About this file

This document contains a federal contract opportunity notice for the modernization of the Agricultural Research Service Technology Center in Salinas, California. The U.S. Department of Agriculture's Agricultural Research Service intends to issue a request for proposal for construction services to modernize their facility through a design-bid-build project delivery method. The project scope involves demolishing outdated buildings and constructing new research facilities in two phases, including a West and East Lab/Office building and a Headhouse/Greenhouse. The base period of performance is approximately 1440 calendar days after notice to proceed. Proposals are due on October 11, 2019 and the contract will be awarded based on best value using the tradeoff source selection method, evaluating past performance, proposed team, and project management approach against cost/price factors. The North American Industry Classification System code is 236220 and there is a small business set-aside with a size standard of $36.5 million. The solicitation documents will be available on FedBizOpps on August 28, 2019 and plans for a pre-proposal site visit are on September 12, 2019.

volume 1 part 8

View the file

Other files

Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MS MS

VS VS

a

DS

Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:44:09 AM Saved By: NICOLE.SERAFIN File: B:\SAG\2016\SAG16056.01\26-SAG16056.01_E\18759E-001.dwg Save Date: 05/21/2019 04:06 PM

SYMBOLS AND GENERAL

NOTES

E001

Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:44:15 AM Saved By: NICOLE.SERAFIN File: B:\SAG\2016\SAG16056.01\26-SAG16056.01_E\18759ES01-1.dwg Save Date: 04/17/2019 11:20 AM

SITE PLAN - POWER

DISTRIBUTION

ES01-1

Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:44:20 AM Saved By: NICOLE.SERAFIN File: B:\SAG\2016\SAG16056.01\26-SAG16056.01_E\18759ES01-3.dwg Save Date: 04/16/2019 05:03 PM

SITE PLAN - POWER

DISTRIBUTION

ES01-3

Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:44:27 AM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\26-SAG16056.01_E\18759ES02-1.dwg Save Date: 04/11/2019 03:39 PM

SITE PLAN - LIGHTING

ES02-1

Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:44:35 AM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\26-SAG16056.01_E\18759ES02-3.dwg Save Date: 04/11/2019 03:40 PM

SITE PLAN - LIGHTING

ES02-3

EXISTING SITE PLAN POWER DISTRIBUTION - DEMOLITION (PHASE 1)

SCALE 1/32"=1'-0"

37A

37B

25A

37C

37D

38A

38B

38C

Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:44:40 AM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\26-SAG16056.01_E\18759ED01-1.dwg Save Date: 04/11/2019 03:40 PM

SITE PLAN EXISTING -

DEMOLITION

ED01-1

EXISTING SITE PLAN POWER DISTRIBUTION - DEMOLITION (PHASE 2)

SCALE 1/32"=1'-0"

37A

37B

25A

37C

37D

38A

38B

38C

Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:44:41 AM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\26-SAG16056.01_E\18759ED01-1.dwg Save Date: 04/11/2019 03:40 PM

SITE PLAN EXISTING -

DEMOLITION

ED01-3

Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:44:45 AM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\26-SAG16056.01_E\18759ED02-1.dwg Save Date: 04/11/2019 03:41 PM

POWER ONE LINE DIAGRAM

ED02-1

Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:44:47 AM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\26-SAG16056.01_E\18759ED02-1.dwg Save Date: 04/11/2019 03:41 PM

ED02-3

Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:44:54 AM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\26-SAG16056.01_E\18759EL-01.dwg Save Date: 04/11/2019 03:41 PM

FIRST FLOOR PLAN -

LIGHTING

EL01

Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:45:01 AM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\26-SAG16056.01_E\18759EL-02.dwg Save Date: 04/11/2019 03:41 PM

SECOND FLOOR PLAN -

EL02

Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:45:05 AM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\26-SAG16056.01_E\18759EL-03.dwg Save Date: 04/11/2019 03:42 PM

PENTHOUSE FLOOR PLAN -

EL03

EAST WING 1ST FLOOR

WEST WING 1ST FLOOR

SCALE 1/8"=1'-0"

SCALE 1/8"=1'-0"

KEYED NOTES

F/A ZONE#1A

F/A ZONE#1C F/A ZONE#1B

ENLARGED ELEVATOR PIT E102

AND ELEVATOR MACHINE ROOM

136 PLANS

SCALE 1/4"=1'-0"

ENLARGED ELEVATOR PIT E101

AND ELEVATOR MACHINE ROOM

136 PLANS

SCALE 1/4"=1'-0"

Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:45:12 AM Saved By: NICOLE.SERAFIN File: B:\SAG\2016\SAG16056.01\26-SAG16056.01_E\18759EP-01.dwg Save Date: 05/22/2019 10:05 AM

FIRST FLOOR PLAN - POWER

EP01

EAST WING 2ND FLOOR

WEST WING 2ND FLOOR

SCALE 1/8"=1'-0"

SCALE 1/8"=1'-0"

KEYED NOTES

SCALE 1/4"=1'-0"

ENLARGED PLAN - LUNCH/BREAK AREA 252

ENLARGED PLAN - STAGING 202

Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:45:18 AM Saved By: NICOLE.SERAFIN File: B:\SAG\2016\SAG16056.01\26-SAG16056.01_E\18759EP-02.dwg Save Date: 05/22/2019 10:05 AM

SECOND FLOOR PLAN -

POWER

EP02

EAST WING PENTHOUSE

WEST WING PENTHOUSE

SCALE 1/8"=1'-0"

SCALE 1/8"=1'-0"

KEYED NOTES

Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:45:28 AM Saved By: NICOLE.SERAFIN File: B:\SAG\2016\SAG16056.01\26-SAG16056.01_E\18759EP-03.dwg Save Date: 05/22/2019 09:49 AM

PENTHOUSE FLOOR PLAN -

POWER

EP03

LAB ELEVATION

LAB DOOR ELEVATION

Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:45:33 AM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\26-SAG16056.01_E\18759E-401.dwg Save Date: 04/11/2019 03:43 PM

ELECTRICAL DETAILS

E401

E

RED

RED

RED

RED

Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:45:45 AM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\26-SAG16056.01_E\18759E-402.dwg Save Date: 04/11/2019 03:43 PM

ELECTRICAL DETAILS

E402

Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:45:48 AM Saved By: NICOLE.SERAFIN File: B:\SAG\2016\SAG16056.01\26-SAG16056.01_E\18759E-601.dwg Save Date: 04/16/2019 05:02 PM

E601

Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:45:51 AM Saved By: NICOLE.SERAFIN File: B:\SAG\2016\SAG16056.01\26-SAG16056.01_E\18759E-602.dwg Save Date: 04/17/2019 11:20 AM

POWER RISER DIAGRAM

EAST WING

E602

Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:45:54 AM Saved By: NICOLE.SERAFIN File: B:\SAG\2016\SAG16056.01\26-SAG16056.01_E\18759E-603.dwg Save Date: 04/15/2019 03:54 PM

POWER RISER DIAGRAM

WEST WING

E603

Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:46:10 AM Saved By: NICOLE.SERAFIN File: B:\SAG\2016\SAG16056.01\26-SAG16056.01_E\18759E-604.dwg Save Date: 04/15/2019 01:59 PM

SCHEDULES

E604

Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:46:24 AM Saved By: NICOLE.SERAFIN File: B:\SAG\2016\SAG16056.01\26-SAG16056.01_E\18759E-605.dwg Save Date: 05/22/2019 10:05 AM

FIRE ALARM DIAGRAM

E605

Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:47:08 AM Saved By: NICOLE.SERAFIN File: B:\SAG\2016\SAG16056.01\26-SAG16056.01_E\18759E-701.dwg Save Date: 04/17/2019 11:20 AM

SWITCHBOARD AND

PANELBOARD SCHEDULES

E701

Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:48:03 AM Saved By: NICOLE.SERAFIN File: B:\SAG\2016\SAG16056.01\26-SAG16056.01_E\18759E-702.dwg Save Date: 04/15/2019 01:58 PM

480V AND 208V

PANELBOARDS AND MCCPW

E702

Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:49:02 AM Saved By: NICOLE.SERAFIN File: B:\SAG\2016\SAG16056.01\26-SAG16056.01_E\18759E-703.dwg Save Date: 04/15/2019 01:58 PM

208V EQ AND LABORATORY

PANELBOARDS

E703

Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:49:51 AM Saved By: NICOLE.SERAFIN File: B:\SAG\2016\SAG16056.01\26-SAG16056.01_E\18759E-704.dwg Save Date: 04/17/2019 11:20 AM

208V LABORATORY

E704

Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:50:40 AM Saved By: NICOLE.SERAFIN File: B:\SAG\2016\SAG16056.01\26-SAG16056.01_E\18759E-705.dwg Save Date: 04/15/2019 01:58 PM

SWITCHBOARD AND

PANELBOARDS SCHEDULES

E705

Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:51:32 AM Saved By: NICOLE.SERAFIN File: B:\SAG\2016\SAG16056.01\26-SAG16056.01_E\18759E-706.dwg Save Date: 04/17/2019 11:20 AM

480V AND 208V

PANELBOARD AND MCCPE

E706

Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:52:32 AM Saved By: NICOLE.SERAFIN File: B:\SAG\2016\SAG16056.01\26-SAG16056.01_E\18759E-707.dwg Save Date: 04/17/2019 11:20 AM

208V EQ AND LABORATORY

E707

Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:53:33 AM Saved By: NICOLE.SERAFIN File: B:\SAG\2016\SAG16056.01\26-SAG16056.01_E\18759E-708.dwg Save Date: 04/17/2019 11:20 AM

208V LABORATORY

E708

File details come from the government source that posted it. Updated .