_8-Lab-Electrical.pdf
PDF 20 MB Posted
- Solicitation number
- 1232SA19R0033
About this file
This document contains a federal contract opportunity notice for the modernization of the Agricultural Research Service Technology Center in Salinas, California. The U.S. Department of Agriculture's Agricultural Research Service intends to issue a request for proposal for construction services to modernize their facility through a design-bid-build project delivery method. The project scope involves demolishing outdated buildings and constructing new research facilities in two phases, including a West and East Lab/Office building and a Headhouse/Greenhouse. The base period of performance is approximately 1440 calendar days after notice to proceed. Proposals are due on October 11, 2019 and the contract will be awarded based on best value using the tradeoff source selection method, evaluating past performance, proposed team, and project management approach against cost/price factors. The North American Industry Classification System code is 236220 and there is a small business set-aside with a size standard of $36.5 million. The solicitation documents will be available on FedBizOpps on August 28, 2019 and plans for a pre-proposal site visit are on September 12, 2019.
volume 1 part 8
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MS MS
VS VS
a
DS
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:44:09 AM Saved By: NICOLE.SERAFIN File: B:\SAG\2016\SAG16056.01\26-SAG16056.01_E\18759E-001.dwg Save Date: 05/21/2019 04:06 PM
SYMBOLS AND GENERAL
NOTES
E001
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:44:15 AM Saved By: NICOLE.SERAFIN File: B:\SAG\2016\SAG16056.01\26-SAG16056.01_E\18759ES01-1.dwg Save Date: 04/17/2019 11:20 AM
SITE PLAN - POWER
DISTRIBUTION
ES01-1
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:44:20 AM Saved By: NICOLE.SERAFIN File: B:\SAG\2016\SAG16056.01\26-SAG16056.01_E\18759ES01-3.dwg Save Date: 04/16/2019 05:03 PM
SITE PLAN - POWER
DISTRIBUTION
ES01-3
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:44:27 AM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\26-SAG16056.01_E\18759ES02-1.dwg Save Date: 04/11/2019 03:39 PM
SITE PLAN - LIGHTING
ES02-1
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:44:35 AM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\26-SAG16056.01_E\18759ES02-3.dwg Save Date: 04/11/2019 03:40 PM
SITE PLAN - LIGHTING
ES02-3
EXISTING SITE PLAN POWER DISTRIBUTION - DEMOLITION (PHASE 1)
SCALE 1/32"=1'-0"
37A
37B
25A
37C
37D
38A
38B
38C
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:44:40 AM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\26-SAG16056.01_E\18759ED01-1.dwg Save Date: 04/11/2019 03:40 PM
SITE PLAN EXISTING -
DEMOLITION
ED01-1
EXISTING SITE PLAN POWER DISTRIBUTION - DEMOLITION (PHASE 2)
SCALE 1/32"=1'-0"
37A
37B
25A
37C
37D
38A
38B
38C
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:44:41 AM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\26-SAG16056.01_E\18759ED01-1.dwg Save Date: 04/11/2019 03:40 PM
SITE PLAN EXISTING -
DEMOLITION
ED01-3
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:44:45 AM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\26-SAG16056.01_E\18759ED02-1.dwg Save Date: 04/11/2019 03:41 PM
POWER ONE LINE DIAGRAM
ED02-1
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:44:47 AM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\26-SAG16056.01_E\18759ED02-1.dwg Save Date: 04/11/2019 03:41 PM
ED02-3
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:44:54 AM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\26-SAG16056.01_E\18759EL-01.dwg Save Date: 04/11/2019 03:41 PM
FIRST FLOOR PLAN -
LIGHTING
EL01
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:45:01 AM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\26-SAG16056.01_E\18759EL-02.dwg Save Date: 04/11/2019 03:41 PM
SECOND FLOOR PLAN -
EL02
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:45:05 AM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\26-SAG16056.01_E\18759EL-03.dwg Save Date: 04/11/2019 03:42 PM
PENTHOUSE FLOOR PLAN -
EL03
EAST WING 1ST FLOOR
WEST WING 1ST FLOOR
SCALE 1/8"=1'-0"
SCALE 1/8"=1'-0"
KEYED NOTES
F/A ZONE#1A
F/A ZONE#1C F/A ZONE#1B
ENLARGED ELEVATOR PIT E102
AND ELEVATOR MACHINE ROOM
136 PLANS
SCALE 1/4"=1'-0"
ENLARGED ELEVATOR PIT E101
AND ELEVATOR MACHINE ROOM
136 PLANS
SCALE 1/4"=1'-0"
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:45:12 AM Saved By: NICOLE.SERAFIN File: B:\SAG\2016\SAG16056.01\26-SAG16056.01_E\18759EP-01.dwg Save Date: 05/22/2019 10:05 AM
FIRST FLOOR PLAN - POWER
EP01
EAST WING 2ND FLOOR
WEST WING 2ND FLOOR
SCALE 1/8"=1'-0"
SCALE 1/8"=1'-0"
KEYED NOTES
SCALE 1/4"=1'-0"
ENLARGED PLAN - LUNCH/BREAK AREA 252
ENLARGED PLAN - STAGING 202
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:45:18 AM Saved By: NICOLE.SERAFIN File: B:\SAG\2016\SAG16056.01\26-SAG16056.01_E\18759EP-02.dwg Save Date: 05/22/2019 10:05 AM
SECOND FLOOR PLAN -
POWER
EP02
EAST WING PENTHOUSE
WEST WING PENTHOUSE
SCALE 1/8"=1'-0"
SCALE 1/8"=1'-0"
KEYED NOTES
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:45:28 AM Saved By: NICOLE.SERAFIN File: B:\SAG\2016\SAG16056.01\26-SAG16056.01_E\18759EP-03.dwg Save Date: 05/22/2019 09:49 AM
PENTHOUSE FLOOR PLAN -
POWER
EP03
LAB ELEVATION
LAB DOOR ELEVATION
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:45:33 AM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\26-SAG16056.01_E\18759E-401.dwg Save Date: 04/11/2019 03:43 PM
ELECTRICAL DETAILS
E401
E
RED
RED
RED
RED
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:45:45 AM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\26-SAG16056.01_E\18759E-402.dwg Save Date: 04/11/2019 03:43 PM
ELECTRICAL DETAILS
E402
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:45:48 AM Saved By: NICOLE.SERAFIN File: B:\SAG\2016\SAG16056.01\26-SAG16056.01_E\18759E-601.dwg Save Date: 04/16/2019 05:02 PM
E601
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:45:51 AM Saved By: NICOLE.SERAFIN File: B:\SAG\2016\SAG16056.01\26-SAG16056.01_E\18759E-602.dwg Save Date: 04/17/2019 11:20 AM
POWER RISER DIAGRAM
EAST WING
E602
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:45:54 AM Saved By: NICOLE.SERAFIN File: B:\SAG\2016\SAG16056.01\26-SAG16056.01_E\18759E-603.dwg Save Date: 04/15/2019 03:54 PM
POWER RISER DIAGRAM
WEST WING
E603
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:46:10 AM Saved By: NICOLE.SERAFIN File: B:\SAG\2016\SAG16056.01\26-SAG16056.01_E\18759E-604.dwg Save Date: 04/15/2019 01:59 PM
SCHEDULES
E604
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:46:24 AM Saved By: NICOLE.SERAFIN File: B:\SAG\2016\SAG16056.01\26-SAG16056.01_E\18759E-605.dwg Save Date: 05/22/2019 10:05 AM
FIRE ALARM DIAGRAM
E605
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:47:08 AM Saved By: NICOLE.SERAFIN File: B:\SAG\2016\SAG16056.01\26-SAG16056.01_E\18759E-701.dwg Save Date: 04/17/2019 11:20 AM
SWITCHBOARD AND
PANELBOARD SCHEDULES
E701
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:48:03 AM Saved By: NICOLE.SERAFIN File: B:\SAG\2016\SAG16056.01\26-SAG16056.01_E\18759E-702.dwg Save Date: 04/15/2019 01:58 PM
480V AND 208V
PANELBOARDS AND MCCPW
E702
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:49:02 AM Saved By: NICOLE.SERAFIN File: B:\SAG\2016\SAG16056.01\26-SAG16056.01_E\18759E-703.dwg Save Date: 04/15/2019 01:58 PM
208V EQ AND LABORATORY
PANELBOARDS
E703
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:49:51 AM Saved By: NICOLE.SERAFIN File: B:\SAG\2016\SAG16056.01\26-SAG16056.01_E\18759E-704.dwg Save Date: 04/17/2019 11:20 AM
208V LABORATORY
E704
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:50:40 AM Saved By: NICOLE.SERAFIN File: B:\SAG\2016\SAG16056.01\26-SAG16056.01_E\18759E-705.dwg Save Date: 04/15/2019 01:58 PM
SWITCHBOARD AND
PANELBOARDS SCHEDULES
E705
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:51:32 AM Saved By: NICOLE.SERAFIN File: B:\SAG\2016\SAG16056.01\26-SAG16056.01_E\18759E-706.dwg Save Date: 04/17/2019 11:20 AM
480V AND 208V
PANELBOARD AND MCCPE
E706
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:52:32 AM Saved By: NICOLE.SERAFIN File: B:\SAG\2016\SAG16056.01\26-SAG16056.01_E\18759E-707.dwg Save Date: 04/17/2019 11:20 AM
208V EQ AND LABORATORY
E707
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:53:33 AM Saved By: NICOLE.SERAFIN File: B:\SAG\2016\SAG16056.01\26-SAG16056.01_E\18759E-708.dwg Save Date: 04/17/2019 11:20 AM
208V LABORATORY
E708