Attachment D.6 Price Schedule Rev 1.xlsx
XLSX spreadsheet 17 KB Posted
- Solicitation number
- 1305M220QNMAN0202
About this file
This document contains a price schedule for drydock repairs to the NOAA Ship OKEANOS EXPLORER. The schedule lists various base items, additional growth items, and optional items for work including life raft inspections, fire detection and suppression inspections, drydocking, hull preservation, propeller and tailshaft inspection, and other repairs and maintenance. Unit prices are not provided. The solicitation number is 1305M220QNMAN0202 and is being issued by the Department of Commerce National Oceanic and Atmospheric Administration for FY21 RFQ for NOAA Ship OKEANOS EXPLORER Drydock Repairs.
View the file
Other files
Show 40 more
Latest 50 of 70 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schedule of Prices
| OKEANOS EXPLORER DRYDOCK FY21 | ||||||
| PRICE SCHEDULE- REV 1 | ||||||
| BASE ITEMS | ||||||
| CLIN | SPEC WORK ITEM | SPECIFICATION WORK ITEM TITLE | UNIT | QTY | UNIT PRICE | EXTENDED PRICE |
| 3.1 | Annual Life Raft Inspections | JB | 1 | $ - 0 | $ - 0 | |
| 3.2 | Annual Fire Detection and Suppression Inspection | JB | 1 | $ - 0 | $ - 0 | |
| 3.3 | Temporary Services | JB | 1 | $ - 0 | $ - 0 | |
| 3.4 | Vestdavit Annual Servicing | JB | 1 | $ - 0 | $ - 0 | |
| 3.5 | 02 Level Raised Deck Steel Repairs | JB | 1 | $ - 0 | $ - 0 | |
| 3.6 | Sea Valves | JB | 1 | $ - 0 | $ - 0 | |
| 3.7 | Bow and Stern Thruster Maintenance | JB | 1 | $ - 0 | $ - 0 | |
| 3.8 | Paint Sewage & Laundry tanks, BT & E.R. Voids | JB | 1 | $ - 0 | $ - 0 | |
| 3.9 | Dock Trials and Sea Trials | JB | 1 | $ - 0 | $ - 0 | |
| 3.10 | Drydocking and Routine Drydock Work | JB | 1 | $ - 0 | $ - 0 | |
| 3.11 | Underwater Hull and Freeboard Preservation | JB | 1 | $ - 0 | $ - 0 | |
| 3.12 | Propeller and Tailshaft Inspection and Repair | JB | 1 | $ - 0 | $ - 0 | |
| 3.13 | ABS Special Survey Hull-7 | JB | 1 | $ - 0 | $ - 0 | |
| 3.14 | LED Navigation Lights | JB | 1 | $ - 0 | $ - 0 | |
| 3.15 | Mission UPS Annual Maintenance | JB | 1 | $ - 0 | $ - 0 | |
| 3.16 | Underwater Scientific Equipment Preservation | JB | 1 | $ - 0 | $ - 0 | |
| 3.17 | Stack Repairs/Paint, AC Vent Refurb. | JB | 1 | $ - 0 | $ - 0 | |
| 3.18 | Forepeak Tank Preservation | JB | 1 | $ - 0 | $ - 0 | |
| 3.19 | Various Steel and Structural Repairs | JB | 1 | $ - 0 | $ - 0 | |
| 3.20 | Binnacle Compass, Searchlight and FLIR | JB | 1 | $ - 0 | $ - 0 | |
| 3.21 | Various Repairs, Inspections and Servicing | JB | 1 | $ - 0 | $ - 0 | |
| 3.22 | Dive Compressor Installation | JB | 1 | $ - 0 | $ - 0 | |
| 3.23 | Various compartment Deck Replacement | JB | 1 | $ - 0 | $ - 0 | |
| 3.24 | Door Installations | JB | 1 | $ - 0 | $ - 0 | |
| 3.25 | Ballast System Maintenance and Valve Repair | JB | 1 | $ - 0 | $ - 0 | |
| 3.26 | Ethanol Storage | JB | 1 | $ - 0 | $ - 0 | |
| 3.27 | Radar Replacement | JB | 1 | $ - 0 | $ - 0 | |
| 3.28 | DP Above Deck Upgrade | JB | 1 | $ - 0 | $ - 0 | |
| 3.29 | Food Grinder | JB | 1 | $ - 0 | $ - 0 | |
| Total Base Items | $ - 0 |
| ADDITIONAL ITEMS - GROWTH | ||||||
| ADDITIONAL ITEM REQUESTS (AIRs) These items relate to Growth Work. The Unit Price Column will be used throughout the life of the contract if growth work is added to the scope of the contract. If Additional Item Requests (AIRs) are issued, these items will be awarded at the quantities needed via a contract modification. The quantity shown is an estimate only and may be exceeded at the unit prices offered. | ||||||
| CLIN | SPEC WORK ITEM | SPECIFICATION WORK ITEM TITLE | UNIT | QTY | UNIT PRICE | EXTENDED PRICE |
| 4.0 | AIRS/Growth (estimated) |
**Provide breakdown, as follows:
AIRs/Growth Labor Rate Unit Price: $________; Quantity: 12,000 ; Unit of Issue: Hour; Extended Price: $____________
| HRS | EST. 12,000 | $ - 0 | $ - 0 |
| 4.0 | AIRs/Growth Material Markup/Handling Fee |
Unit Price: $230,000.00; Quantity: 1; Unit of Issue: Percent ________%;
Extended Price: [$230,000.00 X percentage quoted]: $______________
| % | EST. $230,000.00 | $ - 0 | $ - 0 | |||
| N/A | Additional Temp Services (See CAR CLAUSE 1372.271-86) | Day | EST 1 | $ - 0 | $ - 0 | |
| N/A | Laydays (See CAR CLAUSE 1372.271-89 | Day | EST 1 | $ - 0 | $ - 0 | |
| Total Growth | $ - 0 | |||||
| OPTION ITEMS |
| OPTION ITEMS | ||||||
| CLIN | SPEC WORK ITEM | SPECIFICATION WORK ITEM TITLE | UNIT | QTY | UNIT PRICE | EXTENDED PRICE |
| 5.1 | Transmitter Array Replacement | JB | 1 | $ - 0 | $ - 0 | |
| 5.2 | Fuel Locker Replacement | JB | 1 | $ - 0 | $ - 0 | |
| 5.3 | 86 Ballast Tanks Preservation | JB | 1 | $ - 0 | $ - 0 | |
| 5.4 | Main Engine Room Bilge Painting | JB | 1 | $ - 0 | $ - 0 | |
| 5.5 | Transducer Survey | JB | 1 | $ - 0 | $ - 0 | |
| 5.6 | ROV Stairwell Preservation | JB | 1 | $ - 0 | $ - 0 | |
| 5.7 | Galley 3-Way Valve | JB | 1 | $ - 0 | $ - 0 | |
| 5.8 | DYNACON OEM Tech Rep Support and System Groom. | JB | 1 | $ - 0 | $ - 0 | |
| 5.9 | EK80 38 kHz Transducer Replacement | JB | 1 | $ - 0 | $ - 0 | |
| 5.10 | Superstructure and Stack Painting | JB | 1 | $ - 0 | $ - 0 | |
| 5.11 | Anti-Roll and Anti-Roll Dump BWT Preservation | JB | 1 | $ - 0 | $ - 0 | |
| 5.12 | CHT V2 Tank Replacement | JB | 1 | $ - 0 | $ - 0 | |
| 5.13 | Ballast Tank Vent Replacement | JB | 1 | $ - 0 | $ - 0 | |
| 5.14 | CCTV Camera Upgrades | JB | 1 | $ - 0 | $ - 0 | |
| 5.15 | Separation of Chain Locker, Hyd. Cooler drain | JB | 1 | $ - 0 | $ - 0 | |
| 5.16 | Lower Boson Stores Preservation | JB | 1 | $ - 0 | $ - 0 | |
| 5.17 | Vent Repairs | JB | 1 | $ - 0 | $ - 0 | |
| 5.18 | Transducer Moon Pool Pipe Replacement | JB | 1 | $ - 0 | $ - 0 | |
| 5.19 | Inverted Tank Vent Replacement | JB | 1 | $ - 0 | $ - 0 | |
| 5.20 | Upgrade IMO Sounder SE-700 | JB | 1 | $ - 0 | $ - 0 | |
| 5.21 | HVAC Duct Cleaning | JB | 1 | $ - 0 | $ - 0 | |
| 5.22 | Bunk Bed Replacement | JB | 1 | $ - 0 | $ - 0 | |
| 5.23 | Hull Laser Scan | JB | 1 | $ - 0 | $ - 0 | |
| 5.24 | SWBD and Transformer cleaning & Torqueing | JB | 1 | $ - 0 | $ - 0 | |
| Total Options | $ - 0 |
| BASE | $ - 0 |
| BASE + GROWTH | $ - 0 |
| BASE+GROWTH+OPTIONS | $ - 0 |