Price_Schedule.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
FY20 DRYDOCK REPAIRS TO NOAA SHIP GORDON GUNTER
Solicitation number
1305M219QNMAN0345
Issued by

About this file

Price Schedule in Excel format

View the file

Other files

File Type Posted
SBE38_mounted_at_Sea_Chest_2396.jpg JPG image
5987226_B_Bulwark_Misc_Structure_Dets.pdf PDF
SBE38_mounted_at_Sea_Chest_2395.jpg JPG image
6233545_C_Scantlings_FSCLE___above.pdf PDF
6233544_D_Scantlings_MN_DK___Below.pdf PDF
67071A-PN50244-SBE38-External-Temp-Mount-Kit.pdf PDF
aft_stbd_chock.JPG JPG image
Amendment_0003.pdf PDF
GU_FY20_Drydock_Spec_August_Ch-2.pdf PDF
chock_foundation_steel_thickness.JPG JPG image
TLI_Sys_ISO_EWD.pdf PDF
GU_342_6629785_MN_Engine_FW_Cooling_System_Diagram_MARK_UP.pdf PDF
Amendment_2-1305M219QNMAN0345.pdf PDF
6233772_C_Carpet_AD.pdf PDF
6630021_A_Plumb_Drains_Sewage_Sys_Dia.pdf PDF
winch_control_base.JPG JPG image
6233974_D_NBC_Washdown_Sys_Arr.pdf PDF
GU_FY20_Drydock_Spec_August_Ch-1.pdf PDF
6233663_P_One_Line_Diagram.pdf PDF
6233845_F_Overflow_Vent_Sounding_Tubes_T-13_Class.pdf PDF
6629795_-_Overflow_Vents_Sounding_Tube_Diagram.pdf PDF
Life_Raft_Certs_2018.pdf PDF
AMENDMENT_0001.pdf PDF
6233773_E_Storerooms_Lockers.pdf PDF
6629807_-_One_Line_T-18.pdf PDF
6233816_E_Fuel_Fill_and_XFR_Sys_Dia.pdf PDF
6233779_C_Modular_Bath_Arr_Det.pdf PDF
6629791_-_Weather_Deck_Drain_Diagram.pdf PDF
GU_Immersion_Suit_Inspection_2019.pdf PDF
Foc'sl_chair_stand.JPG JPG image
Gordon_Gunter_Updated_FF_Inspection.pdf PDF
6233754_E_Joiner_Arr_Upper_Dk.pdf PDF
winch_control_boxes_1.JPG JPG image
GU-555-001--.pdf PDF
512-6233800.pdf PDF
drw_DCU-housing-200x200x120.pdf PDF
573-2, Overhaul-Repair of Hydraulic Cylinders.pdf PDF
s1205.pdf PDF
GU_342_6629792 Diesel Engine SW Cooling Sys Diagram.pdf PDF
6233582_B Zinc Arr _ Details.pdf PDF
GU_FY20_Drydock_Spec_AUG_2019.pdf PDF
GU-512-003 Revision B.pdf PDF
GU-512-004 Revision A.pdf PDF
533-1.pdf PDF
528-6233893 Plumbing Drains Above Main Deck.pdf PDF
085-6233567 General Arrangement Fcsle Dk _ Above - Copy.pdf PDF
AMC-505-1B, Valve Overhaul and Test PDF
GU-801-001.pdf PDF
520-001 Science SW System Revision A.pdf PDF
ATTACHMENT_D.5_SUBCONTRACTING_PLAN_AS_WORD_DOC.doc DOC document
Show 40 more

Latest 50 of 104 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Schedule of Prices

PRICE SCHEDULE
BASE ITEMS
CLINSPEC WORK ITEMSPECIFICATION WORK ITEM TITLEUNITQTYUNIT PRICEEXTENDED PRICE
2General Requirements1JB
3.1Temporay Services1JB
3.2Dry Docking and Routine Dry Dock Work1JB
3.3Underwater Hull Preservation and Coating (Maintenance Coat)1JB
3.4Sea Valve Overhauls1JB
3.5Deleted1JB
3.6Bow Thruster Inspection and Service1JB
3.7ABS Drydocking Survey and Inrtermediate Hull Survey 71JB
3.8Annual Life Raft Inspection1JB
3.9Annual Survival Suit Certifications1JB
3.10Weight Tests of Lifting Gear1JB
3.11Annual Fire Inspection1JB
3.12Annual Miranda Davit Repairs, Inspection and Certification1JB
3.13Switchboard Cleaning1JB
3.14Generator Room, EOS Void and Motor Room Bilge Preservation1JB
3.15Galley Exhaust Duct and Fan Cleaning1JB
3.16Miscellaneous Steel Replacement and Preservation1JB
3.17Renew Interior and Exterior Doors1JB
3.18Tank Level Indicator Calibration1JB
3.19Toilet and Shower Decking Replacement1JB
3.20Replacement of the Non-Metallic Expansion Joints1JB
3.21Low Pressure Air Compressor1JB
3.22HVAC System Cleaning1JB
3.23Black and Gray Water System Cleaning1JB
3.24Transformer Cleaning1JB
3.25Main Motor Service1JB
Total Base Items$0.00
ADDITIONAL ITEMS - GROWTH
ADDITIONAL ITEM REQUESTS (AIRs) These items relate to Growth Work. The Unit Price Column will be used throughout the life of the contract if growth work is added to the scope of the contract. If Additional Item Requests (AIRs) are issued, these items will be awarded at the quantities needed via a contract modification. The quantity shown is an estimate only and may be exceeded at the unit prices offered.
CLINSPEC WORK ITEMSPECIFICATION WORK ITEM TITLEUNITQTYUNIT PRICEEXTENDED PRICE
30000/400004.1AIRS/Growth (estimated)

**Provide breakdown, as follows:

AIRs/Growth Labor Rate Unit Price: $________; Quantity: 1,500 ; Unit of Issue: Hour; Extended Price: $____________

HRSEST. 1,500
30000/400004.1AIRs/Growth Material Markup/Handling Fee

Unit Price: $50,000.00; Quantity: 1; Unit of Issue: Percent ________%;

Extended Price: [$50,000.00 X percentage quoted]: $______________

%EST. $50,000.00
N/AAdditional Temp Services (See CAR CLAUSE 1372.271-86)DayEST 1
N/ALaydays (See CAR CLAUSE 1372.271-89DayEST 1
Total Growth$0.00
OPTION ITEMS

CLIN SPEC

WORK

ITEMSPECIFICATION WORK ITEM TITLEUNITQTYUNIT
PRICEEXTENDED

PRICE

5.1Mission UPS Power Distribution Modifications1JB
5.2Engine Room Ventilation Modifications
5.3Potable Water System Modifications1JB
5.4Laundry Room Modifications
5.5Gym Modifications1JB
5.6Renew Deck Machinery Hydraulic Hoses and Fittings1JB
5.7Main Engine Fresh Water and Seawater Piping Modifications1JB
5.8Mission HPU Pipe Installation1JB
Total Options$0.00
BASE$0.00
BASE + GROWTH$0.00
BASE+GROWTH+OPTIONS$0.00