Price_Schedule.xlsx
XLSX spreadsheet 15 KB Posted
- Attached to
- FY20 DRYDOCK REPAIRS TO NOAA SHIP GORDON GUNTER
- Solicitation number
- 1305M219QNMAN0345
About this file
Price Schedule in Excel format
View the file
Other files
Show 40 more
Latest 50 of 104 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schedule of Prices
| PRICE SCHEDULE | ||||||
| BASE ITEMS | ||||||
| CLIN | SPEC WORK ITEM | SPECIFICATION WORK ITEM TITLE | UNIT | QTY | UNIT PRICE | EXTENDED PRICE |
| 2 | General Requirements | 1 | JB | |||
| 3.1 | Temporay Services | 1 | JB | |||
| 3.2 | Dry Docking and Routine Dry Dock Work | 1 | JB | |||
| 3.3 | Underwater Hull Preservation and Coating (Maintenance Coat) | 1 | JB | |||
| 3.4 | Sea Valve Overhauls | 1 | JB | |||
| 3.5 | Deleted | 1 | JB | |||
| 3.6 | Bow Thruster Inspection and Service | 1 | JB | |||
| 3.7 | ABS Drydocking Survey and Inrtermediate Hull Survey 7 | 1 | JB | |||
| 3.8 | Annual Life Raft Inspection | 1 | JB | |||
| 3.9 | Annual Survival Suit Certifications | 1 | JB | |||
| 3.10 | Weight Tests of Lifting Gear | 1 | JB | |||
| 3.11 | Annual Fire Inspection | 1 | JB | |||
| 3.12 | Annual Miranda Davit Repairs, Inspection and Certification | 1 | JB | |||
| 3.13 | Switchboard Cleaning | 1 | JB | |||
| 3.14 | Generator Room, EOS Void and Motor Room Bilge Preservation | 1 | JB | |||
| 3.15 | Galley Exhaust Duct and Fan Cleaning | 1 | JB | |||
| 3.16 | Miscellaneous Steel Replacement and Preservation | 1 | JB | |||
| 3.17 | Renew Interior and Exterior Doors | 1 | JB | |||
| 3.18 | Tank Level Indicator Calibration | 1 | JB | |||
| 3.19 | Toilet and Shower Decking Replacement | 1 | JB | |||
| 3.20 | Replacement of the Non-Metallic Expansion Joints | 1 | JB | |||
| 3.21 | Low Pressure Air Compressor | 1 | JB | |||
| 3.22 | HVAC System Cleaning | 1 | JB | |||
| 3.23 | Black and Gray Water System Cleaning | 1 | JB | |||
| 3.24 | Transformer Cleaning | 1 | JB | |||
| 3.25 | Main Motor Service | 1 | JB | |||
| Total Base Items | $0.00 | |||||
| ADDITIONAL ITEMS - GROWTH | ||||||
| ADDITIONAL ITEM REQUESTS (AIRs) These items relate to Growth Work. The Unit Price Column will be used throughout the life of the contract if growth work is added to the scope of the contract. If Additional Item Requests (AIRs) are issued, these items will be awarded at the quantities needed via a contract modification. The quantity shown is an estimate only and may be exceeded at the unit prices offered. | ||||||
| CLIN | SPEC WORK ITEM | SPECIFICATION WORK ITEM TITLE | UNIT | QTY | UNIT PRICE | EXTENDED PRICE |
| 30000/40000 | 4.1 | AIRS/Growth (estimated) |
**Provide breakdown, as follows:
AIRs/Growth Labor Rate Unit Price: $________; Quantity: 1,500 ; Unit of Issue: Hour; Extended Price: $____________
| HRS | EST. 1,500 | |
| 30000/40000 | 4.1 | AIRs/Growth Material Markup/Handling Fee |
Unit Price: $50,000.00; Quantity: 1; Unit of Issue: Percent ________%;
Extended Price: [$50,000.00 X percentage quoted]: $______________
| % | EST. $50,000.00 | ||||
| N/A | Additional Temp Services (See CAR CLAUSE 1372.271-86) | Day | EST 1 | ||
| N/A | Laydays (See CAR CLAUSE 1372.271-89 | Day | EST 1 | ||
| Total Growth | $0.00 | ||||
| OPTION ITEMS |
CLIN SPEC
WORK
| ITEM | SPECIFICATION WORK ITEM TITLE | UNIT | QTY | UNIT |
| PRICE | EXTENDED |
PRICE
| 5.1 | Mission UPS Power Distribution Modifications | 1 | JB | |
| 5.2 | Engine Room Ventilation Modifications | |||
| 5.3 | Potable Water System Modifications | 1 | JB | |
| 5.4 | Laundry Room Modifications | |||
| 5.5 | Gym Modifications | 1 | JB | |
| 5.6 | Renew Deck Machinery Hydraulic Hoses and Fittings | 1 | JB | |
| 5.7 | Main Engine Fresh Water and Seawater Piping Modifications | 1 | JB | |
| 5.8 | Mission HPU Pipe Installation | 1 | JB | |
| Total Options | $0.00 |
| BASE | $0.00 |
| BASE + GROWTH | $0.00 |
| BASE+GROWTH+OPTIONS | $0.00 |
&KFF0000Price Schedule
File details come from the government source that posted it.