This file is a technical specifications table showing design information for primary coolant system components of a reactor system. The table details specifications for multiple components including primary heat exchangers (HE-1A, HE-1B, HE-1C), primary piping systems, D2O main circulating pumps, shutdown pumps, D2O purification heat exchanger (HE-2), and the reactor vessel.

The components are constructed primarily of stainless steel and aluminum materials, with specific design pressures and testing requirements following ASME codes and standards. Key specifications include primary heat exchangers designed to remove 35x106 BTU per hour with primary flow of 4,800 gpm, main circulating pumps delivering 3,100 gpm at 116 feet of total head, and a reactor vessel made of 6061 aluminum designed for 50 psig at 250°F. The system includes redundancy features, such as HE-1C serving as a spare heat exchanger, and multiple pumping units (4 main circulating pumps and 2 shutdown pumps).

View the file

Other files for this federal contract opportunity

Other files attached to AMENDMENT 0005: Reactor Recovery Services, newest first.
File Type Posted
Attachment 1 - Drawing 4.pdf PDF
Attachment 1 - Drawing 2.pdf PDF
RFP 1333ND25RNB610012 AMENDMENT5 - Final.docx DOCX document
Attachment 3 - Photo 2.jpg JPG image
Attachment 2 Round 2 Reactor Recovery Questions.xlsx XLSX spreadsheet
1333ND25RNB610012 Amendment 5.docx DOCX document
Attachment 1 - Drawing 1 FTV Upgrade.pdf PDF
Attachment 3 - Photo 1.jpg JPG image
Attachment 1 - Drawing 3.pdf PDF
1333ND25RNB610012 Amendment 4.docx DOCX document
RFP 1333ND25RNB610012 AMENDMENT4 - Final.docx DOCX document
RFP 1333ND25RNB610012 - Reactor Recovery Services AMENDMENT3 - Final.docx DOCX document
1333ND25RNB610012 Amendment 3.docx DOCX document
Amendment 3 Attachment 1 Training Memo.docx DOCX document
CHAPTER 01 final.docx DOCX document
CHAPTER 03 final.docx DOCX document
CHAPTER 07 final Rev 17.docx DOCX document
RFP 1333ND25RNB610012 - Reactor Recovery Services AMENDMENT 2.pdf PDF
1333ND25RNB610012 Amendment 2.docx DOCX document
Amendment 2 Attachment 3 Questions and Answers - Final.xlsx XLSX spreadsheet
CHAPTER 05 final Rev 8.docx DOCX document
CHAPTER 09 final Rev 10.docx DOCX document
CHAPTER 13 final Rev 7.docx DOCX document
CHAPTER 14 final rev 7.docx DOCX document
CHAPTER 15 final.docx DOCX document
CHAPTER 02 final Rev 8.docx DOCX document
CHAPTER 04 final Rev 11.docx DOCX document
CHAPTER 08 final Rev 8.docx DOCX document
CHAPTER 12 Final Rev 8.doc DOC document
CHAPTER 16 final.docx DOCX document
CHAPTER 17 final.docx DOCX document
CHAPTER 06 final Rev 08.docx DOCX document
CHAPTER 10 final Rev 08.docx DOCX document
CHAPTER 11 final.docx DOCX document
1333ND25RNB610012 Amendment 1.pdf PDF
RFP 1333ND25RNB610012 - Reactor Recovery Services AMENDMENT 1.pdf PDF
RFP 1333ND25RNB610012 - Reactor Recovery Services Final CAI - CLEANSF33.pdf PDF
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 3.4: Design Information for Primary Coolant System Components

Component (Codes

& Standards)

Materials of

Construction

Design or Test

Pressure

Rating Remarks

Primary Heat

Exchangers (HE-1A, HE-1B and HE-1C)

(ASME B&PV Code, Section VIII)

Plates: 316 type

Stainless Steel

Frame: Carbon

Steel

Gaskets: Nitrile

Primary and

Secondary sides design Pr. & Temp:

150 psi at 200°F

Hydrostatic Test

Pressure: 225 psi

Each HE designed to remove 35x106

BTU per Hour.

Primary flow:

4,800 gpm

Temp. Range:

114°F to 100°F

Secondary flow:

5,000 gpm

Temp. Range:

84°F to 98°F

Plate & frame type design with primary flow through welded plate cassettes and

Secondary Flow between cassettes held by gaskets.

HE-1C is spare but can be readily put in the line, when required.

Primary Piping, Pipe

Fittings and Valves

(ASME/ANSI B31.1)

6061 T6

Aluminum.

Several control valves and valves at the heat exchangers are

Stainless Steel

Valve Gasket and

Diaphragm:

Hypalon

Design Pressure:

125 psi

Pressure: 187.5 psi

All pipe fittings are forged 6061 T6 aluminum.

Certified welders make all welds.

Welds are radiographed and accepted on the basis of ASME codes.

D2O Main Circulating

Pumps

(Total 4 units)

Stainless Steel Delivering 3,100 gpm at 116 feet of

Total Head

Single stage centrifugal units

Shutdown Pumps

(Total 2 units)

Stainless Steel Delivering 800 gpm at 24 feet of Total

Head

Single stage centrifugal units

D2O Purification heat exchanger (HE-2)

Plates: 316 type

Stainless Steel

Frame: Carbon

Steel

Gaskets: Nitrile

Primary and

Secondary sides design Pr. & Temp:

150 psi at 200°F

Pressure: 225 psi

Each HE designed to remove 1.18 x106

BTU per Hour.

Primary flow:

65 gpm

Temp. Range:

100°F to 90°F

Secondary flow:

170 gpm

Temp. Range:

84°F to 98°F

Plate & frame type design with primary flow through welded plate cassettes and

Secondary Flow between cassettes held by gaskets.

Reactor Vessel

6061 Aluminum Design pressure and temperature 50 psig at 250°F.

Hydrostatically tested at 75 psig.

Reactor vessel is unpressurized except for small pressure of 4 inches of water due to helium blanket.