13-Attachment G - Contractor Profile.pdf

PDF 161 KB Posted

Attached to
ITB - Emergency Response for Storm Debris Removal and Disposal Services for the Harris County Flood Control District (FEMA/NRCS)
Solicitation number
25/0290
Issued by
Harris County, Texas

About this file

Attachment G is a Contractor Profile form designed to be submitted within fifteen working days after being notified as the apparent low bidder for an unspecified project. The form requires detailed information about the contractor, including company name, tax identification numbers, type of contract, ownership status, and contact information. The document provides checkboxes for contract types such as Construction, Professional Services, Non-professional Services, Supplies, Equipment, and Architectural/Engineering, allowing the bidder to specify the nature of their proposed work.

The form includes sections for indicating whether the company is women-owned or minority-owned, and requires the estimated contract or subcontract amount. It is structured to capture key information about the bidding entity, including principal owners, contact person, company address, phone, and email. The form concludes with a space for the contractor's signature and date, suggesting it serves as an official declaration of the company's profile and qualifications for the bidding process.

View the file

Other files

File Type Posted
15-Attachment BB – MWBE Goal Participation Information Packet.pdf PDF
12-Attachment DD – MWBE Trucking Procedure Compliance Packet.pdf PDF
3-Attachment D - Statement of Bidder Qualifications.pdf PDF
8-Attachment N - Workers Compensation Insurance Coverage Rule 110.110.pdf PDF
7-Attachment M - Minimum Insurance Requirements for Flood Control District.pdf PDF
11-Attachment CC – MWBE Utilization Plan Commitment Form.pdf PDF
1-Attachment B - Bid Schedule - Pricing Form.pdf PDF
6-Attachment K - Payment Bond.pdf PDF
21-Attachment II - CPI-W Based Price Adjustment Calculations.pdf PDF
18-Attachment HH - Storm Debris Removal Map.pdf PDF
9-Attachment H - Bid Bond Confirmation and Bid Check Authorization Form.pdf PDF
4-Attachment F - References.pdf PDF
5-Attachment I - Performance Bond for Public Works over 100,000.pdf PDF
22-Federal IFB General Conditions and Specifications - Construction .pdf PDF
17-Attachment P - Required Contract Provisions.pdf PDF
14-Attachment A - Bid Addenda Acknowledgement.pdf PDF
10-Attachment FF - Heat Protection Safety Requirements.pdf PDF
19-Attachment R – Standards Specifications .pdf PDF
16-Attachment L - Certification of Compliance with Federal Standards Requirements.pdf PDF
2-Attachment C - Certification Regarding Lobbying.pdf PDF
20-Attachment GG – Prevailing Wage Rate Instructions.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment G

CONTRACTOR PROFILE

(To be submitted within fifteen (15) working days after being notified as apparent low bidder.)

Project Name: _________________________________________________ Project No. _______

Name of Contractor ______________________ FED Tax ID#_____________ UEI # ___________

Name of Subcontractor ___________________ FED Tax ID#_____________ UEI # ___________

Category of Trade (e.g. Carpentry, Electrical, Plumbing, etc.)

Type of Contract:

□ Construction □ Professional □ Non-professional Services □ Supplies □ Equipment

□ Architectural / Engineering

Name of Principal Owner(s) ______________________________________________________________

Name of Contact Person _________________________________________________________________

Company Address ______________________________________________________________________

Phone ______________________________________________________________________________

Email _______________________________________________________________________________

Estimated Amount of Contract or Subcontract:

Women Owned: Yes No

Minority Owned: Yes No

Signature of Contractor Date

File details come from the government source that posted it. Updated .