1305M224R0018-0006.pdf

PDF 276 KB Posted

Attached to
Oscar Dyson FSV Midlife Extension Program
Solicitation number
1305M224R0018
Issued by

About this file

This document is a modification to Solicitation 1305M224R0018 for the Oscar Dyson FSV Midlife Extension Program. The purpose of this amendment is to provide an updated work specification for Work Item 20201 Vessel Repower, specifically updating paragraphs 3, 4.10, and 4.12. Additionally, Attachment J.7 Government Furnished Material has been updated. Contractors must acknowledge receipt of this amendment prior to the specified due date in order to be considered. The solicitation is for the Department of Commerce, National Oceanic and Atmospheric Administration (NOAA) to procure vessel repower services for the Oscar Dyson fisheries survey vessel. Contractors should refer to the full solicitation and all associated attachments for complete details on the requirements, proposal submission, and award.

View the file

Other files

File Type Posted
J.1 NOAA Ship Oscar Dyson FSV Midlife Extension Program Work Specification_Revision-005.pdf PDF
J.7 Government Furnished Material-0001.pdf PDF
Amendment 0005 Tech Manuals - Drawings.zip ZIP file
J.1 NOAA Ship Oscar Dyson FSV Midlife Extension Program Work Specification_Revision-004.pdf PDF
1305M224R0018-0005.pdf PDF
J.1 NOAA Ship Oscar Dyson FSV Midlife Extension Program Work Specification_Revision-003.pdf PDF
1305M224R0018-0004.pdf PDF
J.1 NOAA Ship Oscar Dyson FSV Midlife Extension Program Work Specification-0002.pdf PDF
1305M224R0018-0003.pdf PDF
ROXTEC R Frame Installation Instruction.pdf PDF
J.1 NOAA Ship Oscar Dyson FSV Midlife Extension Program Work Specification-0001.pdf PDF
ROXTEC S Frame - Installation Instructions.pdf PDF
1305M224R0018-0002.pdf PDF
1305M224R0018-0001.pdf PDF
1305M224R0018.pdf PDF
J.2 Specific Contract Definitions and Work Requirements.pdf PDF
J.5 List of Industry Standards & Public Documents.pdf PDF
J.9 List of Deliverables.pdf PDF
J.13 AIRs Process Document.docx DOCX document
J.1 NOAA Ship Oscar Dyson FSV Midlife Extension Program Work Specification.pdf PDF
J.3 NOAA Standard Specifications.pdf PDF
J.10 Schedule of Items and Prices.xlsx XLSX spreadsheet
J.11 Past Performance Information Form.xlsx XLSX spreadsheet
J.15 SF 1418 Performance Bond.pdf PDF
J.4 List of Technical Publications.pdf PDF
J.6 List of Ship Drawings.pdf PDF
J.7 Government Furnished Material.pdf PDF
J.8 Propulsion System Technical Specification.pdf PDF
J.12 Past Performance Questionnaire.docx DOCX document
J.14 SF 1416 Payment Bond.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

1305M224R0018 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

EAD-OMAO

NORFOLK VA 23510

FED BLDG 200 GRANBY ST SUITE 815

EAD-OMAO

08/29/20240006

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

06/05/2024

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

SEE ATTACHMENT PAGE

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

ASHLEY PERRY

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

1305M224R0018 0006

The purpose of Amendment 0006 is to provide an updated work specification:

1. Work Specification: Please see updated Work Specification – Work Item 20201 Vessel Repower. Paragraphs 3, 4.10, and 4.12 have been updated.

2. Government Furnished Material: Please see updated attachment J.7 Government Furnished Material-0001.

File details come from the government source that posted it. Updated .