Amendment 0002.pdf

PDF 310 KB Posted

Attached to
FY21 RFQ NOAA Ship OKEANOS EXPLORER Drydock Repairs
Solicitation number
1305M220QNMAN0202
Issued by

About this file

This document is an amendment to a solicitation for drydock repairs to the NOAA Ship OKEANOS EXPLORER. The amendment provides additional references and drawings requested by vendors, answers seven questions submitted regarding the solicitation requirements, and revises the price schedule attachment. The solicitation is for ship repair services during drydocking including fuel locker replacement, array and transducer upgrades, ballast tank preservation, cathodic protection system work, and superstructure painting. The NOAA is the contracting agency and responses were due by the date specified in the original solicitation. The amendment emphasizes that no ship inspection will be allowed due to COVID-19, but vendors should submit any questions to obtain information normally acquired during an inspection.

View the file

Other files

File Type Posted
Amendment 0008.pdf PDF
Amendment 0007.pdf PDF
Reference 38.pdf PDF
Reference 34.zip ZIP file
Amendment 0006.pdf PDF
Reference 28.zip ZIP file
Reference 35.zip ZIP file
Reference 36.zip ZIP file
Reference 29.zip ZIP file
Reference 27.zip ZIP file
Reference 33.zip ZIP file
Reference 26.zip ZIP file
Reference 31.zip ZIP file
Reference 37.zip ZIP file
Reference 30.zip ZIP file
Reference 32.zip ZIP file
Amendment 0005.pdf PDF
Amendment 0004.pdf PDF
Reference 21.zip ZIP file
Reference 24.zip ZIP file
Amendment 0005.pdf PDF
Reference 22.zip ZIP file
Reference 19.zip ZIP file
Reference 25.zip ZIP file
Reference 23.zip ZIP file
Reference 20.zip ZIP file
Reference 15.4.zip ZIP file
Reference 15.8.zip ZIP file
Reference 15.6.zip ZIP file
Reference 15.2.zip ZIP file
Reference 15.7.zip ZIP file
Reference 15.10.zip ZIP file
Reference 15.3.zip ZIP file
Reference 15.5.zip ZIP file
Reference 15.1.zip ZIP file
Reference 15.9.zip ZIP file
OE_235_01.pdf PDF
Reference 17.zip ZIP file
Reference 16.zip ZIP file
References 18.zip ZIP file
Amendment 0004.pdf PDF
Amendment 0003.pdf PDF
Reference 13.zip ZIP file
References 12.zip ZIP file
Attachment D.6 Price Schedule Rev 1.xlsx XLSX spreadsheet
References 11.zip ZIP file
References 10.zip ZIP file
References 7.zip ZIP file
RFQ OKEANOS EXPLORER DRYDOCK REPAIRS Rev 1.pdf PDF
References 7.5.zip ZIP file
Show 40 more

Latest 50 of 70 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name and Title of Signer (Type or Print) 16A. Name and title of Contracting Officer (Type or Print)

15B. Contractor/Offeror 15C. Date Signed 16B. United States of America

(Signature of Contracting Officer)

16C. Date Signed

(Signature of person authorized to sign)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)

PREVIOUS EDITIONS UNUSABLE Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page of Pages 1 5

5. Project No. (if applicable) 2. Amendment/Modification No.

3. Effective Date 07/13/2020

4. Requisition/Purchase Req. No.

NMAN7200-20-01111

Code AJ930073 7. Administered By (If other than Item 6)

SEE BLOCK 6

6. Issued By

NOAA/EASTERN REGION ACQUISITION

200 GRANBY STREET

SUITE 405

NORFOLK, VA 23510

8. Name and Address of Contractor (No., Street, County, and Zip Code) (X)

X

9A. Amendment of Solicitation No.

1305M220QNMAN0202

9B. Date (See Item 11) July 2, 2020 10A. Modification of Contract/Order No.

10B. Date (See Item 13)

Code Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG- MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting and Appropriation Data (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(x) A. This change order is issued pursuant to: (Specify authority) The changes set forth in item 14 are made in the Contract Order No. in item 9A.

B. The above numbered Contract/Order is modified to reflect the administrative changes (such as changes in paying office, appropriation date, etc.)

Set fourth item 14, pursuant to the authority of FAR 43.103 (b)

C. This supplemental agreement is entered into pursuant to authority of:

D. Other (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. Description of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.

X The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended

DRYDOCK REPAIRS TO NOAA SHIP OKEANOS EXPLORER

This amendment is being issued to make changes to the RFQ OKEANOS EXPLORER DRYDOCK REPAIRS, Attachment D6: PRICE SCHEDULE and includes additional references.

X

The purpose of this Amendment is as follows:

1. Address questions submitted by vendors.

Q1:

I have been reviewing the RFQ for the Okeanos Explorer and have noted a disparity between the excel spread sheet issued for pricing and the specification item titles and numbers in the 3 items. Notably Item 3.1 through 3.22. Please review and confirm the use of the excel spreadsheet is expected.

A1:

The price schedule is revised to include changes to the specification work item titles. Attachment D.6 Price Schedule (Rev-1) is attached.

Q2:

Please clarify that the following CAR means Inter-port Differential is to be calculated on just the trip from Kingstown RI to Pascagoula MS. See the highlighted below.

CAR 1352.271-74 on page 34, paragraph (b)These elements of foreseeable costs consist of the following:(1)Vessel Transit:(i)Vessel delivery costs will be based on one round trip from the vessel's homeport of North Kingstown, RI to the contractor's facility at a cruising speed of 10 knots. Distances will be based on the NOAA publication, “Distance between U.S. Ports”.

A2:

CAR 1352.271-74 states the foreseeable costs will be based on one round trip from North Kingstown, RI which has been changed to Port Canaveral, FL (Amendment 1) to the contractor’s facility and from the contractor’s facility to Port Canaveral, FL which is a round trip.

Q3:

Paragraph 2.2.3 of the repair specification states:

“Contractor shall be responsible for verifying all current configuration, construction, and arrangement changes, as necessary, to comply with and perform the work requirements of these specifications. Contractors are encouraged and expected to review ship’s drawings and to perform a field inspection to inspect the locations and shipboard conditions where services are to be performed aboard the Okeanos Explorer prior to submitting a bid proposal. This inspection should satisfy potential contractors regarding all general and local conditions, (including locations, interferences, tolerances and necessary “work-arounds, etc.)

that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the sites constitute grounds for a change order or claim after contract award.” Paragraph 2.2.19 reflects the same criteria regarding ship checks. “Frame numbers and space names are derived from ship’s drawings. All equipment changes and space modifications over the ship’s life span may not all be reflected in the referenced drawings. Contractors are encouraged to review all referenced drawings and to perform a field inspection of the ship prior to submitting a bid.” However the RFQ paragraph B.1 SPECIFICS, SUB PARAGRAPH 2, indicates that no ship check inspection will be available. Paragraph 2.2.19 reflects the same criteria regarding ship checks. “Frame numbers and space names are derived from ship’s drawings. All equipment changes and space modifications over the ship’s life span may not all be reflected in the referenced drawings. Contractors are encouraged to review all referenced drawings and to perform a field inspection of the ship prior to submitting a bid.”

We take it that paragraph 2.5.7 overrides all requirements stated for ship checks in all work item paragraphs. Is this correct?

A3:

Yes, Paragraph 2.5.7 overrides all requirements or options to perform a ship check due to the ongoing COVID-19 Pandemic. The drawings and references are to be consulted as much as possible. However, questions are highly encouraged. Please submit any questions for information that would normally be obtained during a ship check and the drawings/ references do not address. Every effort will be taken to obtain requested information.

Q4:

Paragraph 2.2.23 “The Ship’s crew will empty all tanks to the lowest point possible using the ships systems. All remaining fluid in the tanks that must be removed by the contractor to complete the tasks associated with these specifications will be the responsibility of the contractor at no additional cost to the Government.” Is this supposed to read “will be the responsibility of the contractor and covered under the tank cleaning requirements necessary for the ABS survey identified as the Load Line Survey and addressed in item 3.13.4.10”?

A4:

Emptying all tanks for the ABS inspections will be the responsibility of the contractor. Paragraph 2.2.23 was included just to indicate that the ship's crew would use the shipboard systems as much as possible to help in the movement and removal of tank liquids.

Q5:

Please provide 02 Level Raised Deck Pictures referenced in 3.5.2.1.

A5:

This additional reference has been therefore added to the RFQ. Reference 10 is attached.

Q6:

For WI 5.2 Fueling Locker Replacement. Please, provide dimensions of locker (L, W, H) and doors.

A6:

This additional reference has been therefore added to the RFQ. Reference 11 is attached.

Q7:

Please, provide these documents:

WI 5.1 EM 304 Array Upgrade - 5.1.2.5 Drawing 631062303576 Paint Schedule, 5.1.2.8 Manual OE-424-02 Kongsberg EM302 Multibeam Echo Sounder Installation Manual

WI 5.3 Ballast Tanks Preservation - 5.3.1.5 Drawing 631-623-3576 – Paint Schedule

WI 5.5 Transducer and Benchmark Survey and Replacement - 5.5.2.3 Drawing OE-405-101_Antenna_Arrangment_Rev_C –

WI 5.10 Superstructure Painting - 5.10.2.11 – Drawing 101-623-3633 (?) - Molded Lines, 5.10.2.12 – Drawing 101-623-3543 (?) - Shell Expansion

WI 5.12 CHT V2 Tank Replacement - 5.12.2.1 750-0003 OMNIPURE Manual September 2015, 5.12.2.3 Technical Manual T9593-BV-MM0- 010 - Operations and Maintenance Instructions for Marine Sanitation Device”

WI 5.18 Transducer Moon Pipes Replacement - 5.14.2.12 Switch

POE8ATN-US

WI 3.28 DP Above Deck Upgrade - 56598-2 Okeanos Explorer WIN 10 Upgrade (PP1-18) Monitor MD 384633A

A7:

This additional reference has been therefore added to the RFQ.

Reference 12 is attached.