2. Schedule of Items - REVISED 7-28-2025.pdf
PDF 202 KB Posted
- Attached to
- 127EAW25R0042 - Monument Road Repair 4N47
- Solicitation number
- 127EAW25R0042
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is a Schedule of Items for the Monument Road Repair 4N47 project, detailing construction activities for a road repair project in the Shasta-Trinity National Forest. The base construction scope includes mobilization, clearing and grubbing, aggregate base work, roadway reconditioning, asphalt overlay, full depth reclamation, pothole patching, traffic control, and sign installation across 10.23 miles of roadway. The solicitation includes three optional line items: a modified overlay option, pavement marking, and a 60-inch metal pipe culvert installation.
The federal contract opportunity (Solicitation Number 127EAW25R0042) is a total small business set-aside with a project magnitude between $1,000,000 and $5,000,000. The project is being executed by the Department of Agriculture Forest Service, with contractors required to submit pricing for all items. Key notes indicate that quantities are estimated and must be field verified, and only one award will be made from this solicitation. Contractors are expected to thoroughly review project drawings, statement of work, and specifications before submitting a proposal.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 127EAW25R0042 - RFI Official Responses - 2.pdf | ||
| A00002 - RFI Responses 2.pdf | ||
| Water Drafting Specifications.pdf | ||
| A00001 - RFI Responses.pdf | ||
| 127EAW25R0042 - RFI Official Responses - 1.pdf | ||
| 3. Project Plans.pdf | ||
| 6. Davis-Bacon Act WD CA20250007.pdf | ||
| 7. RFI Form.docx | DOCX document | |
| 1. Statement of Work.pdf | ||
| 2. Schedule of Items.docx | DOCX document | |
| 127EAW25R0042 - Monument Road Repair 4N47.pdf | ||
| 5. Fire Plan.pdf | ||
| 4. Supplemental Specifications.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PART I—THE SCHEDULE
SECTION B-- SCHEDULE OF ITEMS
B.1 SCHEDULE OF ITEMS - (BASE CONSTRUCTION)
PROJECT: Monument Road Repair 4N47
Item Construction Items Qty UNIT Unit Price Total Price
15101 Mobilization 1 Lump Sum
20103 Clearing and grubbing, disposal method scattering (Roadside)
10.23 Mile $___________ $___________
30103 Aggregate base w/compaction method <D> 3,700.00
Cubic Yard
30315 Roadway reconditioning 10.23 Mile $___________ $___________
40304 CalTrans 1/2 PG 64-16 w/ Coat
Depth 2.0''
5.12 Mile $___________ $___________
40701 Chip Seal Double 1/2'' and 3/8'' w/fog seal
5.12 Mile $___________ $___________
30403 Full Depth Reclamation (FDR) 4-6'' 22,000.00 SY $___________ $___________
41802 Pothole Patch/Repair for Asphalt
Overlay
650.00 SY $___________ $___________
63501 Traffic Control 1.00 Lum Sum
71801 Sign Install 8.00 EA $___________ $___________
BASE TOTAL: $___________
B.2 SCHEDULE OF ITEMS - (OPTION 1)
PROJECT: Monument Road Repair 4N47 – OPTION 1
40304OP1
CalTrans 1/2 PG 64-16 Depth
2.0'' Overlay w/Tack Coat
5.12 Mile $___________ $___________
40701OP1
**REMOVE**Chip Seal Double
1/2'' and 3/8'' w/Fog Seal
5.12 Mile $___________ $___________
OPTION 1 TOTAL: $___________
B.3 SCHEDULE OF ITEMS - (OPTION 2)
PROJECT: Monument Road Repair 4N47 – OPTION 2
63401OP2
Pavement Marking - Fog Lines, Stop Bars & Yield
108,200.00 LF $___________ $___________
OPTION 2 TOTAL: $___________
B.4 SCHEDULE OF ITEMS - (OPTION 3)
PROJECT: Monument Road Repair 4N47 – OPTION 3
60201-
60OP3
60-inch Pipe Culvert, Metal Pipe 60.00 LF $___________ $___________
OPTION 3 TOTAL: $___________
BASE + OPTION 1, 2, & 3 TOTAL: $__________________
B.2 SCHEDULE NOTES
* QUANITIES ARE ESTIMATED, CONTRACTOR SHALL FIELD VERIFY TO SATISFY ALL REQUIREMENTS OF
THE DRAWINGS, STATEMENT OF WORK, AND SPECIFICATIONS.
* One award will be made from this solicitation, contractors must submit pricing for all items.
NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price.