C-70-HIC-85-ID (3 Shts) WetDoorCell.pdf

PDF 381 KB Posted

Attached to
Roll Up door Maintenance & Repair Services
Solicitation number
1333ND26QNB610122
Issued by

About this file

This document is a technical instrumentation and control drawing for cooling tower cells at the National Institute of Standards & Technology (NIST) Reactor Operations & Engineering Group facility in Gaithersburg, Maryland.

The drawing set contains three sheets depicting wet door motor control boxes, cooling towers, SCPB (Supervisory Control and Protection Box), and D-100 instrumentation systems for a cooling tower cell instrumentation control system. Each sheet illustrates the East and West configurations of motor control assemblies, control wiring, and interconnections to the control room. The schematics show wet door mechanisms, motor controls, limit switches, solenoid valve controls, and electrical distribution to various instrumentation sensors and actuators. Notes on each sheet reference specific design requirements including de-energized condition protocols, magnetic proximity limit switch specifications, and thermal points/component layout considerations. Revision tracking tables document multiple ECN (Engineering Change Notice) approvals dated 8/9/04, including revisions for drain in conduit corrections and new SCPB configurations. The drawings are designed by C.J. Roe, reviewed by T.J. Holohan, and approved by NRC Redford, with dates of 5/21/04 and 6/9/04. Drawing number 70-HC-085-D is designated as Sheet 1, 2, and 3 of 3, with dimensions noted in feet and inches. The document serves as the technical specification for cooling tower cell #1, #2, and #3 instrumentation control implementation.

View the file

Other files

File Type Posted
Amendment 0005.docx DOCX document
Amendmentz_0003.docx DOCX document
C-70-HIC-84-ID (3 Shts) DryDoorCell.pdf PDF
External Limit Switch (SK-1309).pdf PDF
GA3 Rev 2.pdf PDF
GA1 Rev 4.pdf PDF
Door Track Heaters (Dwgs 2180-0X).pdf PDF
TYP. Schematic E05 Rev 3.pdf PDF
DEICING System Dwgs M1_M2_E1.pdf PDF
GA2 Rev 5.pdf PDF
Hybrid Electrical Section 5.doc DOC document
Hybrid Electrical Section 5 Trouble Shooting.doc DOC document
Amendment 0001.docx DOCX document
Provisions_Clauses 1333ND26QNB610122.docx DOCX document
PPQ__.docx DOCX document
Experience Project Data Sheet.docx DOCX document
SOW_Final.docx DOCX document
CSS Rollup Door Maint_Repair 1333ND26QNB610122.docx DOCX document
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

70-HIC-085-ID (3 of 3) Rev 2.pdf

70-HIC-085-ID (2 of 3) Rev 2.pdf
70-HIC-085-ID (1 of 3) Rev 2.pdf

File details come from the government source that posted it. Updated .