Amendment 1-Work Log Primrose Trail-ADDENDUM.pdf

PDF 262 KB Posted

Attached to
Primrose Trail Reconstruction Federal contract opportunity
Solicitation number
1240BJ24Q0010
Issued by
Department of Agriculture Forest Service

About this file

This document appears to be an amendment to a work log for the Primrose Trail Reconstruction project in Seward, Alaska, within the Chugach National Forest. The amendment provides a detailed list of the work to be performed, including items such as brush cutting, trail restoration, aggregate surfacing, drain dip construction, culvert installation and replacement, side ditch maintenance, and turnpike construction. The work log also includes information on the location and quantity of each task. This appears to be in support of a federal contract opportunity for the Primrose Trail Reconstruction, with a solicitation number of 1240BJ24Q0010. The opportunity is being administered by the Department of Agriculture Forest Service, with a pre-bid question deadline of August 5, 2024. No substitution requests will be considered prior to award, and offerors must respond as described in Sections L and M, with proposals potentially being rejected if they do not provide a complete response to the Technical Evaluation Factors.

View the file

Other files for this federal contract opportunity

Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Station Description of Work Pay Item Typ ID Pay Unit QTY Comments Mobilization 90701 LS 1 Work log staking 90702 LS 1 For Government approval

0+0 Brush Cutting 91210 CLB-1 MI 5 0+0 Existing Trail Restoration 91106 ETR-1 LF 24,500 TH to start of reroute

25+47 Aggregate Surfacing, Type TSS-1 91300 TSS-1 LF 190 Jct: Long Lake Trail 28+04 Aggregate Surfacing, Type TSS-1 91300 TSS-1 LF 185 31+97 Aggregate Surfacing, Type TSS-1 91300 TSS-1 LF 66 33+62 Existing Bridge 5'x33' 35+00 Construct Drain Dip 92701 DD1-1 EA 1 36+44 Aggregate Surfacing, Type TSS-1 91300 TSS-1 LF 87 37+31 Drain Dip Maintenance 92706 DD1-1 EA 1 37+85 Drain Dip Maintenance 92706 DD1-1 EA 1 43+25 Drain Dip Maintenance 92706 DD1-1 EA 4 43+52 Construct Drain Dip 92701 DD1-1 EA 1 43+59 Bedrock gully -18" depth cut 44+24 37 End Gully 45+21 Side Ditch Maintenance 92504 TDS-1 LF 42 45+63 Construct Drain Dip 92701 DD1-1 EA 1 46+27 Construct Drain Dip 92701 DD1-1 EA 1 47+28 Construct Drain Dip 92701 DD1-1 EA 1 47+73 Side Ditch Maintenance 92504 TDS-1 LF 50 48+10 Install Culvert 92102 CVH-2 EA 1 New 8' Culvert 50+26 Construct Drain Dip 92701 DD1-1 EA 1 50+49 Aggregate Surfacing, Type TSS-1 91300 TSS-1 LF 75 54+53 Side Ditch Maintenance 92504 TDS-1 LF 37 Both sides (total 64 feet) 54+68 Construct Drain Dip 92701 DD1-1 EA 1 54+78 Aggregate Surfacing, Type TSS-1 91300 TSS-1 LF 12 Transition before Bridge 54+95 Trail Resurfacing, W/ Retainers 91302 TSR-1 LF 30 Leading to puncheon 55+25 Existing Puncheon/Bridge 5'x33' 58+98 Aggregate Surfacing, Type TSS-1 91300 TSS-1 LF 53 58+98 Install Culvert 92101 CVH-1 EA 1 New 6' Culvert 59+51 Construct Side Ditch 92501 TDS-1 LF 101 Uphill Side 59+51 Remove water bar and construct drain dip 92205 DD1-1 EA 1 60+00 Aggregate Surfacing, Type TSS-1 91300 TSS-1 LF 52 60+22 Replace Culvert 92104 CVH-2 EA 1 Replace 8' Culvert 60+92 Aggregate Surfacing, Type TSS-1 91300 TSS-1 LF 26 60+92 Install Culvert 92101 CVH-1 EA 1 New 6' Culvert 61+94 Replace Culvert 92102 CVH-2 EA 1 New 8' Culvert 62+15 Side Ditch Maintenance 92504 TDS-1 LF 34 62+30 Install Culvert 92102 CVH-2 EA 1 New 8' Culvert 62+30 Construct Side Ditch 92501 TDS-1 LF 30 63+14 Install Culvert 92102 CVH-2 EA 1 New 8' Culvert 63+14 Side Ditch Maintenance 92504 TDS-1 LF 98 63+44 Replace Culvert 92104 CVH-2 EA 1 Replace 8' Culvert 63+79 Replace Culvert 92105 CVH-3 EA 1 Replace 16' Culvert 63+89 Aggregate Surfacing, Type TSS-1 91300 TSS-1 LF 23 64+12 Install Culvert 92103 CVH-3 EA 1 New 16' Culvert 64+44 Aggregate Surfacing, Type TSS-1 91300 TSS-1 LF 13 64+57 Construct Turnpike 93201 TPK-1 LF 16 (30" depth x 16' long) 64+65 Install Culvert 92103 CVH-3 EA 1 New 16' Culvert 64+73 Side Ditch Maintenance 92504 TDS-1 LF 431 64+73 Aggregate Surfacing, Type TSS-1 91300 TSS-1 LF 95 65+16 Install Culvert 92102 CVH-2 EA 1 New 8' Culvert 66+96 Remove water bar and construct drain dip 92205 DD1-1 EA 1 66+12 Aggregate Surfacing, Type TSS-1 91300 TSS-1 LF 8 66+16 Construct Drain Dip 92701 DD1-1 EA 1 67+89 Install Culvert 92102 CVH-2 EA 1 New 8' Culvert 69+11 Construct Drain Dip 92701 DD1-1 EA 1 70+64 Remove water bar and construct drain dip 92205 DD1-1 EA 1 71+01 Remove water bar and construct drain dip 92205 DD1-1 EA 1 71+63 Remove water bar and construct drain dip 92205 DD1-1 EA 1 72+24 Remove water bar and construct drain dip 92205 DD1-1 EA 1 72+80 Remove water bar and construct drain dip 92205 DD1-1 EA 1 73+28 Remove water bar and construct drain dip 92205 DD1-1 EA 1 74+05 Remove water bar and construct drain dip 92205 DD1-1 EA 1 74+62 Remove water bar and construct drain dip 92205 DD1-1 EA 1 76+37 Side Ditch Maintenance 92504 TDS-1 LF 313 76+49 Aggregate Surfacing, Type TSS-1 91300 TSS-1 LF 351 79+70 Replace Culvert 92104 CVH-2 EA 1 Replace 8' Culvert

Reference Point

Primrose Trail Reconstruction Work Log

5/5/2023 ADDENDUM : 54+53 QTY CHANED FROM 37 TO 74

Hampton Coogle Text Box

80+76 Aggregate Surfacing, Type TSS-1 91300 TSS-1 LF 81 81+01 Aggregate Surfacing, Type TSS-1 91300 TSS-1 LF 68 81+53 Aggregate Surfacing, Type TSS-1 91300 TSS-1 LF 14 Transition to ALBC 81+67 Existing Bridge 5.5'x18'

81+85 Trail Resurfacing, W/ Retainers 91302 TSR-1 LF 25

82+70 Aggregate Surfacing, Type TSS-1 91300 TSS-1 LF 50 Enter muskeg measdow with mucky soils

83+20 Construct Drain Dip 92701 DD1-1 EA 1 83+60 Construct Drain Dip 92701 DD1-1 EA 1 84+30 Construct Drain Dip 92701 DD1-1 EA 1 85+00 Remove water bar and construct drain dip 92205 DD1-1 EA 1 85+64 Construct Drain Dip 92701 DD1-1 EA 1 86+35 Construct Drain Dip 92701 DD1-1 EA 1 87+06 Construct Drain Dip 92701 DD1-1 EA 1 87+76 Construct Drain Dip 92701 DD1-1 EA 1 88+30 Install Culvert 92102 CVH-2 EA 1 New 8' Culvert 88+73 Replace Culvert 92104 CVH-2 EA 1 Replace 8' Culvert 91+75 Remove water bar and construct drain dip 92205 DD1-1 EA 1 92+21 Construct Drain Dip 92701 DD1-1 EA 1 92+21 Construct Drain Dip 92701 DD1-1 EA 1 92+84 Construct Drain Dip 92701 DD1-1 EA 1 93+62 Remove water bar and construct drain dip 92205 DD1-1 EA 1 94+65 Construct Drain Dip 92701 DD1-1 EA 1 96+86 Construct Drain Dip 92701 DD1-1 EA 1 97+51 Remove water bar and construct drain dip 92205 DD1-1 EA 1 98+75 Construct Drain Dip 92701 DD1-1 EA 1 99+40 Construct Drain Dip 92701 DD1-1 EA 1

100+53 Remove water bar and construct drain dip 92205 DD1-1 EA 1 100+90 Construct Drain Dip 92701 DD1-1 EA 1 101+17 Construct Drain Dip 92701 DD1-1 EA 1 101+71 Remove water bar and construct drain dip 92205 DD1-1 EA 1 102+12 Construct Drain Dip 92701 DD1-1 EA 1 103+21 Remove water bar and construct drain dip 92205 DD1-1 EA 1 104+99 Existing Bridge 5.5'x23' 105+22 Aggregate Surfacing, Type TSS-2 91301 TSS-2 LF 6 Transition after Bridge 106+36 Aggregate Surfacing, Type TSS-1 91300 TSS-1 LF 167 106+36 Construct Drain Dip 92701 DD1-1 EA 1 107+16 Construct Drain Dip 92701 DD1-1 EA 1 108+83 Remove water bar and construct drain dip 92205 DD1-1 EA 1 109+33 Jct waterfall trail (informal) 109+41 Construct Drain Dip 92701 DD1-1 EA 1 109+95 Aggregate Surfacing, Type TSS-1 91300 TSS-1 LF 155 110+14 Remove water bar and construct drain dip 92205 DD1-1 EA 1 112+79 Remove water bar and construct drain dip 92205 DD1-1 EA 1 115+02 Construct Drain Dip 92701 DD1-1 EA 1 115+90 Construct Drain Dip 92701 DD1-1 EA 1 116+00 Aggregate Surfacing, Type TSS-1 91300 TSS-1 LF 255 116+20 Replace Culvert 92104 CVH-2 EA 1 Replace 8' Culvert 116+36 Side Ditch Maintenance 92504 TDS-1 LF 206 117+19 Replace Culvert 92104 CVH-2 EA 1 Replace 8' Culvert 117+99 Replace Culvert 92104 CVH-2 EA 1 Replace 8' Culvert 118+42 Construct Drain Dip 92701 DD1-1 EA 1 118+90 Remove water bar and construct drain dip 92205 DD1-1 EA 1 119+90 Aggregate Surfacing, Type TSS-1 91300 TSS-1 LF 46 120+40 Construct Drain Dip 92701 DD1-1 EA 1 121+52 Construct Drain Dip 92701 DD1-1 EA 1 123+16 Aggregate Surfacing, Type TSS-1 91300 TSS-1 LF 10 123+26 Trail Resurfacing, W/ Retainers 91303 TSR-2 EA 10 Transtition to Bridge 123+36 Existing Bridge 4'x18'

123+51 Trail Resurfacing, W/ Retainers 91303 TSR-2 LF 10 Transition after Bridge 123+51 Side Ditch Maintenance 92504 TDS-1 LF 85 123+51 Side Ditch Maintenance 92504 TDS-1 LF 90 123+61 Aggregate Surfacing, Type TSS-1 91300 TSS-1 LF 80 133+02 Construct Drain Dip 92701 DD1-1 EA 1 133+32 Construct Drain Dip 92701 DD1-1 EA 1 134+68 Construct Drain Dip 92701 DD1-1 EA 1 135+37 Construct Drain Dip 92701 DD1-1 EA 1 136+07 Construct Drain Dip 92701 DD1-1 EA 1 138+12 Aggregate Surfacing, Type TSS-1 91300 TSS-1 LF 60 145+99 Remove water bar and construct drain dip 92205 DD1-1 EA 1 146+67 Remove water bar and construct drain dip 92205 DD1-1 EA 1 149+50 Remove water bar and construct drain dip 92205 DD1-1 EA 1 151+44 Remove water bar and construct drain dip 92205 DD1-1 EA 1

Reference Point

ADDENDUM : 123

+26 UNITS

CHANGED FROM EA

TO LF

Hampton Coogle Text Box

LF

152+38 Remove water bar and construct drain dip 92205 DD1-1 EA 1 153+68 Remove water bar and construct drain dip 92205 DD1-1 EA 1 158+14 Remove water bar and construct drain dip 92205 DD1-1 EA 1 159+27 Drain Dip Maintenance 92706 DD1-1 EA 1 159+89 Remove water bar and construct drain dip 92205 DD1-1 EA 1 159+89 Construct Drain Dip 92701 DD1-1 EA 1 162+50 Drain Dip Maintenance 92706 DD1-1 EA 1 166+61 Drain Dip Maintenance 92706 DD1-1 EA 1 167+38 Drain Dip Maintenance 92706 DD1-1 EA 1 168+07 Construct Drain Dip 92701 DD1-1 EA 1 168+62 Remove water bar and construct drain dip 92205 DD1-1 EA 1 169+10 Construct Drain Dip 92701 DD1-1 EA 1 169+38 Remove water bar and construct drain dip 92205 DD1-1 EA 1 171+92 Aggregate Surfacing, Type TSS-1 91300 TSS-1 LF 474 171+92 Construct Drain Dip 92701 DD1-1 EA 1 174+75 Construct Drain Dip 92701 DD1-1 EA 1 173+98 Remove water bar and construct drain dip 92205 DD1-1 EA 1 176+19 Construct Drain Dip 92701 DD1-1 EA 1 176+66 Remove water bar and construct drain dip 92205 DD1-1 EA 1 178+47 Remove water bar and construct drain dip 92205 DD1-1 EA 1 181+33 Remove water bar and construct drain dip 92205 DD1-1 EA 1 182+45 Aggregate Surfacing, Type TSS-2 91301 TSS-2 LF 12 Transtition to Bridge Approach 182+73 Existing Bridge 21' x 5.5' 182+97 Aggregate Surfacing, Type TSS-2 91301 TSS-2 LF 8 Transition after Bridge 183+39 Construct Drain Dip 92701 DD1-1 EA 1 183+89 Remove water bar and construct drain dip 92205 DD1-1 EA 1 183+89 Aggregate Surfacing, Type TSS-1 91300 TSS-1 LF 45 184+34 Construct Turnpike 93201 TPK-1 LF 58 184+92 Aggregate Surfacing, Type TSS-1 91300 TSS-1 LF 230 186+27 Install Culvert 92101 CVH-1 EA 1 New 6' Culvert 186+27 Construct Side Ditch 92501 TDS-1 LF 45 186+32 Construct Drain Dip 92701 DD1-1 EA 1 189+30 Aggregate Surfacing, Type TSS-1 91300 TSS-1 LF 70 189+47 Replace Culvert 92104 CVH-2 EA 1 Replace 8' Culvert

189+47 LF 12 PRESERVE CORDUROY

189+47 Construct Side Ditch 92501 TDS-1 LF 45 PLD uphill of Culvert 190+08 Aggregate Surfacing, Type TSS-1 91300 TSS-1 LF 20 190+18 Replace Culvert 92104 CVH-2 EA 1 Replace 8' Culvert 190+36 Aggregate Surfacing, Type TSS-1 91300 TSS-1 LF 79

190+42 LF 15 PRESERVE CORDUROY

190+42 Construct Side Ditch 92501 TDS-1 LF 73 PLD uphill of Culvert 191+35 Remove water bar and construct drain dip 92205 DD1-1 EA 1 192+13 Aggregate Surfacing, Type TSS-1 91300 TSS-1 LF 91 193+63 Remove water bar and construct drain dip 92205 DD1-1 EA 1 196+17 Jct Cabin Trail (informal) 197+78 Remove water bar and construct drain dip 92205 DD1-1 EA 1 198+25 Remove water bar and construct drain dip 92205 DD1-1 EA 1 198+66 Aggregate Surfacing, Type TSS-1 91300 TSS-1 LF 60 199+33 Remove water bar and construct drain dip 92205 DD1-1 EA 1 199+60 Remove water bar and construct drain dip 92205 DD1-1 EA 1 199+80 Construct Drain Dip 92701 DD1-1 EA 1 199+89 Remove water bar and construct drain dip 92205 DD1-1 EA 1 200+50 Remove water bar and construct drain dip 92205 DD1-1 EA 1 201+63 Construct Drain Dip 92701 DD1-1 EA 4 Replace 4 between 200+91 and 101+63 205+61 Construct Drain Dip 92701 DD1-1 EA 1 205+91 Aggregate Surfacing, Type TSS-1 91300 TSS-1 LF 20 205+97 Construct Ford 91701 RF1-1 EA 1 206+01 Corduroy LF 12 PRESERVE CORDUROY 206+48 Remove water bar and construct drain dip 92205 DD1-1 EA 1 206+73 Remove water bar and construct drain dip 92205 DD1-1 EA 1 208+27 Aggregate Surfacing, Type TSS-1 91300 TSS-1 LF 25 208+52 Construct Drain Dip 92701 DD1-1 EA 1 209+47 Aggregate Surfacing, Type TSS-1 91300 TSS-1 LF 25 209+72 Construct Drain Dip 92701 DD1-1 EA 1 214+34 Aggregate Surfacing, Type TSS-1 91300 TSS-1 LF 96 219+19 Construct Drain Dip 92701 DD1-1 EA 1 220+48 Construct Ford 91701 RF1-1 EA 1 236+30 Drain Dip Maintenance 92706 DD1-1 EA 1 237+58 Aggregate Surfacing, Type TSS-1 91300 TSS-1 LF 104 240+47 Install Culvert 92102 CVH-2 EA 1 New 8' Culvert 240+96 Construct Drain Dip 92701 DD1-1 EA 1 241+83 Aggregate Surfacing, Type TSS-1 91300 TSS-1 LF 77 241+83 Side Ditch Maintenance 92504 TDS-1 LF 57 241+88 Note: Transition to Forest

Reference Point

242+89 Side Ditch Maintenance 92504 TDS-1 LF 30 Repair existing ditch downhill side

(meadow) 243+20 Remove water bar and construct drain dip 92205 DD1-1 EA 1 243+77 Construct Puncheon 93401 SP1-1 LF 10 Existing 3'x12' No Deck Puncheon 245+00 Obliterate Abandoned Trail 91116 OBT-1 LF 1,347 Obliterate Old Trail 245+00 **Start Trail Re-route** 245+00 New Trail Construction 91150 TSF-1 LF 1,368 245+00 Aggregate Surfacing, Type TSS-1 91300 TSS-1 LF 224 245+12 Install Culvert 92102 CVH-2 EA 1 New 8' Culvert 245+12 25% grade 40 feet 245+12 Solid Rock Removal 91260 LF 25 246+06 Install Culvert 92102 CVH-2 EA 1 25% grade 40 feet, New 8' Culvert 247+24 Construct Puncheon 93401 SP1-1 LF 34 249+00 Aggregate Surfacing, Type TSS-1 91300 TSS-1 LF 268 251+68 Construct Puncheon 93401 SP1-1 LF 50 252+19 Aggregate Surfacing, Type TSS-1 91300 TSS-1 LF 228 254+47 Construct Puncheon 93401 SP1-1 LF 30 254+77 Aggregate Surfacing, Type TSS-1 91300 TSS-1 LF 21 255+19 Aggregate Surfacing, Type TSS-1 91300 TSS-1 LF 350 258+68 **End Trail Reroute** 259+70 Aggregate Surfacing, Type TSS-1 91300 TSS-1 LF 152 260+21 Construct Side Ditch 92501 TDS-1 LF 101 Uphill Side 260+21 Construct Drain Dip 92701 DD1-1 EA 1 261+22 End of Project

Reference Point

Sheet1

File details come from the government source that posted it. Updated .