This file contains Chapter 15 from what appears to be a technical document detailing financial qualifications for the NIST Center for Neutron Research (NCNR) and NIST reactor (NBSR). The chapter outlines operating and decommissioning costs, showing that NCNR's operating costs increased from $16.7M in FY99 to $23.4M in FY03, while NBSR costs rose from $10.1M to $11.5M in the same period. The facility serves approximately 2,000 research participants annually from industry, academia, and government.

The document indicates a $1B estimated replacement cost for NCNR including instrumentation. Decommissioning costs were estimated by Duratek, Inc. at $30,224,476 for complete decommissioning, decontamination, and demolition, plus $25,900,000 in NIST direct costs, totaling $56,124,476. As a federal agency under the Department of Commerce, NIST will request funding for decommissioning when NBSR operations terminate, though there are no current plans for decommissioning before the operating license expires.

View the file

Other files for this federal contract opportunity

Other files attached to AMENDMENT 0005: Reactor Recovery Services, newest first.
File Type Posted
Attachment 1 - Drawing 4.pdf PDF
Attachment 1 - Drawing 2.pdf PDF
RFP 1333ND25RNB610012 AMENDMENT5 - Final.docx DOCX document
Attachment 3 - Photo 2.jpg JPG image
Attachment 2 Round 2 Reactor Recovery Questions.xlsx XLSX spreadsheet
1333ND25RNB610012 Amendment 5.docx DOCX document
Attachment 1 - Drawing 3.pdf PDF
Attachment 1 - Drawing 1 FTV Upgrade.pdf PDF
Attachment 3 - Photo 1.jpg JPG image
RFP 1333ND25RNB610012 AMENDMENT4 - Final.docx DOCX document
1333ND25RNB610012 Amendment 4.docx DOCX document
RFP 1333ND25RNB610012 - Reactor Recovery Services AMENDMENT3 - Final.docx DOCX document
Amendment 3 Attachment 1 Training Memo.docx DOCX document
1333ND25RNB610012 Amendment 3.docx DOCX document
CHAPTER 01 final.docx DOCX document
CHAPTER 03 final.docx DOCX document
CHAPTER 07 final Rev 17.docx DOCX document
RFP 1333ND25RNB610012 - Reactor Recovery Services AMENDMENT 2.pdf PDF
1333ND25RNB610012 Amendment 2.docx DOCX document
Amendment 2 Attachment 1.pdf PDF
Amendment 2 Attachment 3 Questions and Answers - Final.xlsx XLSX spreadsheet
CHAPTER 05 final Rev 8.docx DOCX document
CHAPTER 09 final Rev 10.docx DOCX document
CHAPTER 13 final Rev 7.docx DOCX document
CHAPTER 14 final rev 7.docx DOCX document
CHAPTER 06 final Rev 08.docx DOCX document
CHAPTER 10 final Rev 08.docx DOCX document
CHAPTER 11 final.docx DOCX document
CHAPTER 02 final Rev 8.docx DOCX document
CHAPTER 04 final Rev 11.docx DOCX document
CHAPTER 08 final Rev 8.docx DOCX document
CHAPTER 12 Final Rev 8.doc DOC document
CHAPTER 16 final.docx DOCX document
CHAPTER 17 final.docx DOCX document
RFP 1333ND25RNB610012 - Reactor Recovery Services AMENDMENT 1.pdf PDF
1333ND25RNB610012 Amendment 1.pdf PDF
RFP 1333ND25RNB610012 - Reactor Recovery Services Final CAI - CLEANSF33.pdf PDF
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CHAPTER 15 – TABLE OF CONTENTS

15Financial Qualifications1
15.1Operating Costs1
15.2Decommissioning Costs1

List of Tables

Table 15.1: NCNR and NBSR Operating Costs 2

Chapter 15 – Record of Revisions

15 Financial Qualifications

15.1 Operating Costs

The NIST Center for Neutron Research (NCNR) is one of four neutron user facilities in the United States offering all neutron scattering methods coupled with modern instrumentation that are competitive with the world’s best. The NIST reactor (NBSR) is the heart of the NCNR. The cost of operating the NCNR is regularly funded through the Department of Commerce by Congressional appropriation. The current replacement cost of the NCNR, including instrumentation, is estimated to be $1B. The operating costs for the NCNR and the NBSR are presented in Table 15.1. The data are for fiscal years 1999 to 2003.

NCNR does not charge fees to research associates for use of the research facilities. While most access is for research, which results are freely available to the general public, proprietary research can be performed under full cost recovery. Each year, approximately 2000 research participants from all areas of the country, and from industry, academia, and government use the facility for measurements not otherwise possible.

15.2 Decommissioning Costs

Neither NIST nor the Department of Commerce plan to decommission the NBSR prior to the expiration date of its operating license. An estimate of the cost of decommissioning the NBSR was performed by Duratek, Inc. and is referenced and discussed in Chapter 17. The total estimated cost in 2003 for complete decommissioning, decontamination, and demolition costs (excluding NIST direct costs) is $30,224,476. The NIST direct costs are estimated as $25,900,000, for a total cost of $56,124,476.

NIST is a federal agency of the Department of Commerce. When operation of the NBSR is terminated, NIST will request funding for decommissioning, decontamination, and demolition.

15-2 Table 15.1: NCNR and NBSR Operating Costs

CATEGORY

FY99

FY00

FY01

FY02

FY03

NCNR

$16.7M

$19.2M

$21.8M

$23.2M

$23.4M

NBSR

$10.1M

$10.3M

$12.2M

$12.6M

$11.5M

Table 15.1 lists actual operating costs. This includes salaries, benefits, fuel, heavy water, and shipping of spent fuel.