This document provides details for a federal solicitation seeking construction services. The U.S. Department of Agriculture's Agricultural Research Service intends to modernize its Agricultural Research Technology Center in Salinas, California through a design-bid-build project delivery method. The solicitation will involve demolishing outdated buildings and constructing new laboratory, office and greenhouse facilities in two phases over approximately 1440 calendar days. Construction firms are sought to provide all necessary construction services based on completed design documents. The technical evaluation will consider past performance, proposed team and project management approach. The contract will be awarded using best value tradeoff and requires payment and performance bonds from the successful offeror. The solicitation documents will be posted on August 28, 2019 with a pre-proposal site visit scheduled for September 12th. Proposals are due around October 11, 2019. The project aims for LEED Silver certification and requires use of biobased products when reasonably available and priced.
volume 1 part 7
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
A
Plotted By: BRUCE MCINTOSH Plot Date: 8/27/2019 5:34:35 PM Saved By: DEJAN.TADIC File: B:\SAG\2016\SAG16056.01\22-SAG16056.01_P\18759P-001.dwg Save Date: 05/15/2019 02:59 PM
SYMBOLS, ABBR, NOTES,
SCHEDULES - PLUMBING
AND FIRE PROT.
P-001
Plotted By: BRUCE MCINTOSH Plot Date: 8/27/2019 5:34:41 PM Saved By: DEJAN.TADIC File: B:\SAG\2016\SAG16056.01\22-SAG16056.01_P\18759P-100.dwg Save Date: 08/27/2019 05:05 PM
FOUNDATION PLANS -
PLUMBING
P-100
Plotted By: BRUCE MCINTOSH Plot Date: 8/27/2019 5:34:50 PM Saved By: DEJAN.TADIC File: B:\SAG\2016\SAG16056.01\22-SAG16056.01_P\18759P-101.dwg Save Date: 08/26/2019 01:39 PM
FIRST FLOOR PLANS -
PLUMBING WATER AND FIRE
PROTECTION
P-101
Plotted By: BRUCE MCINTOSH Plot Date: 8/27/2019 5:34:55 PM Saved By: DEJAN.TADIC File: B:\SAG\2016\SAG16056.01\22-SAG16056.01_P\18759P-102.dwg Save Date: 08/27/2019 05:24 PM
SECOND FLOOR PLANS -
PLUMBING WATER AND FIRE
P-102
Plotted By: BRUCE MCINTOSH Plot Date: 8/27/2019 5:35:00 PM Saved By: DEJAN.TADIC File: B:\SAG\2016\SAG16056.01\22-SAG16056.01_P\18759P-103.dwg Save Date: 05/15/2019 02:51 PM
PENTHOUSE FLOOR PLANS -
PLUMBING WATER AND FIRE
P-103
Plotted By: BRUCE MCINTOSH Plot Date: 8/27/2019 5:35:07 PM Saved By: DEJAN.TADIC File: B:\SAG\2016\SAG16056.01\22-SAG16056.01_P\18759P-201.dwg Save Date: 08/27/2019 05:04 PM
FIRST FLOOR PLANS -
SANITARY AND STORM
P-201
Plotted By: BRUCE MCINTOSH Plot Date: 8/27/2019 5:35:12 PM Saved By: DEJAN.TADIC File: B:\SAG\2016\SAG16056.01\22-SAG16056.01_P\18759P-202.dwg Save Date: 08/27/2019 05:05 PM
SECOND FLOOR PLANS-
P-202
Plotted By: BRUCE MCINTOSH Plot Date: 8/27/2019 5:35:18 PM Saved By: DEJAN.TADIC File: B:\SAG\2016\SAG16056.01\22-SAG16056.01_P\18759P-203.dwg Save Date: 04/22/2019 08:19 AM
P-203
Plotted By: BRUCE MCINTOSH Plot Date: 8/27/2019 5:35:26 PM Saved By: DEJAN.TADIC File: B:\SAG\2016\SAG16056.01\22-SAG16056.01_P\18759P-301.dwg Save Date: 04/22/2019 08:19 AM
FIRST FLOOR PLANS - LAB &
NATURAL GAS PIPING
P-301
Plotted By: BRUCE MCINTOSH Plot Date: 8/27/2019 5:35:31 PM Saved By: DEJAN.TADIC File: B:\SAG\2016\SAG16056.01\22-SAG16056.01_P\18759P-302.dwg Save Date: 04/22/2019 08:15 AM
SECOND FLOOR PLANS -
LAB & NATURAL GAS PIPING
P-302
Plotted By: BRUCE MCINTOSH Plot Date: 8/27/2019 5:35:35 PM Saved By: DEJAN.TADIC File: B:\SAG\2016\SAG16056.01\22-SAG16056.01_P\18759P-303.dwg Save Date: 04/22/2019 08:11 AM
LAB & NATURAL GAS PIPING
P-303
GAS PIPE ROOF PENETRATION DETAIL
NOT TO SCALE
PLUMBING VENT THROUGH FLAT ROOF DETAIL
NOT TO SCALE
DE-IONIZED WATER SYSTEM SCHEMATIC (DI-1/DI-2), ALTERNATES NO. 1001/2001
NOT TO SCALE
GAS METER DETAIL
NOT TO SCALE
6INSPECTORS TEST CONNECTION DETAIL
NOT TO SCALE
15THERMOSTATIC MIXING VALVE (TMV)
NOT TO SCALE
PIPE ANCHOR DETAIL
NOT TO SCALE
INLINE PUMP SUPPORT DETAIL PP-1 THROUGH PP-6
NOT TO SCALE
TRAP PRIMER DETAIL
NOT TO SCALE
16FIRE SERVICE ENTRANCE DETAIL
NOT TO SCALE
PIPE PENETRATION THROUGH FIRE RATED WALLS
NOT TO SCALE
3PIPE SUPPORT DETAIL
NOT TO SCALE
8COMBINATION EMERGENCY SHOWER AND EYE/FACE WASH DETAIL
NOT TO SCALE
12WATER HEATER PIPING DIAGRAM - LWH-1/2
NOT TO SCALE
GAS EQUIPMENT CONNECTION DETAIL
NOT TO SCALE
WATER HEATER PIPING DIAGRAM - DWH-1/2
NOT TO SCALE
HYDRAULIC ELEVATOR PIT DRAINAGE PUMP DETAIL - PP-7/8
NOT TO SCALE
13 RO/DI WATER SYSTEM SCHEMATIC
NOT TO SCALE
S
INDIRECT WASTE DRAIN
NOT TO SCALE
7PIPE SUPPORT AND SEISMIC RESTRAINT
NOT TO SCALE
WATER SOFTENER PIPING CONNECTION
NOT TO SCALE
23 DUPLEX AIR COMPRESSOR
NOT TO SCALE
DUPLEX VACUUM PUMP
NOT TO SCALE
MAX DISTANCE
6X PIPE DIA.
TYPICAL D.I. FAUCET PIPING DETAIL
Plotted By: BRUCE MCINTOSH Plot Date: 8/27/2019 5:35:40 PM Saved By: HOON.SEO File: B:\SAG\2016\SAG16056.01\22-SAG16056.01_P\18759P-501 DETAILS.dwg Save Date: 05/15/2019 04:14 PM
DETAILS - PLUMBING AND
FIRE PROT.
P-501
WATER HEATER SCHEDULE
P01
P02
DWH-3 202 & 252 - - -
DWH-4 105A - - -
LWH-1 P01
LWH-2 P02
PUMP SCHEDULE
THERMOSTATIC MIXING VALVE SCHEDULE
WATER SOFTENER SCHEDULE
AIR COMPRESSOR AND VACUUM PUMP SCHEDULE
- - 50 -
- - 28 -
PLUMBING FIXTURE SCHEDULE
LABORATORY FIXTURE/EQUIPMENT CONNECTION SCHEDULE
REMARKS
SKID MOUNTED (RO/D1) HIGH PURITY SYSTEM
Plotted By: BRUCE MCINTOSH Plot Date: 8/27/2019 5:35:44 PM Saved By: DEJAN.TADIC File: B:\SAG\2016\SAG16056.01\22-SAG16056.01_P\18759P-601.dwg Save Date: 04/22/2019 07:46 AM
SCHEDULES - PLUMBING
P-601
Plotted By: BRUCE MCINTOSH Plot Date: 8/27/2019 5:35:48 PM Saved By: DEJAN.TADIC File: B:\SAG\2016\SAG16056.01\22-SAG16056.01_P\18759P-701 RISER DIAGRAM.dwg Save Date: 08/27/2019 05:23 PM
WATER RISER DIAGRAMS -
EAST & WEST WING
P-701
Plotted By: BRUCE MCINTOSH Plot Date: 8/27/2019 5:35:51 PM Saved By: DEJAN.TADIC File: B:\SAG\2016\SAG16056.01\22-SAG16056.01_P\18759P-702 RISER DIAGRAM.dwg Save Date: 04/22/2019 11:59 AM
SANITARY, VENT & STORM
RISER DIAGRAMS - EAST &
WEST WING
P-702
Plotted By: BRUCE MCINTOSH Plot Date: 8/27/2019 5:35:55 PM Saved By: DEJAN.TADIC File: B:\SAG\2016\SAG16056.01\22-SAG16056.01_P\18759P-703 RISER DIAGRAM.dwg Save Date: 08/27/2019 05:04 PM
LAB WASTE, VENT AND
STORM RISER DIAGRAM -
EAST & WEST WING
P-703
Plotted By: BRUCE MCINTOSH Plot Date: 8/27/2019 5:35:59 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\22-SAG16056.01_P\18759P-704 RISER DIAGRAM.dwg Save Date: 08/26/2019 10:21 AM
LAB & NATURAL GAS RISER
DIAGRAM - EAST & WEST
WING
P-704