1333ND25RNB190009.pdf

PDF 2 MB Posted

Attached to
Mechanical Construction IDIQ Federal contract opportunity
Solicitation number
1333ND25RNB190009
Issued by
Department of Commerce National Institute of Standards and Technology

About this file

This is a Request for Proposals (RFP) for a Mechanical Construction Indefinite Delivery/Indefinite Quantity (IDIQ) contract issued by the National Institute of Standards and Technology (NIST). The solicitation seeks a contractor to provide mechanical construction products and services for NIST's Gaithersburg, Maryland campus, with a total maximum contract value of $8,000,000 over three years. The contract will cover various mechanical construction activities including installation, replacement, and modification of systems such as HVAC, plumbing, air handling units, control systems, utility metering, fire sprinklers, and laboratory equipment.

Key solicitation details include a pre-proposal conference and site visit on July 31, 2025, with proposal submissions due by August 21, 2025. The evaluation will be based on factors including bonding capacity, technical approach, mechanical and multidiscipline laboratory experience, key personnel qualifications, and past performance. The first task order involves replacing an exhaust scrubber system in Building 215, with a period of performance of 300 days. Offerors must provide a detailed technical proposal, pricing breakdown, bid bond, and meet specific requirements such as per-contract bonding capacity of at least $2,000,000 and aggregate bonding capacity of $8,000,000.

View the file

Other files for this federal contract opportunity

Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(See ).

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".

SOLICITATION

1. SOLICITATION NUMBER

5. REQUISITION/PURCHASE REQUEST NUMBER

CODE

6. PROJECT NUMBER

8. ADDRESS OFFER TO

4. CONTRACT NUMBER

7. ISSUED BY

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

11. The contractor shall begin performance within

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES", indicate within how many calendar days after award in Item 12b.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and

b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

is, is not required.

local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.

calendar days and complete it within calendar days after receiving

a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

12b. CALENDAR DAYS

2. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED PAGE OF PAGES

See Attached

STANDARD FORM 1442 (REV. )

Prescribed by GSA - FAR (48 CFR) 53.236-1(d)

1333ND25RNB190009

NATIONAL INST OF STDS AND TECHNOLOGY

100 BUREAU DRIVE STOP 1640

BUILDING 301 ROOM B129

GAITHERSBURG MD 20899-1640

NATIONAL INST OF STDS AND TECHNOLOGY

100 BUREAU DRIVE STOP 1640

BUILDING 301 ROOM B129

GAITHERSBURG MD 20899-1640

NB195000-25-00012

000SB

JULIE MORRIS 303-497-6504 JULIE.MORRIS@NIST.GOV

1 82JUL 22, 2025

AUG 21, 2025

10:00 AM MT

FAR Clause 52.211-10 - first TO

000SB

8/2014

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

OFFER (Must be fully completed by offeror)

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT

NUMBER

DATE.

AWARD (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

CODE FACILITY CODE

15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14.)

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

21. ITEMS ACCEPTED:

22. AMOUNT

26. ADMINISTERED BY

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)

31c. DATE31b. UNITED STATES OF AMERICA

BY

31a. NAME OF CONTRACTING OFFICER (Type or print)

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30b. SIGNATURE 30c. DATE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.) Contractor agrees to furnish

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

23. ACCOUNTING AND APPROPRIATION DATA

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

27. PAYMENT WILL BE MADE BY

10 U.S.C. 2304(c) ( )

20b. SIGNATURE 20c. OFFER DATE

STANDARD FORM 1442 (REV. ) BACK1333ND25RNB190009 8/2014

SCHEDULE Continued

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

The total maximum quantity to be ordered is $8,000,000 for the length of the contract, not to exceed three years.

The maximum quantity is calculated as the sum of all orders issued, including modifications.

0001 The contractor shall provide mechanical construction products and services.

Period of Performance: 10/01/2025 to 09/30/2028

1.00 EA

PAGE 3 OF 82 1333ND25RNB190009

Table of Contents

SECTION B SUPPLIES OR SERVICES AND PRICES/COSTS

B.1 1352.216-75 MINIMUM AND MAXIMUM CONTRACT AMOUNTS (APR 2010)

SECTION C DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

C.1

C.2

SECTION E INSPECTION AND ACCEPTANCE

E.1 52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996)

SECTION F DELIVERIES OR PERFORMANCE

F.1 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

F.2 52.211-10 First Task Order

F.3 52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

F.4 52.211-12 Liquidated Damages for First Task Order

SECTION G CONTRACT ADMINISTRATION DATA

G.1 1352.201-70 CONTRACTING OFFICER?s AUTHORITY (APR 2010)

G.2 1352.201-72 CONTRACTING OFFICER`S REPRESENTATIVE (COR) (APR 2010)

G.3 1352.216-76 PLACEMENT OF ORDERS (APR 2010)

G.4 TASK ORDER PROCEDURES

G.5 52.232-99 DEVPROVIDING ACCELERATED PAYMENT TO SMALL BUSINESS CONTRACTORS (AUG 2012)

G.6 NIST LOCAL-40BILLING INSTRUCTIONS FOR DELIVERY/TASK ORDERS

G.7 NIST LOCAL-53CONTRACT PERFORMANCE DURING CHANGES IN NIST OPERATING STATUS

G.8 NIST LOCAL-55ELECTRONIC BILLING INSTRUCTIONS FOR DELIVERY/TASK ORDERS

SECTION H SPECIAL CONTRACT REQUIREMENTS

H.1 1352.209-73 COMPLIANCE WITH THE LAWS (APR 2010)

H.2 1352.209-74 ORGANIZATIONAL CONFLICT OF INTEREST (APR 2010)

H.3 1352.216-74 TASK ORDERS (APR 2010)

H.4 1352.237-71 SECURITY PROCESSING REQUIREMENTS - LOW RISK CONTRACTS (APR 2010)

H.5 1352.237-73 FOREIGN NATIONAL VISITOR AND GUEST ACCESS TO DEPARTMENTAL RESOURCES (APR 2010)..33

H.6 1352.228-70 INSURANCE COVERAGE (APR 2010)

H.7 1352.237-75 KEY PERSONNEL (APR 2010)

H.8 Contractor Responsibility

SECTION I CONTRACT CLAUSES

I.1 52.202-1DEFINITIONS (JUN 2020)

I.2 52.203-3 GRATUITIES (APR 1984)

I.3 52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)

I.4 52.203-6RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (JUN 2020)

I.5 52.203-7ANTI-KICKBACK PROCEDURES (JUN 2020)

I.6 52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR IMPROPER ACTIVITY (MAY

2014)

I.7 52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)

I.8 52.203-12LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS (JUN 2020)

I.9 52.203-13CONTRACTOR CODE OF BUSINESS ETHICS AND CONDUCT (NOV 2021)

I.10 52.203-14DISPLAY OF HOTLINE POSTER(S) (NOV 2021)

I.11 52.203-17CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS (NOV 2023)

I.12 52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS OR STATEMENTS

(JAN 2017)

PAGE 4 OF 82 1333ND25RNB190009

I.13 52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (JAN 2011)

I.14 52.204-10REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS (JUN 2020)

I.15 52.204-13SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018)

I.16 52.204-15 SERVICE CONTRACT REPORTING REQUIREMENTS FOR INDEFINITE-DELIVERY CONTRACTS (OCT 2016) 37

I.17 52.204-18COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (AUG 2020)

I.18 52.204-19INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC 2014)

I.19 52.204-20PREDECESSOR OF OFFEROR (AUG 2020)

I.20 52.204-23PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES DEVELOPED OR PROVIDED

BY KASPERSKY LAB COVERED ENTITIES (DEC 2023)

I.21 52.204-25PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE

SERVICES OR EQUIPMENT (NOV 2021)

I.22 52.204-27PROHIBITION ON A BYTEDANCE COVERED APPLICATION (JUNE 2023)

I.23 52.209-6PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (NOV 2021)

I.24 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018) 38

I.25 52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS (NOV 2015)

I.26 52.210-1MARKET RESEARCH (NOV 2021)

I.27 52.215-8 ORDER OF PRECEDENCE--UNIFORM CONTRACT FORMAT (OCT 1997)

I.28 52.215-21REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN CERTIFIED COST OR

PRICING DATA--MODIFICATIONS (NOV 2021)

I.29 52.219-6NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (NOV 2020)

I.30 52.219-8UTILIZATION OF SMALL BUSINESS CONCERNS (JAN 2025)

I.31 52.219-14LIMITATIONS ON SUBCONTRACTING (OCT 2022)

I.32 52.219-28POSTAWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JAN 2025)

I.33 52.222-1 NOTICE TO THE GOVERNMENT OF LABOR DISPUTES (FEB 1997)

I.34 52.222-3 CONVICT LABOR (JUN 2003)

I.35 52.222-4 CONTRACT WORK HOURS AND SAFETY STANDARDS --OVERTIME COMPENSATION (MAY 2018)

I.36 52.222-7 WITHHOLDING OF FUNDS (MAY 2014)

I.37 52.222-8PAYROLLS AND BASIC RECORDS (JUL 2021)

I.38 52.222-10 COMPLIANCE WITH COPELAND ACT REQUIREMENTS (FEB 1988)

I.39 52.222-11 SUBCONTRACTS (LABOR STANDARDS) (MAY 2014)

I.40 52.222-12 CONTRACT TERMINATION--DEBARMENT (MAY 2014)

I.41 52.222-13 COMPLIANCE WITH CONSTRUCTION WAGE RATE REQUIREMENTS AND RELATED REGULATIONS (MAY

2014)

I.42 52.222-14 DISPUTES CONCERNING LABOR STANDARDS (FEB 1988)

I.43 52.222-15 CERTIFICATION OF ELIGIBILITY (MAY 2104)

I.44 52.222-35EQUAL OPPORTUNITY FOR VETERANS. (JUN 2020)

I.45 52.222-36EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)

I.46 52.222-37EMPLOYMENT REPORTS ON VETERANS (JUN 2020)

I.47 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT (DEC 2010). 39

I.48 52.222-50COMBATING TRAFFICKING IN PERSONS (NOV 2021)

I.49 52.222-54EMPLOYMENT ELIGIBILITY VERIFICATION (JAN 2025)

I.50 52.222-55MINIMUM WAGES FOR CONTRACTOR WORKERS UNDER EXECUTIVE ORDER 14026. (JAN 2022)

I.51 52.223-2REPORTING OF BIOBASED PRODUCTS UNDER SERVICE AND CONSTRUCTION CONTRACTS (MAY 2024)..39

I.52 52.223-3HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA (MAY 2024)

I.53 52.223-5POLLUTION PREVENTION AND RIGHT-TO-KNOW INFORMATION (MAY 2024)

I.54 52.223-11OZONE-DEPLETING SUBSTANCES AND HIGH GLOBAL WARMING POTENTIAL HYDROFLUOROCARBONS (MAY

2024)

I.55 52.223-12MAINTENANCE, SERVICE, REPAIR, OR DISPOSAL OF REFRIGERATION EQUIPMENT AND AIR

CONDITIONERS (MAY 2024)

I.56 52.223-20AEROSOLS (MAY 2024)

PAGE 5 OF 82 1333ND25RNB190009

I.57 52.223-21FOAMS (MAY 2024)

I.58 52.223-23SUSTAINABLE PRODUCTS AND SERVICES (MAY 2024)

I.59 52.225-13RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (FEB 2021)

I.60 52.226-7DRUG-FREE WORKPLACE (MAY 2024)

I.61 52.226-8ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE DRIVING (MAY 2024)

I.62 52.227-1AUTHORIZATION AND CONSENT (JUN 2020)

I.63 52.227-17 RIGHTS IN DATA--SPECIAL WORKS (DEC 2007)

I.64 52.227-23 RIGHTS TO PROPOSAL DATA (TECHNICAL) (JUN 1987)

I.65 52.228-2 ADDITIONAL BOND SECURITY (OCT 1997)

I.66 52.228-11INDIVIDUAL SURETY--PLEDGE OF ASSETS (FEB 2021)

I.67 52.228-14 IRREVOCABLE LETTER OF CREDIT (NOV 2014)

I.68 52.228-15PERFORMANCE AND PAYMENT BONDS--CONSTRUCTION (JUN 2020)

I.69 52.229-3 FEDERAL, STATE, AND LOCAL TAXES (FEB 2013)

I.70 52.229-11Tax on Certain Foreign Procurements--Notice and Representation (JUN 2020)

I.71 52.229-12TAX ON CERTAIN FOREIGN PROCUREMENTS (FEB 2021)

I.72 52.232-5 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (MAY 2014)

I.73 52.232-16 IPROGRESS PAYMENTS (NOV 2021)--ALTERNATE I (MAR 2000)

I.74 52.232-17 INTEREST (MAY 2014)

I.75 52.232-18 AVAILABILITY OF FUNDS (APR 1984)

I.76 52.232-23 ASSIGNMENT OF CLAIMS (MAY 2014)

I.77 52.232-27 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS (JAN 2017)

I.78 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER--SYSTEM FOR AWARD MANAGEMENT (OCT 2018)

I.79 52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS (JUNE 2013)

I.80 52.232-40PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS (MAR 2023)

I.81 52.233-1 DISPUTES (MAY 2014)

I.82 52.233-3 PROTEST AFTER AWARD (AUG 1996)

I.83 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)

I.84 52.236-1 PERFORMANCE OF WORK BY THE CONTRACTOR (APR 1984)

I.85 52.236-2 DIFFERING SITE CONDITIONS (APR 1984)

I.86 52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (APR 1984)

I.87 52.236-5 MATERIAL AND WORKMANSHIP (APR 1984)

I.88 52.236-6 SUPERINTENDENCE BY THE CONTRACTOR (APR 1984)

I.89 52.236-7 PERMITS AND RESPONSIBILITIES (NOV 1991)

I.90 52.236-8 OTHER CONTRACTS (APR 1984)

I.91 52.236-9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS

(APR 1984)

I.92 52.236-10 OPERATIONS AND STORAGE AREAS (APR 1984)

I.93 52.236-11 USE AND POSSESSION PRIOR TO COMPLETION (APR 1984)

I.94 52.236-12 CLEANING UP (APR 1984)

I.95 52.236-13 ACCIDENT PREVENTION (NOV 1991)

I.96 52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (FEB 1997)

I.97 52.236-26 PRECONSTRUCTION CONFERENCE (FEB 1995)

I.98 52.240-1PROHIBITION ON UNMANNED AIRCRAFT SYSTEMS MANUFACTURED OR ASSEMBLED BY AMERICAN SECURITY

DRONE ACT--COVERED FOREIGN ENTITIES (NOV 2024)

I.99 52.242-13 BANKRUPTCY (JUL 1995)

I.100 52.243-4 CHANGES (JUN 2007)

I.101 52.244-2SUBCONTRACTS (JUN 2020)

I.102 52.244-6SUBCONTRACTS FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (JAN 2025)

I.103 52.245-1 IGOVERNMENT PROPERTY (SEP 2021)--ALTERNATE I (APR 2012)

I.104 52.245-9 USE AND CHARGES (APR 2012)

I.105 52.246-21 WARRANTY OF CONSTRUCTION (MAR 1994)

PAGE 6 OF 82 1333ND25RNB190009

I.106 52.247-63PREFERENCE FOR U.S.-FLAG AIR CARRIERS (JAN 2025)

I.107 52.247-64PREFERENCE FOR PRIVATELY OWNED U.S.-FLAG COMMERCIAL VESSELS (NOV 2021)

I.108 52.249-2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE) (APR 2012)

I.109 52.249-3 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (DISMANTLING, DEMOLITION, OR REMOVAL OF

IMPROVEMENTS) (APR 2012)

I.110 52.249-8 DEFAULT (FIXED-PRICE SUPPLY AND SERVICE) (APR 1984)

I.111 52.253-1 COMPUTER GENERATED FORMS (JAN 1991)

I.112 52.216-18ORDERING (AUG 2020)

I.113 52.216-19 ORDER LIMITATIONS (OCT 1995)

I.114 52.216-22 INDEFINITE QUANTITY (OCT 1995)

I.115 Option Clause

I.116 52.222-6-DEVCONSTRUCTION WAGE RATE REQUIREMENTS (AUG 2018) (DEVIATION FEB 2025)

I.117 52.222-9-DEVAPPRENTICES AND TRAINEES (JUL 2005) (DEVIATION FEB 2025)

I.118 52.222-11-DEVSUBCONTRACTS (LABOR STANDARDS) (MAY 2014) (DEVIATION FEB 2025)

I.119 52.222-12-DEVCONTRACT TERMINATION--DEBARMENT (MAY 2014) (DEVIATION FEB 2025)

I.120 52.223-2-DEVREPORTING OF BIOBASED PRODUCTS UNDER SERVICE AND CONSTRUCTION CONTRACTS (MAY 2024)

(DEVIATION FEB 2025)

I.121 52.244-6-DEVSUBCONTRACTS FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (JAN 2025) (DEVIATION

FEB 2025)

I.122 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

SECTION J LIST OF ATTACHMENTS

J.1

J.2 Attach 11 D-B WD #MD20250120 (First TO)

SECTION K REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS

K.1 52.203-11CERTIFICATION AND DISCLOSURE REGARDING PAYMENTS TO INFLUENCE CERTAIN FEDERAL

TRANSACTIONS (SEP 2024)

K.2 52.203-18 PROHIBITION ON CONTRACTING WITH ENTITIES THAT REQUIRE CERTAIN INTERNAL CONFIDENTIALITY

AGREEMENTS OR STATEMENTS--REPRESENTATION (JAN 2017)

K.3 52.204-26COVERED TELECOMMUNICATIONS EQUIPMENT OR SERVICES--REPRESENTATION (OCT 2020)

K.4 52.209-2 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS-REPRESENTATION (NOV

2015)

K.5 52.222-38 COMPLIANCE WITH VETERANS` EMPLOYMENT REPORTING REQUIREMENTS (FEB 2016)

K.6 52.223-1BIOBASED PRODUCT CERTIFICATION (MAY 2024)

K.7 52.223-4RECOVERED MATERIAL CERTIFICATION (MAY 2008)

K.8 52.223-22PUBLIC DISCLOSURE OF GREENHOUSE GAS EMISSIONS AND REDUCTION GOALS--REPRESENTATION (DEC

2016)

K.9 52.225-20 PROHIBITION ON CONDUCTING RESTRICTED BUSINESS OPERATIONS IN SUDAN--CERTIFICATION (AUG

2009)

K.10 52.225-25PROHIBITION ON CONTRACTING WITH ENTITIES ENGAGING IN CERTAIN ACTIVITIES OR TRANSACTIONS

RELATING TO IRAN--REPRESENTATION AND CERTIFICATIONS (JUN 2020)

K.11 52.236-28 PREPARATION OF PROPOSALS--CONSTRUCTION (OCT 1997)

K.12 52.204-24REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR

EQUIPMENT (NOV 2021)

K.13 52.204-29FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS--REPRESENTATION AND DISCLOSURES

(DEC 2023)

K.14 52.209-5CERTIFICATION REGARDING RESPONSIBILITY MATTERS (AUG 2020)

K.15 52.204-8-DEVANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2025) (DEVIATION FEB 2025)

SECTION L INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

PAGE 7 OF 82 1333ND25RNB190009

L.1 52.204-7SYSTEM FOR AWARD MANAGEMENT (NOV 2024)

L.2 52.204-16COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING (AUG 2020)

L.3 52.204-22 ALTERNATIVE LINE ITEM PROPOSAL (JAN 2017)

L.4 52.207-6SOLICITATION OF OFFERS FROM SMALL BUSINESS CONCERNS AND SMALL BUSINESS TEAMING

ARRANGEMENTS OR JOINT VENTURES (MULTIPLE-AWARD CONTRACTS) (AUG 2024)

L.5 52.214-34 SUBMISSION OF OFFERS IN THE ENGLISH LANGUAGE (APR 1991)

L.6 52.214-35 SUBMISSION OF OFFERS IN U.S. CURRENCY (APR 1991)

L.7 52.216-27 SINGLE OR MULTIPLE AWARDS (OCT 1995)

L.8 52.233-2 SERVICE OF PROTEST (SEP 2006)

L.9 52.215-1INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION (NOV 2021)

L.10 Instruction to Offerors

L.11 52.216-1 TYPE OF CONTRACT (APR 1984)

L.12 1352.233-70 AGENCY PROTESTS (APR 2010)

L.13 1352.270-71 PRE-BID / PRE-PROPOSAL CONFERENCE AND SITE VISIT (APR 2010)

SECTION M EVALUATION FACTORS FOR AWARD

M.1 Evaluation Factors for Award

PAGE 8 OF 82 1333ND25RNB190009

SECTION B

SUPPLIES OR SERVICES AND PRICES/COSTS

B.1 1352.216-75 MINIMUM AND MAXIMUM CONTRACT AMOUNTS (APR 2010)

During the term of the contract, the Government shall place orders totaling a minimum of $2,500.00 for each contract . The amount of all orders shall not exceed $8,000,000.00 for all contractors, combined .

(End of clause)

PAGE 9 OF 82 1333ND25RNB190009

SECTION C

DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

C.1

PAGE 10 OF 82 1333ND25RNB190009

STATEMENT OF WORK

Mechanical Construction Indefinite Delivery Indefinite Quantity (IDIQ)

I. BACKGROUND INFORMATION

The U.S. Department of Commerce, National Institute of Standards and Technology (NIST) Gaithersburg, Maryland campus is a research and development facility with over 50 buildings located on a 578-acre campus. The majority of the buildings were constructed in the early to late 1960s. There are several buildings that were constructed from the 1990s to the present.

The majority of the buildings contain laboratory facilities with specialized environmental and utility systems, although there are also administrative and support buildings on campus.

The mission of the NIST Office of Facilities and Property Management (OFPM) is to safely and reliably manage and operate NIST facilities. This includes providing cost-effective and efficient services and infrastructure programs essential for NIST’s operations while ensuring maximum responsiveness to the needs of the NIST technical programs. The OFPM is responsible for facility activities and services including facilities planning and building design, construction, and renovation.

Utilities are typically distributed to the individual buildings by underground piping from an on-campus central utility plant (steam, chilled water, compressed air) or municipal utility (domestic water, natural gas, sanitary sewage). Some services (i.e. vacuum, nitrogen, helium, pure-water, hot water) are generated and distributed at the building level. Piping and associated equipment can date back to original building construction or be a more recent installation.

Building environmental control is typically provided by central air-handling units with a variety of systems used for individual space control. Those systems can include constant- or variable-volume air-handling units with hot deck/cold deck mixing boxes, reheat coils (hot-water, steam, electric), or variable-air-volume boxes (with or without reheat) for space control. Control is provided by a mixture of direct-digital controls (primarily Alerton, Andover, and Siemens) and pneumatic controls.

II. PURPOSE

The NIST OFPM requires mechanical construction products and services for NIST facilities in Gaithersburg, Maryland. NIST intends to acquire the construction products and services via a design-bid-build process.

- Design-bid-build means the traditional delivery method where design and construction are sequential and contracted for separately with two contracts and two contractors.

This acquisition is only for bid-build requirements. Architect-engineer services for design are not within the scope of this contract; NIST will provide design requirements for each task order (TO) that NIST solicits and awards under this contract.

PLACE OF PERFORMANCE

NIST campus in Gaithersburg, Montgomery County, Maryland

PERIOD OF PERFORMANCE

The contract period of performance is three years. Each TO will include its own specific period of performance.

III. SCOPE

PAGE 11 OF 82 1333ND25RNB190009

The Contractor shall provide the necessary supervision, management, personnel, materials, and equipment to perform repairs, renovations, and alterations to facilities and utilities.

Representative bid-build scope of individual TOs may include:

• Demolition, repair, replacement, modification, or addition to hydronic, plumbing, refrigeration, and steam/condensate piping systems including associated equipment. This may include campus distribution systems as well as building-level systems.

• Demolition, repair, replacement, modification, or addition to air-conditioning/distribution and exhaust air systems and associated equipment. Work may include performing air and water balance of systems.

• Demolition, repair, replacement, modification, or addition to air-conditioning/distribution control systems including direct-digital, electric, and pneumatic systems.

• Demolition, repair, replacement, modification, or addition to utility metering and/or monitoring systems.

• Demolition, repair, replacement, modification, or addition to fire sprinkler systems

• Demolition, repair, replacement, modification, or addition to laboratory safety equipment such as safety showers and eye wash stations

• Maintenance activities for air-conditioning/distribution equipment, exhaust air equipment, hydronic equipment, plumbing equipment, and refrigeration equipment

• Demolition, repair, replacement, modification, or addition to electrical, communication, and fire detection/alarm systems when associated with work mentioned above

• Demolition, excavation, repair, replacement, modification, or addition to site and building structures when associated with work mentioned above

• Hazardous material abatement when associated with work mentioned above

• Permit applications to regulatory agencies including completing applications from inception

Contractor work will generally be performed in areas that are occupied by NIST employees and/or NIST associates and, accordingly, may involve phasing to maintain or limit disturbances to those occupants. Such restrictions will be identified in the scope of work for the individual TOs. Work shall be performed in accordance with the general requirements listed in the “Guidelines for OFPM Contractors.”

Homeland Security Presidential Directive (HSPD)-12

The Contractor (and/or any subcontractor) and its employees who require physical access to NIST facilities or logical access to NIST IT networks or systems must comply with Homeland Security Presidential Directive (HSPD)-12, Policy for a Common Identification Standard for Federal Employees and Contractors; OMB M-05-24; OMB M- 19-17; FIPS 201, Personal Identity Verification (PIV) of Federal Employees and Contractors; NIST HSPD-12 policy; and Executive Order 13467, Part 1 §1.2.

Roster

PAGE 12 OF 82 1333ND25RNB190009

The Contractor (and/or any subcontractor) must submit a roster by name, position, e-mail address, phone number and responsibility, of all staff working under this acquisition where the Contractor will develop, have the ability to access, or host and/or maintain a government information system(s).

The roster must be submitted to the COR and/or CO within 14 days of the effective date of this contract. Any revisions to the roster as a result of staffing changes must be submitted within 14 days of the change. The COR will notify the Contractor of the appropriate level of investigation required for each staff member. If the employee is filling a new position, the Contractor must provide a position description and the Government will determine the appropriate suitability level.

Position Sensitivity Designations Requirement All Contractor (and/or any subcontractor) employees must obtain a background investigation commensurate with their position sensitivity designation that complies with Parts 1400 and 731 of Title 5, Code of Federal Regulations (CFR).

The following position sensitivity designation levels apply to this solicitation/contact:

Non-Sensitive, Low Risk.

IV. GENERAL REQUIREMENTS

Government Furnished Property NIST will furnish applicable hazardous material information to the contractor on each TO. Any other Government furnished property, material, equipment, or information will be detailed on each TO.

Inspection & Acceptance In addition to the inspection and acceptance terms articulated in FAR clause 52.246-12 that allows the Government reserves the right to perform such performance tests and evaluations as defined below to verify specified system performance. Such tests and evaluations, if performed, shall be conducted within the environment that the system is to be operated. The Contractor has the right to be present during the tests and evaluations, if performed at the Contractor’s expense.

Performance Tests and Acceptance

A visual inspection of the equipment will be performed by the COR to identify surface defects or any form of indication that any equipment was damaged during transport to NIST.

The COR will test, inspect, and accept or reject the equipment within 10 days of the receipt of the equipment unless otherwise indicated above. The Government reserves the right to conduct quality assurance testing to confirm that a given instrument(s) meets the manufacturer’s and/or the Government’s performance specifications.

REQUIREMENTS FOR CONTRACTOR PERSONNEL

PAGE 13 OF 82 1333ND25RNB190009

Safety: The Contractor employee must be responsible for knowing and complying with all installation safety prevention regulations. Such regulations include, but are not limited to, general safety, fire prevention, and waste disposal.

Security: NIST is a restricted campus. An identification badge is required for access for entry into buildings and is shown to the armed Security Police when entering the campus. All contract employees shall obtain badges for this contract. The badge type is a Facility Access Card (FAC)/ Personal Identification (PIV) Card. Contractor shall allow for up to 90 minutes to collect a badge (M-F 9AM to 12:00 PM). NIST will not provide escort services to the contractor during the performance of this contract.

Contractor travel: No contractor travel is required.

Special Material Requirements: None

Other Unique Requirements: Work will be performed in and around occupied areas performing scientific/research experiments where vibration, noise, outages of utilities, and disturbances to the physical environment may hinder the ability of the Government to perform required activities. As such, some tasks may involve phasing to maintain or limit disturbances to on-going operations. Any restriction will be identified in the scope of work for the individual TO.

Certain activities may have to be performed outside of normal business hours. In this event, overtime rates would be applicable. Work shall be performed in accordance with the general requirements listed in the “Guidelines for OFPM contractors and A/E Firms Performing Site Investigations and Fieldwork (Including Construction) at the National Institute of Standards and Technology, Gaithersburg, MD. The contractor shall submit a job-specific safety plan with Activity Hazard Analysis (AHA) for review and approval by NIST. A notice to proceed will be issued after safety plan approval.

V. SCHEDULE OF DELIVERABLES

To be defined in each TO.

ATTACHMENTS:

Attachment 1 - Guidelines for Contractors Attachment 2 - NIST S 7401.01_Fire Protection Life Safety for Design and Construction Attachment 3 - NIST Suborders Policies and Notices Attachment 4 - Outline of a Safety and Health Plan for Contractor Specific Contract

C.2

PAGE 14 OF 82 1333ND25RNB190009

STATEMENT OF WORK

AMLC - Replace Exhaust Scrubber

I. BACKGROUND INFORMATION

The U.S. Department of Commerce, National Institute of Standards and Technology (NIST), Center for Nanoscale Science and Technology (CNST) is replacing one Exhaust Scrubber System (ESS) that serves Building 215 on the NIST campus in Gaithersburg, Maryland.

II. PURPOSE

The ESS is at the end of its life cycle and needs replacement in kind. The ESS is currently available through the same manufacturer of the existing ESS. The Contractor shall provide mechanical construction services to remove and replace the existing ESS in kind. The form, fit, function, operating parameters, and capacities of the new ESS shall be the same as the existing ESS. Additionally, the construction services shall pose little or no impact to the 24 hour per day, seven days per week operation of Building 215. Any disruption shall be coordinated in advance with the Contracting Officer’s Representative (COR) for nights or weekends (off-hours).

PLACE OF PERFORMANCE

Building 215 on NIST campus in Gaithersburg, Maryland

Regular Business Hours Regular business hours are Monday through Friday, 8:30 AM to 5:00 PM Eastern Time, excluding Federal holidays and other days of NIST closure.

PERIOD OF PERFORMANCE

The period of performance for this TO is 300 days after the contracting officer (CO) issues a written notice to proceed to the contractor.

For planning purposes, the contractor shall assume that the CO will issue a notice to proceed within 30 days of TO award after NIST review of the following.

All bonds All insurance documents Contractor health and safety plan (activity hazard assessment based)

III. MINIMUM REQUIREMENTS

ESS and related services:

Duall Division Exhaust Air Scrubber, Model F105-123S HF The ESS to be supplied and installed by the contractor includes the following sub-systems:

o Steel Support Frame o Horizontal Scrubber o Recirculation Pumps (Qty-2) o Scrubber Control Panel o 300-gallon Chemical Mixing Tank o Piping and valves between the Chemical Mixing Tank and the Exhaust Scrubber

Recirculation Pumps o Freeze Protection

PAGE 15 OF 82 1333ND25RNB190009

• The minimum specifications for the new ESS are indicated in Attachment 5.

The ESS installation shall be in accordance with the latest codes and standards, to include requirements of The Environmental Protection Agency (EPA) and OSHA.

The contractor shall provide the following rigging services:

o Existing and new ESS o Existing and new steel support frames o Existing and new 300-gallon chemical mixing tank

The Contractor shall be responsible for removing all crating and packaging of all new components.

The Contractor shall properly dispose of the existing ESS including the existing 55-gallon chemical tank. This tank is located at the roof access area.

NIST will be responsible for dispose and renew of any chemicals for the existing and new systems.

New electrical power conduit, cabling and circuit breakers shall be provided from the main power panel of the ESS and freeze protection.

Existing ductwork shall remain up to the point of connection to the Exhaust Scrubber.

The contractor shall provide any ductwork transitions that the installation may require for a complete operational system.

No roof modifications are permitted.

The contractor shall closely coordinate construction activities with the COR and be done in a manner to result in minimal downtime and impact to CNST laboratory capabilities.

Training on how to properly operate and maintain the ESS shall be supplied by the

Contractor. The training plan shall be submitted for government approval 30 days prior to the planned performance of the training.

All contractor personnel, including sub-contractors, shall obtain Green NIST PIV badge with a higher security review for out of hours access.

The contractor shall provide weekly status/update meetings with the COR and other NIST stakeholders that are invited by the COR.

Contractor Safety Plan NIST is committed to maintaining a work environment that safeguards the public and the environment, as well as personnel and property.

The Contractor shall:

PAGE 16 OF 82 1333ND25RNB190009

Provide a detailed, site-specific Safety Plan to the contracting officer within 10 days after task order award that describes how the contractor will maintain a safe work environment and comply with applicable Occupational Safety and Health Administration (OSHA) standards, as well as with applicable state and local laws, standards, and codes.

The Safety Plan shall specify how the company’s policies and practices will comply with each of the applicable standards, laws, and codes.

The contracting officer will provide written comments regarding the plan to the contractor within seven days of receipt and will require the contractor to submit a revised safety plan within seven days after that to the contracting officer for their review.

This cycle may be repeated, if necessary, until the contracting officer determines the safety plan to be acceptable.

Safety-Related Equipment

The Contractor shall:

Provide all safety-related equipment required to perform the work under this award, including personal protective equipment (PPE) and other equipment that is required or appropriate to protect contractor personnel and other personnel on the NIST campus.

Contractor-provided personal protective equipment shall include, at a minimum, hard hats, safety shoes, safety glasses (prescription or standard), respiratory protection (powered air purifying respirator or full-face mask respirator), high visibility clothing and gloves that meet applicable OSHA standards for PPE.

Training

The Contractor shall:

Provide safety-related training required by applicable OSHA, state and local regulations or standards to affected contractor personnel (including subcontractor personnel) that perform work under this award. Such training may include, for example, training for proper use of PPE, respirator use, fall protection, crane operation, forklift operation;

electrical safety, or other safety-related topics.

Maintain records of safety training provided to contractor personnel (including subcontractor personnel) that perform work on this award. The contractor shall make those records available to the contracting officer, contracting officer’s representative for the award, or other authorized personnel within 7 days of receipt of their written request, and annually thereafter or upon request.

PAGE 17 OF 82 1333ND25RNB190009

Require contractor personnel (including subcontractors) to attend all required NIST-specific health or safety training that is required by the award.

Health Hazard Assessments and Medical Evaluations

The Contractor shall:

Provide required health hazard exposure assessments, medical evaluations and screenings, and exposure monitoring required by applicable OSHA requirements.

Ensure PII information is protected.

Homeland Security Presidential Directive (HSPD)-12

The Contractor (and/or any subcontractor) and its employees who require physical access to NIST facilities or logical access to NIST IT networks or systems must comply with Homeland Security Presidential Directive (HSPD)-12, Policy for a Common Identification Standard for Federal Employees and Contractors; OMB M-05-24; OMB M- 19-17; FIPS 201, Personal Identity Verification (PIV) of Federal Employees and Contractors; NIST HSPD-12 policy; and Executive Order 13467, Part 1 §1.2.

Roster

The Contractor (and/or any subcontractor) must submit a roster by name, position, e-mail address, phone number and responsibility, of all staff working under this acquisition where the Contractor will develop, have the ability to access, or host and/or maintain a government information system(s).

The roster must be submitted to the COR and/or CO within 14 days of the effective date of this TO. Any revisions to the roster as a result of staffing changes must be submitted within 14 days of the change. The COR will notify the Contractor of the appropriate level of investigation required for each staff member. If the employee is filling a new position, the Contractor must provide a position description, and the Government will determine the appropriate suitability level.

Position Sensitivity Designations Requirement

All Contractor (and/or any subcontractor) personnel must obtain a background investigation commensurate with their position sensitivity designation that complies with Parts 1400 and 731 of Title 5, Code of Federal Regulations (CFR).

IV. GENERAL REQUIREMENTS

Government Responsibilities

PAGE 18 OF 82 1333ND25RNB190009

The Government is responsible for the disposal and renewal of any chemicals for the existing and new scrubber systems.

Government Furnished Property Not Applicable

Inspection & Acceptance In addition to the inspection and acceptance terms articulated in FAR clause 52.246-12 that allows the Government to perform inspection of delivered products and services, NIST reserves the right to perform such performance tests and evaluations as defined below to verify specified system performance. Such tests and evaluations, if performed, shall be conducted within the environment that the system is to be operated. The Contractor has the right to be present during the tests and evaluations, if performed at the Contractor’s expense.

Performance Tests and Acceptance

A visual inspection of the equipment will be performed by the COR to identify surface defects or any form of indication that any equipment was damaged during transport to NIST.

The COR will test, inspect, and accept or reject the equipment within 10 days of the receipt of the equipment unless otherwise indicated above. The Government reserves the right to conduct quality assurance testing to confirm that a given instrument(s) meets the manufacturer’s and/or the Government’s performance specifications.

REQUIREMENTS FOR CONTRACTOR PERSONNEL

Safety: Contractor personnel (including subcontractors) are responsible for knowing and complying with all installation safety prevention regulations. Such regulations include, but are not limited to, general safety, fire prevention, and waste disposal.

Security: NIST is a restricted campus. An identification badge is required for access for entry into buildings and is shown to the armed Security Police when entering the campus.

Identification Badges: Contractor personnel (including subcontractors) must comply with NIST identification and access requirements. Each Contractor employee must wear a visible identification badge provided by the NIST Security Office.

V. SCHEDULE OF DELIVERABLES

Deliverable Number Description Format Due Date

Quantity

1 Contractor (including subcontractor) PIV Badge Applications:

Completed “NIST Site Badge Requests (New/Extensions)” and OF-306 forms

Password protected email files.

Send to COR.

Within 14 days after task order award

All personnel working on the project site

PAGE 19 OF 82 1333ND25RNB190009

2 Contractor and subcontractor job specific Health and Safety Plans & Activity Hazard Analysis (AHA) (based safety plans specific to the scope described in this Statement of Work)

Electronic PDF submission by email to COR and

CO

Within 10 days after task order award

As required

3 Detailed project schedule: to be incorporated into the contract documents.

Electronic PDF submission by email to COR and

CO

Within 10 days after task order award

4 Subcontractors and key personnel assignments (refer to Specification section 01 31 00)

Electronic PDF submission by email to COR and

CO

Within 10 days after task order award

As required

5 Schedule of Values: shall become the basis for the contractor’s cost loaded schedule, monthly invoices, and payments during execution

Electronic PDF submission by email to COR and

CO

Within 15 days after task order award

As required

6 Submittal Schedule (refer to specification section 01 33 00)

Electronic PDF submission by email to COR and

CO

Within 15 days after task order award

As required

7 Construction Security Plan (in accordance with

IAW ISC

standards)

Electronic PDF submission by email to COR and

CO

Within 15 days after task order award

As required

8 System Layout Submissions

Electronic PDF submission by email to COR and

CO

Within 15 days after task order award

As required

The COR and their designees shall inspect deliverables, and the COR will provide a written indication of acceptance or rejection, along with any explanatory remarks, to the Contractor Point of Contact (POC) within 10 days of receipt of deliverable. This section applies to deliverables which must be reviewed and approved for acceptance (e.g., draft plans, drawings, etc.).

PAGE 20 OF 82 1333ND25RNB190009

ATTACHMENTS:

Attachment 5 – Existing Acid Scrubber Attachment 6 - Advanced Measurement Laboratory Guidelines Attachment 7 – Division 1 Specifications Exhaust Scrubber

PAGE 21 OF 82 1333ND25RNB190009

SECTION E

INSPECTION AND ACCEPTANCE

E.1 52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996)

(Reference 52.246-12)

PAGE 22 OF 82 1333ND25RNB190009

SECTION F

DELIVERIES OR PERFORMANCE

F.1 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to

(a) commence work under this contract within **TBD task order level** calendar days after the date the Contractor receives the notice to proceed,

(b) prosecute the work diligently, and

(c) complete the entire work ready for use not later than **TBD task order level** The time stated for completion shall include final cleanup of the premises.

(End of Clause)

PAGE 23 OF 82 1333ND25RNB190009

F.2 52.211-10 First Task Order

PAGE 24 OF 82 1333ND25RNB190009

First Task Order (Bldg. 215 AMLC Replace Exhaust Scrubber):

This clause will be revised at the time of award based on the successful offeror and proposed period of performance.

52.211-10 Commencement, Prosecution, and Completion of Work (Apr 1984)

The Contractor shall be required to

(a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed,

(b) prosecute the work diligently, and

(c) complete the entire work ready for use not later than 300 calendar days after notice to proceed has been issued. The time stated for completion shall include final cleanup of the premises.

F.3 52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of (to be specified, if applicable, in a TO) for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor`s right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

PAGE 25 OF 82 1333ND25RNB190009

F.4 52.211-12 Liquidated Damages for First Task Order

PAGE 26 OF 82 1333ND25RNB190009

52.211-12 Liquidated Damages-Construction (Sept 2000)

Contractor shall pay liquidated damages to the Government in the amount of $3,000.00 for each calendar day of delay until the work is completed or accepted.

continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

PAGE 27 OF 82 1333ND25RNB190009

SECTION G

CONTRACT ADMINISTRATION DATA

G.1 1352.201-70 CONTRACTING OFFICER?s AUTHORITY (APR 2010)

The Contracting Officer is the only person authorized to make or approve any changes in any of the requirements of this contract, and, notwithstanding any provisions contained elsewhere in this contract, the said authority remains solely in the Contracting Officer. In the event the contractor makes any changes at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract terms and conditions, including price.

G.2 1352.201-72 CONTRACTING OFFICER`S REPRESENTATIVE (COR) (APR 2010)

(a) To be specified in award is hereby designated as the Contracting Officer`s Representative (COR).

The COR may be changed at any time by the Government without prior notice to the contractor by a unilateral modification to the contract. The COR is located at:

Phone Number:

Email:

(b) The responsibilities and limitations of the COR are as follows:

(1) The COR is responsible for the technical aspects of the contract and serves as technical liaison with the contractor. The COR is also responsible for the final inspection and acceptance of all deliverables and such other responsibilities as may be specified in the contract.

(2) The COR is not authorized to make any commitments or otherwise obligate the Government or authorize any changes which affect the contract price, terms or conditions. Any contractor request for changes shall be referred to the Contracting Officer directly or through the COR. No such changes shall be made without the express written prior authorization of the Contracting Officer. The Contracting Officer may designate assistant or alternate COR(s) to act for the COR by naming such assistant/alternate(s) in writing and transmitting a copy of such designation to the contractor.

G.3 1352.216-76 PLACEMENT OF ORDERS (APR 2010)

(a) The contractor shall provide goods and/or services under this contract only as directed in orders issued by authorized individuals. In accordance with FAR 16.505, each order will include:

(1) Date of order;

(2) Contract number and order number;

(3) Item number and description, quantity, and unit price or estimated cost or fee;

(4) Delivery or performance date;

(5) Place of delivery or performance (including consignee);

(6) Packaging, packing, and shipping instructions, if any;

(7) Accounting and appropriation data;

(8) Method of payment and payment office, if not specified in the contract;

(9) Any other pertinent information.

(b) In accordance with FAR 52.216-18, Ordering, the following individuals (or activities) are authorized to place orders against this contract:

Any appropriately warranted NIST contracting officer

(c) If multiple awards have been made, the contact information for the DOC task and delivery order ombudsman is OAM_Mailbox@doc.gov.

PAGE 28 OF 82 1333ND25RNB190009

G.4 TASK ORDER PROCEDURES

PAGE 29 OF 82 1333ND25RNB190009

TO REQUEST FOR PROPOSAL (RFP) PROCEDURES

A. GENERAL

1.

2.

3.

4. -

5.

B. CONTRACTOR PARTICIPATION AND SUBMISSON OF PROPOSALS FOR TO RFP’s

1. -

2.

3.

C. TO AWARD AND ADMINISTRATION

1. The c

2. 1442.

PAGE 30 OF 82 1333ND25RNB190009

D. CONTRACTOR PERFORMANCE INFORMATION

G.5 52.232-99 DEV PROVIDING ACCELERATED PAYMENT TO SMALL BUSINESS CONTRACTORS (AUG 2012) This clause implements the temporary policy provided by OMB Policy Memorandum M-12-16, Providing Prompt Payment to Small Business Subcontractors, dated July 11, 2012.

(a) Upon receipt of accelerated payments from the Government, the contractor is required to make accelerated payments to small business subcontractors to the maximum extent practicable after receipt of a proper invoice and all proper documentation from the small business subcontractor.

(b) Include the substance of this clause, including paragraph (b), in all subcontracts will small business concerns.

(c) The acceleration of payments under this clause does not provide any new rights under the Prompt Payment Act.

G.6 NIST LOCAL-40 BILLING INSTRUCTIONS FOR DELIVERY/TASK ORDERS

(a) NIST prefers electronic Invoice/Voucher submissions and they should be emailed to

INVOICE@NIST.GOV.

(b) Each Delivery/Task Order Invoice or Voucher submitted shall include the following: (1) Contract Number; identified in Block 2 of the OF347. (2) Delivery/Task Order number identified in Block 3 of the OF347. (3) Contractor Name and Address. (4) Date of Invoice. (5) Invoice Number. (6) Amount of Invoice and Cumulative Amount Invoiced to-date. (7) Contract Line Item Number (CLIN).

(8) Description, Quantity, Unit of Measure, Unit Price, and Extended Price of Supplies/Services Delivered. (9) Prompt Payment Discount Terms, if Offered. (10) Any other information or documentation required by the contract.

(c) In the event electronic submissions are not used, the Contractor shall submit an original invoice or voucher in accordance with paragraph (b) above to the address identified in Block 21 of the OF347.

(END OF CLAUSE)

G.7 NIST LOCAL-53 CONTRACT PERFORMANCE DURING CHANGES IN NIST OPERATING STATUS

All contractors performing work on active contracts at the U.S. Department of Commerce(DOC), National Institute of Standards and Technology (NIST) campuses and/or working in NIST workspaces should go to the www.nist.gov website and under the "About NIST" tab click on "Visit". This site includes information about campus access and security information; identification requirements; parking information and more.

Contractor personnel are required to check the appropriate campus operating status and personnel requirements at https://www.nist.gov/campus-status daily prior to arriving on site. All personnel must adhere to the requirements set forth in the operating status.

Unless otherwise stated in the contract terms and conditions, normal days of business operation are Monday through Friday, excluding Federal Holidays.