11-01720 Project Record Documents.pdf

PDF 70 KB Posted

Attached to
County Line Bridge Replacement Design Build
Solicitation number
Not on record
Issued by
Montgomery County, Pennsylvania

About this file

This is a project record documents specification section governing record-keeping requirements for the County Line Bridge Replacement Design Build project in Douglass Township, Montgomery County, Pennsylvania. The specification establishes mandatory procedures for maintaining, recording, and submitting comprehensive project documentation throughout construction. Contractors must maintain one copy of all record documents at the job site, including original drawings, specifications, amendments, change orders, shop drawings, product data, and samples, stored in clean and dry condition in accordance with Construction Specifications Institute filing standards. All documents must be legibly marked as "Project Record" and annotated concurrently with construction progress to record actual conditions, including horizontal and vertical locations of utilities and underground appurtenances, field changes, modifications from supplemental instructions or change orders, and manufacturer and supplier information for all installed products and equipment. At project completion, contractors must submit one set of annotated contract drawings, two copies of any shop drawings or product data requiring annotation after approval, and two sets of all other project record documents, accompanied by a transmittal letter certifying completeness and accuracy and signed by an authorized representative.

The specification contains no pricing terms, set-asides, incumbent vendor information, or funding requirements, as it functions exclusively as a technical specification governing documentation standards and procedures rather than as a procurement instrument establishing contract values or financial terms. The bridge replacement project itself is subject to Pennsylvania Prevailing Wage Act requirements, includes a mandatory pre-bid conference on May 12, 2026, and a non-mandatory pre-bid meeting on July 22, 2026, with sealed bids due by July 29, 2026, requiring ten percent bid security and subsequent performance, labor, material, and maintenance bonds from the selected contractor.

View the file

Other files

File Type Posted
20-02547 Superpave Wearing Course.pdf PDF
8-03300 Concrete.pdf PDF
23-z2015 DVRPC Grant Agreement.pdf double sided.pdf PDF
17-02210 Rough Grading.pdf PDF
10-01340 Shop Drawings Samples.pdf PDF
18-PREVAILING WAGE RATES - COUNTY LINE BRIDGE.pdf PDF
21-02545 Superpave Base Course.pdf PDF
25-02548 Pavement Markings.pdf PDF
13-9000-0001 - DESIGN-BUILD PRECAST REINFORCED CONCRETE STRUCTURE.pdf PDF
2-1.00 FRONT END DOCS COUNTY LINE RD BRIDGE REPLACEMENT.pdf PDF
4-02912 Topsoil Sub-Soil.pdf PDF
26-County Line Bridge Replacement-Plan Set.pdf PDF
12-02260 Finish Grading.pdf PDF
7-01010 Contractors Work.pdf PDF
14-02010 Maintenance Protection of Traffic.pdf PDF
22-02270 Erosion Sediment Control.pdf PDF
9-01001 Special Provisions.pdf PDF
5-01201 Preconstruction Conference.pdf PDF
15-DEP - Douglass Township General Permit Acknowledgement 3.7.16.pdf PDF
6-01025 Measurement Payment (2).pdf PDF
1-NONDISCRIMINATION - SEXUAL HARRASSMENT CLAUSE.pdf PDF
27-PNDI submission and results..pdf PDF
24-GilmoreAssociates - Geotechnical Report - 07.20.2015.pdf PDF
19-01700 Project Closeout.pdf PDF
3-Multimodal Transportation Fund Grant Agreement.pdf PDF
16-Exhsting Bridge Photos.pdf PDF
1-24-0018-Douglass Township Bid Set-Final.pdf PDF
2-24-0018-Douglass Township Bid Spec-Final.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

01720-1

SECTION 01720

PROJECT RECORD DOCUMENTS

PART 1 GENERAL

1.1 MAINTENANCE OF DOCUMENTS

A. Maintain at job site, one copy of record documents including Drawings, Specification, Amendments, Change Orders and other modifications, Shop Drawings, product date and samples.

B. In addition, maintain one copy of field orders or written instructions and field test records.

C. Provide files and racks for storage documents.

D. File documents and samples in accordance with Data Filing Format of the Construction Specifications Institute (C.S.I).

E. Maintain documents in a clean, dry, legible condition and in good order. Do not use record documents for construction purposes.

F. Make Documents and samples available at all times for inspection.

1.2 RECORDING

A. Label each document "Project Record" in neat large letters.

B. Record information concurrently with construction progress.

C. Do not conceal any work until required information is recorded.

D. Drawings - Legibly mark to record actual construction:

1. Horizontal and vertical locations of laterals, underground utilities and appurtenances, referenced to permanent surface improvements.

2. Field changes of dimension and detail.

3. Changes made by Supplemental Instruction or by Change Order.

4. Details not on original Contract Drawings.

E. Specifications and Amendments - Legibly mark each Section to record

01720-2

1. Manufacturer, trade name, catalog number, and Supplier of each Product and item of equipment actually installed.

2. Changes made by Supplemental Instructions or by Change Order.

F. Shop Drawings - Maintain as record documents. Legibly annotate any changes made after review.

1.3 SUBMITTALS

A. At completion of the Work, furnish one set of drawings showing all notations specified above. A copy of the Design Professional's drawings may be used for this purpose upon reimbursement of the printing costs to the Design Professional. In addition, furnish two copies of any shop drawings or product data sheet which required annotation after approval.

B. After inclusion of additional data, if any, furnish:

1. One set of contract drawings as specified under 1.3, A. above.

2. Two sets of all other Project Record Documents.

C. Accompany this final submittal with transmittal letter containing data, project title and number, Contractor's name and address, title and number of each Record Document, certification that each document as submitted as complete and accurate, signature of Contractor or his authorized representative.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

END OF SECTION