573-2, Overhaul-Repair of Hydraulic Cylinders.pdf

PDF 22 KB Posted

Attached to
FY20 DRYDOCK REPAIRS TO NOAA SHIP GORDON GUNTER
Solicitation number
1305M219QNMAN0345
Issued by

About this file

ATTACHMENT D: REFERENCE DOCUMENT

View the file

Other files

File Type Posted
SBE38_mounted_at_Sea_Chest_2396.jpg JPG image
5987226_B_Bulwark_Misc_Structure_Dets.pdf PDF
SBE38_mounted_at_Sea_Chest_2395.jpg JPG image
6233545_C_Scantlings_FSCLE___above.pdf PDF
6233544_D_Scantlings_MN_DK___Below.pdf PDF
67071A-PN50244-SBE38-External-Temp-Mount-Kit.pdf PDF
aft_stbd_chock.JPG JPG image
Amendment_0003.pdf PDF
GU_FY20_Drydock_Spec_August_Ch-2.pdf PDF
chock_foundation_steel_thickness.JPG JPG image
TLI_Sys_ISO_EWD.pdf PDF
GU_342_6629785_MN_Engine_FW_Cooling_System_Diagram_MARK_UP.pdf PDF
Amendment_2-1305M219QNMAN0345.pdf PDF
6233772_C_Carpet_AD.pdf PDF
6630021_A_Plumb_Drains_Sewage_Sys_Dia.pdf PDF
winch_control_base.JPG JPG image
6233974_D_NBC_Washdown_Sys_Arr.pdf PDF
GU_FY20_Drydock_Spec_August_Ch-1.pdf PDF
6233663_P_One_Line_Diagram.pdf PDF
6233845_F_Overflow_Vent_Sounding_Tubes_T-13_Class.pdf PDF
6629795_-_Overflow_Vents_Sounding_Tube_Diagram.pdf PDF
Life_Raft_Certs_2018.pdf PDF
AMENDMENT_0001.pdf PDF
6233773_E_Storerooms_Lockers.pdf PDF
6629807_-_One_Line_T-18.pdf PDF
6233816_E_Fuel_Fill_and_XFR_Sys_Dia.pdf PDF
6233779_C_Modular_Bath_Arr_Det.pdf PDF
6629791_-_Weather_Deck_Drain_Diagram.pdf PDF
GU_Immersion_Suit_Inspection_2019.pdf PDF
Foc'sl_chair_stand.JPG JPG image
Gordon_Gunter_Updated_FF_Inspection.pdf PDF
6233754_E_Joiner_Arr_Upper_Dk.pdf PDF
winch_control_boxes_1.JPG JPG image
Price_Schedule.xlsx XLSX spreadsheet
GU-555-001--.pdf PDF
512-6233800.pdf PDF
drw_DCU-housing-200x200x120.pdf PDF
s1205.pdf PDF
GU_342_6629792 Diesel Engine SW Cooling Sys Diagram.pdf PDF
6233582_B Zinc Arr _ Details.pdf PDF
GU_FY20_Drydock_Spec_AUG_2019.pdf PDF
GU-512-003 Revision B.pdf PDF
GU-512-004 Revision A.pdf PDF
533-1.pdf PDF
528-6233893 Plumbing Drains Above Main Deck.pdf PDF
085-6233567 General Arrangement Fcsle Dk _ Above - Copy.pdf PDF
AMC-505-1B, Valve Overhaul and Test PDF
GU-801-001.pdf PDF
520-001 Science SW System Revision A.pdf PDF
ATTACHMENT_D.5_SUBCONTRACTING_PLAN_AS_WORD_DOC.doc DOC document
Show 40 more

Latest 50 of 104 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MOC-573-2

September 2000

National Oceanic and Atmospheric Administration Marine Operation Center

Standard Specification MOC-573-2

OVERHAUL/REPAIR OF HYDRAULIC CYLINDERS

1. SCOPE: This specification provides the minimum requirements for the overhaul and/or repair of hydraulic cylinders.

2. REFERENCES

None

3. REQUIREMENTS

3.1 Tag out system controllers and actuators to preclude

inadvertent operation and secure the movable member to prevent movement while cylinder is removed.

3.1.1 Disconnect and cap hydraulic lines from the cylinder.

Ensure containment is provided to prevent spillage of oil.

Hydraulic lines and inlet/outlet ports shall be capped or plugged with threaded fittings to prevent leakage or contamination of the system.

3.1.2 Remove the cylinder from the ship and transport to

repair facility.

3.2 Perform the following work on the removed cylinder:

3.2.1 Completely disassemble the cylinder and clean all

parts.

3.2.2 Prepare and preserve the external painted surfaces in

accordance with the identified painting specification or as original.

3.2.3 Reassemble the cylinder under clean conditions using

new "O" rings, seals, gaskets, packing, and piston rings.

Materials used shall meet or exceed original manufacturers specifications. During reassembly lubricate the above with a product equal to Hilton's Hyper-Lube, that is compatible with the system fluid.

3.2.4 Provide and install new nuts, washers, bolts, studs and inlet and outlet fittings.

3.3 Reinstall the cylinder in its original location.

MOC-573-2

September 2000

3.4 Top off hydraulic reservoir to full mark and purge all air from the system taking care to contain any fluid bled off.

3.5 Remove tag outs.

4. QUALITY ASSURANCE

4.1 After disassembly, inspect all components for trueness of bore and rod, wear, damage, corrosion or pitting. Provide a Condition Report detailing the inspection results, contractor's corrective action recommendations, and list of additional parts, material and labor not covered by this specification, required to restore the cylinder to the manufacturers specifications.

4.2 After reassembly, bench test the assembly at system working pressure to prove smoothness of operation and tightness of sealing surfaces.

4.3 Cycle the cylinder through a minimum of four evolutions to demonstrate operation and tightness of all disturbed fittings and connections. Upon satisfactory demonstration of operation and tightness apply "Denso tape" to all connections.

END OF SPECIFICATION

Page 1
Page 2

File details come from the government source that posted it.