J.12 Past Performance Questionnaire.docx

DOCX document 24 KB Posted

Attached to
Oscar Dyson FSV Midlife Extension Program
Solicitation number
1305M224R0018
Issued by

About this file

This document is a Past Performance Questionnaire that will be used to evaluate a contractor's performance on a previous contract. The questionnaire assesses the contractor's performance in the areas of quality of service, schedule, and management. Evaluators are instructed to rate the contractor's performance using adjectival ratings ranging from "Exceptional" to "Unsatisfactory" and to provide comments to support the ratings. The completed questionnaire is to be sent to Shawn Griscom at NOAA by 4:00 PM EDT on September 2, 2024.

The related federal contract opportunity is for the Oscar Dyson FSV Midlife Extension Program, Solicitation Number 1305M224R0018, issued by the Department of Commerce National Oceanic and Atmospheric Administration (NOAA). The solicitation requires the contractor to provide products and services for the midlife extension of the Oscar Dyson Fisheries Survey Vessel. Interested parties can request reference drawings and technical manuals by emailing the contract specialist, Shawn Griscom.

View the file

Other files

File Type Posted
1305M224R0018-0006.pdf PDF
J.1 NOAA Ship Oscar Dyson FSV Midlife Extension Program Work Specification_Revision-005.pdf PDF
J.7 Government Furnished Material-0001.pdf PDF
1305M224R0018-0005.pdf PDF
Amendment 0005 Tech Manuals - Drawings.zip ZIP file
J.1 NOAA Ship Oscar Dyson FSV Midlife Extension Program Work Specification_Revision-004.pdf PDF
1305M224R0018-0004.pdf PDF
J.1 NOAA Ship Oscar Dyson FSV Midlife Extension Program Work Specification_Revision-003.pdf PDF
J.1 NOAA Ship Oscar Dyson FSV Midlife Extension Program Work Specification-0002.pdf PDF
1305M224R0018-0003.pdf PDF
1305M224R0018-0002.pdf PDF
ROXTEC S Frame - Installation Instructions.pdf PDF
ROXTEC R Frame Installation Instruction.pdf PDF
J.1 NOAA Ship Oscar Dyson FSV Midlife Extension Program Work Specification-0001.pdf PDF
1305M224R0018-0001.pdf PDF
J.14 SF 1416 Payment Bond.pdf PDF
J.1 NOAA Ship Oscar Dyson FSV Midlife Extension Program Work Specification.pdf PDF
J.3 NOAA Standard Specifications.pdf PDF
J.10 Schedule of Items and Prices.xlsx XLSX spreadsheet
J.11 Past Performance Information Form.xlsx XLSX spreadsheet
J.15 SF 1418 Performance Bond.pdf PDF
J.4 List of Technical Publications.pdf PDF
J.6 List of Ship Drawings.pdf PDF
J.7 Government Furnished Material.pdf PDF
J.8 Propulsion System Technical Specification.pdf PDF
1305M224R0018.pdf PDF
J.2 Specific Contract Definitions and Work Requirements.pdf PDF
J.5 List of Industry Standards & Public Documents.pdf PDF
J.9 List of Deliverables.pdf PDF
J.13 AIRs Process Document.docx DOCX document
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

J.12 Past Performance Questionnaire

PAST PERFORMANCE QUESTIONNAIRE

REFERENCE CONTRACT #: _______________________________

(the contract the evaluation is based on) Evaluator’s Name:___________________________ Evaluator’s email: ____________________ Evaluator’s Phone Number: _______________ Evaluator’s Agency or Company Name: ____________________________ Send Completed Questionnaire to Shawn.Griscom@noaa.gov no later than 4:00 PM EDT on September 2, 2024.

1. QUALITY OF SERVICE

Assess the contractor’s performance to contract requirements, specifications, and standards of good workmanship (e.g. commonly accepted technical, professional, or environmental standards).

(Check the appropriate rating box.)

RATING
ADJECTIVAL RATING
DEFINITION
EXCEPTIONAL
Performance meets contractual requirements and exceeds many to the Government’s benefit. The element being assessed was accomplished with few minor problems for which corrective actions taken by the Contractor were highly effective.
VERY GOOD
Performance meets contractual requirements and exceeds some to the Government’s benefit. The element being assessed was accomplished with some minor problems for which corrective actions taken by the Contractor were effective.
SATISFACTORY
Performance meets contractual requirements. The element being assessed contains some minor problems for which corrective actions taken by the Contractor appear or were
MARGINAL
Performance does not meet some contractual requirements. The element being assessed reflects a serious problem for which the Contractor has not yet identified corrective actions.
UNSATISFACTORY
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The element being assessed contains a serious problem(s) for which the Contractor’s corrective actions appear or were ineffective.

Comments:

2. SCHEDULE

Assess the timeliness of the contractor against the completion of the contract, task orders, milestones, delivery schedules, and administrative requirements (e.g. efforts that contribute to or affect the schedule variance). (Check the appropriate rating box.)

RATING
ADJECTIVAL RATING
DEFINITION
EXCEPTIONAL
Performance meets contractual requirements and exceeds many to the Government’s benefit. The element being assessed was accomplished with few minor problems for which corrective actions taken by the Contractor were highly effective.
VERY GOOD
Performance meets contractual requirements and exceeds some to the Government’s benefit. The element being assessed was accomplished with some minor problems for which corrective actions taken by the Contractor were effective.
SATISFACTORY
Performance meets contractual requirements. The element being assessed contains some minor problems for which corrective actions taken by the Contractor appear or were
MARGINAL
Performance does not meet some contractual requirements. The element being assessed reflects a serious problem for which the Contractor has not yet identified corrective actions.
UNSATISFACTORY
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The element being assessed contains a serious problem(s) for which the

Contractor’s corrective actions appear or were ineffective.

Comments:

3. MANAGEMENT

Assess the integration and coordination of all activities needed to execute the contract, specifically the timeliness, completeness and quality of problem identification, corrective action plans, proposal submittals, the contractor’s history of reasonable and cooperative behavior, and customer satisfaction.

(Check the appropriate rating box.)

RATING
ADJECTIVAL RATING
DEFINITION
EXCEPTIONAL
Performance meets contractual requirements and exceeds many to the Government’s benefit. The element being assessed was accomplished with few minor problems for which corrective actions taken by the Contractor were highly effective.
VERY GOOD
Performance meets contractual requirements and exceeds some to the Government’s benefit. The element being assessed was accomplished with some minor problems for which corrective actions taken by the Contractor were effective.
SATISFACTORY
Performance meets contractual requirements. The element being assessed contains some minor problems for which corrective actions taken by the Contractor appear or were
MARGINAL
Performance does not meet some contractual requirements. The element being assessed reflects a serious problem for which the Contractor has not yet identified corrective actions.
UNSATISFACTORY
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The element being assessed contains a serious problem(s) for which the

Contractor’s corrective actions appear or were ineffective.

Comments:

ADDITIONAL COMMENTS, IF ANY:

Rater’s Name:

Rater’s Signature:

Date:

Send Completed Questionnaire to Shawn.Griscom@noaa.gov no later than 4:00 PM EDT on September 2, 2024.

Page of Source Selection Information

1305M219QNMAN0242

Page of Source Selection Information

1305M219QNMAN0242

1305M224R0018

File details come from the government source that posted it. Updated .