Am4 RFP-Hazmat-Question-Responses.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
Rio Grande Supervisor's Office Hazardous Material Abatement Solicitation
Solicitation number
1282AK20R0002
Issued by

About this file

This document includes questions and answers related to a solicitation for hazardous materials abatement work. The solicitation seeks a contractor to remove hazardous materials from the Del Norte High School building constructed in 1968. After removal, part of the building will be demolished and the remainder remodeled for use as an office by the Rio Grande National Forest Supervisor's Office. Davis Bacon wage rates apply fully to the abatement scope of work. There will be no public bid opening or sharing of bid tabulations, and the site visit date has passed. The contractor will be responsible for pre-abatement activities like ceiling tile removal and power isolation. The bid bond should be made payable to the USDA.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP QUESTIONS

1282AK20R0002
Rio Grande Supervisor's Office Hazardous Materials Abatement
RFP Questions and Answers - Amendment Four
Date SubmittedRFP LocationQuestionAnswer (Government Use)Notes (Government Notes)
8/4/20N/AWill there be a public bid opening pertaining to this contract? If so, is there a time and place.No, this solicitation is advertised as an RFP not an IFB, therefore there is no public bid opening.
8/4/20N/AWill there be an extension to the due date?No.
N/AAfter receiving all prices, will the tabulation of bids be shared with bidders?No.
Sheet 2 of inspection site plansApprox. 32,089sqft of ceiling tile and suspended grid systems in the classrooms and corridors are not listed as ACM but will need to be removed prior to abatement, will this be completed by the awarded contractor? Or will the USDA Forestry Service or any others perform any pre-abatement activities?Removal of items to enable abatement is the responsibility of the awarded contractor.
Page 27 - Section H.6Is it the GAC's responsibility to hire an electrician to isolate the electrical power and install a temporary power source? If a subcontractor is necessary, do they need to be called out in the bid documents? Do Davis Bacon wages apply to the subcontractor along with certified payroll as well?Power is available at the building. The GAC will need to hire the electrician if work requires electrical power to be isolated.
Page 2 - Attachment 03 Wage RateShould the wage determination provided at a rate of $32.98 plus fringe of $14.73 be applied during all phases of the abatement project to include mobilization, preclean, setup, gross removal, final clean, tear down, waste transportation and waste disposal?See Amendment Two Questions and Answers.
7/28/20Do you have scaleable plans?See Amendment Four, Attachment Two
8/4/20Who is the bid bond payable to> Is it for United States Department of Agriculture? And what is the address?The bid bond should be made out to the United States Department of Agriculture. The address is the office’s physical address which is USDA Forest Services, Region Two, Arapaho and Roosevelt National Forest Supervisor’s Office, 2150 Centre Avenue, Building E, Fort Collins, CO 80526.
8/4/20Is it possible to access the site before bids are due?There is an electronic version of a site visit available on BetaSam.gov in for Amendment One. The date for the face-to-face site visit opportunities has passed.
8/4/20Do Davis-Bacon wages apply to the full scope of the asbestos abatement?Yes, Davis Bacon Wage Rates apply.
8/4/20Which components of the base scope are Davis-Bacon wages not applied?Davis Bacon Wage Rates apply fully to this project.

File details come from the government source that posted it. Updated .