533-1.pdf

PDF 25 KB Posted

Attached to
FY20 DRYDOCK REPAIRS TO NOAA SHIP GORDON GUNTER
Solicitation number
1305M219QNMAN0345
Issued by

About this file

ATTACHMENT D: REFERENCE DOCUMENT

View the file

Other files

File Type Posted
SBE38_mounted_at_Sea_Chest_2396.jpg JPG image
5987226_B_Bulwark_Misc_Structure_Dets.pdf PDF
SBE38_mounted_at_Sea_Chest_2395.jpg JPG image
6233545_C_Scantlings_FSCLE___above.pdf PDF
6233544_D_Scantlings_MN_DK___Below.pdf PDF
67071A-PN50244-SBE38-External-Temp-Mount-Kit.pdf PDF
aft_stbd_chock.JPG JPG image
Amendment_0003.pdf PDF
GU_FY20_Drydock_Spec_August_Ch-2.pdf PDF
chock_foundation_steel_thickness.JPG JPG image
TLI_Sys_ISO_EWD.pdf PDF
GU_342_6629785_MN_Engine_FW_Cooling_System_Diagram_MARK_UP.pdf PDF
Amendment_2-1305M219QNMAN0345.pdf PDF
6233772_C_Carpet_AD.pdf PDF
6630021_A_Plumb_Drains_Sewage_Sys_Dia.pdf PDF
winch_control_base.JPG JPG image
6233974_D_NBC_Washdown_Sys_Arr.pdf PDF
GU_FY20_Drydock_Spec_August_Ch-1.pdf PDF
6233663_P_One_Line_Diagram.pdf PDF
6233845_F_Overflow_Vent_Sounding_Tubes_T-13_Class.pdf PDF
6629795_-_Overflow_Vents_Sounding_Tube_Diagram.pdf PDF
Life_Raft_Certs_2018.pdf PDF
AMENDMENT_0001.pdf PDF
6233773_E_Storerooms_Lockers.pdf PDF
6629807_-_One_Line_T-18.pdf PDF
6233816_E_Fuel_Fill_and_XFR_Sys_Dia.pdf PDF
6233779_C_Modular_Bath_Arr_Det.pdf PDF
6629791_-_Weather_Deck_Drain_Diagram.pdf PDF
GU_Immersion_Suit_Inspection_2019.pdf PDF
Foc'sl_chair_stand.JPG JPG image
Gordon_Gunter_Updated_FF_Inspection.pdf PDF
6233754_E_Joiner_Arr_Upper_Dk.pdf PDF
winch_control_boxes_1.JPG JPG image
Price_Schedule.xlsx XLSX spreadsheet
GU-555-001--.pdf PDF
512-6233800.pdf PDF
drw_DCU-housing-200x200x120.pdf PDF
573-2, Overhaul-Repair of Hydraulic Cylinders.pdf PDF
s1205.pdf PDF
GU_342_6629792 Diesel Engine SW Cooling Sys Diagram.pdf PDF
6233582_B Zinc Arr _ Details.pdf PDF
GU_FY20_Drydock_Spec_AUG_2019.pdf PDF
GU-512-003 Revision B.pdf PDF
GU-512-004 Revision A.pdf PDF
528-6233893 Plumbing Drains Above Main Deck.pdf PDF
085-6233567 General Arrangement Fcsle Dk _ Above - Copy.pdf PDF
AMC-505-1B, Valve Overhaul and Test PDF
GU-801-001.pdf PDF
520-001 Science SW System Revision A.pdf PDF
ATTACHMENT_D.5_SUBCONTRACTING_PLAN_AS_WORD_DOC.doc DOC document
Show 40 more

Latest 50 of 104 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMC-533-1

AUGUST 1991

NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION (NOAA)

ATLANTIC MARINE CENTER

STANDARD SPECIFICATION AMC-533-1

POTABLE WATER TANK DISINFECTION

1. SCOPE. This specification contains the general requirements for disinfecting potable water tanks on NOAA ships.

2. REFERENCES.

None

3. REQUIREMENTS.

3.1 General Requirements.

3.1.1 When introducing chlorine treatment solution to a

potable water tank, ensure that the solution is diluted and is introduced only through a sounding tube or threaded connection.

Immediately after adding the treatment solution, add a rinse consisting of at least five gallons of potable water through the same sounding tube or threaded connection.

3.1.2 Isolate the tank(s) from the rest of the potable

water service system and thoroughly rinse and drain the tank interiors.

3.2 Disinfect Procedure.

3.2.1 Fill the potable water tank with potable water until

it overflows, exercising care not to pressurize the tank. As it fills, introduce sufficient chlorine solution to provide at least 100 parts-per-million (ppm) Free Available Chlorine (FAC) content in the completely filled tank.

3.2.2 Monitor the FAC content hourly for at least four

hours. If the FAC content drops below 50 ppm at any time, add additional chlorine solution to the tank to bring the FAC content back up to 100 ppm and begin the four-hour period anew. Continue until the FAC content remains at or above 50 ppm for a four-hour period.

3.2.3 If more than one tank is to be disinfected, repeat

the above procedure for the other tank. At the contractor's discretion, the same water used to disinfect the first tank may be used, as long as the initial FAC content in the second tank is increased to 100 ppm at the start of the four-hour test period.

AMC-533-1

AUGUST 1991

3.2.4 Drain the tank(s) and refill with potable water.

Repeat the above tests, except that an initial FAC content of

1.0 ppm or greater shall be provided, the monitoring period shall be 30 minutes, and the minimum allowable FAC content shall be

0.2 ppm.

3.2.5 After successfully completing the 30-minute test

period, drain and refill the tank(s) with potable water until the total FAC content falls to 1.0 ppm or less.

END OF SPECIFICATION

Page 1
Page 2

File details come from the government source that posted it.