About this file
This is a specification document for Section 02010 (Maintenance and Protection of Traffic During Construction) applicable to Douglass Township in Montgomery County, Pennsylvania for the County Line Road Bridge Replacement Project. The specification outlines the contractor's responsibilities for maintaining safe traffic flow and protecting the public during construction activities. Key requirements include furnishing and maintaining barricades, safety fencing, warning signs, detour signs, flashers, traffic cones, flagmen, and pedestrian walkways. The contractor must maintain vehicular and pedestrian access to adjacent properties and emergency vehicle access at all times unless authorized otherwise. A minimum of one nine-foot-wide lane must be maintained through work areas during working hours, with proper signage and flagmen provided as necessary. Safety fencing must be bright orange, at least five feet in height, and placed around excavations during non-work hours. The work area must be properly barricaded and secured during non-work hours to provide unrestricted full-width use for through traffic lanes. All work must comply with 67 PA Code Chapter 203 (Work Zone Traffic Control) and PennDOT Publication 203 standards.
The contractor is responsible for notifying Borough Police, School Districts, and Fire Departments 24 hours prior to any road closures and obtaining Borough approval before closing any Borough roadways. Specific signage requirements are mandated for daytime and nighttime closures, including "ROAD CLOSED" or "ROAD CLOSED LOCAL TRAFFIC ONLY" signs at intersecting streets and illuminated signs during nighttime hours. The contractor must maintain fire hydrants, water valves, fire alarm boxes, and letter boxes in uncovered and accessible conditions. The Engineer has authority to halt construction if traffic control is deemed inadequate, with no additional compensation owed to the contractor for such stoppages. All materials, equipment, and labor necessary for traffic maintenance and protection are the contractor's responsibility, with specifications subject to Engineer approval and direction.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
02010-1
SECTION 02010
MAINTENANCE AND PROTECTION OF TRAFFIC
DURING CONSTRUCTION
PART 1 GENERAL
1.1 WORK INCLUDED
A. This work includes but is not limited to providing satisfactory barricades, safety fence, warning signs, detour signs, flashers, traffic cones, flagmen, pedestrian walks, temporary decking and all materials, equipment and labor necessary for the acceptable maintenance and protection of traffic as indicated on the drawings, outlined in PennDOT Publication 203, entitled "Work Zone Traffic Control" or as directed by the Engineer.
1.2 GENERAL REQUIREMENTS
A. The Contractor shall maintain vehicular and pedestrian access to adjacent properties at all times during construction, unless otherwise authorized.
B. The contractor shall monitor parking of construction personnel's vehicles and maintain vehicular access to and through parking areas.
C. The contractor shall prevent parking on or adjacent to access roads or in non-designated areas.
D. The Contractor shall maintain access for emergency vehicles at all times during construction.
E. All fire hydrants, water valves, fire alarm boxes and letter boxes shall be left uncovered and readily accessible for use.
F. The Contractor shall furnish, place, maintain and remove steel plates for temporary decking over excavations as indicated and directed. The decking shall be of sufficient strength and shall be installed so as to safely support an HS-25 and the alternate military loading.
G. Where permission for detouring traffic is granted, the Contractor shall post detour signs to the satisfaction of the appropriate Authorities, and the Contractor shall maintain such detour routes until such time as they are deemed unnecessary by the appropriate Authority.
H. No State Highway may be closed to traffic without State approval.
02010-2
I. No Borough roadway may be closed to traffic without the Borough's approval.
J. Contractor shall provide an adequate number of flagmen as required or as directed by the Engineer.
K. The Contractor shall be responsible for notifying the Borough Police, School Districts, and Fire Departments when it is necessary to close any roadway 24 hours prior to road closure.
L. Maintenance and protection of traffic during construction shall conform to 67 PA Code, Chapter 203 entitled "Work Zone Traffic Control".
1.3 SPECIAL REQUIREMENTS
A. The work area shall be properly barricaded and secured during non-work hours to provide unrestricted full width use for through traffic lanes.
B. During working hours, the Contractor shall provide a minimum of one (1) nine (9) foot wide lane through the work area for through traffic. Proper signage, barricades and flagmen shall be provided as necessary to facilitate traffic flow as necessary, or as directed by the Engineer or Borough.
C. As a minimum, the following signage must be employed during closures of Borough Roads.
1. Closure during daytime hours.
a. Minimum of 2 ea. "ROAD CLOSED LOCAL TRAFFIC ONLY" signs conforming to PennDOT Standards at each intersecting street or as directed by the Engineer or Borough.
b. Minimum of 1 detour arrow at each intersecting street.
2. Closure during nighttime hours.
a. Minimum of 2 ea. "ROAD CLOSED" signs conforming to PennDOT Standards at each intersecting street or as directed by the Engineer or Borough.
b. Minimum of 2 ea. "ROAD CLOSED AHEAD" signs on each road preceding the intersection to be closed.
c. All signs shall be illuminated with PennDOT Type A or Type B lights.
D. The Contractor shall furnish, place and maintain safety fence around all excavat
02010-3 ions and other areas designated by the Engineer during non-work hours. Safety fencing shall be the product of Tenax Corporation, bright orange, no less than five feet in height, or approved equal.
E. The Engineer shall have the authority, upon proper written notice to the Contractor, to stop construction progress until such time when all deficiencies have been corrected to the satisfaction of the Engineer, if in the opinion of the Engineer traffic control is inadequate thereby creating a safety hazard. In such instance, the Contractor shall have no claim for extra compensation or increase to the contract time for such disturbances.
END OF SECTION