10-Attachment FF - Heat Protection Safety Requirements.pdf

PDF 43 KB Posted

Attached to
ITB - Emergency Response for Storm Debris Removal and Disposal Services for the Harris County Flood Control District (FEMA/NRCS)
Solicitation number
25/0290
Issued by
Harris County, Texas

About this file

This document is Attachment FF, a Heat Protection Safety Requirement detailing worker safety guidelines for a construction or field work project. The attachment mandates comprehensive weather-related safety provisions within the project's Safety Plan, with specific focus on protecting workers from heat and cold-related illnesses during work execution. When temperatures reach or exceed 90 degrees (by temperature or heat index), the Prime Contractor must implement a project-specific Heat Awareness Plan that includes provisions for worker acclimatization, access to water, rest periods, and shade.

The requirement stipulates that vendors acknowledge and agree to follow these heat protection safety guidelines by signing the Bid Acknowledgement at the time of submission. The document emphasizes the Prime Contractor's responsibility to provide necessary accommodations during extended periods of adverse weather conditions, ensuring worker safety is a priority throughout the project's duration. By requiring vendors to explicitly agree to these terms during the bidding process, the contracting entity ensures a proactive approach to worker protection and heat-related safety management.

View the file

Other files

File Type Posted
15-Attachment BB – MWBE Goal Participation Information Packet.pdf PDF
12-Attachment DD – MWBE Trucking Procedure Compliance Packet.pdf PDF
3-Attachment D - Statement of Bidder Qualifications.pdf PDF
8-Attachment N - Workers Compensation Insurance Coverage Rule 110.110.pdf PDF
7-Attachment M - Minimum Insurance Requirements for Flood Control District.pdf PDF
11-Attachment CC – MWBE Utilization Plan Commitment Form.pdf PDF
13-Attachment G - Contractor Profile.pdf PDF
1-Attachment B - Bid Schedule - Pricing Form.pdf PDF
6-Attachment K - Payment Bond.pdf PDF
21-Attachment II - CPI-W Based Price Adjustment Calculations.pdf PDF
18-Attachment HH - Storm Debris Removal Map.pdf PDF
9-Attachment H - Bid Bond Confirmation and Bid Check Authorization Form.pdf PDF
4-Attachment F - References.pdf PDF
5-Attachment I - Performance Bond for Public Works over 100,000.pdf PDF
22-Federal IFB General Conditions and Specifications - Construction .pdf PDF
17-Attachment P - Required Contract Provisions.pdf PDF
14-Attachment A - Bid Addenda Acknowledgement.pdf PDF
19-Attachment R – Standards Specifications .pdf PDF
16-Attachment L - Certification of Compliance with Federal Standards Requirements.pdf PDF
2-Attachment C - Certification Regarding Lobbying.pdf PDF
20-Attachment GG – Prevailing Wage Rate Instructions.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment FF

Heat Protection Safety Requirement

Guidance for all weather-related safety of workers, including but not limited to, extreme heat, cold weather or any adverse weather conditions shall be included in the project

Safety Plan. At a minimum, this must include provisions for keeping workers safe from heat related and/or cold related illnesses throughout the execution of their work. During extended periods of adverse weather conditions, the Prime Contractor shall provide accommodations to the workers as deemed necessary. This may include a project specific Heat Awareness Plan when temperatures reach over 90 degrees (temperature or heat index) with provisions for acclimatization, water, rest and shade.

Vendor understands by signing the Bid Acknowledgement at the time of submission that they agree to follow this heat protection safety requirement.