This document provides details for a federal solicitation seeking construction services. The U.S. Department of Agriculture's Agricultural Research Service intends to modernize its Agricultural Research Technology Center in Salinas, California through a design-bid-build project delivery method. The solicitation will involve demolishing outdated buildings and constructing new laboratory, office and greenhouse facilities in two phases over approximately 1440 calendar days. Construction firms are sought to provide all necessary construction services based on completed design documents. The technical evaluation will consider past performance, proposed team and project management approach. The contract will be awarded using best value tradeoff and requires payment and performance bonds from the successful offeror. The solicitation documents will be posted on August 28, 2019 with a pre-proposal site visit scheduled for September 12th. Proposals are due around October 11, 2019. The project aims for LEED Silver certification and requires use of biobased products when reasonably available and priced.

volume 1 part 7

View the file

Other files

Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

A

Plotted By: BRUCE MCINTOSH Plot Date: 8/27/2019 5:34:35 PM Saved By: DEJAN.TADIC File: B:\SAG\2016\SAG16056.01\22-SAG16056.01_P\18759P-001.dwg Save Date: 05/15/2019 02:59 PM

SYMBOLS, ABBR, NOTES,

SCHEDULES - PLUMBING

AND FIRE PROT.

P-001

Plotted By: BRUCE MCINTOSH Plot Date: 8/27/2019 5:34:41 PM Saved By: DEJAN.TADIC File: B:\SAG\2016\SAG16056.01\22-SAG16056.01_P\18759P-100.dwg Save Date: 08/27/2019 05:05 PM

FOUNDATION PLANS -

PLUMBING

P-100

Plotted By: BRUCE MCINTOSH Plot Date: 8/27/2019 5:34:50 PM Saved By: DEJAN.TADIC File: B:\SAG\2016\SAG16056.01\22-SAG16056.01_P\18759P-101.dwg Save Date: 08/26/2019 01:39 PM

FIRST FLOOR PLANS -

PLUMBING WATER AND FIRE

PROTECTION

P-101

Plotted By: BRUCE MCINTOSH Plot Date: 8/27/2019 5:34:55 PM Saved By: DEJAN.TADIC File: B:\SAG\2016\SAG16056.01\22-SAG16056.01_P\18759P-102.dwg Save Date: 08/27/2019 05:24 PM

SECOND FLOOR PLANS -

PLUMBING WATER AND FIRE

P-102

Plotted By: BRUCE MCINTOSH Plot Date: 8/27/2019 5:35:00 PM Saved By: DEJAN.TADIC File: B:\SAG\2016\SAG16056.01\22-SAG16056.01_P\18759P-103.dwg Save Date: 05/15/2019 02:51 PM

PENTHOUSE FLOOR PLANS -

PLUMBING WATER AND FIRE

P-103

Plotted By: BRUCE MCINTOSH Plot Date: 8/27/2019 5:35:07 PM Saved By: DEJAN.TADIC File: B:\SAG\2016\SAG16056.01\22-SAG16056.01_P\18759P-201.dwg Save Date: 08/27/2019 05:04 PM

FIRST FLOOR PLANS -

SANITARY AND STORM

P-201

Plotted By: BRUCE MCINTOSH Plot Date: 8/27/2019 5:35:12 PM Saved By: DEJAN.TADIC File: B:\SAG\2016\SAG16056.01\22-SAG16056.01_P\18759P-202.dwg Save Date: 08/27/2019 05:05 PM

SECOND FLOOR PLANS-

P-202

Plotted By: BRUCE MCINTOSH Plot Date: 8/27/2019 5:35:18 PM Saved By: DEJAN.TADIC File: B:\SAG\2016\SAG16056.01\22-SAG16056.01_P\18759P-203.dwg Save Date: 04/22/2019 08:19 AM

P-203

Plotted By: BRUCE MCINTOSH Plot Date: 8/27/2019 5:35:26 PM Saved By: DEJAN.TADIC File: B:\SAG\2016\SAG16056.01\22-SAG16056.01_P\18759P-301.dwg Save Date: 04/22/2019 08:19 AM

FIRST FLOOR PLANS - LAB &

NATURAL GAS PIPING

P-301

Plotted By: BRUCE MCINTOSH Plot Date: 8/27/2019 5:35:31 PM Saved By: DEJAN.TADIC File: B:\SAG\2016\SAG16056.01\22-SAG16056.01_P\18759P-302.dwg Save Date: 04/22/2019 08:15 AM

SECOND FLOOR PLANS -

LAB & NATURAL GAS PIPING

P-302

Plotted By: BRUCE MCINTOSH Plot Date: 8/27/2019 5:35:35 PM Saved By: DEJAN.TADIC File: B:\SAG\2016\SAG16056.01\22-SAG16056.01_P\18759P-303.dwg Save Date: 04/22/2019 08:11 AM

LAB & NATURAL GAS PIPING

P-303

GAS PIPE ROOF PENETRATION DETAIL

NOT TO SCALE

PLUMBING VENT THROUGH FLAT ROOF DETAIL

NOT TO SCALE

DE-IONIZED WATER SYSTEM SCHEMATIC (DI-1/DI-2), ALTERNATES NO. 1001/2001

NOT TO SCALE

GAS METER DETAIL

NOT TO SCALE

6INSPECTORS TEST CONNECTION DETAIL

NOT TO SCALE

15THERMOSTATIC MIXING VALVE (TMV)

NOT TO SCALE

PIPE ANCHOR DETAIL

NOT TO SCALE

INLINE PUMP SUPPORT DETAIL PP-1 THROUGH PP-6

NOT TO SCALE

TRAP PRIMER DETAIL

NOT TO SCALE

16FIRE SERVICE ENTRANCE DETAIL

NOT TO SCALE

PIPE PENETRATION THROUGH FIRE RATED WALLS

NOT TO SCALE

3PIPE SUPPORT DETAIL

NOT TO SCALE

8COMBINATION EMERGENCY SHOWER AND EYE/FACE WASH DETAIL

NOT TO SCALE

12WATER HEATER PIPING DIAGRAM - LWH-1/2

NOT TO SCALE

GAS EQUIPMENT CONNECTION DETAIL

NOT TO SCALE

WATER HEATER PIPING DIAGRAM - DWH-1/2

NOT TO SCALE

HYDRAULIC ELEVATOR PIT DRAINAGE PUMP DETAIL - PP-7/8

NOT TO SCALE

13 RO/DI WATER SYSTEM SCHEMATIC

NOT TO SCALE

S

INDIRECT WASTE DRAIN

NOT TO SCALE

7PIPE SUPPORT AND SEISMIC RESTRAINT

NOT TO SCALE

WATER SOFTENER PIPING CONNECTION

NOT TO SCALE

23 DUPLEX AIR COMPRESSOR

NOT TO SCALE

DUPLEX VACUUM PUMP

NOT TO SCALE

MAX DISTANCE

6X PIPE DIA.

TYPICAL D.I. FAUCET PIPING DETAIL

Plotted By: BRUCE MCINTOSH Plot Date: 8/27/2019 5:35:40 PM Saved By: HOON.SEO File: B:\SAG\2016\SAG16056.01\22-SAG16056.01_P\18759P-501 DETAILS.dwg Save Date: 05/15/2019 04:14 PM

DETAILS - PLUMBING AND

FIRE PROT.

P-501

WATER HEATER SCHEDULE

P01

P02

DWH-3 202 & 252 - - -

DWH-4 105A - - -

LWH-1 P01

LWH-2 P02

PUMP SCHEDULE

THERMOSTATIC MIXING VALVE SCHEDULE

WATER SOFTENER SCHEDULE

AIR COMPRESSOR AND VACUUM PUMP SCHEDULE

- - 50 -

- - 28 -

PLUMBING FIXTURE SCHEDULE

LABORATORY FIXTURE/EQUIPMENT CONNECTION SCHEDULE

REMARKS

SKID MOUNTED (RO/D1) HIGH PURITY SYSTEM

Plotted By: BRUCE MCINTOSH Plot Date: 8/27/2019 5:35:44 PM Saved By: DEJAN.TADIC File: B:\SAG\2016\SAG16056.01\22-SAG16056.01_P\18759P-601.dwg Save Date: 04/22/2019 07:46 AM

SCHEDULES - PLUMBING

P-601

Plotted By: BRUCE MCINTOSH Plot Date: 8/27/2019 5:35:48 PM Saved By: DEJAN.TADIC File: B:\SAG\2016\SAG16056.01\22-SAG16056.01_P\18759P-701 RISER DIAGRAM.dwg Save Date: 08/27/2019 05:23 PM

WATER RISER DIAGRAMS -

EAST & WEST WING

P-701

Plotted By: BRUCE MCINTOSH Plot Date: 8/27/2019 5:35:51 PM Saved By: DEJAN.TADIC File: B:\SAG\2016\SAG16056.01\22-SAG16056.01_P\18759P-702 RISER DIAGRAM.dwg Save Date: 04/22/2019 11:59 AM

SANITARY, VENT & STORM

RISER DIAGRAMS - EAST &

WEST WING

P-702

Plotted By: BRUCE MCINTOSH Plot Date: 8/27/2019 5:35:55 PM Saved By: DEJAN.TADIC File: B:\SAG\2016\SAG16056.01\22-SAG16056.01_P\18759P-703 RISER DIAGRAM.dwg Save Date: 08/27/2019 05:04 PM

LAB WASTE, VENT AND

STORM RISER DIAGRAM -

EAST & WEST WING

P-703

Plotted By: BRUCE MCINTOSH Plot Date: 8/27/2019 5:35:59 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\22-SAG16056.01_P\18759P-704 RISER DIAGRAM.dwg Save Date: 08/26/2019 10:21 AM

LAB & NATURAL GAS RISER

DIAGRAM - EAST & WEST

WING

P-704