Text version
x
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
1 5
2. AMENDMENT/MODIFICATION NUMBER
A0009
3. EFFECTIVE DATE
04/10/2019
4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
USDA FOREST SERVICE
PACIFIC SOUTHWEST REGION
1323 CLUB DRIVE
VALLEJO, CA 94592-1110
SAME AS ITEM 6.
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
1291S819R4002
9B. DATED (SEE ITEM 11)
02/22/2019
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of the amendment is for the following:
1. Extends the proposal due date. The proposal due is hereby extended to NLT Thursday, April 18, 2019 – 2pm/1400 PST.
2. Answers RFIs 57-64.
3. Revises Section I, J, and L language and adds attachment.
See continuation pages 2-4 for RFI responses and information on revised sections and language.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Jeremy Bedner, Contracting Officer
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
04/10/2019 (Signature of person authorized to sign)
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
Amendment A0009
04/10/2019
RFP 1291S819R4002
LOS PRIETOS FIRE ENGINE GARAGE CONSTRUCTION
SANTA BARBARA RANGER DISTRICT, LOS PADRES NATIONAL FOREST
US FOREST SERVICE
This amendment also completes the following:
A. Revises FAR 52.225-9 Buy American Act – Construction Materials (MAY 2014). Section I replacement page 23-25 of 56 is attached.
B. Provides Attachment 10 – Door Schedule with Hardware Groups. Section J replacement page 27 of 56 is attached.
C. Adds language “LIMIT TO FIVE (5) CONTRACTS/PROJECTS” for Factor 1 – Construction Project Experience. Adds Section M Technical Approach language to Section L-10 Technical Proposal Instructions as Factor 3. Section L replacement 49-52 of 56 is attached.
E. NOTE – All amendments to this solicitation are considered to have effective dates of 2019.
Amendments 1-3 listed Block 3 effective dates as 2018. These were typographical error.
The following are responses to Request for Information [RFIs] 57-64.
57. What kind of phones will be used in the new station? Will they be VoIP?
ANSWER:
Yes, VOIP is Forest Service standard. The Forest Service will provide the phone equipment
58. Will the armored fiber in the 4” conduit need to be in sub duct? Are 12 strands of 50 micron and 12 strands of SM wanted for this installation from the mobile home? How many copper pairs are needed from the mobile home? Do the technicians need to have a BICSI Certificate? If so, what kind? Please note that the BICSI website's search tool shows no approved contractors within approximately 50 miles of the project site.
ANSWER:
Final configuration of fiber service to the new station will be coordinated after bid closing. Contractor shall note assumptions in the technical approach corresponding to bid price. BICSI Certificate is required.
59. Specification section 06 10 00 makes reference to specification 07190. Specification 07190 does not exist. Please advise.
ANSWER:
The correct reference in Specification Section 06 10 00 is Section 07 25 05
04/10/2019
RFP 1291S819R4002
LOS PRIETOS FIRE ENGINE GARAGE CONSTRUCTION
SANTA BARBARA RANGER DISTRICT, LOS PADRES NATIONAL FOREST
US FOREST SERVICE
60. The plans do not provide a communication plans, and only a supplemental specification concerning comm was included. Please clarify the following:
1. Who’s providing the network switches?
2. Who’s providing the telco (PBX/phones) equipment (this is normally done by the owner/government)?
3. Are there going to be any access points for WIFI?
4. Concerning the free standing data/server racks, how many are needed?
5. Is the fire engine Garage the only facility requiring communication installation.
ANSWER:
1. Government is providing network switches.
2. Government is providing telco/phone equipment
3. No wifi planned for office
4. one rack assumed for data/server rack.
5. The fire engine garage is the only facility requiring telecom installation.
61. The geotechnical report, page 6, paragraph 1 states that "Native soils encountered beneath the gravely sand fill materials are not considered suitable for directly supporting the proposed warehouse slab, concrete apron and AC pavements. We recommend placement of at least twelve inches (12”) of base course material underneath these improvements." Accordingly, the concrete and asphalt on the Civil drawings (C3.4) call for 12" of crushed aggregate base. However, the Structural drawings (7/S2.2; cf.
"Slab Requirements" on S2.0) call for only 4" of gravel base under the Main Slab and Garage Slab. What is the requirement for aggregate base thickness for the building slab? Please advise.
ANSWER:
As stated in the contract documents, comply with the Geotechnical Memorandum provided by Bengal Engineering for engineered fill used to support foundations, slabs-on-grade and driveway and parking areas. See RFP attachment #
62. Scheduled Reznor heating units are not made in the US. Will a Buy American Act exemption be allowed for these units?
ANSWER:
FAR Clause 52.225-9 Buy American Act – Construction Material (May 2014) has been modified.
BAA exemption for REZNOR Heatings Units has been added to paragraph (b)(2)
Refer to solicitation replacement page 23-25 of 56. Attached to this amendment.
04/10/2019
63. Specification 08 71 00, 3.07 lists nine detailed hardware groups with specific manufacturers and model numbers. The immediately preceding paragraph, 3.06B, explains that "the Door Schedule on the Drawings indicates which hardware set is used with each door." However, the actual door schedule on A5 lacks a column for "hardware group." Please indicate, at least preliminarily for bid purposes, which hardware group is to be associated with which doors. Please note: The "submittals and substitutions" section of 08 71 00 nowhere provides this standard project design information.
ANSWER:
Door hardware groups listed in the specifications are keyed to the corresponding doors in the attached schedule. Provided as Attachment 10.
64. What is the structural thickness of the existing parking lot? What is known of possible existing foundations for the warehouse that was demolished two years ago (Geotechnical Design Memorandum,
p. 3, par. 1)?
ANSWER:
Existing asphalt parking lot thickness ranges from 1”- 3” (HMAC/chip seal layers). Depth of the concrete for the previously demolished building is estimated at 12” thick for the slab, and approximately 36” deep continuous footings (based on observations during the previous demolition).
Observations by Forest Service staff (during the prior building demo), indicated that the slab and continuous footings were demolished and removed, during previous project.
Replacement Page 23 of 56
RFP 1291S819R4003
(c) In the performance of this contract, the Contractor shall—
(1) Report to http://www.sam.gov , with a copy to the Contracting Officer, on the product types and dollar value of any USDA-designated biobased products purchased by the Contractor during the previous Government fiscal year, between October 1 and September 30; and
(2) Submit this report not later than—
(i) October 31 of each year during contract performance; and
(ii) At the end of contract performance.
I.4 FAR 52.225-9 BUY AMERICAN ACT—CONSTRUCTION MATERIALS (MAY 2014)
(a) Definitions. As used in this clause-- “Commercially available off-the-shelf (COTS) item”—
(1) Means any item of supply (including construction material) that is—
(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
“Component” means an article, material, or supply incorporated directly into a construction material.
“Construction material” means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies.
However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
“Cost of components” means--
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
“Domestic construction material” means—
(1) An unmanufactured construction material mined or produced in the United States;
(2) A construction material manufactured in the United States, if—
(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been http://www.sam.gov/
Replacement Page 24 of 56
SANTA BARBARA RANGER DISTRICT, LOS PADRES NATIONAL FOREST
made are treated as domestic; or
(ii) The construction material is a COTS item.
“Foreign construction material” means a construction material other than a domestic construction material.
“United States” means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference.
(1) This clause implements the 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. (See FAR 12.505(a) (2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b) (2) and (b) (3) of this clause.
(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:
REZNOR Heating Units
(3) The Contracting Officer may add other foreign construction material to the list in paragraph
(b) (2) of this clause if the Government determines that
(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;
(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American statute.
(1)
(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including--
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with
Replacement Page 25 of 56
SANTA BARBARA RANGER DISTRICT, LOS PADRES NATIONAL FOREST
paragraph (b) (3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award.
If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Price Comparison
Construction material description Unit of measure Quantity Price (dollars) *
Item 1
Foreign construction material
Domestic construction material
Item 2
Foreign construction material
Domestic construction material
[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.]
[Include other applicable supporting information.]
[*Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).]
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
Replacement Page 27 of 56
SANTA BARBARA RANGER DISTRICT, LOS PADRES NATIONAL FOREST
US FOREST SERVICE
PART III--LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J – LIST OF ATTACHMENTS
NUMBER TITLE PAGES
1 Specifications 554
2 Supplemental Specifications Section 270000, Telecommunication Wiring Systems
3 Project Drawings and Plans 44
4 Geotechnical Design Memorandum, Bengal Engineering 24
5 DOL Wage Decision No. CA190023 01/04/2019 CA23 DOL General Decision No. CA190014 02/22/2019 CA14
6 Past Performance Questionnaire 5
7 Asbestos & Lead Survey Report, Environmental Consulting Services 39
8 Site Plan with Building Numbers 1
9 Supplemental Specification Section 09841, Acoustical Panels 4
10 Door Schedule with Hardware Groups 1
Replacement Page 49 of 56
L-10 TECHNICAL PROPOSAL INSTRUCTIONS
1. General Proposal Information
The proposal should be prepared simply and economically, providing straightforward, concise delineation of capabilities to perform the contract. The proposal should be practical, legible, clear and coherent. All proposal information is to be submitted utilizing the English language.
Offerors are cautioned that sufficient and detailed information must be presented in their technical proposals to enable the Government to evaluate their proposals fully in accordance with the evaluation and award criteria contained herein. The Government is not obligated to request additional information, and in the absence of appropriate information, the proposal may be rated deficient. Offerors are discouraged from providing information not required by the RFP.
The technical proposal shall address the offeror’s proposed approach to fully perform the requirements of the Request for Proposals (RFP).
2. General Submission Instructions
All offerors shall be required to submit the proposal with the minimum content as specified herein. Proposals without the minimum content may be rejected. Proposals submission will be allowed until the date and time indicated on Standard Form 1442. Submit to the following address:
Hardcopy/paper:
USDA Forest Service Region 5 Regional Office AQM ATTN: Jeremy Bedner 1323 Club Drive Vallejo, CA 94592
Electronic (if email):
Jeremy.bedner@usda.gov
NOTE: Electronic proposals must be transmitted and confirmed received by the established due date and time.
Hardcopy mailed proposals shall be considered received timely provided the package has been POSTMARKED by the shipping company NLT the established due DATE.
Replacement Page 50 of 56
SANTA BARBARA RANGER DISTRICT, LOS PADRES NATIONAL FOREST
US FOREST SERVICE
3. Proposal Format and Submittal Requirements
Proposals shall be submitted in two parts (volumes):
Volume 1. Technical Proposal
Volume 2. Price Proposal
The Technical Proposal and Price Proposal shall be separate and complete in itself for the purpose of evaluating each proposal part independently of the other. Failure to submit a complete proposal may result in the entire offer being rejected.
Offeror shall submit: One (1) hardcopy/paper copy; and ONE (1) electronic copy in Adobe Acrobat format for each Volume 1 and 2 proposal.
Email is preferable for the electronical copy submission. A USB flash drive is recommended if the proposal file size makes email transmission prohibitive.
Volume 1, Technical Proposal.
FACTOR 1 – Construction Project Experience
1. Offerors shall submit construction project experience information with references for their firm and any proposed major subcontractors. Performance information may be obtained from references provided.
2. List major contracts and subcontracts completed during the past three years similar in nature, scope, and difficulty as this project. Contractors may include those with the Federal Government, agencies of state and local governments, and commercial customers. For each contract or subcontract, provide the information below in one page. LIMIT TO FIVE (5)
CONTRACTS/PROJECTS.
3. Include the following information for each contract/subcontract:
a. Name of customer or contracting activity
b. Contract number
c. Contract type
d. Total contract value
e. Completion date, or anticipated completion date if in progress
f. Scope, complexity and difficulty of work
g. Contracting Officer or Customer Representative
h. Contracting Officer's Representative or Customer Project Manager
i. List of major subcontractors.
NOTE: Provide name, address, telephone, and email address for items g. and h.
Replacement Page 51 of 56
SANTA BARBARA RANGER DISTRICT, LOS PADRES NATIONAL FOREST
FACTOR 2 – Past Performance
For each of the projects/contracts submitted under Factor 1, the offeror should submit copies of Federal Government performance evaluations that are currently in the government’s past performance databases e.g., copies of evaluations in the Past Performance Information Retrieval System (PPIRS). To improve accuracy of database searches, the offeror should also provide the CAGE Codes for the prime contractor.
For each of the project submitted under Factor 1 for which the Government has not already prepared an evaluation in the PPIRS system, the offeror shall provide a Past Performance Questionnaire [PPQ] to a representative that can provide an opinion of the offeror’s past performance for the project.
Attachment 6 Past Performance Questionnaire [PPQ] is included in this solicitation.
Alternate formats/substitutes for the PPQ Attachment 6 may be submitted and shall be considered acceptable provided the format, general contract/project information requested, factors and ratings are similar to the PPQ included in this solicitation.
Completed PPQ forms should be submitted with your proposal. The PPQ does not have to be sent directly from the client. If the offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the offeror should complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s). Ensure correct phone numbers and email addresses are provided for the client point of contact. Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government’ s point of contact – Jeremy Bedner, via email at Jeremy.bedner@usda.gov prior to proposal closing date. The offeror is responsible for ensuring that the completed questionnaires are submitted by the closing date. There is no page limit for this factor.
The Government will evaluate the past performance information provided with the proposal. The Government may contact and interview the project/contract representative on the PPQ and reserves the right to interview evaluating/submitting POCs. While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the offeror.
In addition to the above, the Government may review any other sources of information for evaluating past performance. Past performance information may be obtained from any other sources available to the Government, to include, but not limited to, the Past Performance Information Retrieval System(PPIRS), Contractor Performance Appraisal Reporting System(CPARS), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), or other databases;
interviews with Program Managers, Contracting Officers, and Fee Determining Officials; and the Defense Contract Management Agency.
At no time during this process, nor during the debriefing, nor after award, will the names of the individuals providing reference information about an offeror’s past performance be revealed to the offerors or to any other party. If the Government evaluates adverse past performance information to which an offeror has not had a prior opportunity to respond, and the Government elects to enter into discussions with the
Replacement Page 52 of 56
SANTA BARBARA RANGER DISTRICT, LOS PADRES NATIONAL FOREST
US FOREST SERVICE
offeror or that information is the determining factor preventing the offeror from being placed within the competitive range, the offeror will be provided an opportunity to respond to that adverse past performance information.
FACTOR 3 – Technical Approach
Offerors shall submit a narrative that addresses the items below:
• Describe the proposed management structure for the organization, and the authorities and the delegations of authority within the organization.
• Describe the overall management approach including:
o Lines and methods of communication and decision-making o The role of key subcontractors and specialty contractors o How schedule and cost will be managed.
• Describe the offeror’s quality assurance / quality control plan
• Describe the offeror’s proposed approach for completing the requirement within the established period of performance.
• Describe the offeror’s past experience working in a similar setting. Describe other similar projects where you have successfully overcome challenges based on setting or scope.
Volume 2, Price Proposal
Consisting of an original signed Standard Form 1442 “Solicitation, Offer, and Award”; providing a price for all contract line items (CLINs) in the corresponding bid schedule; and acknowledgment of all amendments to the solicitation. No breakdown of the unit price is required.
Notice of Award. A written notice of award or acceptance of the offer/proposal to the successful offeror within the time for acceptance specified in the offer shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer, whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
(END OF SECTION)
DOOR SCHEDULE
DOOR DOOR
# TYPE
Fl
2 fl
5 RP
G FL
7 fl
8 FIJSL
9 FL
10 G.O.
I I G.O.
12 G.O.
13 G.O.
14 flJSL
15 FIJSL
IG FL
DOOR SIZES DOOR FRAME
WIDTH HEIGHT THICK MATL. FINISH MATL. FINISH REMARKS
3'-0" 6'-8"
3'-0"
3'-0"
3'-011
3'-0"
3'-0" G'-8"
I 2'-0' I 2'-0''
I 2'-0' I 2'-0''
I 2'-0' I 2'-0''
I 2'-0' I 2'-0''
3'-0
G'-8"
SC
3/4"
WOOD
STAINED/
SEALED
MET AL
PRIMED/
PAINTED
SC STAINED/
METAL
PRIMED'
I 3/4"
WOOD SEALED PAINTED
1 314., INSUL. STAINED/
MET AL
PRIMED/
METAL SEALED PAINTED
1 314., SC STAINED/
METAL
PRIMED/
WOOD SEALED PAINTED 1 • UNDERCUT
1 314., SC STAINED/
METAL
PRIMED/
WOOD SEALED PAINTED 1 • UNDERCUT
I 314., INSUL. PRIMED/
METAL
PRIMED/
I HR. RATED
METAL PAINTED PAINTED
1 314., INSUL. PRIMED/
METAL
PRIMED/
1 HR. RATED
METAL PAINTED PAINTED
INSUL. POWDER
MET AL
PRIMED/ OVERHEAD
METAL COAT PAINTED SECTIONAL
INSUL. POWDER
MET AL
PRIMED/ OVERHEAD
METAL COAT PAINTED SECTIONAL
INSUL. POWDER
METAL
PRIMED/ OVERHEAD
METAL COAT PAINTED SECTIONAL
INSUL. POWDER
METAL
PRIMED/ OVERHEAD
METAL COAT PAINTED SECTIONAL
1 314., INSUL. PRIMED/
METAL
PRIMED/
1 HR. RATED
METAL PAINTED PAINTED
I 3/4"
I 3/4"
INSUL. PRIMED/
METAL
PRIMED/
1 HR. RATED
METAL PAINTED PAINTED
PRIMED/
MET AL
PAINTED
DOOR SCHEDULf NOTES:
'" PROVIDE ACCE551Blf SIGNAGE TO DOOR FACE
SEf SPECIFIC ATIONS SECTION FOR HARDWARE SCHEDULf
GENERAL NOTES:
I. SIZE REFER S TO INSIDE FACE Of FRAMES. CONTRACTOR TO VERIFYWMANUF.
FOR ROUGH-IN DIMENSIONS.
2. CONTRACTOR TO COORDINATE AND INSURE FRICTION FIT DOOR FRAMES FIT ACTUAL WAil THlaNE55ES.
Hardware Group
3. REFERENCE DOOR HARDWARE SPECIFICATION: 08 71 00 FOR HARWARE GROUP
DESCRIPTIONS
Attachment 10
| SF-30 A0009 |
| 11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS |
| 13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14. |
| E. IMPORTANT: Contractor is not is required to sign this document and return 1 copies to the issuing office. |
| The purpose of the amendment is for the following: |
| 1. Extends the proposal due date. The proposal due is hereby extended to NLT Thursday, April 18, 2019 – 2pm/1400 PST. |
| 2. Answers RFIs 57-64. |
| 3. Revises Section I, J, and L language and adds attachment. |
| See continuation pages 2-4 for RFI responses and information on revised sections and language. |
| A9 continutation - RFIs + Replacement Pages |
| REPLACEMENT PAGES |
| ATT 10 Door Schedule with Hardware Groups |