10-01340 Shop Drawings Samples.pdf

PDF 43 KB Posted

Attached to
County Line Bridge Replacement Design Build
Solicitation number
Not on record
Issued by
Montgomery County, Pennsylvania

About this file

This is a specification section document for shop drawings, product data, and samples applicable to construction projects in Douglass Township, Montgomery County, Pennsylvania, specifically the Administration Building renovations and the County Line Road Bridge Replacement Project. The document outlines submission requirements for contractors and suppliers to provide detailed shop drawings, product data, and instruction manuals in accordance with contract specifications. All submittals must be made electronically and in a timely manner to prevent delays in construction work. Submissions must include project identification information, contractor and supplier details, product identification with specification section numbers, applicable standards such as ASTM or Federal Specification numbers, deviations from contract documents, and an 8-inch by 3-inch blank space for contractor and engineer stamps. Contractors must certify their review of submittals, verification of products, field measurements, and field construction criteria before submission. Resubmittals are required if the Engineer requests corrections or changes, with revisions clearly marked to indicate modifications beyond those previously noted.

The specification mandates that shop drawings and product data be presented clearly and thoroughly with proper identification of details by reference to contract drawings, including performance characteristics, capacities, dimensions, and required clearances. No specific pricing terms, set-asides, incumbent vendors, or funding sources are detailed in this specification section, as it functions as a technical requirement document rather than a financial or procurement summary. The requirements apply to both the Administration Building renovation project with a bid deadline of June 4, 2026, and the County Line Road Bridge Replacement Project with a bid deadline of July 29, 2026, both subject to Pennsylvania Prevailing Wage Act compliance and domestic material requirements under the Build America Buy America Act.

View the file

Other files

File Type Posted
18-PREVAILING WAGE RATES - COUNTY LINE BRIDGE.pdf PDF
21-02545 Superpave Base Course.pdf PDF
25-02548 Pavement Markings.pdf PDF
13-9000-0001 - DESIGN-BUILD PRECAST REINFORCED CONCRETE STRUCTURE.pdf PDF
2-1.00 FRONT END DOCS COUNTY LINE RD BRIDGE REPLACEMENT.pdf PDF
4-02912 Topsoil Sub-Soil.pdf PDF
26-County Line Bridge Replacement-Plan Set.pdf PDF
12-02260 Finish Grading.pdf PDF
7-01010 Contractors Work.pdf PDF
14-02010 Maintenance Protection of Traffic.pdf PDF
22-02270 Erosion Sediment Control.pdf PDF
9-01001 Special Provisions.pdf PDF
5-01201 Preconstruction Conference.pdf PDF
15-DEP - Douglass Township General Permit Acknowledgement 3.7.16.pdf PDF
6-01025 Measurement Payment (2).pdf PDF
1-NONDISCRIMINATION - SEXUAL HARRASSMENT CLAUSE.pdf PDF
27-PNDI submission and results..pdf PDF
24-GilmoreAssociates - Geotechnical Report - 07.20.2015.pdf PDF
19-01700 Project Closeout.pdf PDF
3-Multimodal Transportation Fund Grant Agreement.pdf PDF
11-01720 Project Record Documents.pdf PDF
16-Exhsting Bridge Photos.pdf PDF
20-02547 Superpave Wearing Course.pdf PDF
8-03300 Concrete.pdf PDF
23-z2015 DVRPC Grant Agreement.pdf double sided.pdf PDF
17-02210 Rough Grading.pdf PDF
1-24-0018-Douglass Township Bid Set-Final.pdf PDF
2-24-0018-Douglass Township Bid Spec-Final.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

01340-1

SECTION 01340

SHOP DRAWINGS, PRODUCT DATA AND SAMPLES

PART 1 GENERAL

1.1 WORK INCLUDED

A. Submit Shop Drawings, Product Data, and Instruction Manuals required by Contract Documents.

1.2 RELATED REQUIREMENTS

A. Definitions, and Additional Responsibilities of Parties: Conditions of the Contract.

1.3 SHOP DRAWINGS

A. Drawings shall be presented in a clear and thorough manner.

1. Details shall be identified by reference to sheet and detail, shown on Contract Drawings.

1.4 PRODUCT DATA

A. Preparation

1. Clearly mark each copy to identify pertinent products or models.

2. Show performance characteristics and capacities.

3. Show dimensions and clearances required.

1.5 SUBMISSION REQUIREMENTS

A. Make submittals promptly in accordance with approved schedule, and in such sequence as to cause no delay in the Work or in the work of any other contractor.

B. Number of Submittals Required:

1. Shop Drawings: Submit electronically.

2. Product Data: Submit electronically.

C. Submittals Shall Contain:

01340-2

1. The date of submission and the dates of any previous submissions.

2. The Project title and contract number.

3. The names of:

a. Contractor.

b. Supplier.

c. Manufacturer.

4. Identification of the product, with the specification section number.

5. Applicable standards, such as ASTM or Federal Specification numbers.

6. Identification of deviations from Contract Documents.

7. Identification of revisions on resubmittals.

8. An 8 in. x 3 in. blank space for Contractor and Engineer stamps.

9. Contractor's stamp, initialed or signed, certifying to review of submittal, verification of products, field measurements and field construction criteria, and coordination of the information within the submittal with requirements of the Work and of Contract Documents.

1.6 RESUBMISSION REQUIREMENTS

A. Make any corrections or changes in the submittals required by the Engineer and resubmit until approved.

B. Shop Drawings and Product Data:

1. Revise initial drawings or data, and resubmit as specified for the initial submittal.

2. Indicate any changes which have been made other than those previously noted by the Engineer.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

END OF SECTION