Attachment F 2026_PRIOR YEAR QUESTIONS ASKED.pdf

PDF 254 KB Posted

Attached to
A-E Shortlist for USDA-FS, Region 8 and 10, SRS-PNW-IITF Research Stations 2026
Solicitation number
12445124R0001
Issued by

About this file

This is a Questions and Answers document for Notice ID 12445124R0001, an Architect-Engineer (A-E) Shortlist solicitation for the USDA Forest Service (USDA-FS) Regions 8 and 10, SRS-PNW-IITF Research Stations, issued as of April 7, 2020.

The solicitation is restricted to small businesses qualifying under the applicable NAICS code. Respondents must submit the SF 330 form (Architect-Engineer Qualifications) in its entirety as one PDF document, with a separate Section F page for each project example. A minimum of five projects is preferred to demonstrate capability across the anticipated range of requirements, though offerors will not be disqualified for submitting fewer projects. The submission limit is 50 pages, with front and back of a single piece of paper counting as two pages, and email submission is required. All text must be legible without magnification; no specific font requirements are mandated. Resumes are not required but may be included at the respondent's discretion to demonstrate firm capabilities. The work scope includes overall facility condition assessments for both USFS structures and dams, with the majority being facilities such as work centers, wet and dry laboratories, and general office space. Non-small businesses interested in the work are advised to identify themselves on the Interested Vendor List and reach out to posted Award Notices to identify potential small business partners.

View the file

Other files

File Type Posted
SRS Shortlist training slides and TownHall Update Jul 2026.pdf PDF
A-E Shortlist Region 8 and 10PNW-IITF Firm Session MAR 2026.docx DOCX document
SRS Shortlist training slides and FIrm Info SF330 Review Training 19 MAR 2026.pdf PDF
ADHOC REPORT add_remove columns from SAM.GOV award search.pdf PDF
A-E Shortlist Region 8 and 10 Research Stations Firm Session Transcript FEB 2026.docx DOCX document
12445124R0001 Call for Qualifications SAM.GOV POSTING 01202026 Rev 2.docx DOCX document
Firm SRS Shortlist training slides and FIrm Info SF330 Review Training 19 Feb 2026.pdf PDF
A-E Shortlist for Region 8 _10 SRS 2026 Firm Virtual QA Session Schedule.docx DOCX document
Attachment A 2026 AE SUBMITTAL COVER SHEET.pdf PDF
Attachment B 2026 STANDARD FORM 330.pdf PDF
12445121R0005 2026 SRS Renewal Request_ COMPANY NAME.pdf PDF
Attachment C 2026 DESIGN FEE LIMITATION NOTICE.pdf PDF
12445121R0005 SRS Renewal Request_ 2025.pdf PDF
12445124R0001 Townhall 2 Q and A Opportunity 8MAR24.docx DOCX document
12445124R0001 2024 Southern Research Station Shortlist (SRS) CONTRACTOR TOWNHALL SLIDE DECK AND FORMS.pdf PDF
12445124R0001 2024 Southern Research Station Shortlist (SRS) CONTRACTOR TOWNHALL TRANSCRIPT.pdf PDF
Virtual Contractor Townhall 25 JAN 2024 1400ET.docx DOCX document
Attachment B 2024 STANDARD FORM 330.pdf PDF
Attachment D 2024 SBA Table of Size Standards March 17 2023 Rev excerpt.pdf PDF
Attachment A 2024 AE SUBMITTAL COVER SHEET.pdf PDF
Attachment C 2024 DESIGN FEE LIMITATION NOTICE.pdf PDF
12445124R0001 Call for Qualifications SAM.GOV POSTING 02012024 Rev 1.docx DOCX document
Attachment F 2020_PRIOR YEAR QUESTIONS ASKED.pdf PDF
Attachment E_AE_RFP EXAMPLE_FORMAT_NO PROJECT.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

12445124R0001

A-E Shortlist for USDA-FS, Regions 8 and 10, SRS-PNW-IITF Research Stations

Q&A as of 7 April 2020

1. Should we provide a resume for every name on the organization chart or can we provide additional qualified personnel on the org chart (i.e., a deeper team) and resumes for those who have worked on the projects to be submitted?

Answer: Resumes are not a requirement and should be included as each respondent feels appropriate to demonstrate the firm’s capabilities specifically relating to project examples provided.

2. The 50 page limit: Is this limit considering a PDF page as one page; therefore, a printed front and back is considered 2 pages?

Answer: Front and back of a single piece of paper count as 2 pages. E-mail submission is now required.

3. Is there a 12-point font requirement for all text, including text in tables? Can smaller font be used in tables if legible?

Answer: There are no font requirements but all submissions must be legible without any form of magnification.

4. Your solicitation states the work includes “overall facility condition assessments“. What type of facilities would require repair? Various USFS structures/buildings or dams or both?

Answer: Both are anticipated with the majority being facilities vs. dams. Facility types include work centers, wet and dry laboratories, and general office space.

5. My firm is interested in pursuing the “A-E Shortlist for USDA-FS, Regions 8 and 10, SRS-PNW- IITF Research Stations (Notice ID 12445124R0001)”; however, we are not a small business. We are looking for a small business partner that we could potentially serve as a subconsultant to in order to provide our niche expertise in dams to USDA.

Is it possible for you to share the approved shortlist of firms from the previous year with me? If not, do you have any other suggestions for ways we could approach this?

Answer: My suggestion would be to identify yourselves on the Interested Vendor List, and reach out to area A-E firms that are identified in posted Award Notices.

6. In reference to Notice ID 12445124R0001, is the solicitation only for qualified Small Businesses? The language is a little confusing because the same section that discusses what a short selection process is also refers to a sources sought date, which isn’t provided.

Answer: Awards from the Short Selection List, established from responses to 12445124R0001, are only to be made to firms qualifying as small businesses under the applicable NAICS code. Language in the announcement has been revised for clarity with regards to a sources sought vs. solicitation.

7. How many examples would you like?

Answer: The preference is for a minimum of 5 projects that demonstrate the respondent’s ability to support the range of requirements anticipated. However, Offeror’s will not be disqualified for failing to submit a specific number of projects.

8. Do we use the complete form and just fill out section F to show our work after we completely fill out the ARCHITECT-ENGINEER QUALIFICATIONS form in its entirety once?

Answer: It is requested that the SF 330 be submitted in one entire PDF documents, with a Section F page for each example project submitted.

File details come from the government source that posted it. Updated .