Attachment 4 - Photos for Treasure Lake Bridge.pdf
PDF 6 MB Posted
- Solicitation number
- 1240LT24R0072
About this file
This document appears to be an attachment containing photographs and descriptions related to the Teton Canyon Bridge Replacement Construction project at the Caribou-Targhee National Forest in Idaho. The associated federal contract opportunity is solicitation number 1240LT24R0072, posted by the Department of Agriculture Forest Service R4-Intermountain Region. The photos depict the current bridge site, showing the north and south abutments and potential construction access routes. Primary access will be from the south bank, though a mini excavator may be able to access the north abutment. Proposals for this construction project are due by 5:00 p.m. Central Time on September 24, 2024.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Treasure Lake Bridge Site pictures and description.
Picture taken from north bank at abutment 1 looking towards the south bank and abutment 2.
Primary construction access will be on the south bank. Equipment my cross the stream but crossings should be minimized. A mini excavator may be able to access abutment 1 from the north side.
Picture taken from edge of water looking north at abutment 1 location.
Picture taken from south bank at abutment 2 looking north toward abutment 1.
Looking upstream from abutment 2.
Looking downstream from abutment 2.
Looking north toward abutment 2 approach.
Area immediately downstream of abutment 2 on south bank.
Looking south from the abutment area towards an existing road. This will be the access route and will be roughed in by Forest Service personnel.
File details come from the government source that posted it. Updated .