This document contains a schedule of items and description for the Rio Grande Supervisor's Office Hazardous Material Removal project. The project involves hazardous material abatement at the former Del Norte High School building, which is being converted to the Rio Grande Supervisor's Office. Base items include mobilization and hazardous material removal in 11 designated areas and 2 corridors. Optional items include removal of ceiling tiles, chalkboards, fire door insulation, an iron rest, and thermal insulation. Floor tile and auditorium curtain removal are also optional. Testing for asbestos-containing materials is included as a base item. The Department of Agriculture Forest Service Rocky Mountain Region is the contracting agency. No pricing is included in the schedule of items.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT NUMBER PROJECT TITLE DATE

Supervisor's Office Hazardous Material Removal

ESTIMATORS Rio Grande National Forest

Type Item

(Base Item) #

BI 1 Mobilization L.S.Q Lump Sum Job

BI 2 Area 1 Hazardous Material Removal L.S.Q Lump Sum Job

BI 3 Area 2 Hazardous Material Removal L.S.Q Lump Sum Job

BI 4 Area 3 Hazardous Material Removal L.S.Q Lump Sum Job

BI 5 Area 4-1 Hazardous Material Removal L.S.Q Lump Sum Job

BI 6 Area 4-2 Hazardous Material Removal L.S.Q Lump Sum Job

BI 7 Area 5 Hazardous Material Removal L.S.Q Lump Sum Job

BI 8 Area 6 Hazardous Material Removal L.S.Q Lump Sum Job

BI 9 Area 7 Hazardous Material Removal L.S.Q Lump Sum Job

BI 10 Area 8 Hazardous Material Removal L.S.Q Lump Sum Job

BI 11 Area 9 Hazardous Material Removal L.S.Q Lump Sum Job

BI 12 Area 10 Hazardous Material Removal L.S.Q Lump Sum Job

BI 13 Area 11 Hazardous Material Removal L.S.Q Lump Sum Job

BI 14 Corridor 1 Hazardous Material Removal L.S.Q Lump Sum Job

BI 15 Corridor 2 Hazardous Material Removal L.S.Q Lump Sum Job

BI 16 Testing for ACMs L.S.Q Lump Sum Job

Type

(Optional Items)

TOTAL

TOTAL BASE ITEMS

Description Method of Measure

Unit Quantity Unit Price

Schedule of Items

Description Method of Measure

Unit Quantity Unit Price TOTAL

RIO GRANDE SUPERVISOR'S OFFICE HAZARDOUS MATERIAL REMOVAL SCHEDULE OF ITEMS

OI 1 Auditorium Ceiling Tile Removal A.Q. SF 2520

OI 2 Chalkboard Removal A.Q. SF 675

OI 3 Fire Door Insulation Removal A.Q. Ea 22

OI 4 Iron Rest Removal A.Q. Ea 3

OI 5 Thermal Insulation Removal A.Q. Ea 1

OI 6 Floor Tile Removal A.Q. SF 100

OI 7 Auditorium Curtain Removal L.S.Q Lump Sum Job

TOTAL OPTIONAL

ITEMS

TOTAL BASE PLUS

OPTIONAL ITEMS

RIO GRANDE SUPERVISOR'S OFFICE HAZARDOUS MATERIAL REMOVAL SCHEDULE OF ITEMS