J- 3 LittleSnowiesRx_Summary.pdf

PDF 78 KB Posted

Attached to
USFS Region One/Region Four Mechanical Thinning IDIQ
Solicitation number
1284LM22R0006
Issued by

About this file

This document outlines a federal contract opportunity for mechanical thinning services on United States Forest Service lands. The solicitation will be posted on March 4th, 2022 for a multiple award, indefinite delivery indefinite quantity contract to provide mechanical tree thinning, mastication, hauling, and other fuels reduction services on National Forests and Grasslands in Forest Service Regions One and Four. Services will primarily involve the use of heavy machinery but may also include some manual labor. The contract will have a base year and four option years. A pre-proposal meeting will be held virtually on March 15th, and interested parties should register on SAM.gov to access the full solicitation once posted.

View the file

Other files

File Type Posted
Correct Call in number .pdf PDF
J- 2 FrankLakeAlkaliLostLake_UnitMap.pdf PDF
J-3 LittleSnowy HLF 08 Mechanical vicinity map.pdf PDF
J-11 WD 1977-0030 Rev 62 03152022 UT.pdf PDF
J-2 KootenaiFoodStorageOrder.pdf PDF
J- 2 RabbitTracksVicinityMap.pdf PDF
J- 1 Crestline QASP.pdf PDF
J-2 Item2_3_4_5_VicinityMap.pdf PDF
J- 2 QRCodes_RabbitTracks_Maps.pdf PDF
J-2 AlkaliFuelsRxSummary.pdf PDF
J-3 Food Storage Order.pdf PDF
J-3 MAP.pdf PDF
J-12 WD 77-0727 (Rev 66 03_15_2022 CA.pdf PDF
J- 3 Seed TO 3 Little Snowies.pdf PDF
J-4 Thinning Inspection Plot Form.pdf PDF
J-2 HagadoreFrassRxSummary.pdf PDF
J-5 Sample Thinning Inspection Plot Form.pdf PDF
J- 2 RabbitTracksUnitMap.pdf PDF
J-13 WD 1976-1342 Rev 69 03_15_2022 MT.pdf PDF
J-7 Equipment Evaluation Form.pdf PDF
J- 2 Summary_Info_Chart.pdf PDF
J- 3 Little Snowy HLF-08 Mechanical Treatment Units.pdf PDF
J-2 HagadoreFrassUnitMap.pdf PDF
J-10 WD 1969-0113 Rev 67 03152022 NV.pdf PDF
J- 2 Rabbit Tracks RxSummary.pdf PDF
J-6 Sample Forest Camping Permit.pdf PDF
J-2 FrankLakeRoad213RxSummary.pdf PDF
J-3 Summary Information Chart.pdf PDF
J-8 WD 1995-0228 Rev 53 03152022 ID.pdf PDF
J- 2 Seed TO 2 Kootenai NF.pdf PDF
1284LM22R0006 Final.pdf PDF
J-1 Seed TO 1 Crestline.pdf PDF
J-9 WD 1979-0948 Rev 61 03152022 WY.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SILVICULTURE SUMMARY PRESCRIPTION/STATEMENT OF WORK

Item No. 6-1M, 6-2M, and 6-3M Acres: 232 acres total – Individual unit breakdown found in summary chart.

Seed Task Oder Number 3

Task Order Name: Little Snowies Mastication

Unit(s) Name: 6-1M, 6-2M, and 6-3M.

Location – 40 Miles NW of Roundup, MT Legal-T12 N., R21 E., Sec. 26, 27 and 35

Approximate Elevation – 4900-5200 feet Average Stand Age - 100-135 years

Average Aspect - SE Average Slope – 5-15%

Average Leave Tree Height – 55-75 feet Average Cut Tree Height – 15-40 feet

To the extent possible, complete between July and December to prevent ips beetle infestation.

Masticate at least 95 percent of trees up to 9 inch diameter at breast height.

• Spread chips/shreds of various sizes over 65% to 85% of the soil surface. Should not exceed 2 inches. If the chip depth criteria cannot be achieved, reduce the maximum diameter limit in that site-specific area to achieve chip criteria. Priority for tree mastication would be within 15

ft. of canopy dripline of trees greater than 18 inches diameter.

• If cut tree cannot be masticated without significant damage to adjacent leave trees (>9”) then the cut tree can remain uncut. Significant damage would be defined as greater than 25% physical damage to leave tree.

• Do not deposit chips/shreds on roadway or in ditches, stream channels, or areas that support surface water.

• Stump height would be less than 4 inches above the forest floor or natural obstacles.

• Avoid damaging isolated limber pine (5-needle) if possible

• Avoid damaging concentrated areas of shrubs.

• Ensure that large diameter, existing, coarse woody debris (2 logs/acre) remains on site to provide for soil productivity.

ALL OTHER CONSIDERATIONS:

(1) Minimize soil scarification and detrimental soil impacts to the extent possible.

(2) There is a barb-wire range allotment boundary fence between Unit 6-2M and Unit 6-3M; Care should be taken to ensure machinery does not damage this fence and that slash is not deposited on top of fences in a manner that damages or drops the fence.