Questions and Answers 2.docx

DOCX document 16 KB Posted

Attached to
Chiller Coil Replacement Federal contract opportunity
Solicitation number
1232SA26Q1195
Issued by
Department of Agriculture Agricultural Research Service

About this file

This is a Questions and Answers document (Amendment 2) providing technical clarifications for RFQ 1232SA26Q1195, a Total Small Business Set-Aside solicitation issued by the USDA Agricultural Research Service for Chiller Coil Replacement services. The Q&A addresses critical technical specifications and site conditions relevant to the work scope. The facility operates two chillers with only one running at any given time, while the other serves as a backup unit. The work scope is limited to replacing a single damaged condenser coil on Chiller 1, Circuit 2, with the faulty unit to be powered down and locked out during repair operations.

Technical specifications provided include condenser coil piping line sizes of OD 3/8" and OD 7/8" copper tubing, and identification of the liquid line filter drier as YORK P/N 026-43984-002, requiring two 48 Size filter cores or Filter Drier Cartridge replacement components. The Government has provided photographic documentation of the filter drier body and part number information, along with piping connection details showing where tubing must be broken for coil removal. Contractors are explicitly advised to confirm all tubing sizes and drier part numbers before ordering materials. Quotations are due August 31, 2026 at 9:00 AM PT and must be submitted to Elizabeth Calhoun at Elizabeth.Calhoun@usda.gov with the solicitation title and number in the subject line.

View the file

Other files for this federal contract opportunity

Other files attached to Chiller Coil Replacement, newest first.
File Type Posted
Attachment 1- SF 1449- 1232SA26Q1195.pdf PDF
PXL_20260820_170453606.PORTRAIT.jpg JPG image
RFQ Q1195 Posted to SAM- ContractData-20260810-105753.pdf PDF
Newark Chiller Coil P2.jpg JPG image
Newark Chiller Coil P1.jpg JPG image
Questions and Answers 1.docx DOCX document
York-YLAA-Product-Manual-2017-12.pdf PDF
Attachment 3- Past Performance.docx DOCX document
Attachment 2- Statement of Work.docx DOCX document
Attachment 1- SF 1449- 1232SA26Q1195.pdf PDF
Attachment 4- Wage Determination.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers #2

1. Confirm whether there are two chillers installed at the facility?

ANSWER: Yes, there are two chillers. Only one chiller is running at any given time. The lag chiller acts as a backup with the lead chiller.

2. We understand the work requirement itself is limited to replacing the damaged condenser coil on Chiller 1, Circuit 2, rather than replacing the complete chiller or performing work on both units. Please let us know if that understanding is incorrect.

ANSWER: Yes, only the one condenser coil is being replaced on one unit. The unit with the faulty coil will be powered down and locked out for the duration of repair work.

3. What is the line size on the condenser coil piping for circuit 2, and can the Government provide the make and model of the liquid line filter drier so the correct replacement cores can be sourced?

ANSWER: There are two different diameters of copper tubing feeding the coil, OD 3/8” & OD 7/8” The dryer is YORK P/N 026-43984-002 Use replacement core two 48 Size filter cores or Filter Drier Cartridge. PLEASE NOTE: Contractor Should Confirm Tubing Sizes and Drier P/N Before Ordering Parts.

4. Would it be possible to provide a photograph of the filter drier and the coil piping connections showing where the piping would be broken to remove the coil?

ANSWER: a picture of the drier body w/ Part # info. has been added to attachments.

File details come from the government source that posted it. Updated .