
ORDERING EARLIER THAN CUSTOMARY.
SUBSTITUTION PROCEDURE AFTER AWARD OF CONTRACT:
REQUESTS PROPOSED BY THE CONTRACTOR AFTER THE AWARD OF THE CONTRACT AND
METHODS OF CONSTRUCTION REQUIRED BY THE CONTRACT DOCUMENTS WILL BE
CONSIDERED BY THE ARCHITECT ONLY UNDER ONE OF THE FOLLOWING CONDITIONS:
A. WHEN SPECIFIED PRODUCT IS NOT AVAILABLE OR NO LONGER MANUFACTURED.
B. WHEN A GUARANTEE OF PERFORMANCE IS REQUIRED AND, IN THE JUDGMENT OF THE
CONTRACTOR, SPECIFIED PRODUCT OR PROCESS WILL NOT PRODUCE THE DESIRED
RESULTS, AND WHERE THE CONTRACTOR CERTIFIES THAT THE PROPOSED SUBSTITUTION
PROVIDES THE REQUIRED WARRANTY.
C. THE SPECIFIED PRODUCT OR METHOD OF CONSTRUCTION CANNOT RECEIVE NECESSARY
APPROVAL BY A GOVERNING AUTHORITY, AND THE REQUESTED SUBSTITUTION CAN BE
APPROVED.
D. THE SPECIFIED PRODUCT OR METHOD OF CONSTRUCTION CANNOT BE PROVIDED IN A
MANNER THAT IS COMPATIBLE WITH OTHER MATERIALS, AND WHERE THE CONTRACTOR
CERTIFIES THAT THE SUBSTITUTION WILL OVERCOME THE INCOMPATIBILITY.
ACCOMPANY REQUEST FOR SUBSTITUTION WITH SUCH DRAWINGS, SPECIFICATIONS,
SAMPLES, MANUFACTURER'S LITERATURE, PERFORMANCE DATA, AND OTHER INFORMATION
NECESSARY TO DESCRIBE AND EVALUATE THE PROPOSED SUBSTITUTION AND COMPARE IT
TO THE SPECIFIED PRODUCT COMPLETELY.
THE BURDEN OF PROOF SHALL BE ON THE CONTRACTOR.
AGREEMENT TO MAKE SUBSTITUTION SHALL NOT RELIEVE CONTRACTOR, SUBCONTRACTOR,
MANUFACTURER, FABRICATOR, OR SUPPLIER FROM RESPONSIBILITY FOR ANY DEFICIENCY
THAT MAY EXIST IN THE SUBSTITUTED PRODUCT, OR FOR ANY DEPARTURES OR DEVIATIONS
FROM THE REQUIREMENTS OF THE CONTRACT DOCUMENTS AS MODIFIED BY SUCH
CHANGE. CONTRACTOR SHALL BE DEEMED TO WARRANT BY HIS REQUEST THAT THE
PROPOSED SUBSTITUTE PRODUCT WILL SATISFY ALL STANDARDS AND REQUIREMENTS
SATISFIED BY THE ORIGINALLY SPECIFIED PRODUCT, AND THAT AGREEMENT TO THE
CHANGE SHALL NOT BE DEEMED TO MODIFY CONTRACT DOCUMENTS WITH RESPECT
THERETO.
IF ANY SUBSTITUTION WILL AFFECT A CORRELATED FUNCTION, ADJACENT CONSTRUCTION,
OR THE WORK OF OTHER TRADES OR CONTRACTORS, NECESSARY CHANGES AND
MODIFICATIONS TO AFFECTED WORK SHALL BE CONSIDERED AS AN ESSENTIAL PART OF
THE PROPOSED SUBSTITUTION, TO BE ACCOMPLISHED BY CONTRACTOR AT HIS EXPENSE.
SUBMIT, FOR APPROVAL, FIELD DRAWINGS SHOWING NECESSARY CHANGES OR
MODIFICATIONS TO BE AFFECTED INCLUDING THOSE WHICH REQUIRE STRUCTURAL
CHANGES, BUILDING CHANGES, OR EQUIPMENT CHANGES
01300 - ADMINSTRATIVE REQUIREMENTS
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
CONTRACTOR USE OF THE PREMISES: BEFORE BEGINNING WORK, SECURE APPROVAL FROM
OWNER (OR THE CITY) AREAS PERMITTED FOR THE FOLLOWING:
A. SITE ACCESS AND PERSONNEL PARKING, MATERIAL STORAGE AND DUMPSTERS
B. LOCATION OF CRANES, HOISTS AND CHUTES
C. LOCATION OF TEMPORARY SANITARY FACILITIES AND UTILITY HOOKUPS
SEE GENERAL SITE AND BUILDING OPERATION NOTES ON THE COVER SHEET
INSURANCE: BEFORE COMMENCING ANY WORK, PROVIDE TO THE OWNER SATISFACTORY
EVIDENCE OF COVERAGE IN THE AMOUNTS SPECIFIED, OR IN THE ABSENCE OF SPECIFIED
REQUIREMENTS, AMOUNTS SUITABLE FOR THE PROJECT FOR:
A. BUILDER'S RISK INSURANCE
B. WORKMAN'S COMPENSATION INSURANCE
FROM THE DATE THAT WORK COMMENCES UNTIL COMPLETION AND ACCEPTANCE OF WORK,
ASSUME FULL RESPONSIBILITY FOR MAINTAINING THE AFFECTED BUILDING SECURE AND WEATHER
TIGHT AFTER CONSTRUCTION HAS PROCEEDED TO ENCLOSE AND SECURE THE BUILDING.
THE CONTRACTOR SHALL PROVIDE AND MAINTAIN SAFEGUARDS AS REQUIRED TO PREVENT INJURY
TO THE WORKMEN, OWNER, ARCHITECT, VISITORS, AND DELIVERY PERSONNEL. MAINTAIN
PROTECTED INGRESS AND EGRESS TO THE SITE AT ALL TIMES. ERECT SUCH BARRIERS TO
PROTECT THE PUBLIC AND NOT CREATE AN “ATTRACTIVE NUISANCE”. ALL OSHA AND OTHER
SAFETY REQUIREMENTS SHALL BE THE SOLE RESPONSIBILITY OF THE G.C.
THE CONTRACTOR SHALL PROVIDE AN EXPERIENCED, JOB SUPERINTENDENT WHO WILL OVERSEE
CONSTRUCTION.
MATERIAL HANDLING - G.C. MUST PROVIDE -
A. A SAFE, CLIMATE CONTROLLED BUILDING AND SUBFLOOR FOR ALL SPACES
B. A SECURE STORAGE AREA THAT IS MAINTAINED PERMANENTLY OR TEMPORARILY AT AMBIENT
TEMPERATURE AND HUMIDITY PER MATERIAL MANUFACTURERS
C. A PROTECTED INSTALLATION AREA PER MANUFACTURER'S SPECFICATIONS
INTENT, PURPOSE, AND INTERPRETATION OF DRAWINGS AND SPECIFICATIONS:
A. IN THE CASE OF AN ERROR OR INCONSISTENCY, SPECIFICATIONS SHALL TAKE PRECEDENCE
OVER DRAWINGS. FIGURED DIMENSIONS SUPERSEDE SCALED ONES.
B. CONTRACTOR, ARCHITECT OR OWNER SHALL TAKE NO ADVANTAGE OF, AND SHALL PROMPTLY
CALL TO THE ARCHITECT'S ATTENTION TO ANY ERROR, OMISSION OR INCONSISTENCY IN/OR
BETWEEN THE DRAWINGS AND SPECIFICATIONS.
PRE-CONSTRUCTION CONFERENCE: PRIOR TO COMMENCEMENT OF THE WORK, REPRESENTATIVES
OF THE ARCHITECT AND OWNER WILL MEET WITH THE CONTRACTOR, HIS SUPERINTENDENT OR
FOREMAN WHO WILL BE ENGAGED FULL TIME ON THE PROJECT WITH SUBCONTRACTORS, TO
REVIEW THE ADMINISTRATIVE REQUIREMENTS, MATERIALS AND PROCEDURES TO BE FOLLOWED IN
PERFORMING THE WORK.
PROGRESS (JOB OR OAC) MEETINGS: THE CONTRACTOR AND ANY SUBCONTRACTORS, MATERIAL
SUPPLIERS, OR VENDORS WHOSE PRESENCE IS NECESSARY OR REQUESTED MUST ATTEND
MEETINGS (REFERRED TO AS PROGRESS OR JOB MEETINGS) WHEN CALLED BY THE ARCHITECT,
CONTRACTOR OR OWNER AT DESIGNATED INTERVALS FOR THE PURPOSE OF DISCUSSING THE
EXECUTION OF THE WORK. EACH OF SUCH MEETINGS WILL BE HELD AT THE SITE OR A TIME AND
PLACE AGREED TO BY THE ARCHITECT, OWNER AND THE CONTRACTOR OR THEIR
REPRESENTATIVES.
CONSTRUCTION SCHEDULE:
A. WITHIN TEN (10) DAYS OF THE CONTRACT SIGNING THE G.C. SHALL PREPARE A CONSTRUCTION
SCHEDULE FOR THE OWNER'S REVIEW.
B. THE CONTRACTOR AND ALL SUBCONTRACTORS, SUPPLIERS, AND MANUFACTURERS SHALL
SCHEDULE THE WORK TO CONFORM TO THE CONSTRUCTION SCHEDULE.
C. SUBMIT REVISIONS TO THE SCHEDULE AS CONSTRUCTION PROCEEDS NOTING MAJOR
DIFFERENCES TO THE SCHEDULE.
D. A DELAY TO SUBMIT A SCHEDULE AS STATED COULD DELAY THE RELEASE OF PAYMENT(S).
SUBMITTALS: SUBMIT THE FOLLOWING:
A. PRODUCT DATA: SUBMIT ENTIRE CATALOG OR BROCHURE, NOT JUST A SINGLE CUT-SHEET.
INDICATE THE EXACT PRODUCT TO BE USED.
B. SAMPLES: WHEN REQUESTED, SAMPLES SHALL BE THE PRECISE ARTICLE PROPOSED TO BE
FURNISHED.
C. SHOP DRAWINGS: UNLESS OTHERWISE DIRECTED, MAKE ALL SHOP DRAWINGS ACCURATELY TO A SCALE SUFFICIENTLY LARGE TO SHOW ALL PERTINENT FEATURES INCLUDING CONNECTIONS TO THE WORK. SUBMIT ELECTRONICALLY IN PDF FORMAT NO PAPER COPIES. EACH SUBMITTAL MUST
BE NUMBERED CONSECUTIVELY WITH THE GENERAL CONTRACTOR'S LETTERHEAD/TRANSMITTAL.
THE ARCHITECT WILL MARK UP ONE (1) SET AND RETURN COPIES ELECTRONICALLY TO THE
CONTRACTOR.
D. COLORS:
1). WHERE COLORS ARE NOT SPECIFICALLY DESCRIBED IN THE CONTRACT DOCUMENTS AND A
CHOICE OF COLOR OR PATTERNS IS AVAILABLE IN A PRODUCT, SUBMIT ACCURATE COLOR AND/OR
PATTERN CHARTS FOR ARCHITECT'S REVIEW.
2). INCLUDE RELATIVE COSTS OF COLORS AND PATTERNS IF THEY VARY.
E. MANUALS, CONTENTS: MANUALS SHALL CONTAIN AT LEAST THE FOLLOWING ITEMS:
1). COMPLETE MANUFACTURERS' INSTRUCTIONS REGARDING MAINTENANCE OF EQUIPMENT,
PRODUCTS, ETC.
2). COMPLETE NOMENCLATURE OF ALL REPLACEABLE PARTS, THEIR PART NUMBERS, AND NAME
AND ADDRESS OF NEAREST VENDOR.
3). COPY OF ALL GUARANTEES AND WARRANTEES ISSUED.
CHANGES TO THE WORK: (CHANGE ORDER REQUESTS AND CHANGE ORDERS)
A. CONTRACTORS SHALL NOT CONSTRUE ANY CORRESPONDENCE OR VERBAL COMMUNICATIONS
WITH OR BY THE ARCHITECT, OR HIS REPRESENTATIVE AS AUTHORIZATION FOR "EXTRA"
CONSTRUCTION PAYMENT. SUBMIT IN WRITING TO THE ARCHITECT ALL CHANGE ORDER REQUESTS
(C.O.R.) FOR ADDITIONS TO THIS CONTRACT FOR CONSIDERATION BY THE OWNER'S
REPRESENTATIVE. WORK PERFORMED WITHOUT WRITTEN APPROVAL OF THE OWNER AND
ARCHITECT WILL BE AT THE CONTRACTOR'S SOLE RESPONSIBILITY.
B. PROCESSING CHANGES INITIATED BY THE OWNER - SHOULD THE OWNER CONTEMPLATE MAKING A CHANGE IN THE WORK OR A CHANGE IN THE CONTRACT TIME OF COMPLETION, THE ARCHITECT WILL ISSUE EITHER THE ARCHITECT'S SUPPLEMENTAL INSTRUCTIONS OR A PROPOSAL REQUEST
TO THE CONTRACTOR. THE SUPPLEMENTAL INSTRUCTIONS AND PROPOSALS WILL DESCRIBE THE
CONTEMPLATED CHANGE, AND WILL CARRY ONE OF THE FOLLOWING INSTRUCTIONS TO THE
CONTRACTOR:
1) MAKE THE DESCRIBED CHANGE IN THE WORK AT NO CHANGE IN THE CONTRACT SUM AND NO
CHANGE IN THE CONTRACT TIME OF COMPLETION; (SUPPLEMENTAL INSTRUCTION ONLY)
2) MAKE THE DESCRIBED CHANGE IN THE WORK, CREDIT OR COST FOR WHICH WILL BE EVALUATED
BY THE ARCHITECT AND OWNER (PROPOSAL REQUEST)
3) PROMPTLY ADVISE THE ARCHITECT AS TO CREDIT OR COST PROPOSED FOR THE DESCRIBED
CHANGE. THIS IS NOT AN AUTHORIZATION TO PROCEED WITH THE CHANGE. (PROPOSAL REQUEST)
4) NO CHANGES WILL BE ACCEPTED WITHOUT THE ARCHITECT'S AND OWNER'S APPROVAL OF THE
CONTRACTOR'S REQUEST FOR CHANGE ORDER (RFCO).
C. PROCESSING CHANGES INITIATED BY THE CONTRACTOR - SHOULD THE CONTRACTOR DISCOVER
A DISCREPANCY AMONG THE CONTRACT DOCUMENTS, A CONCEALED CONDITIONS, OR OTHER
CAUSE FOR SUGGESTING A CHANGE IN THE WORK, A CHANGE IN THE CONTRACT SUM, OR A
CHANGE IN THE CONTRACT TIME OF COMPLETION, THEY SHALL NOTIFY THE ARCHITECT AS
REQUIRED BY PERTINENT PROVISIONS OF THE CONTRACT DOCUMENTS. NO CLAIMS FOR EXTRA
TIME OR WORK SHALL BE HONORED WITH OUT A WRITTEN CHANGE ORDER, APPROVED BY THE
OWNER AND THE ARCHITECT, PRIOR TO THE EXECUTION OF THE SAID CLAIM. UPON AGREEMENT BY
THE ARCHITECT THAT THERE IS REASONABLE CAUSE TO CONSIDER THE CONTRACTOR'S
PROPOSED CHANGE, THE ARCHITECT WILL RECOMMEND TO THE OWNER APPROVAL OF THE
REQUEST FOR CHANGE ORDER, PROMPTING A FORMAL CHANGE ORDER ISSUED TO ALL PARTIES
FOR SIGNATURE.
D. PROCESSING CHANGE ORDERS
1) CHANGE ORDERS WILL BE DATED AND WILL BE NUMBERED IN SEQUENCE.
2) THE CHANGE ORDER WILL DESCRIBE THE CHANGE OR CHANGES (BASED ON APPROVED CHANGE ORDER REQUESTS), WILL REFER TO THE PROPOSAL OR PROPOSALS INVOLVED (C.O.R.), AND WILL
BE SIGNED BY THE CONTRACTOR, OWNER AND THE ARCHITECT.
GUARANTEE:
A. CONTRACTOR SHALL SUBMIT A LETTER TO THE OWNER GUARANTEEING THE WORK IN ITS
14.
15.
16.
17.
18.
19.
20.
21.
ENTIRETY FOR A PERIOD OF ONE (1) YEAR, UNLESS SPECIFICALLY STATED ELSEWHERE IN THE
PROJECT MANUAL TO BE IN EXCESS OF ONE YEAR.
B. THE…
This is the start of the file's text. The full file is on GovTribe.