This is a Schedule of Items for federal contract 1240LU26Q0013, updated February 2, 2026, for the Park Lake Dam Rehabilitation project located in the Helena-Lewis and Clark National Forest. The schedule outlines a comprehensive base bid and one optional work package with detailed line items, quantities, units of measure, and provisions for unit pricing and cost calculations.
The base bid encompasses preconstruction activities (mobilization, access road improvements, construction staking, and temporary traffic control); clearing and grubbing (20,300 square yards downstream of dam); deconstruction including dam excavation (22,200 cubic yards in-situ), temporary stockpiling (24,000 cubic yards), and borrow material procurement (3,750 cubic yards); reconstruction featuring embankment fill (24,000 cubic yards compacted), soil mixing and disking (30,260 cubic yards), Class 2 riprap placement for dam and saddle dike (770 and 5,860 cubic yards respectively), multiple filter and bedding layers, drainage pipe installation (270 linear feet perforated and 240 linear feet solid), and a 24-inch riser inlet. The base bid also includes seismic foundation improvements with primary and secondary borings and compaction grouting (132 and 30 units), hydraulic seepage control barrier work with shallow, mid-level, and deep borings (179, 62, and 33 units), road reconstruction with 425 cubic yards of surface aggregate and gate installations, reclamation work including vegetation transplanting, and instrumentation additions (14 piezometers and one early warning system). A saddle dike section requires 6,260 cubic yards of soil borrow and 5,641 cubic yards of embankment fill. Optional work (Option 001) includes roadway reconditioning for 16.8 miles, involving blade work on a 5.6-mile stretch repeated three times. The vendor must provide name, representative, SAM UEI number, phone, and email upon submission.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1240LU26Q0013
SCHEDULE OF ITEMS
Updated 02/02/26
PARK LAKE DAM REHABILITATION
HELENA-LEWIS AND CLARK NATIONSL FOREST
BASE BID: Park Lake-Complete Dam Rehabilitation No. Description Quantity Unit Unit Price Cost Notes
Preconstruction
15101 Mobilization and Demobilization 1 LS 15102 Access Road Improvements 1 LS 15201 Construction Staking and Survey 1 LS 63501 Temporary Traffic Control 1 LS
Clearing and Grubbing
20101 Clearing and Grubbing downstream of dam and along access
20,300 SY
Deconstruction
20401 Dam Excavation 22,200 CY Quantity is in-situ.
20402 Temporary Stock Piling of Material 24,000 CY Assumes 440 CY waste of existing drain material and 10% swell.
20403 Borrow for Grout Mix 3,750 CY Quantity is in-situ.
Assume 750 CY will be wasted.
63001 Dewatering 1 LS Reconstruction
20404 Embankment Fill 24,000 CY Quantity is compacted in-place. Placement is incidental.
20405 Soil Mixing and Disking 30,260 CY 25101 Class 2 Riprap - Dam Embankment 770 CY Placement cost only.
Quantity is placed volume.
25102 Class 2 Riprap - Saddle Dike 5,860 CY Placement cost only.
Quantity is placed volume.
25103 Class 2 Riprap - Ripping/Excavating 4,296 CY Quantity is in-situ bedrock volume, assumes 40% swell to placed volume and 80% of dam riprap is salvage.
70401 M1 Filter (ASTM C33 Washed Concrete Sand) 1,740 CY Placement is incidental.
70402 M2 Filter/Bedding Layer (AASHTO #89) 120 CY Placement is incidental.
70403 M3 Filter/Bedding Layer (AASHTO #357) 385 CY Placement is incidental.
60401 24" Standard Riser Inlet 1 UNITS Weir and customization incidental.
64001 6-inch Diameter Dual-Wall HDPE Perforated Drain
Pipe 270 LNFT Fittings and installation are incidental.
64002 6-inch Diameter Dual-Wall HDPE Solid Drain Pipe 240 LNFT Includes cleanouts.
Fittings and installations are incidental.
Seismic Foundation Improvement
26201 Primary Borings and Compaction Grouting 132 UNITS
26202 Secondary Borings and Compaction Grouting 30 UNITS 26203 Performance Testing 400 FEET
Hydraulic Seepage Control Barrier
26204 Shallow Borings and Compaction Grouting 179 UNITS 26205 Mid-Level Borings and Compaction Grouting 62 UNITS 26206 Deep Borings and Compaction Grouting 33 UNITS 26207 Secondary Borings and Grouting 15 UNITS 26208 Performance Testing 1 LS
Road Reconstruction
15202 Grade Survey 1 LS 30102 Road Surface Aggregate 425 CY Includes 25 cy of 6" thick aggregate for area of turnaround (1333 sf)
20406 Soil Borrow for Turnaround 7 CY 20404 Fill for Turnaround 5 CY 61901 Silt Fencing 2,000 LNFT See Section 157 for all other incidental erosion control.
61902 16' Gate 1 EA 61903 25' Gate 2 EA
Reclamation
62601 Transplanting Existing Vegetation 1 LS 21101 Temporary Haul Road Obliteration and Borrow Site
Reclamation
1 LS
Misc Costs
64003 Add Instrumentation (Piezometers) 14 EA 11 in Dam, 3 in Saddle Dike.
64004 Add Instrumentation (Early Warning System) 1 LS Saddle Dike
20406 Soil Borrow 6,260 CY Quantity is in-situ and assumes 10% shrink from in-situ to compacted in-place condition.
70402 M2 Filter/Bedding Layer (AASHTO #89) 2,459 CY 70403 M3 Filter/Bedding Layer (AASHTO #357) 1,511 CY 20404 Embankment Fill 5,641 CY Quantity is compacted in-place. Placement is incidental.
BASE Item TOTAL $
Method of Measures: CY= Cubic Yard, LS=Lump Sum, SY= Square Yard, LNFT= Linear Feet
OPTION 001: Road Reconditioning No. Description Quantity Unit Unit Price Cost Notes
30307 Roadway Reconditioning 16.8 MILE Blade 5.6 mile stretch 3 times.
OPTION Item TOTAL
TOTAL PROJECT COST: BASE + OPTIONS $
Vender Name: ____________________________________
Representative: ____________________________________
SAM UEI #: ______________________________________
Phone#: _______________________________________ E-Mail: _________________________________________
HELENA-LEWIS AND CLARK NATIONSL FOREST