This document is an amendment to a solicitation for hazardous materials abatement services. The amendment provides additional information to support contractor bids. Specifically, it notifies contractors that a video walkthrough has been added to allow viewing of the project site remotely. It also clarifies that some minor items shown in the video may be removed prior to contract start. In addition, two modular buildings adjacent to the project site will be demolished by the school district before work begins. The amendment emphasizes that all other solicitation terms and conditions remain unchanged. The related federal contract opportunity provides further context, seeking hazardous materials removal and partial demolition of the Del Norte High School building to ready it for use as office space by the Rio Grande National Forest Supervisor's Office. The Department of Agriculture Forest Service R2-Rocky Mountain Region is the contracting agency.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF30 Sol_1282AK20R0002_Amd_0004.pdf | ||
| Amendment4 Attach2 RGS0-Existing Floor Plan.pdf | ||
| Am4 RFP-Hazmat-Question-Responses.xlsx | XLSX spreadsheet | |
| Amendment3 SF30.pdf | ||
| Amendment2 SF30.pdf | ||
| Am2 SF1442 Section A.pdf | ||
| Am2 010150_Div_1-revised.pdf | ||
| Am2 AG82AK20R0002 Preproposal Meeting Notes 07172020.pdf | ||
| Am2 Rio Grande_HazMat-Schedule_of_Items_Revised.pdf | ||
| Am2 RFP-Hazmat-Question-Responses.xlsx | XLSX spreadsheet | |
| Former High School Walk Through - Outside 07222020.mp4 | MP4 file | |
| Former High School Walk Through - Inside Part1.mp4 | MP4 file | |
| Former High School Walk Through - Inside Part2.mp4 | MP4 file | |
| Solicitation v4 Final.pdf | ||
| Attach05 RFP Question Submission Form.xlsx | XLSX spreadsheet | |
| Attach03 Wage Rates.docx | DOCX document | |
| Attach04 Technical Proposal Submission Aid.docx | DOCX document | |
| SF1442 Section A.pdf | ||
| Attach02 RIOG_HazMat_Spec_Binder.pdf | ||
| Attach01 Rio Grande_HazMat-Schedule_of_Items.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
1282AK20R0002
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
82AT
FORT COLLINS CO 80526-8119
2150 CENTRE AVENUE BUILDING E
ARAPAHOE-ROOSEVELT NF PAWNEE NG
USDA FOREST SERVICE
07/23/20200001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
07/23/2020
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not iXXis required to sign this document and return ___1_______________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
CHRISTINA A. SCHOFIELD
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Amendment One (01)
The solicitation documents are being amended to include a video walk through of the building for anyone interested in viewing the site but that may not be able to attend the site visit in person. Some minor items shown in the video may be removed prior to the start of the contract. The school district is still working to remove all school items. In addition, the school district is planning to remove the two modular buildings located adjacent to the northeast corner of the former high school building prior to the start of the contract.
All other terms and conditions remain unchanged.
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
File details come from the government source that posted it. Updated .