About this file

This solicitation document requests proposals for a design-bid-build construction project to modernize the Agricultural Research Service Technology Center in Salinas, California. The project involves demolishing outdated buildings and constructing new laboratory, office and greenhouse facilities in two phases over approximately 1440 calendar days. Proposals are due on or about October 11, 2019. The construction contractor will be selected using the best value tradeoff source selection process, evaluating past performance, proposed project team qualifications and project management approach. The contract has a small business set-aside threshold of $36.5 million. Performance and payment bonds will be required. Plans and specifications are available electronically only on FedBizOpps. A site walkthrough is scheduled for September 12, 2019. The project must incorporate biobased products and be certified LEED Silver. The soliciting agency is the United States Department of Agriculture's Agricultural Research Service.

volume 1 part 1

View the file

Other files

Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SYMBOLS, ABBREVIATIONS,

LEGEND, AND INDEX OF

DRAWINGS VOL. 1

G001

Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:20:28 AM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Architectural-Interior-Structural\18759-A-G101-SHEET.dwg Save Date: 04/08/2019 09:57 AM

FIRST FLOOR CODE AND

EGRESS PLAN

G101

BUILDING SECTION NET

AREA

(SF)

OCCUPANCY

TYPE

TYPE OF

USE

LOAD

FACTOR

EXIT LOAD

PER AREA

EAST WING FIRST FLOOR

SUBTOTAL EAST WING

B

B

PHASE 2

B

WEST WING FIRST FLOOR PHASE 1

SUBTOTAL WEST WING

B

B

B

ASSEMBLY - UNCONCENTRATED

ACCESSORY STORAGE AREAS, MECHANICAL EQUIPMENT ROOM

OFFICES

15 SF - NET

100 SF - GROSS

300 SF - GROSS

256 NET

925 GROSS

14142 GROSS

12961 GROSS

ASSEMBLY - UNCONCENTRATED

ACCESSORY STORAGE AREAS, MECHANICAL EQUIPMENT ROOM

OFFICES

15 SF - NET

100 SF - GROSS

300 SF - GROSS

637 NET

1019 GROSS

17537 GROSS

15881 GROSS

Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 10:20:33 AM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Architectural-Interior-Structural\18759A-G102-SHEET.dwg Save Date: 04/08/2019 09:57 AM

SECOND FLOOR CODE AND

EGRESS PLAN

G102

BUILDING SECTION AREA

(SF)

OCCUPANCY

TYPE

TYPE OF USE LOAD

FACTOR

EXIT LOAD

PER AREA

EAST WING SECOND FLOOR

SUBTOTAL EAST WING

703 GROSS

852 NET B

B ACCESSORY STORAGE AREAS,

MECHANICAL EQUIPMENT ROOM

ASSEMBLY - UNCONCENTRATED

OFFICES

15 SF - NET

300 SF - GROSS

100 SF - GROSS 145

PHASE 2

14459 GROSS B

WEST WING SECOND FLOOR PHASE 1

SUBTOTAL WEST WING

B

B

B

1512 NET A-3 (UNSEPARATED) 15 SF - NET

ASSEMBLY - UNCONCENTRATED

17526 GROSS

ASSEMBLY - UNCONCENTRATED

ACCESSORY STORAGE AREAS,

MECHANICAL EQUIPMENT ROOM

OFFICES

15 SF - NET

100 SF - GROSS

300 SF - GROSS

731 NET

554 GROSS

14640 GROSS

13355 GROSS