This document is a Commonwealth of Pennsylvania Department of Community & Economic Development (DCED) MBE/WBE Section 3 Contract Solicitation and Commitment Statement for the Historic Gallatin School Living Centre Preservation - Phase 2 project in Uniontown, PA. The project involves renovation and preservation work for City Mission Living Stones, Inc., with bids to be received until 3:00 PM on October 28th, 2025. Phase 2A specifically includes site work, paving, walks, landscaping, minor interior drywall, painting, electrical work, and window demolition and replacement. Bids must be submitted with a bidder's bond or certified/cashier's check for 10% of the total bid amount, and no bid may be withdrawn for 60 days.
The project is funded through the Redevelopment Assistance Capital Program (RACP) and emphasizes Section 3 employment requirements, which mandate hiring local residents, particularly low-income individuals. The document includes detailed workforce needs tracking and definitions of Section 3 residents and business concerns, with minimum participation levels of 5% for Minority-Owned Businesses (MBE) and 3% for Women-Owned Businesses (WBE). Contractors must demonstrate a good faith effort to employ local residents and provide documentation of solicited and unsolicited quotes from minority and women-owned businesses. Failure to meet these requirements or provide proper documentation may result in bid rejection.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Commonwealth of Pennsylvania
Department of Community & Economic Dev.
DCED-CCD-286 Attachment B
MBE/WBE SECTION 3 CONTRACT SOLICITATION AND COMMITMENT STATEMENT
(8) NOTE: List those certified minority/women owned businesses from which you solicited quotes or which contacted you and gave you quotes in regard to this invitation for bid. Bidder’s contract with
Subcontractors and suppliers should be at least five days prior to the bid opening date.
*(3) COMPANY
NAME EIN/SSN
TELEPHONE NUMBER
(4)
MBE
(X)
(4)
WBE
(X)
(4)
Sec. 3
(X)
(5)
TYPE OF CONSTRUCTION,
EQUIPMENT, SERVICES AND/OR
SUPPLIES TO BE PROVIDED TO THE
PROJECT
(6)
TOTA
L
DOLLAR AMOUNT
OF
* (7) TOTAL
COMMITMENT
DOLLAR
AMOUNT
(9) NOTE Minimum Levels (MPL): MBE-5%, WBE-3%
A presumption of responsibility may be made if the dollar commitment of MBE/WBE reflects this minimum participation level.
Use additional sheets if necessary.
(10) Prepared By:
Telephone Number/E-mail Address:
(1) Name of Bidder (2) IFB Number
Address Bid Opening Date
Telephone Number Contact Person
EXPLANATION OF
COLUMN ITEMS
(MBE/WBE Section 3 Contract Solicitation and Commitment Statement)
1. Provide your company name, address, telephone number.
2. Provide the Invitation for Bid (IFB) number, if available, bid opening date and bidder’s contact person.
3. Company’s name, Employer Identification Number (EIN) or Social Security Number (SSN) and telephone number with area code. Name and contact number are mandatory items.
4. Indicate whether or not the firm is a Section 3, Minority Owned Business or a Women Owned Business. Place a check mark in the appropriate column.
5. Indicate type of work to be performed and/or material to be supplied.
6. Enter the total dollar amount of the quote received.
7. Enter the dollar amount of the commitment which you have made to the firm. If no amount is provided in this space, it will be presumed that your firm made no commitment.
8. NOTE: You must include information on both solicited and unsolicited quotes. Failure to include a firm providing solicited or unsolicited quotes may result in the rejection of the bid.
Five days is a guide. However, adequate time must be provided for subcontractors and suppliers to respond to bids.
9. NOTE: If the minimum participation levels for this project are not achieved, you must provide a written explanation on this on a separate sheet explaining the failure to achieve the MPL. Failure to provide this explanation will result in rejection of the bid as non-responsive.
10. Indicate the name and title of the person(s) who prepared form, along with an e-mail address.
*KEY NOTE: Mandatory Items: Failure to provide mandatory items will result in rejection of the bid as non-responsive. These items appear in Columns 3, 4 and 8.
Commonwealth of Pennsylvania
Department of Community and Economic Development
Center for Community Development
Section 3 Work Force Needs Table – Employees
Occupation
Category
(1)
Approximate
Number of Skilled
Employees Required
Total Number of
Skilled
Employees
Presently on
Payroll
Total Number of
Skilled
Employees to be Hired
Total Number of
Section 3
Residents to be
Hired
TOTALS
(1) The following occupational category classifications may be used above.
1. Accounting
2. Architecture
3. Appliance repair
4. Bookkeeping
5. Bricklaying
6. Carpentry
7. Carpet Installation
8. Catering 9.
Cement/Masonry 10.
Computer/Info
11. Demolition 12.
Drywall
13. Electrical
14. Elevator Construction
15. Engineering
16. Fencing
17. Florists
18. Heating
19. Iron Works
20. Janitorial
21. Landscaping
22. Machine Operation
23. Manufacturing
24. Marketing
25. Painting
26. Payroll
27. Plastering
28. Plumbing
29. Printing
30. Research
31. Surveying
32. Tile setting
33.Transportation
34. Word processing
Employment Certification
A. The Contractor hereby certifies that the above table represents the approximate number of employees positions that are needed and which are not presently filled by regular and permanent employees, and which will require new employees in the execution of the
Contract and also represents the number o f Section 3 project area residents that the contractor proposes to make a good faith effort to employ.
B. The Contractor certifies that it will make a good faith effort to employ the number of
Section 3 residents stated above.
C. The contractor, prior to subcontracting any portion of the work covered by this contract will require a
Work Force Needs Table to be prepared and certification similar to paragraphs A., B., and C. to be executed.
Please note: If the contractor is fully staffed and will not need additional employees it should indicate such by submitting a letter explaining that if employees are required at a later time an effort will be made to employ section 3 residents. The letter should also explain the procedures taken to solicit Section 3 Residents.
SECTION 3 DEFINITIONS
Section 3 Business Concern - means a business concern:
1. That is 51 percent or more owned by Section 3 residents; or
2. Whose permanent, full-time employees include persons, at least 30 percent of whom are currently Section 3 residents, or within three years of the date of first employment were Section 3 residents; or
3. That provides evidence of a commitment to subcontract in excess of 25 percent of the dollar award of all subcontracts to be awarded to business concerns that meet the qualifications set forth in (1) or
(2) above.
Section 3 Resident - means
1. A public housing resident; or
2. An individual who resides in the metropolitan area or non-metropolitan county in which the Section 3 covered assistance is expended, and who is:
a) A low-income person, as this term is defined in Section 3(b)(2) of the 1937 Act [42 U.S.C. 1437a(b)(2)]. Section 3 (b)(2) of the 1937 Act defines this term to mean families (including single persons) whose incomes do not exceed 80 per centum of the median income for the area, as determined by the Secretary, with adjustments for smaller and larger families, except that the
Secretary may establish income ceilings higher or lower than 80 per centum of the median for the area on the basis of the
Secretary’s findings that such variations are necessary because of prevailing levels of construction costs or unusually high or low-income families; or
b) A very low-income person, as this term is defined in Section 3(b)(2) of the 1937 Act [42 U.S.C. 1437a(b)(2)] defines this term to mean families (including single persons) whose incomes do not exceed 50 per centum of the median income for the area, as determined by the Secretary, with adjustments for smaller and larger families, except that the Secretary may establish income ceilings higher or lower than 50 per centum of the median for the area on the basis of the Secretary’s findings that such variations are necessary because of unusually high- or low-income families.
NOTE: Specific median family income levels are available from the
Redevelopment Authority A person seeking the training and employment preference provided by Section 3 bears the responsibility of providing evidence (if requested) that the person is eligible for the preference.
Service Area - means the geographical area in which the persons benefiting from the Section 3 covered Project reside. The service area shall not extend beyond the unit of County government in which the Section
3 covered assistance is expended.