Attachment 1 - Drawing 2.pdf

PDF 62 KB Posted

Attached to
AMENDMENT 0005: Reactor Recovery Services Federal contract opportunity
Solicitation number
1333ND25RNB610012
Issued by
Department of Commerce National Institute of Standards and Technology

About this file

This is a technical drawing (D-60-022) showing the CO2 gas system diagram for the National Bureau of Standards Reactor (NBSR) at the National Institute of Standards and Technology's Reactor Radiation Division in Gaithersburg, Maryland. The drawing was originally created in 1968 and has undergone multiple revisions, with the latest revision occurring in July 2023.

The diagram details a complex CO2 gas system that includes a 4,043-gallon reactor vessel, an 800-gallon reserve tank, and various components such as controlled valves, pressure relief valves, pressure regulators, check valves, ball valves, diaphragm valves, gate valves, rotameters, and pressure gauges. The system features multiple flow paths, including connections to a Flexo Rabbit System (B-200), thermal shield, and irradiated air lines. Key pressure settings are specified, including 25 psig, 30 psig, and water column measurements of 5" and 8-9". The drawing includes detailed pipe sizing information and an embedded CO2 circular header with six nozzles.

View the file

Other files for this federal contract opportunity

Other files attached to AMENDMENT 0005: Reactor Recovery Services, newest first.
File Type Posted
Attachment 1 - Drawing 4.pdf PDF
Attachment 1 - Drawing 1 FTV Upgrade.pdf PDF
Attachment 3 - Photo 1.jpg JPG image
RFP 1333ND25RNB610012 AMENDMENT5 - Final.docx DOCX document
Attachment 3 - Photo 2.jpg JPG image
Attachment 2 Round 2 Reactor Recovery Questions.xlsx XLSX spreadsheet
1333ND25RNB610012 Amendment 5.docx DOCX document
Attachment 1 - Drawing 3.pdf PDF
1333ND25RNB610012 Amendment 4.docx DOCX document
RFP 1333ND25RNB610012 AMENDMENT4 - Final.docx DOCX document
1333ND25RNB610012 Amendment 3.docx DOCX document
RFP 1333ND25RNB610012 - Reactor Recovery Services AMENDMENT3 - Final.docx DOCX document
Amendment 3 Attachment 1 Training Memo.docx DOCX document
CHAPTER 01 final.docx DOCX document
CHAPTER 03 final.docx DOCX document
CHAPTER 07 final Rev 17.docx DOCX document
CHAPTER 02 final Rev 8.docx DOCX document
CHAPTER 04 final Rev 11.docx DOCX document
CHAPTER 08 final Rev 8.docx DOCX document
CHAPTER 12 Final Rev 8.doc DOC document
CHAPTER 16 final.docx DOCX document
CHAPTER 17 final.docx DOCX document
RFP 1333ND25RNB610012 - Reactor Recovery Services AMENDMENT 2.pdf PDF
1333ND25RNB610012 Amendment 2.docx DOCX document
Amendment 2 Attachment 1.pdf PDF
Amendment 2 Attachment 3 Questions and Answers - Final.xlsx XLSX spreadsheet
CHAPTER 05 final Rev 8.docx DOCX document
CHAPTER 09 final Rev 10.docx DOCX document
CHAPTER 13 final Rev 7.docx DOCX document
CHAPTER 14 final rev 7.docx DOCX document
CHAPTER 15 final.docx DOCX document
CHAPTER 06 final Rev 08.docx DOCX document
CHAPTER 10 final Rev 08.docx DOCX document
CHAPTER 11 final.docx DOCX document
1333ND25RNB610012 Amendment 1.pdf PDF
RFP 1333ND25RNB610012 - Reactor Recovery Services AMENDMENT 1.pdf PDF
RFP 1333ND25RNB610012 - Reactor Recovery Services Final CAI - CLEANSF33.pdf PDF
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(4043 GAL.)

VESSEL

REACTOR

(800 GAL.)

RESERVE TANK

INNER

HOLDER

CO2 GAS

B-2

B-1 PROCESS

ROOM

C-100

FLEXO RABBIT

SYSTEM (B-200)

SET AT

25 psig

SET AT

30 psig

COV

COV

COV

COV

SET AT

8" TO 9"

WATER

SET AT

5" WATER

LI

LA

TO IRRADIATED AIR

4" LINE

TO RABBIT SYSTEM

AT BLOWER SUCTION

TO RABBIT SYSTEM

AT BLOWER DISCHARGE

TO IRRADIATED AIR

4" LINE

PNEUMATIC

RELIEF

THERMAL SHIELD

3"Ø

2"Ø

1/2"Ø

2"Ø

3/4"Ø 3/4"Ø

1"Ø

1 1/4"Ø

1/2"Ø

2"Ø

1/ 2"

Ø

EMBEDED CO 2

CIRCULAR HEADER

WITH SIX NOZZLES

C ELE. 442'-8"L

1" Ø

F L O W

TO CRYO. PURGE

1/ 2"

Ø

2"Ø

W O L F

1/

4" Ø

1/2"Ø

3/4"Ø

3/4"Ø

COV

3/4"Ø

W O L F

LEGEND:

CONTROLLED VALVE

PRESSURE RELIEF

PRESSURE REGULATOR

CHECK VALVE

BALL VALVE

DIAPHRAM VALVE

GATE VALVE

VALVE

ROTAMETER

PRESSURE GAUGE

BULK

TANK

1"Ø1"Ø

TO DWG 5937-M-3101, P-100A

TO DWG 5937-M-3101, P-100B

TO DWG 5937-M-3201, P-101A

TO DWG 5937-M-3201, P-101B

4"Ø

FLOWMETERS

(ROTAMETER

OMEGA

FL-4AA-05C-05C-05C-05C)

AN

3-28

PG

PIC

LT

LS

LS

3/4"Ø

4"Ø

COV

A B C D

LA

COV

COV

COV

COV

COV

COV

COV

COV

COV

COV

COV

COV

COV

34 COV

COV

COV

COV

1 COV

COV

COV

COV

COV

COV

COV

COV

COV

COV

COV

COV

COV

COV

COV

COV

COV

COV

COV

COV

COV

8 11

D-60-022

NATIONAL INSTITUTE OF STANDARDS & TECHNOLOGY

REACTOR RADIATION DIVISION

GAITHERSBURG, MARYLAND 20899

CO GAS SYSTEM

NBSR

DESIGNED BY:

DATE:

CHECKED BY:

DATE:

APPROVED BY:

DRAWN BY:

DATE:

DATE: 01/07/68

H. A. JACKSON

DIMENSIONS IN FEET AND INCHES DO NOT SCALE THIS DRAWING

DIV. 856

REACTOR ENGINEERING GROUP

ISSUE DATE:

DRAWING NO.

ORIGINAL DATE OF DRAWING

REVISIONS

NO. E.C.N. CHANGE INCORP. BY CHKD. BY APPR. BY DATE

JIM TORRENCE

01/08/69

01/08/69

6 REDRAWN ON CAD MAS PJL NB 09/10/96

7 NEW CO2 TANK PJL523 DF PJL 08/29/08

8 REMOVED OLD CO2 TANK (3/22/11)523 PJL

ADDED TEE & VALVE TO FLOW METER723

DF PJL 06/19/12

ADDED CONNECTION FOR THERMAL

SHIELD PUMP SEAL FLUSH SYSTEM9819 JJT TN PJL 04/25/2017

CHANGED AND REPLACED TEXT TO

CREATE TEXT SEARCHABLE PDF.N/A10 JJT PJL RLS 04/12/2020

INSTALLATION OF CO2 ISOLATION VALVE

COV-8126011 MSZ AWM PJL 07/12/2023

AutoCAD SHX Text

FOR

fct Stamp

Sheets and Views