This document includes a solicitation for a hazardous materials abatement project and related floor plans. The U.S. Forest Service Rocky Mountain Region is seeking contractors to remove hazardous materials from the Del Norte High School building in preparation for its conversion to the Rio Grande Supervisor's Office. Work will include supplying all labor, materials, equipment, permits and licenses to complete hazardous material removal from the 1968 building. Floor plans detail areas for demolition, hazardous materials to be removed, and other abatement work. Upon project completion, remaining areas of the building will be demolished and remodeled for use as an office under separate contracts.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AREA SHOWN NOT HATCHED TO BE

REMODELED. RE: STRUC FOR

ADDITIONAL NOTES

DEMO (E) WINDOWS, DOORS, AND

FRAMES. WALL AND STRUCTURE TO

REMAIN HERE, RE: STRUC FOR MORE

INFO

64' - 6 1/2" VIF

DEMO ALL (E) INTERIOR WALLS,

DOORS, WINDOWS SHOWN

DASHED

DEMO MECHANICAL MEZZANINE

CONSTRUCTION (FLOOR, WALLS,

LADDER, EQUIPMENT, ETC.), TYP.

BEARING WALLS TO REMAIN OR BE

MODIFIED TO MEET CURRENT

STRUCTURAL REQUIREMENTS, TYP,

RE: STRUC

EXTERIOR WALLS TO REMAIN OR BE

MODIFIED TO MEET CURRENT

STRUCTURAL REQUIREMENTS, TYP,

RE: STRUC

RE: STRUC FOR AREA OF FLOOR

SLAB TO BE REMOVED

COLUMNS AND OTHER STRUCTURAL

ELEMENTS TO REMAIN OR BE

MODIFIED TO MEET CURRENT

STRUCTURAL REQUIREMENTS, RE:

STRUC, TYP

A721

HATCH INDICATES AREA TO BE

DEMOLISHED ENTIRELY, RE: STRUC,

MECH, ELEC, AND PLUMB, FOR MORE

INFO

DEMO (E) LOCKERS, TYP

DEMO (E) MILLWORK, TYP

DEMO (E) AUDITORIUM

SEATING, TYP. (NOT SHOWN)

DEMO (E) RAISED STAGE

RE: CIVIL & LANDSCAPE FOR SITE

DEMO INFO, TYP

DEMO (E) RR'M

FIXTURES, TYP

DEMO (E) RR'M

FIXTURES, TYP

D E

M O

E

R

R 'M

F

IX

T

U R

E S

T

Y P

RE: STRUC FOR AREA OF FLOOR

SLAB TO BE REMOVED

DEMO (E) SLAB WITHIN EXTERIOR

STORAGE AREA, TYP

RE: STRUC FOR AREA OF FLOOR

SLAB TO BE REMOVED, TYP

DEMO (E) OPERABLE PARTITIONS, TYP

FOR ALL WALLS REMAINING DEMOLISH

ANY GYP BOARD FINISH THAT REMAINS

AFTER ABATEMENT, TYP FOR BUILDING

EXTERIOR STORAGE

ROOM TO BE

DEMOLISHED UP TO

FRAMING

STRUCTURE

VIF

5' - 7"

AT WING WALLS

DEMO TO FULL/HALF

COURSE BRICK AT

PERPENDICULAR

WALL

V

IF

/4

V

IF

V

IF

V

IF

/2

INTENT IS FOR DEMO TO GO TO

EXISTING CLASSROOM DOOR

OPENINGS, VIF ANY POTENTIAL

CONFLICTS WITH NEW FLOOR PLAN

DOOR TO BE

DEMOLISHED, INFILL W/

STUD FRAMING AND

GYP, RE: PLAN DETAILS

SEE STRUCTURAL DRAWINGS FOR

INFORMATION REGARDING DEMO

ALONG THIS WALL AND

STRUCTURAL COMPONENTS TO

REMAIN

TRENCH EXISTING FLOOR AS NEEDED

FOR INSTALL OF PLUMBING

FIXTURES/PIPING AND

POWER/DATA/FLOORBOXES; RE:

PLUMBING AND ELECTRICAL DRAWINGS

1. PRIOR TO BIDDING DEMOLITION WORK, THE CONTRACTOR MUST VISIT

THE SITE AND VERIFY THE EXISTING BUILDING CONDITION AND AREAS TO

BE DEMOLISHED. THE FULL SCOPE OF THE DEMO WORK SHALL BE VERIFIED

ONSITE.

2. CONTRACTOR SHALL COORDINATE ALL DEMOLITION WITH ANY PHASING

REQUIRED TO COMPLETE THE WORK. COORD. REQUIREMENTS W/

CONTRACTING OFFICER.

3. ALL DEMOLITION SHALL BE MADE CLEAN AND COMPLETE AND IN A

MANNER SUITABLE TO ACCEPT NEW FINISHES AND/OR SURFACES.

4. EXISTING WALL, FLOOR AND CEILING FINISHES TO REMAIN SHALL BE

PROTECTED FROM DAMAGE DUE TO DEMOLITION WORK. WHEN

DEMOLITION CAUSES DAMAGE TO FLOOR, WALL, OR CEILING SURFACES

THAT WILL REMAIN EXPOSED IN THE FINISHED WORK, SUCH DAMAGE SHALL

BE REPAIRED AS REQUIRED TO RECEIVE NEW FINISHES TO MATCH

ADJACENT.

5. THE CONTRACTOR SHALL COVER AND PROTECT EQUIPMENT WHICH

CANNOT BE REMOVED FROM THE PROJECT AREA.

6. REMOVE ALL EXISTING WALL MOUNTED ITEMS WITHIN THE PROJECT

LIMIT AREA WHICH ARE NOT NOTED TO REMAIN. THE CONTRACTOR SHALL

DISPOSE OF THESE ITEMS AFTER INSPECTION BY THE CONTRACTING

OFFICER FOR FUTURE USE. IF ITEMS ARE REMOVED FROM WALLS THAT

ARE TO REMAIN, THE CONTRACTOR SHALL PATCH WALLS AS REQUIRED TO

RECEIVE NEW FINISHES AND SURFACES TO MATCH ADJACENT.

7. REFER TO STRUCTURAL, CIVIL, LANDSCAPE, MECHANICAL, PLUMBING,

ELECTRICAL, & DETAILS ADDITIONAL DEMOLITION INFORMATION.

8. DEMOLITION FOR BUILDING SERVICES AND UTILITIES SHALL BE

PERFORMED BY THE TRADE RESPONSIBLE FOR THAT UTILITY. OPENINGS

FOR DEMOLISHED UTILITIES SHALL BE INFILLED BY TRADE RESPONSIBLE

FOR PIPING, DUCT OR CONDUIT DEMOLITION. OPENINGS THROUGH FIRE-

RATED CONSTRUCTION SHALL BE PATCHED TO MATCH EXISTING

CONSTRUCTION OR BE FIRESTOPPED.

9. WHERE EXTERIOR WALLS, DOORS AND/OR WINDOWS ARE TO BE

REMOVED OR MODIFIED, THE CONTRACTOR SHALL TAKE ALL NECESSARY

PRECAUTIONS TO ENSURE THAT THE EXISTING BUILDING REMAINS

WEATHER-TIGHT AND WITHOUT DRAFTS.

10. REMOVE EXISTING FLOOR AND BASE MATERIALS IN ALL AREAS

SCHEDULED TO RECEIVE NEW FLOOR AND BASE. REFER TO FINISH

DRAWINGS OR SCHEDULES. ALL FLOOR DEMOLITION TO REFER TO

'GENERAL DEMOLITION NOTE #4'.

11. CONTRACTOR TO SALVAGE EXTERIOR VENEER WALLS NOTED TO BE

REMOVED FOR INFILL AREAS THAT WILL BE NEEDED ON THIS PROJECT.

COORDINATE WITH NEW CONSTRUCTION DRAWINGS AND WALL TYPES.

DEMOLITION GENERAL NOTES

DEMOLITION LEGEND

DASHED LINE INDICATES EXISTING

ELEMENT TO BE DEMOLISHED

UNLESS NOTED OTHERWISE

SOLID LINE INDICATES EXISTING

ELEMENT TO REMAIN

EXISTING WALL TO REMAIN

EXISTING WALL TO BE REMOVED

(SALVAGE BRICK VENEER FOR REUSE)

RIO GRANDE

SUPERVISOR'S

OFFICE

RIO GRANDE

NATIONAL FOREST

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

ARCHIVE NO.

DESIGNER

CHECKED

DATE/ISSUE

SUB SHEET NO.

NO REVISION / ISSUE DATE

R2

ROCKY MOUNTAIN

REGION

A030

DEMOLITION PLANS

BRS

KH

4/6/2020 - 100% 0 8' 16' 24'1

DEMOLITION PLAN

PROJECT TRUE

File details come from the government source that posted it. Updated .