Coyote Roof Replacement (127EAVX26Q0080) - Questions and Answers

This document is a Questions and Answers file addressing clarifications for a federal contract opportunity for roof replacement at the Coyote Ranger District Office. The contract solicitation, issued by the USDA, calls for replacement of approximately 8,000 square feet of standing-seam metal roofing with specifications including minimum 26-gauge steel panels, #30 felt underlayment, metal flashing, fascia, and soffit work. Key clarifications provided include: roof specifications have been updated in the September 2026 Coyote Ranger District Office Roof Replacement Specifications; underlayment must remain #30 felt (premium synthetic alternatives are not acceptable); gutters will be removed and not replaced; skylights will be removed and openings will be framed and covered with metal roofing; damaged sub-roof decking repair is estimated at 2,400 square feet; and approximately ten existing lightning protection rods must be disconnected, protected, and reinstalled by a qualified installer in accordance with NFPA 780, LPI-175, and UL96A standards.

Additional contractual requirements include: a bid bond of 20 percent of the quoted amount is required; the contractor must hold either a GS-21 Roofing License or GB-98 General Building License issued by the New Mexico Construction Industries Division; the contractor is responsible for obtaining all permits and scheduling post-installation inspections required by the State of New Mexico; and noncompliant work must be corrected and re-inspected at the contractor's expense. The document also details changes made to the original specifications, scope of work, and schedule of items based on bidder questions, including removal of skylight and gutter requirements, clarification of roofing material specifications, addition of fascia and soffit language, and substitution of the lightning protection system as Pay Item 4.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Coyote Roof Replacement – 127EAVX26Q0080

Questions and Answers – 9/22/2026

1. Roof Specifications

• Please Clarify:

o Required replacement roof type and panel profile o Minimum metal gauge o Galvanized/Galvalume or other required substrate o Required coating/finish, including whether PVDF/Kynar is required o Required color o Seam height and whether the system must be mechanically seamed or snap-lock o Concealed clip/attachment requirements

• Good afternoon, will the USDA accept a pro-panel alternative (exposed fasteners and usually more cost effective)?

• Standing-seam roofing: Section 07610 specifies a minimum 26-gauge steel panel. Please confirm the required seam configuration and attachment method, including whether a 24-gauge, single-lock mechanically seamed system is acceptable if it meets the remaining specifications.

Answer: Roof specifications have been clarified in the updated Coyote Ranger District Office Roof Replacement Specifications dated September 2026.

2. Underlayment and Insulation

• Required underlayment, including whether high-temperature or self-adhered underlayment is required over the full roof deck

• Insulation or R-value requirements, if applicable

• Roofing Underlayment: The specifications call for #30 felt underlayment. Based on the applicable requirements we’re working from, we have concerns about using this product.

We would recommend using a premium self-adhered synthetic roofing underlayment, such as TopShield PS Max HT 2.0, subject to approval. Would this substitution be acceptable?

Answer: Underlayment has been specified as #30 Felt.

3. Flashing / Soffit / Fascia

• Flashing and trim material/gauge requirements

• Fascia and soffit scope: Metal fascia and soffit cover are not identified in the Scope of

Work (01010) or the Schedule of Items — the only fascia reference is the eave/ridge/rake flashing in 07610 §3.1.H. Please confirm whether any fascia or soffit repair, replacement, or metal cover is required or anticipated, or whether new gutters are to be mounted to the existing fascia with no fascia/soffit work in scope.

Answer: Requirements for fascia and soffits have been added to Section 07610 – Sheet Metal Roofing (Interlocking Standing Seam)

4. Snow

• Any snow-retention requirements

• Are snow guards required above entryways?

Answer: There are no snow retention requirements and snow guards are not required or included in the specifications.

5. Gutters

• Gutter Slope: The specifications call for a 1/8-inch slope per foot, which seems excessive for the gutter runs. Can you confirm whether the 1/8-inch-per-foot slope is required, or if a reduced slope would be acceptable?

• Gutter substitution: Specification §07631 §2.1.A specifies 5" K-style aluminum gutters.

Will the Government accept a 6" seamless aluminum gutter as an "equal or better" substitution under §1.6, or is the 5" K-style required?

• 3. Downspout discharge: Specification §07631 addresses downspout attachment but does not specify terminations. Please confirm the required downspout terminations (splash blocks, extensions, or connection to existing site drainage).

• Gutters and downspouts: Section 07631 specifies 5-inch K-style aluminum gutters and 3-by-4-inch aluminum downspouts with 24-gauge minimum material. Our team understands the existing system is shop-fabricated box-style. Please confirm the required material and thickness, preferably in inches, and whether a 24-gauge box-style replacement with appropriate supports would be acceptable given anticipated snow loads.

Answer: Gutters will be removed from the building and will not be replaced. Gutter specifications have been removed from Coyote Ranger District Office Specifications dated September 2026.

6. Skylights

• Skylights: Can you clarify the required skylight glazing/material? Are the skylights intended to be vinyl/acrylic or glass? We would recommend glass if permitted by the specifications.

• Skylights: The existing units reportedly have raised acrylic domes, while Section 08520, “Aluminum Windows,” describes clear insulating glass and performance criteria. Please confirm whether those requirements apply to all eight replacement skylights, including the maximum U-value of 0.30 and SHGC of 0.50. Must replacements use glass, or would acrylic units be acceptable with revised performance criteria?

Answer: Skylights will be removed from the building and will not be re-installed. Skylight openings will be framed and covered with metal roofing. The interior space will be framed and finished to match the surrounding ceiling.

7. Lightning Protection

• Lightning protection: Our team identified approximately ten lightning-protection rods associated with the existing roof. Please clarify whether the roofing contractor must disconnect, temporarily protect, reinstall, test, or recertify this system; whether a qualified lightning-protection subcontractor is required; and whether existing drawings are available.

Answer: Requirements related to the lightning protection system have been added to the Coyote Ranger District Office Roof Replacement Specifications dated September 2026, Section 13100 Lightning Protection. The contractor shall coordinate a qualified installer to remove and re-install the existing lightning protection system in accordance with NFPA 780, LPI-175, and UL96A.

8. Decking quantity and payment: Attachment 2 describes damaged sub-roof repair as “Estimate 20%” but lists 2,400 SF, while the SOW and specifications state 30% of the estimated 8,000-SF roof. Please confirm that offerors should price 2,400 SF and explain how differences between estimated and Government-approved actual quantities will be measured and paid.

Answer: Decking quantity has been revised to state 2400ft2

9. Bid guarantee: SF 1442, Block 13b, indicates that an offer guarantee is required, and

FAR 52.228-1 is included. Please confirm the required amount or percentage and acceptable documentation and format for submitting the guarantee electronically with the quotation.

Answer: Percentage of bid bond is 20% of quoted amount

10. New Mexico licensing: Please clarify the New Mexico contractor-license requirements applicable to this project, whether they apply to the prime contractor, performing roofing subcontractor, or both, and when evidence of licensing must be provided.

Answer: Contractor will be required to hold a GS-21 Roofing License or a GB-98 General Building License issued by the New Mexico Construction Industries Division.

Contractor will be responsible for all permits required to perform roof replacement work.

Contractor will be responsible for scheduling and coordinating any post installation inspections required by the State of New Mexico or other relevant jurisdiction. Non-compliant work will be the responsibility of the contractor to fix and have re-inspected.

Changes to specifications, statement of work and schedule of items:

1. Coyote Ranger District Office Specifications:

a. Removed skylight specification: During the site walk the prospective bidders had many questions about the skylight requirement. This requirement was removed to simplify the contract.

b. Removed the gutter specification: During the site walk the prospective bidders had many questions about the gutter system requirement. This requirement was removed to simplify the contract.

c. Clarified roofing material specifications: Multiple questions were asked to clarify the requirements for the roof material. Updated language answers those questions.

d. Added language for fascia and soffits: Multiple questions were asked to clarify requirements for the fascia and soffits, so language was added to better describe the system and material to be used.

e. Added specifications for the lightning protection system: The prospective bidders had some questions about the lightning protection system that is integrated into the roof system. Not including the lightning protection system was an oversight on my part when I wrote the original scope, so this has been included.

2. Coyote Ranger District Office Scope of Work:

a. Added language to match requirements for skylights, gutters, and fascia and soffit found in the Specifications.

b. Clarified the estimated quantities to be used for bidding to answer a specific question asked about that.

c. Added a section about required licenses, permits, and inspections to address questions asked directly about each of these topics.

3. Schedule of Items:

a. Changed Pay Item 4 from skylights to Lightning Protection System.

File details come from the government source that posted it. Updated .