This document contains structural engineering plans and specifications for the modernization of the Agricultural Research Technology Center in Salinas, California. The United States Department of Agriculture Agricultural Research Service intends to issue a request for proposal for construction services to demolish outdated buildings and construct new laboratory, office and greenhouse facilities in two phases totaling approximately 108,000 square feet. Proposals are due on October 11, 2019 with contract award anticipated shortly thereafter based on best value. The contract period of performance is approximately 1440 calendar days. Construction must meet LEED Silver certification and utilize biobased products where reasonably available and priced.
volume 1 part 4
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:21:52 AM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Architectural-Interior-Structural\18759S001.dwg Save Date: 04/08/2019 09:58 AM
STRUCTURAL NOTES
S001
INSPECTION ITEM REQUIRED
GENERAL
CONDUCT WEEKLY VISUAL
OBSERVATIONS OF THE STRUCTURAL
SYSTEMS FOR GENERAL
CONFORMANCE TO THE CONSTRUCTION
DOCUMENTS AND PREPARE WEEKLY
REPORTS OF OBSERVATIONS
DESCRIBING WORK PROGRESS AND
NON-CONFORMING ITEMS
EARTHWORK
VERIFY EXCAVATIONS ARE
EXTENDED TO PROPER DEPTH AND
HAVE REACHED PROPER MATERIAL
OBSERVE PROOF ROLLING OF
SUBGRADE PRIOR TO FILL
PLACEMENT
PERFORM CLASSIFICATION AND
TESTING OF CONTROLLED FILL
MATERIAL
TESTING AND EVALUATION OF IN-
PLACE DENSITY OF COMPACTED
FILL AS WORK PROGRESSES
INSPECT VAPOR RETARDER FOR
CONFORMANCE WITH MANUFACTURER'S
WRITTEN INSTALLATION INSTRUCTIONS
PERFORM CONCRETE STRENGTH
TESTING
INSPECTION ITEM REQUIRED
SCHEDULE OF SPECIAL INSPECTION SERVICES
FREQUENCY
SPECIFICATION
SECTION
CONTINUOUS PERIODIC
STRUCTURAL STEEL AND METAL DECK
VERIFY FABRICATOR CERTIFICATION
VISIT FABRICATION SHOP TO OBSERVE
FABRICATION PROCEDURES
VERIFY CORRECT STRUCTURAL STEEL
MATERIAL DELIVERED TO JOB SITE
INSPECT STEEL FRAME JOINT DETAILS
FOR COMPLIANCE WITH APPROVED
CONTRACT DOCUMENTS
VERIFY JOINT WELD PROCEDURES ARE
BEING USED IN ACCORDANCE WITH AWS
VERIFY CONTRACTOR'S RECEIPT OF
WELDERS CERTIFICATE
VERIFY CORRECT FILLER MATERIAL
USED IN WELDS
VISUALLY INSPECT ALL WELDS, PROVIDE
CONTINUOUS INSPECTION ON ALL
FULL OR PARTIAL PENETRATION WELDS
AND FILLET WELDS GREATER THAN 5/16"
PERFORM ULTRASONIC TESTING OR
RADIOGRAPHIC TESTING ON ALL
FULL PENETRATION WELDS
PERFORM MAGNETIC PARTICLE TESTING
ON 20% OF ALL PARTIAL PENETRATION
AND FILLET WELDS GREATER THAN 5/16"
THERMALLY CUT ACCESS HOLES SHALL
BE TESTED BY MAGNETIC PARTICLE
TESTING OR PENETRANT TESTING
WHEN THE FLANGE OR WEB THICKNESS
EXCEEDS 2 IN. ANY CRACK SHALL BE
DEEMED UNACCEPTABLE REGARDLESS
OF SIZE OR LOCATION
OBSERVE INSTALLATION OF FASTENERS
FOR SNUG-TIGHT JOINTS
OBSERVE INSTALLATION OF FASTENERS
FOR PRE-TENSIONED JOINTS AND
SLIP-CRITICAL JOINTS WHEN THE
INSTALLER IS USING TURN OF THE
NUT METHOD WITH MATCHMARKING
TECHNIQUES, THE DIRECT-TENSION
INDICATOR METHOD, OR THE
TWIST-OFF TYPE TENSION
CONTROL BOLT METHOD
OBSERVE INSTALLATION OF BOLTS FOR
PRE-TENSIONED AND SLIP CRITICAL
JOINTS WHEN THE INSTALLER IS USING
CALIBRATED WRENCH METHOD OR THE
TURN OF THE NUT METHOD WITHOUT
MATCHMARKING TECHNIQUES
OBSERVE AND TEST ALL FIELD
APPLIED HEADED STUDS
VISUALLY INSPECT ALL FLOOR AND
ROOF DECK WELDS, SCREWS,
OR OTHER APPROVED FASTENERS
FOR COMPLIANCE WITH CONTRACT
DOCUMENTS
AISC 360 N5.5c
AISC 360 N5
AWS D1.1
AWS D1.1
AISC 360 N5
AWS D1.1
AISC 360 N5
TABLE N5.4-1
TABLE N5.4-2
TABLE N5.4-3
AWS D1.1/D1.1M
AISC 360 N5.5b
AWS D1.1/D1.1M
PER ASIC 360 N5.2: QA
DESIGNATED INSPECTION TASKS
TO BE COMPLETED BY
INSPECTION AND TESTING
AGENCY FOR WELDING
OBSERVATION
APPLIES TO STRUCTURES IN
RISK CATEGORY III AND IV.
FOR RISK CATEGORY II, 10%
OF WELDS SHALL BE TESTED
CBC CHAPTER 17
ONLY ONE INSPECTION IS
REQUIRED UNLESS ON-SITE
EVENTS INDICATE FURTHER
INSPECTIONS ARE NECESSARY
OBSERVE FOR PROPER CURING
TEMPERATURE AND TECHNIQUES
PRECAST, PRESTRESSED, OR
POST-TENSIONED CONCRETE
VERIFY THAT THE NECESSARY DESIGN
STRENGTH HAS BEEN REACHED PRIOR
TO THE APPLICATION OF POST-
TENSIONING OR PRESTRESSED
FORCES AND THE REMOVAL OF FORMS
OBSERVATION DURING APPLICATIONS
OF PRESTRESSED AND
POST-TENSIONING FORCES
OBSERVATION DURING PLACEMENT OF
GROUT IN BONDED POST-TENSIONING
TENDONS
VERIFY FABRICATION/ QUALITY
CONTROL PROCEDURES FOR PRECAST
CONCRETE MANUFACTURER
ERECTION OF PRECAST MEMBERS AND
INSPECTION OF MEMBER CONNECTIONS
MEASURE FLOOR FLATNESS AND
LEVELNESS AS DIRECTED
INCLUDE UNIT PRICE IN BID
PROPOSAL FORM
COLD-FORMED STEEL FRAMING
OBSERVE AND VERIFY USE OF
CORRECT MEMBER SIZES,
MATERIAL THICKNESS,
FASTENERS, AND WELDING
REFERENCE
REFERENCE
CODE AND
STANDARDS
MAINTAIN A SPREADSHEET SHOWING
DATE, SEQUENTIAL ORDER OF
STRENGTH TEST RESULTS, AND
INDICATE RUNNING AVERAGE
REMARKS
OBSERVE CONCRETE PLACEMENT
DIVISION 31 CBC CHAPTER 17
ALL FOOTING AND PILE CAP
EXCAVATIONS SHALL BE
OBSERVED AND APPROVED PRIOR
TO CONCRETE PLACEMENT
WEEKLY REPORTS ARE TO BE
SUBMITTED TO THE
CONTRACTOR, ENGINEER OF
RECORD, BUILDING OFFICIAL
AND OWNER
SCHEDULE OF SPECIAL INSPECTION SERVICES
FREQUENCY
SPECIFICATION
SECTION
CONTINUOUS PERIODIC
REFERENCE
REFERENCE
CODE AND
STANDARDS
REMARKS
INSPECTION ITEM REQUIRED
SCHEDULE OF SPECIAL INSPECTION SERVICES
FREQUENCY
SPECIFICATION
SECTION
CONTINUOUS PERIODIC
CONCRETE AND REINFORCING STEEL
INSPECT CONCRETE FORMWORK FOR
SHAPE, LOCATION, AND DIMENSIONS OF
THE CONCRETE MEMBER BEING
FORMED
OBSERVE PLACEMENT OF REINFORCING
STEEL PRIOR TO CLOSING OF THE
FORMS AND ARRIVAL OF CONCRETE TO
THE JOBSITE
INSPECTION OF PRESTRESSED AND
POST- TENSIONED TENDON PLACEMENT
OBSERVE WELDING OF STEEL
REINFORCEMENT
TEST EACH SOURCE
ONE DENSITY TEST FOR EACH LIFT,
DAYS OPERATION, OR 5000 SQ. FT.
OF FILL AREA
VERIFY CORRECT MATERIAL USED,
INCLUDING THE USE OF A706 IN WELDED
SPLICES, IF ANY
OBSERVE AND VERIFY PLACEMENT OF
BOLTS AND RODS PRIOR TO CONCRETE
PLACEMENT
OBSERVE AND VERIFY CORRECT
PLACEMENT AND INSTALLATION
OF ANCHORS POST-INSTALLED
IN HARDENED CONCRETE
VERIFY USE OF CORRECT CONCRETE
MIX DESIGN AND REVIEW DELIVERY
TICKETS
SAMPLE FRESH CONCRETE AND
MEASURE SLUMP, AIR CONTENT, AND
TEMPERATURE DURING CONCRETE
DELIVERY
SAMPLE CONCRETE SPECIMENS FOR
STRENGTH TESTS TO BE PERFORMED
IN A LAB. A MINIMUM OF FOUR (4)
CYLINDERS SHALL BE MADE. TEST ONE
AT 7 DAYS, TWO AT 28 DAYS. THE 4TH
CYLINDER SHALL BE HELD IN RESERVE.
TEST FOR DENSITY, BONDING
STRENGTH, AND THICKNESS
ASTM E605
ASTM E736
DIVISION 03
AC1 318 6.1.1
CBC CHAPTER 19
ACI 318-14
ACI 318-14
ADDITIONAL CYLINDERS SHALL
BE MADE FOR EARLY FORM
REMOVAL. NOTE: TWO 6X12
OR THREE 4X8 CYLINDERS
ARE REQUIRED FOR AN
ACCEPTABLE TEST
VISUAL INSPECTION OF
ALL BOLTS
REFERENCE
REFERENCE
CODE AND
STANDARDS
REMARKS
INSPECTION ITEM REQUIRED
SPRAY FIRE PROTECTION MATERIAL
INSPECT SURFACE PREPARATION
OF MEMBERS, RECORD AMBIENT
TEMPERATURES, AND VENTILATION
MEASURES
MEASURE APPLIED THICKNESS
CBC CHAPTER 17
VERIFY CONDITIONS ARE
IN CONFORMANCE WITH
MANUFACTURERS WRITTEN
INSTRUCTIONS
ASTM E605
ONE SET FOR MEASUREMENT FOR
EVERY 10,000 SQ FT OF FLOOR AND
ROOF AREA AND 25 PERCENT THE
STEEL MEMBERS ON EACH LEVEL
ONE SAMPLE FOR EVERY 10,000 SQ
FT OF FLOOR AND ROOF AREA
SCHEDULE OF SPECIAL INSPECTION SERVICES
FREQUENCY
SPECIFICATION
SECTION
CONTINUOUS PERIODIC
REFERENCE
REFERENCE
CODE AND
STANDARDS
REMARKS
VERIFY PLANT IS PCI
CERTIFIED
AISC 360 N5.6
TABLE N5.6-1
TABLE N5.6-3
AISC 360 N5.6
TABLE N5.6-1
TABLE N5.6-2
TABLE N5.6-3
PER ASIC 360 N5.2: QA
DESIGNATED INSPECTION TASKS
TO BE COMPLETED BY
INSPECTION AND TESTING
AGENCY FOR BOLTING
OBSERVATION
AISC 360 N5.6
TABLE N5.6-1
TABLE N5.6-2
TABLE N5.6-3
AISC 360 N6
AWS D1.1
AISC 360 N5.6
VERIFY CORRECT NUMBER PER
BEAM, LOCATION, AND WELDING
CBC CHAPTER 17
CBC CHAPTER 17
CBC CHAPTER 17
DIVISION 31
ACI 318-14
CBC CHAPTER 19
ACI 318-14
CBC CHAPTER 19
ACI 318-14
CBC CHAPTER 19
ACI 318-14
CBC CHAPTER 19
ACI 318-14
CBC CHAPTER 19
ACI 318-14
DIVISION 03
DIVISION 03
ACI 318-14
CBC CHAPTER 19
CBC CHAPTER 19
ACI 318-14
ACI 318-14
ACI 318-14
ACI 318-14
ACI 318-14
DIVISION 05
DIVISION 05
CBC CHAPTER 17
CBC CHAPTER 17
DIVISION 05
DIVISION 05
DIVISION 05
CBC CHAPTER 17
CBC CHAPTER 17
CBC CHAPTER 17
CBC CHAPTER 17
CBC CHAPTER 17
CBC CHAPTER 17
CBC CHAPTER 17
CBC CHAPTER 17
CBC CHAPTER 17
DIVISION 05
CBC CHAPTER 17
ACI 318-14
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:21:57 AM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Architectural-Interior-Structural\18759S002.dwg Save Date: 04/08/2019 09:58 AM
TEST AND INSPECTIONS
S002
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:22:01 AM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Architectural-Interior-Structural\18759S101.dwg Save Date: 04/08/2019 09:59 AM
FOUNDATION AND FIRST
FLOOR PLAN
S101
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:22:05 AM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Architectural-Interior-Structural\18759S102.dwg Save Date: 04/08/2019 09:59 AM
SECOND FLOOR FRAMING
PLAN
S102
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:22:09 AM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Architectural-Interior-Structural\18759S103.dwg Save Date: 04/08/2019 10:00 AM
ROOF AND PENTHOUSE
FLOOR FRAMING PLAN
S103
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:22:14 AM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Architectural-Interior-Structural\18759S104.dwg Save Date: 04/08/2019 10:00 AM
PENTHOUSE ROOF FRAMING
PLAN
S104
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:22:17 AM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Architectural-Interior-Structural\18759S201.dwg Save Date: 04/08/2019 10:00 AM
FOUNDATION SCHEDULE,
SECTIONS AND DETAILS
S201
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:22:24 AM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Architectural-Interior-Structural\18759S202.dwg Save Date: 04/08/2019 10:01 AM
COLUMN SCHEDULE, KEY
PLAN, SECTIONS AND
DETAILS
S202
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:22:27 AM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Architectural-Interior-Structural\18759S203.dwg Save Date: 04/08/2019 10:01 AM
BRACING ELEVATIONS,
S203
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:22:30 AM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Architectural-Interior-Structural\18759S204.dwg Save Date: 04/08/2019 10:01 AM
MOMENT FRAME
ELEVATIONS
S204
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:22:33 AM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Architectural-Interior-Structural\18759S205.dwg Save Date: 04/08/2019 10:02 AM
MOMENT FRAME
ELEVATIONS
S205
TEE INTERSECTION
CORNER INTERSECTION
OUTSIDE LOADED
CORNER INTERSECTION
INSIDE LOADED
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:22:37 AM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Architectural-Interior-Structural\18759S301.dwg Save Date: 04/08/2019 10:02 AM
CONCRETE - TYPICAL
DETAILS
S301
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:22:41 AM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Architectural-Interior-Structural\18759S302.dwg Save Date: 04/08/2019 10:02 AM
STEEL - TYPICAL DETAILS
S302
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:22:44 AM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Architectural-Interior-Structural\18759S303.dwg Save Date: 04/08/2019 10:03 AM
S303
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:22:47 AM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Architectural-Interior-Structural\18759S304.dwg Save Date: 04/08/2019 10:03 AM
S304
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:22:50 AM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Architectural-Interior-Structural\18759S401.dwg Save Date: 04/08/2019 10:03 AM
S401
File details come from the government source that posted it. Updated .