Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
1 4
2. AMENDMENT/MODIFICATION NUMBER
A0010
3. EFFECTIVE DATE
04/17/2019
4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
USDA FOREST SERVICE
PACIFIC SOUTHWEST REGION
1323 CLUB DRIVE
VALLEJO, CA 94592-1110
SAME AS ITEM 6.
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
1291S819R4002
9B. DATED (SEE ITEM 11)
02/22/2019
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Amendment A0010 is for the purpose of providing answers to RFIs 65-75 and additional response to RFI 12.
The offer due date/time is unchanged. Offers are due NLT Thursday, April 18, 2019, 2pm/1400 PST.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Jeremy Bedner, Contracting Officer
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
04/17/2019 (Signature of person authorized to sign)
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
Amendment A0010
04/17/2019
RFP 1291S819R4002
LOS PRIETOS FIRE ENGINE GARAGE CONSTRUCTION
SANTA BARBARA RANGER DISTRICT, LOS PADRES NATIONAL FOREST
US FOREST SERVICE
The following are responses to Request for Information [RFIs] 65-75 and additional response for RFI 12.
12. Floor Plans on A1 show two different rooms numbered 110: "Cache 110" and "Workstation 110." On the interior finish schedule (A5), only "Workstation 110" is shown. Concrete flatwork plan 1/A4 shows only "Cache 110." When the finish schedule refers to acoustical ceiling tile and cedar base in the Dayroom, please clarify whether this refers to the entire "Dayroom/Workstation" area (as it is referenced in B/A7) or rather to only the portion between gridlines 2 and 3 (as suggested by the floor plan).
REVISED ANSWER:
This information to be provided following proposal receipt if necessary IAW FAR 15.306 – Exchanges with offerors after receipt of proposals.
65. Request clarification of buildings for demolition listed as Building 402 & Building 402 in Section B – Prices and Cost Schedule of Items, ANSWER:
Building 403 is Warehouse/Garage. Building 402 is Los Prietos Station 42. Refer to Project Drawings and Plans C-2 (Attachment 3). F - Warehouse/Garage. G - LP Station 42.
66. Specification 27 00 00, 1.06 calls for a 25-year warranty for telecommunications labor and materials.
This is well beyond industry standards, which are 1-year for labor and 2- or 3-year for materials.
Workmanship issues typically surface right away for telecommunications wiring; problems arising later tend to be due to rodent issues or misuse by the end user. In light of this, please confirm that the extended warranty requirement is not applicable, and that one-year labor and three-year materials warranties will suffice.
ANSWER:
Agreed that labor warranty for 1 year and material warranty for 2-3 years is typical and acceptable;
however it is noted that the manufacture warranty for some materials will likely exceed 2-3 years.
67. Civil plans do not show an (e) 1-1/2" irrigation line that runs the length of the chain link fence.
Portions of it will have to be demolished to make way for the new garage entry. Please confirm that repairs to this line are not in contract.
ANSWER:
If referring to the above ground line along the bottom of the fence. Yes; it is confirmed that repairs to this line are not included in the contract.
68. Chain link note 4 on sheet 3 of detail 600-3 of C-3.4 says that "barbed wire shall be used only when specified." Barbed wire is nowhere specified. Existing fence into which the new fence will tie in has barbed wire. Please confirm that (n) chain link fence shall have barbed wire as drawn on Sheet 1 of the chain link fence details.
ANSWER:
It is confirmed that new chain link fence shall have barbed wire, per details.
69. There are overhead wires running from the (e) L.P. Station 42 to the (e) L.P. Communications building. Please advise what is to be done with this wiring when the Station is demolished.
Additional information to be provided post-award and prior to project implementation/execution.
70. Sheet C-4.1 shows a new UG communications line running directly under the location of the (e) Warehouse/Garage building (cf. C-4.0). With the anticipated phasing of the project, at the time that this trench is to be dug, the Warehouse will still be standing. Please indicate where this new communications line is to be routed.
ANSWER:
Additional information to be provided post-award and project implementation. An alternate alignment will likely need to be provided in order to accommodate the construction phasing, although it is not anticipated that it will result in a significant increase to quantities for this item.
71. Specification 10 52 00, 2.A.5, calls for Contractor to provide six (6) corner guards. There are only two outside corners in the building—the southwest corner of Office 101 and the southeast corner of Restroom 104—as well as the 30" wall in the laundry area of the Engine Bays. We will provide two corner guards and one wall protector, rather than six corner guards. Please confirm that this is acceptable.
Confirmed; acceptable
72. Section B/A7 shows that the surface-applied acoustical ceiling tile stops short of the north and south walls of the Dayroom by approximately 3'. This distribution is not shown on the reflected ceiling plan on A5. We intend to include 400 SF of surface-applied acoustical tile for bidding purposes. Please confirm that this is acceptable.
ANSWER:
Surface-applied ceiling tile to be applied to all of Dayroom 106. Building section B/A7, Surface-applied acoustical ceiling should extend to north and south walls.
73. Electrical note 4 on E2.0 is not referenced on the power/signal plan (2/E2.0), and television is not shown on the panelboard schedule on E1.0. Please confirm electrical note 4 is not applicable, or else indicate location of television.
ANSWER:
Note 4 on E2.0 references to a Tele/Data outlet (see Legend) located as specified in the drawings and runs to the tele/com closet and not to the panelboard. Coordinate installation with Forest Service Office of the Chief Information Officer [OCIO]. No Televisions on the drawings.
74. r/signal plan 2/E2.0 shows fused disconnects (per Note 10) to two heaters, one at the north end and the other at the south end of the engine bays. Reflected ceiling plan 1/A5 similarly shows two heaters.
M and P drawings show heater only at south end. Please confirm no fused disconnect is necessary at the north end of the engine bays.
Provide fused disconnects where heaters are located per M&P drawings only.
75. Specification 08 50 00, 1.1A2 calls for "single-hung windows." This feature is not available in the specified wood-clad fiberglass window line. Please confirm that double-hung is acceptable.
ANSWER:
Window distributor for Milguard was contacted by architect. Single-hung windows are still available and required.
| A10 CONTINUATION |
| SF-30 A10 |
| 11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS |
| 13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14. |
| Amendment A0010 is for the purpose of providing answers to RFIs 65-75 and additional response to RFI 12. |