Attachment 4 - Photos for Treasure Lake Bridge.pdf

PDF 6 MB Posted

Attached to
Teton Canyon Bridge Replacement Construction at Caribou-Targhee National Forest, Idaho
Solicitation number
1240LT24R0072
Issued by

About this file

This document appears to be an attachment containing photographs and descriptions related to the Teton Canyon Bridge Replacement Construction project at the Caribou-Targhee National Forest in Idaho. The associated federal contract opportunity is solicitation number 1240LT24R0072, posted by the Department of Agriculture Forest Service R4-Intermountain Region. The photos depict the current bridge site, showing the north and south abutments and potential construction access routes. Primary access will be from the south bank, though a mini excavator may be able to access the north abutment. Proposals for this construction project are due by 5:00 p.m. Central Time on September 24, 2024.

View the file

Other files

File Type Posted
Amendment 0007 - Page 2_QandAs_24OCT2024.pdf PDF
Amendment 0007 - 1st Page_QandAs and Extends to 28OCT2024.pdf PDF
Amendment 0006 - Page 2_Incorporate Bid Bond Clauses and Extend to 25OCT2024.pdf PDF
Attachment 10 - SF25 Performance Bond Form.pdf PDF
Attachment 9 - SF24 Bid Bond Form.pdf PDF
Attachment 11 - SF25A Payment Bond Form.pdf PDF
Amendment 0006 - 1st Page_11OCT2024.pdf PDF
Amendment 0005 - Page 2_QandAs and Extends to 18OCT2024.pdf PDF
Amendment 0005 - 1st Page_08OCT2024.pdf PDF
List of 30SEP2024 Site Visit Attendees_Teton Canyon Bridge.pdf PDF
Amendment 0004 - 1st Page_06OCT2024.pdf PDF
Amendment 0004 - Page 2_QandAs and Extends to 14OCT2024.pdf PDF
Amendment 0003 - Site Visit Announcement_24SEP2024.pdf PDF
Amendment 0002 - 2nd Page_18SEP2024_1240LT24R0072.pdf PDF
Attachment 8 - Treasure Lake Bridge Specs.pdf PDF
Amendment 0002 - 1st Page_18SEP2024_1240LT24R0072.pdf PDF
Attachment 5 - Photos for Sheep Bridge.pdf PDF
Attachment 6 - FP-14 Standard Specifications for Roads and Bridges.pdf PDF
Amendment 0001 - 1st Page_13SEP2024_1240LT24R0072.pdf PDF
Attachment 1 - Plans and Drawings.pdf PDF
Amendment 0001 - Pages 2 and 3_13SEP2024_1240LT24R0072.pdf PDF
Attachment 2 - SOW_Teton Bridge Replacements.pdf PDF
Attachment 7 - DBA WD ID20240087 dtd 16FEB2024.pdf PDF
Attachment 3 - Bridges Project FS Supplemental Specs - FSSS.pdf PDF
Attachment 4 - DBA WD ID20240087 dtd 16FEB2024.pdf PDF
Attachment 1 - Plans and Drawings.pdf PDF
1240LT24R0072.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Treasure Lake Bridge Site pictures and description.

Picture taken from north bank at abutment 1 looking towards the south bank and abutment 2.

Primary construction access will be on the south bank. Equipment my cross the stream but crossings should be minimized. A mini excavator may be able to access abutment 1 from the north side.

Picture taken from edge of water looking north at abutment 1 location.

Picture taken from south bank at abutment 2 looking north toward abutment 1.

Looking upstream from abutment 2.

Looking downstream from abutment 2.

Looking north toward abutment 2 approach.

Area immediately downstream of abutment 2 on south bank.

Looking south from the abutment area towards an existing road. This will be the access route and will be roughed in by Forest Service personnel.

File details come from the government source that posted it. Updated .