11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return 1 copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Amendment A0002 is for the purpose of providing answers to RFIs 1-8 and adding RFP Attachment 7 - Asbestos & Lead Survey Report and Attachment 8 - Site Plan.

This amendment continuation includes answers to RFIs 1-8 and RFP replacement page 30. New RFP attachments 7 and 8 attached separately.

The offer due date/time is unchanged. Offers are due NLT Friday, March 22, 2019, 3pm/1500 PST.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Jeremy Bedner, Contracting Officer

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

03/05/2019 Previous edition unusable STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT PAGE OF PAGES

1 4

5. PROJECT NUMBER (If applicable)2. AMENDMENT/MODIFICATION NUMBER

A0002

6. ISSUED BY

USDA FOREST SERVICE

PACIFIC SOUTHWEST REGION

1323 CLUB DRIVE

VALLEJO, CA 94592-1110

CODE 7. ADMINISTERED BY (If other than Item 6)

SAME AS ITEM 6.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NUMBER

1291S819R4002

9B. DATED (SEE ITEM 11)

02/22/2019

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

(X)

4. REQUISITION/PURCHASE REQUISITION NUMBER3. EFFECTIVE DATE

03/05/2018

1. CONTRACT ID CODE

Amendment A0002 3/5/2019

RFP 1291S819R4002

LOS PRIETOS FIRE ENGINE GARAGE CONSTRUCTION

SANTA BARBARA RANGER DISTRICT, LOS PADRES NATIONAL FOREST

US FOREST SERVICE

The following responses to Request for Information [RFIs] 1-8 received for this solicitation:

1. Specifications, Section 22 15 14, General – Service Compressed-Air Piping, addresses compressed air lines, but the plans do not show locations or size of air lines. J.2, Project Drawings, page A1, Keynote #2, shows the location of the new compressor, but it is not included in the contract. Is a compressed air system to be provided in this project?

Answer: See 3.2 - PIPING INSTALLATION, paragraph A.

“A. Drawing plans, schematics, and diagrams indicate general location and arrangement of compressed-air piping. Indicated locations and arrangements were used to size pipe and calculate friction loss, expansion, air-compressor sizing, and other design considerations. Install piping as indicated unless deviations to layout are approved on Coordination Drawings.”

2. Drawing plans, schematics, and diagrams indicate general location and arrangement of compressed-air piping. Indicated locations and arrangements were used to size pipe and calculate friction loss, expansion, air-compressor sizing, and other design considerations. Install piping as indicated unless deviations to layout are approved on Coordination Drawings.”

Will the turn-out lockers be provided by the contractor?

Answer: No.

3. Specifications Section 07 11 50, Bituminous Damp Proofing. Will below grade damp proofing be required?

Answer: No.

4. Can you please provide the color of the concrete?

Answer: Davis color 677 Outback.

5. The specifications for concrete testing seem excessive. Typically (3) cylinders or flexural beams are taken every 50 yards or fraction thereof. Will you consider decreasing the frequency of testing?

SANTA BARBARA RANGER DISTRICT, LOS PADRES NATIONAL FOREST

US FOREST SERVICE

Answer: Three concrete test cylinders will be taken for every truckload of concrete placed. One cylinder will be tested at 7 (seven) days and two will be tested at 28 days, cured and tested per ASTM standards.

6. The specs reference a microbial growth test in section 01 35 20. Will this be required on the new building?

Answer: Yes. This is required for the new building as specified.

7. Please provide more information as to what hardware group pairs with door numbers.

Answer: This will be addressed at the pre-work meeting.

8. Option items call for demolition of Buildings B.402 and B.403. Has there been an asbestos and lead survey? Will the sites just be graded with dirt after demolition?

Answer: Results of previous lead and asbestos testing is provided for reference. Contractor shall provide additional testing as needed to meet all applicable Federal, State and Local regulations.

See Specification SECTION 02 41 00, DEMOLITION, PART 1 – GENERAL, SCOPE:

“This project consists of the demolition and removal of two structures; Building 402/Engine 42 Station and Building 403/Warehouse-Garage located adjacent to the Los Prietos Ranger Station, in Santa Barbara County, on the Santa Barbara Ranger District of the Los Padres National Forest.

A. Existing conditions shall be verified by the Contractor.

1. An environmental assessment for Building 402/Engine 42 Station and Building 403/Warehouse-Garage to test for lead based paint and asbestos containing materials has previously been completed. The initial results of the testing confirmed the presence of both lead based paint and asbestos containing materials. The contractor is responsible to have the building retested for asbestos by an independent Certified Asbestos Consultant (CAC) prior to commencing any demolition work. The CAC test results will confirm the accuracy of the

SANTA BARBARA RANGER DISTRICT, LOS PADRES NATIONAL FOREST

US FOREST SERVICE

original asbestos tests and ensure that all required asbestos tests for demolition are completed in accordance with Federal, State and Local regulations.

It is the intent of this contract to remove these two structures and any associated asbestos containing materials, lead based paint materials, or any other hazardous materials contained within or on the structures. Reference the Civil drawings for the site plan showing Building 402/Engine 42 Station and Building 403/Warehouse-Garage locations on the site.”

Answer: Specifications, SECTION 02 41 00, DEMOLITION, PART 1 – GENERAL, 1.1 SCOPE, (C) General Items, paragraph 8:

“Contractor shall grade the site smooth with the emphasis on drainage. No import or export of soil is included in this proposal. Any soil removal necessary to remove lead-based paint chips, asbestos fragments, etc. will be included with hazardous material removal.”

REPLACEMENT PAGE

SANTA BARBARA RANGER DISTRICT, LOS PADRES NATIONAL FOREST

US FOREST SERVICE

PART III--LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

SECTION J – LIST OF ATTACHMENTS

NUMBER

TITLE PAGES

1 Specifications

2 Supplemental Specifications Section 270000, Telecommunication Wiring Systems

3 Project Drawings and Plans

4 Geotechnical Design Memorandum, Bengal Engineering

5 DOL Wage Decision No. CA190023 01/04/2019 CA23

6 Past Performance Questionnaire

7 Asbestos & Lead Survey Report, Environmental Consulting Services

Site Plan with Building Numbers 1

August 19, 2017

Mr. Adam Furlow Los Padres National Forest 6755 Hollister Avenue, Suite 150 Goleta, PA 93117

Subject: Asbestos & Lead Survey Report Los Prietos Ranger Station – 5 Buildings Law Enforcement Building, Forklift Shed, Buildings 403 and 402 and Hazardous Materials Storage 3505 Paradise Road Santa Barbara, CA 93105

FCG Project Code: LPNF-25

Dear Mr. Furlow:

FCG Environmental (FCG) conducted a hazardous materials survey of five individual structures at the Los Prietos Ranger Station which are scheduled for future demolition. Field services included asbestos bulk sampling and lead-based paint testing. The investigation was performed on July 16, 2015 by William Miller, a California Certified Site Surveillance Technician (No. 07- 4160) and by Blake Forbess, a CA Certified Lead Sampling Technician (No. 28474); under the supervision of Alan Forbess, a CA Certified Asbestos Consultant (#94-1549) and CA Certified Lead Inspector (No. 17425). This report documents the findings of our survey, which was conducted to identify proper handling of hazardous materials prior to demolition of the selected structures.

1.0 Background Information / Scope of Project

Background: The structures included as part of our survey are the Law Enforcement residence, Forklift Shed, Buildings 402 and 403 and the Hazardous Materials Storage Container. The subject site structures are scheduled for demolition and replacement. The following is a summary of each structure:

• Buildings 402 and 403 are large rectangular structures with several roll-up doors used for storage of fire trucks, equipment and office space. These structures are built on concrete slab foundations with steel and wood-framing, corrugated metal walls and composite shingle roofing. Office areas and limited partition walls between bays are wood-framed with drywall or plywood paneling.

• The Law Enforcement Building is a manufactured home with two bedrooms, two bathrooms and a small kitchen. Building materials include metal exterior siding, wood trim, metal windows and a metal roof. The interior consists of fiberboard walls and ceilings, carpet and vinyl sheet flooring.

• The Forklift Shed is a wooden structure with no walls and a metal roof. There is a small metal shed attached that has wood windows, a wood door and a metal roof.

FCG Environmental Asbestos & Lead Survey August 19, 2017 Los Prietos Ranger Station

Paradise Road, Santa Barbara County, CA

LPNF-25, Los Prietos Ranger Station, Asb and lead Survey

• The Hazardous Materials Storage Container is a steel storage container that has been modified for hazardous materials storage. It has four storage areas with metal doors and no windows.

Scope of Services: The following services were conducted in order to define asbestos and lead concerns at the subject site:

• A visual inspection of representative interior and exterior building materials was conducted to identify suspect ACMs.

• Bulk samples were collected from suspect asbestos containing materials for submittal to a qualified laboratory for analysis. All bulk samples were analyzed by Forensic Analytical, a state-certified laboratory located in Rancho Dominguez, CA. All samples were analyzed by polarized light microscopy (PLM), to determine asbestos fiber concentrations in bulk building material samples. PLM is applicable for the analysis of building survey submissions and other bulk materials.

• A survey for lead-based paint was conducted using an X-Ray Fluorescence (XRF) paint analyzer to screen representative surfaces and materials suspected of being coated with lead-based paint.

• All field observations, laboratory analytical data, XRF readings and other findings have been evaluated, with this written report summarizing our findings and providing recommendations as necessary.

2.0 Asbestos Survey Findings

Suspect Materials: After a visual inspection of the site was completed, the following suspect asbestos materials were noted:

Law Enforcement Building

• 12” Off-white vinyl floor tile over vinyl sheet floor in kitchen

• Beige vinyl sheet floor over vinyl sheet floor in laundry room, north restroom and SE restroom

• Gold and brown vinyl sheet floor in NE office, SE office and dining room

• HVAC exhaust flange in HVAC closet

• Drywall in HVAC closet

• Metal roof coating

• Roof seam coating at ridge line

• Roof penetration mastics

• Exterior window caulking

Forklift Shed with attached metal shed

• Exterior window putty on metal shed attached to forklift shed

Building 403

• Exterior window putty on wood and metal windows

• Roof layers

• Roof patching mastic on the north side awning

• Tan vinyl floor tile under carpet in the office area

• Drywall / joint compound in the office area and locker room

• Roof penetration mastic (material not sampled, no access)

Building 402

• Drywall / joint compound in main restroom, exterior of main restroom, and laundry room

• Brown mosaic vinyl sheet flooring in office under carpet

• 12” ceiling tiles in office area

• Roof layers (composite roof shingle)

• Roof mastic (patching mastic)

• Roof mastic (roof penetrations)

• Exterior window putty

• 6” Cove base with mastic

Hazardous Materials Bin

• Roof layers

• Roof mastic

Bulk Sampling Results: FCG collected 53 bulk samples from suspect asbestos containing materials from the subject site structures. Samples were forwarded to Forensic Analytical, a state-certified asbestos laboratory located in Rancho Dominguez, CA. All samples were analyzed by Polarized Light Microscopy (PLM) using EPA Method 600/R-93-116, Visual Area Estimation. Table 1 below provides a summary of those materials which tested positive for asbestos based on laboratory analytical data from collected samples. Please refer to the Attachments for a complete copy of the laboratory analytical results.

Table 1: List of Asbestos Containing Materials

Sample Numbers

Asbestos Containing

Material

Location/ Est. Quantity

% Asbestos (Chrysotile)

Friability & Condition

Law Enforcement Building

HVAC Exhaust Flange/Gasket

HVAC Closet Ceiling (2 sf)

Off-White Flange/Gasket = 55%

RACM

Fair

12, 13 & 14

Roof Coating

Roof (Throughout)

Stones = ND Black Mastic = 3%

Paint = ND Silver Paint = 2%

Category I, Non-friable

Material Poor

Condition

15 & 16 Roof Seam

Coating Roof Ridge Line

(100 sf)

White Coating = ND Stones = ND

Black Mastic = 3% Paint = ND

Silver Paint = 2%

Category I, Non-friable

Material Fair

Condition

Roof

Penetration Mastic

Roof Penetrations

(~20 sf)

Black Mastic = 5%

Category I, Non-friable

Material Fair

Condition

18 & 19 Window Caulking

Exterior Windows (~200 lf)

Grey Caulking = 5% Category I, Non-friable

Material

Sample Numbers

Asbestos Containing

Material

Location/ Est. Quantity

% Asbestos (Chrysotile)

Friability &

Fair Condition

Building 403

24 & 25 Window Putty

Exterior Window Putty on Metal

Windows (~180 lf)

Window Putty = Trace (<1%)

Category II, Non-friable

Material Poor

Condition

30, 31 & 32 Tan Vinyl Floor

Tiles

Office Area Under Carpet

(~280 sf)

Beige Tile = 3% Black Felt = ND

Category I, Non-friable

Material Fair

Condition

Drywall / Joint

Compound SE side of Office Area

Off-White Joint Compound = 2%

Category II, Non-friable

Material Good

Condition

Not Sampled

Roof Penetration

Mastic

Two Roof Vents (~4 sf)

PACM

(No Access)

Category I, Non-friable

Material

Building 402

39, 40 & 41 Brown Mosaic

Vinyl Sheet Flooring

Office Area (~300 sf)

Vinyl Sheet Floor = ND Paper Backing = 70%

Tan Mastic = ND

RACM

Fair

ND = Non-detect for asbestos

NOTE: No asbestos was detected in the Forklift Shed or Hazardous Material Storage Container.

Materials Showing a “Trace” of Asbestos: Grey Putty located on the exterior windows of Building 403 showed a “trace” or less than 1% asbestos by standard PLM methodology. Further analysis by more quantitative methods such as “Point Count” or transmission electron microscopy (TEM) would be required to quantify the actual concentration of asbestos in “trace” PLM sample results. Otherwise, these window putty materials must be managed as ACM.

All other suspect materials sampled at this site tested negative for asbestos. Please refer to the attached laboratory analytical data and field notes for more details. Please see the section below for definitions of friability, material class, and other terms used in the table.

Notes on Tables and Assessment Terms:

• Asbestos containing material (ACM): Federal and County APCD regulations define ACM as any material or product that contains more than 1% asbestos. State regulations define ACM as any material with greater than 0.1% asbestos by weight.

• Asbestos renovation: Defined by NESHAPS as the removal of more than 160 square feet or 260 linear feet of ACM. OSHA requires registration of all contractors removing more than 100 sq. ft.

on any project.

• Friable ACM: any ACM that when dry can be crumbled, pulverized, or reduced to powder by normal hand pressure.

• Non-friable ACM: any ACM that cannot be reduced to powder by normal hand pressure.

• Category I non-friable ACM: asbestos-containing packings, gaskets, resilient floor covering, and asphalt roofing products (typically pliable materials, including sealants and mastics).

• Category II non-friable ACM: any other ACM that when dry cannot be reduced to powder by hand pressure (typically non-pliable/cementitious materials).

• Regulated Asbestos Containing Material (RACM): any friable ACM that will be removed during a renovation of a regulated structure. ACM that will become friable due to the removal technique is also regulated. Note: while linoleum flooring is considered Category II ACM while managed in place, removal always renders it friable.

• Presumed Asbestos Containing Materials (PACM): This designation is for those materials which are normally asbestos containing but were not sampled due to access issues or potential for irreparable damage. This typically includes transite (asbestos cement) piping or sheeting, or HVAC insulation materials in walls, under floors, etc. where destructive testing is not recommended. Regulations allow asbestos inspectors to “presume” that these materials contain asbestos without laboratory data based on the inspector’s experience and knowledge of building materials.

• Trace (<1%) Asbestos: Federal and local APCD regulations define an asbestos containing material (ACM) as any compound with greater than 1% asbestos. The State of California through Cal-OSHA regulation further defines an asbestos containing material as any compound which meets or exceeds a concentration of 0.1% asbestos by weight. This definition is primarily for worker and occupant protection during disturbance work. The polarized light microscopy (PLM) method does not quantify the concentration asbestos in bulk samples at levels of less than 1%.

Furthermore, PLM methodology will include all fibers with a similar aspect ratio (3:1) to asbestos fibers, and therefore may count non-asbestos fibers as part of the overall total. PLM analytical methods must report a “trace” amount where fibers are noted in concentrations of less than 1% of the total. Further analysis by more quantitative methods such as “Point Count” or transmission electron microscopy (TEM) are required to quantify the actual concentration of asbestos in “trace” PLM sample results.

Summary: Our survey identified Asbestos Containing Materials (ACM) at the site which will require abatement or special handling as part of planned demolition tasks. Please see the Conclusions & Recommendations (Section 4.0) below for further discussion regarding the abatement and handling of asbestos.

3.0 Lead-Based Paint Survey

FCG was contracted to perform field testing to determine the presence of lead-based paint or lead components at the subject site. A visual inspection of the site was conducted to identify areas of suspect lead based paint or coatings. Screening for lead was conducted in the field using XRF methodology in accordance with current state and federal regulations. All field work was conducted by a CA Certified Lead Sampling Technician or Lead Inspector/Assessor. The findings of this survey will be used by contracting personnel to determine appropriate lead safe work practices.

Background Information on Lead Paint Requirements: Several regulations apply to the disturbance and possible exposure to lead from paints and other coatings. Title 17 of the California Code of Regulations (CCR) applies to residences and buildings accessible to the public that were constructed prior to 1979, and schools constructed before 1993 where lead paint may exist. Cal-OSHA regulations found within Title 8 of the CCR apply to worker exposure as stated in the Lead-in-Construction Standard (8-CCR-1532.1). The EPA recently issued a final rule to address lead-based paint hazards created by renovation, repair and painting activities that disturb lead-based paint in target housing and child-occupied facilities.

The EPA’s Lead Renovation, Repair and Painting (RRP) Program was passed into regulation requiring compliance with training and certification requirements per Title 40 of the Code of Federal Regulations (40 CFR Part 745). The RRP rule states that firms and individuals conducting renovations of target housing constructed before 1978 must assume that lead is present in all painted surfaces or coatings unless a written determination has been made by a Certified Inspector that the components affected by the renovation are free of paint or other surface coatings that contain lead equal to or in excess of 1.0 milligrams per square centimeter (mg/cm2) or 0.5% by weight.

Scope of Services: FCG’s scope of services involved field testing through use of X-ray fluorescence (XRF) instrumentation, which provides instantaneous readings in the field. The XRF instrument is used because of its demonstrated abilities to accurately determine the amount of lead that is present without disturbing the painted surfaces, as well as their high speed and relatively low cost per sample. The XRF device is capable of measuring lead in both deteriorated and intact paint. See the Attachments to this report for more information on XRF sampling methodology.

Inspection Results: Per EPA and California regulations, paint or coatings are considered to be lead-based at concentrations at or above 1.0 milligram per square centimeter (mg/cm2) using XRF technology. FCG tested representative surfaces at the subject site structures. Calibration tests were performed at the beginning of the survey and again at the end of the survey to document that the equipment was working properly.

Summary: We have listed below those materials/surfaces with lead concentrations greater than

1.0 milligrams per square centimeter (mg/cm2) using XRF equipment, and are therefore considered positive for lead per current state and federal regulations.

Forklift Shed

• Beige Metal Ceiling

Building 403 Exterior

• Tan Metal Exterior Walls on all sides

• Tan Wood Roll-up Door Frames on roll-up doors

• Tan Metal Roll-up Door Frames on roll-up doors

• Red Wood Windows, Frames and Sills on all red wood windows

• Brown Metal Door Frame located on the A side

• Tan Metal Downspouts

• Red Metal Rain Gutters

• Tan Metal Eaves

• Tan Wood Rafter Tails

Building 403 Interior

• White Metal Walls and Ceilings in Main Shop and East Storage

• White Wood Wall in East Storage Area (B side)

Building 402 Exterior

• Tan Metal Walls on all sides

• Brown Wood Rafter Tails

• Brown Wood Eaves

• Brown/Tan Metal Eaves

• Brown Wood Fascia

• Tan Metal Downspouts

• Brown Metal Rain Gutters

• Brown Wood Windows on the C side

Building 402 Interior

• Brown Metal Door Frame on the B Side (locked storage room, old walk-in cooler) – Fair Condition

• Green Wood Windows in the South Restroom – Fair Condition

See the Attachments to this report for a complete copy of the XRF Field Readings Table and a listing of all surfaces or materials sampled. The “A” side listed on the table is the front or main entry side of the building, with the B, C and D sides continuing in a clockwise direction around the site. Please note that all of the surfacing materials were observed to be in “Poor Condition”, with the exception of Building 402 interior areas.

4.0 Conclusions & Recommendations

An asbestos and lead paint survey of the subject site has been completed per the terms of our agreement to define asbestos and lead containing materials. Based on our visual observations and our evaluation of analytical data, we conclude the following:

Asbestos Findings and Recommendations:

1. Asbestos Containing Materials (ACM): The following materials at the subject site were found to contain greater than 1% asbestos and are therefore considered ACM under current federal, state and local regulations:

Law Enforcement Building o HVAC Exhaust Flange located in the HVAC closet was found to contain 55% chrysotile asbestos. This is a Regulated Asbestos Containing Material (RACM) in fair condition with approximately 2 square feet.

o Roof Coating, Seam Mastic and Penetration Mastic. The black mastic is 3% chrysotile asbestos and silver paint is 2% chrysotile asbestos. This is a Category I, non-friable material in poor condition.

o Exterior Window Caulking located on all windows. Grey caulking was found to contain 5% chrysotile asbestos. This is a Category I, non-friable material in fair condition with approximately 18 linear feet.

Building 403 o Tan Vinyl Floor Tile located in the office area was found to contain 3% chrysotile asbestos. This material is a Category I, non-friable material in fair condition with approximately 280 square feet.

o Off-White Drywall Joint Compound located on the SE side of the office area was found to contain 2% chrysotile asbestos. This material is a Category II, non-friable material in good condition (quantity is unknown).

Building 402 o Brown Mosaic Vinyl Sheet Flooring with Paper Backing located in the office area under the carpet. The paper backing was found to contain 70% chrysotile asbestos. This is a Regulated Asbestos Containing Material (RACM), with approximately 300 square feet.

2. Presumed Asbestos Containing Materials (PACM): Penetration mastic located on two vents on the roof of Building 403 was not sampled due to lack of access. There is approximately 4 square feet of this material, which should be removed or disturbed in accordance with current federal, state and local regulations.

3. Trace Asbestos Containing Materials: Grey Window Putty located on the exterior metal windows of building 403 was found to contain a trace (<1%) of chrysotile asbestos.

There is approximately 180 linear feet of this material which must be managed as ACM unless additional testing is conducted to quantify the actual concentration of asbestos.

Asbestos Recommendations:

1. Activities where asbestos containing materials are disturbed must be performed only by properly trained abatement contractors using appropriate controls to prevent fiber emissions during the removal process. This may include the use of wet methods (water mist), negative air containment, HEPA filtration and other engineering controls to keep fibers from being dispersed.

4. Workers performing removal should be properly protected to prevent exposure, including the use of respiratory protection with HEPA filtration. Asbestos containing waste materials should be properly contained and transported for off-site disposal at a properly permitted facility.

5. It may be acceptable to demolish the structure in place without removal of the asbestos containing roof seam caulking materials, due to the non-friable nature of the materials in question and the difficulty in removing the materials prior to demolition. The roof is not safe for supporting personnel, particularly in the damaged west end. We recommend that the roofing panels be removed as part of the demolition process and disposed as asbestos containing waste in accordance with state and local requirements. This is acceptable as long as the demolition workers on the ground are properly trained and protected. Air monitoring can be conducted as necessary to ensure no asbestos fiber emissions occur above the regulated action level.

6. Similarly, it may be acceptable to demolish the structure with the drywall materials in place, as the composite of all wall system components (gypsum wall board, tape, joint compound, paint, etc.) totals less than 1% asbestos and therefore can be disposed of as non-hazardous construction debris. However, because of the presence of asbestos in the drywall joint compound, the workers on the ground must be protected and trained per OSHA requirements.

7. The local enforcement agency for asbestos removal and demolition projects in Santa Barbara County is the Air Pollution Control District (APCD). They require notification for removal of friable, regulated asbestos containing materials (RACM) above 160 sq. ft., and for all building demolition work within the County. This survey report should be submitted along with any required notification forms, permits and fees required by County agencies. The APCD should also be advised and will need to approve the demolition in place of the roofing and drywall materials.

8. The local Building Department may also require notification and survey information prior to issuing a demolition permit. We recommend that you contact the APCD and local Building Departments directly for further information regarding permitting and regulatory requirements.

9. The contractor conducting abatement work is responsible for complying with local, state and federal standards for worker protection and NESHAPS regulations regarding asbestos fiber emissions. Proper removal and demolition methods must be followed to prevent the dissemination of asbestos fibers. Notification and permitting is typically the responsibility of the abatement contractor and/or property owner. If you would like assistance regarding these matters or would like the names of qualified contractors in your area, please feel free to contact FCG at (805) 646-1995.

Lead-Based Paint (LBP):

1. The following painted materials were found to contain lead above the regulated level of

1.0 mg/cm2 as noted in the previous section. All surfaces were found to be in “Poor Condition”, with the exception of the interior of Building 402. Please refer to Attachment 2 for a complete copy of all XRF field readings taken from the site.

Forklift Shed o Beige Metal Ceiling

Building 403 Exterior o Tan Metal Exterior Walls on all sides o Tan Wood Roll-up Door Frames on all roll-up doors o Tan Metal Roll-up Door Frames on all roll-up doors o Red Wood Windows, Frames and Sills on all red wood windows o Brown Metal Door Frame located on the A side o Tan Metal Downspouts o Red Metal Rain Gutters o Tan Metal Eaves o Tan Wood Rafter Tails

Building 403 Interior o White Metal Walls and Ceilings in Main Shop and East Storage o White Wood Wall in East Storage on the B side

Building 402 Exterior o Tan Metal Walls on all sides o Brown Wood Rafter Tails o Brown Wood Eaves o Brown/Tan Metal Eaves o Brown Wood Fascia o Tan Metal Downspouts o Brown Metal Rain Gutters o Brown Wood Windows on the C side

Building 402 Interior o Brown Metal Door Frame on the B Side (locked storage room, old walk-in cooler) o Green Wood Windows in the South Restroom

Lead Recommendations:

1. The painted surfaces which tested above the 1.0 mg/cm2 regulated level for Lead-Based Paint (LBP) will require the implementation of lead safe work practices to prevent exposure to workers and possible contamination of the site.

2. It should be noted that there is no requirement to remove lead paint from a structure prior to demolition activities, as long as the resulting paint chips and other waste are properly managed. Painted metal materials with lead can still be recycled as long as the recycling facility is properly permitted to accept and process the painted metal. Materials that will not be recycled and will be disposed to landfill must be properly characterized for hazardous waste criteria.

3. All work should be performed in accordance with applicable State, and Federal regulations. We recommend that all disturbance of lead-based paint be performed by properly trained personnel using lead safe work practices, including dust reduction methods or containment as necessary to prevent generation of a lead hazard. Proper controls and lead safe work practices must be used to avoid the generation of lead dust emissions which may contaminate the site and pose a possible health risk to occupants, unprotected workers or the general public. This will include appropriate containment, wet methods and use of hand scraping or similar methods that will minimize the generation of airborne dust emissions and potential lead hazards. Mitigation, abatement or component removal must be conducted using proper containment and controls, followed by thorough HEPA cleaning and encapsulation of the scraped surfaces with an approved coating.

4. It is the responsibility of the contractor conducting LBP disturbance work to protect employees, the general public and prevent contamination of the site when disturbing lead. The contractor must comply with current OSHA and EPA regulations, which requires the use of “lead safe work practices” when disturbing lead.

5. Lead waste materials should be properly contained and transported for off-site disposal at a properly permitted facility. Lead paint chips and similar lead waste is typically hazardous waste and must be properly manifested and disposed at a Class I landfill. If necessary, waste characterization testing should be conducted to ensure proper handling and disposal. Please contact FCG at 805/646-1995 for additional information.

Limitations Statement

The data compiled and evaluated as part of this assessment was limited and may not represent all conditions at the subject site. Asbestos was widely used until the late 1970’s in thousands of building materials (i.e. joint compound, wallboard, thermal system insulation (TSI), acoustical ceiling, roofing material, etc.), making it difficult to locate all areas of ACM usage. This assessment reflects the data collected from the specific locations tested to identify Asbestos Containing Materials (ACM) in those locations and may not be all encompassing. There is always potential for asbestos containing materials to be missed due to problems with accessibility, and the broad variety of uses. The presence or absence of lead-based paint or lead-based paint hazards applies only to the tested or assessed surfaces on the date of the field visit. It should be understood that conditions noted within this report were accurate at the time of the inspection and in no way reflect the conditions at the property after the date of the inspection. All data collection, findings, conclusions and recommendations presented by FCG within this report are based upon limited data using current standard practices accepted within the industry. The conclusions and recommendations presented within this report are based on current regulations and the professional experience of the certified professionals involved in this project.

The data collected during this assessment and any resulting recommendations shall be used only by the client for the site described in this report. Any use or reliance of this report by a third party, including any of its information or recommendations, without the explicit authorization of the client shall be strictly at the risk of the third party.

It should not be misconstrued that this assessment has identified any or all environmental conditions at the subject site. FCG makes no representations regarding the accuracy of the enclosed data and will not be held responsible for any incidental or consequential loss or punitive damages including but not limited to, loss of profits or revenues, loss of use of a facility or land, delay in construction or action of regulatory agencies.

If you have any questions or concerns regarding the information provided, please do not hesitate to call us at 805.646.1995.

FCG Environmental

Alan Forbess, Principal Consultant

Certified Lead Inspector/Assessor #17425 CA Certified Asbestos Consultant #94-1549

Attachments: 1 - Forensic Analytical Results & FCG Sampling Log (Asbestos) 2 - XRF Field Readings and XRF Sampling Methodology (Lead Paint) 3 - FCG Inspector Certifications

N

FY 16 Demo

FY 18 Demo

FY 18 Engine Garage

Construction

Los Prietos Burned Warehouse Replacement

Project Exhibit

1.28.17

Not to Scale

Legend .

Exist Eng 43 (Bldg #415)

Hazmat Storage

Dozer WH (Bldg #403)

New Engine Garage

Location Option #2

Eng 42 (Bldg #402)

Location Option #1

Location Option #3

Fork Lift Shed

Law Enforcement Trailer

Attachment 1

Laboratory Analytical Results Bulk Sample Log Sheet

Final Report

(EPA Method 600/R-93-116, Visual Area Estimation)

Bulk Asbestos Analysis 7238Client ID:FCG Environmental B237604Report Number:Alan Forbess

Date Received:1009 Mercer Avenue 04/11/17Date Analyzed:

04/11/17Date Printed:Ojai, CA 93023

First Reported:

7238LPNF-25; Los Prietos Ranger Station, Paradise Lane FALI Job ID:Job ID/Site:

Date(s) Collected: 04/06/2017 53Total Samples Submitted:

Total Samples Analyzed: 46

04/10/17

04/11/17

Sample ID Lab Number Asbestos

Type Percent in

Layer Asbestos AsbestosPercent in Percent in

Type TypeLayer Layer

1 51052698 Layer: Off-White Tile ND Layer: Tan Mastic with Debris ND Layer: Beige Sheet Flooring ND Layer: Fibrous Backing ND

Asbestos (ND)Total Composite Values of Fibrous Components:

Cellulose (10 %) Synthetic (3 %)

2 51052699 Layer: Off-White Tile ND Layer: Tan Mastic with Debris ND Layer: Beige Sheet Flooring ND Layer: Fibrous Backing ND Layer: Tan Mastic ND

Asbestos (ND)Total Composite Values of Fibrous Components:

Cellulose (25 %) Synthetic (5 %)

3 51052700 Layer: Off-White Tile ND Layer: Tan Mastic with Debris ND Layer: Beige Sheet Flooring ND Layer: Fibrous Backing ND

Asbestos (ND)Total Composite Values of Fibrous Components:

Cellulose (25 %) Synthetic (5 %)

4 51052701 Layer: Beige Sheet Flooring ND Layer: Fibrous Backing ND Layer: Tan Mastic ND Layer: Tan Sheet Flooring ND Layer: Fibrous Backing ND

Asbestos (ND)Total Composite Values of Fibrous Components:

Cellulose (25 %) Fibrous Glass (Trace) Synthetic (5 %)

2959 Pacific Commerce Drive, Rancho Dominguez, CA 90221 / Telephone: (310) 763-2374 (888) 813-9417 / Fax: (310) 763-8684

Report Number: B237604 Date Printed: 04/11/17Client Name: FCG Environmental

Sample ID Lab Number Asbestos

Type Percent in

Layer Asbestos AsbestosPercent in Percent in

Type TypeLayer Layer

5 51052702 Layer: White Non-Fibrous Material ND Layer: Beige Sheet Flooring ND Layer: Fibrous Backing ND Layer: Tan Mastic ND Layer: Fibrous Backing ND

Asbestos (ND)Total Composite Values of Fibrous Components:

Cellulose (20 %) Fibrous Glass (Trace) Synthetic (Trace)

6 51052703 Layer: Beige Sheet Flooring ND Layer: Fibrous Backing ND Layer: Tan Mastic ND Layer: Tan Sheet Flooring ND Layer: Fibrous Backing ND

Asbestos (ND)Total Composite Values of Fibrous Components:

Cellulose (40 %) Fibrous Glass (Trace) Synthetic (10 %)

7 51052704 Layer: Tan Drywall ND Layer: Drywall Tape ND Layer: White Skimcoat/Joint Compounds ND Layer: Paint ND

Asbestos (ND)Total Composite Values of Fibrous Components:

Cellulose (35 %)

8 51052705 Layer: Beige Sheet Flooring ND Layer: Fibrous Backing ND Layer: Wood ND

Asbestos (ND)Total Composite Values of Fibrous Components:

Cellulose (40 %) Synthetic (10 %)

9 51052706 Layer: Tan Sheet Flooring ND Layer: Fibrous Backing ND Layer: Wood ND

Asbestos (ND)Total Composite Values of Fibrous Components:

Cellulose (40 %) Synthetic (10 %)

10 51052707 Layer: Off-White Fibrous Material Chrysotile 55 %

Asbestos (55%)Total Composite Values of Fibrous Components:

Cellulose (5 %)

11 51052708 Layer: White Drywall ND

Asbestos (ND)Total Composite Values of Fibrous Components:

Cellulose (75 %) Fibrous Glass (Trace)

2959 Pacific Commerce Drive, Rancho Dominguez, CA 90221 / Telephone: (310) 763-2374 (888) 813-9417 / Fax: (310) 763-8684

Sample ID Lab Number Asbestos

Type Percent in

Layer Asbestos AsbestosPercent in Percent in

Type TypeLayer Layer

12 51052709 Layer: Stones ND Layer: Black Semi-Fibrous Tar Chrysotile 3 % Layer: Paint ND Layer: Silver Paint Chrysotile 2 %

Asbestos (2%)Total Composite Values of Fibrous Components:

Cellulose (Trace)

13 51052710 Comment: Sample not analyzed due to prior positive result in series.

14 51052711 Comment: Sample not analyzed due to prior positive result in series.

15 51052712 Layer: White Coating ND Layer: Stones ND Layer: Black Semi-Fibrous Tar Chrysotile 3 % Layer: Paint ND Layer: Silver Paint Chrysotile 2 %

Asbestos (Trace)Total Composite Values of Fibrous Components:

Cellulose (Trace)

16 51052713 Comment: Sample not analyzed due to prior positive result in series.

17 51052714 Layer: Black Semi-Fibrous Tar Chrysotile 5 % Layer: White Fibrous Material ND

Asbestos (5%)Total Composite Values of Fibrous Components:

Cellulose (Trace) Fibrous Glass (10 %)

18 51052715 Layer: Grey Putty Chrysotile 5 % Layer: Paint ND

Asbestos (5%)Total Composite Values of Fibrous Components:

Cellulose (Trace)

19 51052716 Layer: Grey Putty Chrysotile 5 % Layer: Paint ND

Asbestos (5%)Total Composite Values of Fibrous Components:

Cellulose (Trace)

20 51052717 Layer: Beige Putty ND Layer: Paint ND

Asbestos (ND)Total Composite Values of Fibrous Components:

Cellulose (Trace)

2959 Pacific Commerce Drive, Rancho Dominguez, CA 90221 / Telephone: (310) 763-2374 (888) 813-9417 / Fax: (310) 763-8684

Sample ID Lab Number Asbestos

Type Percent in

Layer Asbestos AsbestosPercent in Percent in

Type TypeLayer Layer

21 51052718 Layer: Beige Putty ND Layer: Paint ND

Asbestos (ND)Total Composite Values of Fibrous Components:

Cellulose (Trace)

22 51052719 Layer: Beige Putty ND Layer: Paint ND

Asbestos (ND)Total Composite Values of Fibrous Components:

Cellulose (Trace)

23 51052720 Layer: Beige Putty ND Layer: Paint ND

Asbestos (ND)Total Composite Values of Fibrous Components:

Cellulose (Trace)

24 51052721 Layer: Grey Putty Chrysotile Trace Layer: Paint ND

Asbestos (Trace)Total Composite Values of Fibrous Components:

Cellulose (Trace)

25 51052722 Layer: Grey Putty Chrysotile Trace Layer: Paint ND

Asbestos (Trace)Total Composite Values of Fibrous Components:

Cellulose (Trace)

26 51052723 Layer: Beige Roof Shingle ND Layer: Black Felt with Debris ND Layer: Wood ND

Asbestos (ND)Total Composite Values of Fibrous Components:

Cellulose (40 %) Fibrous Glass (10 %)

27 51052724 Layer: Beige Roof Shingle ND Layer: Black Felt with Debris ND

Asbestos (ND)Total Composite Values of Fibrous Components:

Cellulose (25 %) Fibrous Glass (15 %)

28 51052725 Layer: Beige Roof Shingle ND Layer: Black Felt with Debris ND

Asbestos (ND)Total Composite Values of Fibrous Components:

Cellulose (30 %) Fibrous Glass (15 %)

2959 Pacific Commerce Drive, Rancho Dominguez, CA 90221 / Telephone: (310) 763-2374 (888) 813-9417 / Fax: (310) 763-8684

Sample ID Lab Number Asbestos

Type Percent in

Layer Asbestos AsbestosPercent in Percent in

Type TypeLayer Layer

29 51052726 Layer: Light Grey Non-Fibrous Material ND Layer: Grey Foam ND

Asbestos (ND)Total Composite Values of Fibrous Components:

Cellulose (Trace)

30 51052727 Layer: Beige Tile Chrysotile 3 % Layer: Black Felt ND

Asbestos (2%)Total Composite Values of Fibrous Components:

Cellulose (25 %)

31 51052728 Comment: Sample not analyzed due to prior positive result in series.

32 51052729 Comment: Sample not analyzed due to prior positive result in series.

33 51052730 Layer: Pink Drywall ND Layer: White Skimcoat/Joint Compound ND Layer: Paints ND

Asbestos (ND)Total Composite Values of Fibrous Components:

Cellulose (30 %)

34 51052731 Layer: Off-White Skimcoat/Joint Compound Chrysotile 2 % Layer: Paints ND

Asbestos (2%)Total Composite Values of Fibrous Components:

Cellulose (Trace)

35 51052732 Layer: Pink Drywall ND Layer: White Skimcoat/Joint Compound ND Layer: Paints ND

Asbestos (ND)Total Composite Values of Fibrous Components:

Cellulose (10 %)

36 51052733 Layer: Tan Drywall ND Layer: Drywall Tape ND Layer: White Skimcoat/Joint Compound ND Layer: Paint ND

Asbestos (ND)Total Composite Values of Fibrous Components:

Cellulose (35 %)

37 51052734 Layer: White Skimcoat/Joint Compound ND Layer: Paint ND

Asbestos (ND)Total Composite Values of Fibrous Components:

Cellulose (Trace)

2959 Pacific Commerce Drive, Rancho Dominguez, CA 90221 / Telephone: (310) 763-2374 (888) 813-9417 / Fax: (310) 763-8684

Sample ID Lab Number Asbestos

Type Percent in

Layer Asbestos AsbestosPercent in Percent in

Type TypeLayer Layer

38 51052735 Layer: Tan Drywall ND Layer: Drywall Tape ND Layer: White Skimcoat/Joint Compound ND Layer: Paint ND

Asbestos (ND)Total Composite Values of Fibrous Components:

Cellulose (35 %)

39 51052736 Layer: Brown Sheet Flooring ND Layer: Fibrous Backing Chrysotile 70 % Layer: Tan Mastic ND

Asbestos (25%)Total Composite Values of Fibrous Components:

Cellulose (5 %)

40 51052737 Comment: Sample not analyzed due to prior positive result in series.

41 51052738 Comment: Sample not analyzed due to prior positive result in series.

42 51052739 Layer: Brown Mastic ND Layer: Tan Fibrous Material ND Layer: Paint ND

Asbestos (ND)Total Composite Values of Fibrous Components:

Cellulose (55 %)

43 51052740 Layer: Off-White Drywall ND Layer: Brown Mastic ND Layer: Tan Fibrous Material ND Layer: Paint ND

Asbestos (ND)Total Composite Values of Fibrous Components:

Cellulose (60 %)

44 51052741 Layer: Beige Roof Shingle ND Layer: Black Felt ND

Asbestos (ND)Total Composite Values of Fibrous Components:

Cellulose (25 %) Fibrous Glass (15 %)

45 51052742 Layer: Beige Roof Shingle ND Layer: Black Felt ND

Asbestos (ND)Total Composite Values of Fibrous Components:

Cellulose (25 %) Fibrous Glass (15 %)

2959 Pacific Commerce Drive, Rancho Dominguez, CA 90221 / Telephone: (310) 763-2374 (888) 813-9417 / Fax: (310) 763-8684

Sample ID Lab Number Asbestos

Type Percent in

Layer Asbestos AsbestosPercent in Percent in

Type TypeLayer Layer

46 51052743 Layer: Beige Roof Shingle ND Layer: Black Felt ND

Asbestos (ND)Total Composite Values of Fibrous Components:

Cellulose (25 %) Fibrous Glass (15 %)

47 51052744 Layer: Black Semi-Fibrous Tar ND

Asbestos (ND)Total Composite Values of Fibrous Components:

Cellulose (10 %)

48 51052745 Layer: Black Semi-Fibrous Tar ND

Asbestos (ND)Total Composite Values of Fibrous Components:

Cellulose (10 %)

49 51052746 Layer: White Putty ND Layer: Paint ND

Asbestos (ND)Total Composite Values of Fibrous Components:

Cellulose (Trace)

50 51052747 Layer: Black Non-Fibrous Material ND Layer: Brown Mastic ND

Asbestos (ND)Total Composite Values of Fibrous Components:

Cellulose (Trace)

51 51052748 Layer: Black Non-Fibrous Material ND Layer: Brown Mastic ND

Asbestos (ND)Total Composite Values of Fibrous Components:

Cellulose (Trace)

52 51052749 Layer: White Fibrous Material ND Layer: Black Tar ND Layer: Black Non-Fibrous Material ND

Asbestos (ND)Total Composite Values of Fibrous Components:

Cellulose (Trace) Fibrous Glass (60 %)

53 51052750 Layer: Black Felt ND

Asbestos (ND)Total Composite Values of Fibrous Components:

Cellulose (60 %)

2959 Pacific Commerce Drive, Rancho Dominguez, CA 90221 / Telephone: (310) 763-2374 (888) 813-9417 / Fax: (310) 763-8684

Sample ID Lab Number Asbestos

Type Percent in

Layer Asbestos AsbestosPercent in Percent in

Type TypeLayer Layer

Analytical results and reports are generated by Forensic Analytical Laboratories Inc. (FALI) at the request of and for the exclusive use of the person or entity (client) named on such report. Results, reports or copies of same will not be released by FALI to any third party without prior written request from client. This report applies only to the sample(s) tested.

Supporting laboratory documentation is available upon request. This report must not be reproduced except in full, unless approved by FALI. The client is solely responsible for the use and interpretation of test results and reports requested from FALI. Forensic Analytical Laboratories Inc. is not able to assess the degree of hazard resulting from materials analyzed. FALI reserves the right to dispose of all samples after a period of thirty (30) days, according to all state and federal guidelines, unless otherwise specified. All samples were received in acceptable condition unless otherwise noted.

Note: Limit of Quantification ('LOQ') = 1%. 'Trace' denotes the presence of asbestos below the LOQ. 'ND' = 'None Detected'.

Tiffani Ludd, Laboratory Supervisor, Rancho Dominguez Laboratory

2959 Pacific Commerce Drive, Rancho Dominguez, CA 90221 / Telephone: (310) 763-2374 (888) 813-9417 / Fax: (310) 763-8684

Forensic Analytical Laboratories, Inc. Analysis Request Form (COC)

Client Name & Address: Client No.: 7238

FCG (Forbess Consulting Group, Inc.)

1009 Mercer Avenue Ojai, CA 93023

Client Name & Address: Client No.: 7238

FCG (Forbess Consulting Group, Inc.)

1009 Mercer Avenue Ojai, CA 93023

Turn Around Time: Same Day/Z'lDaJ / 2Day / 3Day / 4Day / 5Day

Client Name & Address: Client No.: 7238

FCG (Forbess Consulting Group, Inc.)

1009 Mercer Avenue Ojai, CA 93023 • PCM: n NIOSH 7400A / • NIOSH 7400B O Rotometer

Client Name & Address: Client No.: 7238

FCG (Forbess Consulting Group, Inc.)

1009 Mercer Avenue Ojai, CA 93023

IJPPLM: B^tandard / • Point Count 400 - lOOO / O GARB 435

Contact: Alan Forbess, President • TEM Air: • AHERA / • Yamate2 / D NIOSH 7402

• TEM Bulk: D Quantitative / • Qualitative / • Oiatfield

• TEM Water: • Potable / a Non-Potable / • Weight %

• TEM Microvac: • Qual(+/-) / • D5755(str/area) / •…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.