This document summarizes a federal solicitation for the modernization of the Agricultural Research Service Technology Center in Salinas, California. The project will be implemented using the design-bid-build delivery method. It involves constructing two new phases of research buildings totaling 107,000 square feet to replace outdated facilities. Phase one includes a west and east lab/office building totaling 71,000 square feet. Phase two is a headhouse/greenhouse facility of 37,000 square feet. The contract period of performance is approximately 1440 calendar days. The North American Industry Classification System code is 236220 and the small business set-aside is $36.5 million. Proposals are due around October 11, 2019 with award by early 2020. The solicitation will be available on FedBizOpps on August 28, 2019 and plans will be viewable but not provided in hard copy. A site walkthrough is scheduled for September 12, 2019. The selected contractor must provide all construction services and the contract will be awarded using best value tradeoff including past performance, team experience, and technical approach.
volume 1 part 6
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Plotted By: BRUCE MCINTOSH Plot Date: 8/27/2019 4:29:54 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\23-SAG16056.01_M\redone drawings\18759M-001.dwg Save Date: 04/08/2019 03:25 PM
SYMBOLS AND
ABBREVIATIONS
M-001
Plotted By: BRUCE MCINTOSH Plot Date: 8/27/2019 4:29:55 PM Saved By: MATTHEW.HAMER File: B:\SAG\2016\SAG16056.01\23-SAG16056.01_M\redone drawings\18759MH-01.dwg Save Date: 08/27/2019 03:01 PM
FIRST FLOOR PLAN - HVAC
M-101
PHASE 2
PHASE 1
Plotted By: BRUCE MCINTOSH Plot Date: 8/27/2019 4:29:57 PM Saved By: MATTHEW.HAMER File: B:\SAG\2016\SAG16056.01\23-SAG16056.01_M\redone drawings\18759MH-02.dwg Save Date: 08/27/2019 03:42 PM
SECOND FLOOR PLAN -
HVAC
M-102
Plotted By: BRUCE MCINTOSH Plot Date: 8/27/2019 4:30:01 PM Saved By: MATTHEW.HAMER File: B:\SAG\2016\SAG16056.01\23-SAG16056.01_M\redone drawings\18759MH-03.dwg Save Date: 08/26/2019 12:13 PM
PENTHOUSE AND ROOF
PLAN - HVAC
M-103
Plotted By: BRUCE MCINTOSH Plot Date: 8/27/2019 4:30:10 PM Saved By: MATTHEW.HAMER File: B:\SAG\2016\SAG16056.01\23-SAG16056.01_M\redone drawings\18759MP-01.dwg Save Date: 08/26/2019 06:55 PM
4'0 8' 16'
SCALE: 1/8"=1'-0"
FIRST FLOOR PLAN - PIPING
M-201
Plotted By: BRUCE MCINTOSH Plot Date: 8/27/2019 4:30:16 PM Saved By: MATTHEW.HAMER File: B:\SAG\2016\SAG16056.01\23-SAG16056.01_M\redone drawings\18759MP-02.dwg Save Date: 08/26/2019 06:51 PM
SECOND FLOOR PLAN -
PIPING
M-202
SCALE 1/4" = 1'-0"SCALE 1/4" = 1'-0"
WEST WING FIRST & SECOND FLOOR
EAST WING FIRST & SECOND FLOOR
SCALE 1/4" = 1'-0"
EAST WING ROOF
SCALE 1/4" = 1'-0"
WEST WING ROOF
Plotted By: BRUCE MCINTOSH Plot Date: 8/27/2019 4:30:21 PM Saved By: MATTHEW.HAMER File: B:\SAG\2016\SAG16056.01\23-SAG16056.01_M\redone drawings\18759M-301.dwg Save Date: 08/26/2019 06:53 PM
SECTIONS
M-301
Plotted By: BRUCE MCINTOSH Plot Date: 8/27/2019 4:30:27 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\23-SAG16056.01_M\redone drawings\18759M-401.dwg Save Date: 04/08/2019 03:42 PM
ENLARGED PENTHOUSE
HVAC & PIPING
M-401
Plotted By: BRUCE MCINTOSH Plot Date: 8/27/2019 4:30:31 PM Saved By: MATTHEW.HAMER File: B:\SAG\2016\SAG16056.01\23-SAG16056.01_M\redone drawings\18759M-501.dwg Save Date: 08/27/2019 01:47 PM
DETAILS
M-501
ROOF
Plotted By: BRUCE MCINTOSH Plot Date: 8/27/2019 4:30:35 PM Saved By: MATTHEW.HAMER File: B:\SAG\2016\SAG16056.01\23-SAG16056.01_M\redone drawings\18759M-502.dwg Save Date: 08/27/2019 09:16 AM
M-502
Plotted By: BRUCE MCINTOSH Plot Date: 8/27/2019 4:30:39 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\23-SAG16056.01_M\redone drawings\18759M-503.dwg Save Date: 04/08/2019 03:43 PM
M-503
Plotted By: BRUCE MCINTOSH Plot Date: 8/27/2019 4:30:42 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\23-SAG16056.01_M\redone drawings\18759M-504.dwg Save Date: 04/08/2019 03:44 PM
AIR HANDLING UNIT
M-504
AIR HANDLING UNIT SCHEDULE
UNIT NO. LOCATION SERVICE
MIN OUTDOOR
AIR
FLOW (CFM)
SUPPLY FAN DATA RETURN FAN DATA COOLING COIL DATA HEATING COIL DATA SILENCER DATA ELECTRICAL DATA
UNIT WEIGHT
(LBS) REMARKS
TOTAL CAPACITY
(MBH)
SENSIBLE
CAPACITY
(MBH) EWT (°F) LWT (°F)
FLOW
(GPM)
EAT (°F)
DB/WB
LAT (°F)
DB/WB
TOTAL
CAPACITY
(MBH) EWT (°F) LWT (°F)
FLOW
(GPM)
EAT (°F)
DB
LAT (°F)
DB
AIR FLOW
(CFM)
MAX PD
(IN.
W.C.) STC V / PH / HZ FLA MCA MOPQTY.
AIR FLOW
(CFM)
MOTOR HP
/WATT
ESP
(IN. W.C.)
TSP
(IN. W.C.) QTY. CFM MOTOR HP
ESP
(IN. W.C.)
AHU-1
EAST WING
PENTHOUSE/ROOF LABS 100% 1 13436 25 4.03 7.3 - - - - 636 497 44 56 106.2 82/65 48.4/48.3 467 150 120 31.7 28 60 13436 0.35 45 460 / 3 / 60 34.2 42.7 70 10230 ALL
AHU-2
EAST WING
PENTHOUSE/ROOF LABS 100% 1 13097 25 4.13 7.3 - - - - 620 484 44 56 106.2 82/65 48.4/48.3 455 150 120 31.7 28 60 13097 0.35 45 461 / 3 / 60 34.2 42.7 70 10210 ALL
AHU-3
EAST WING
PENTHOUSE/ROOF ADMIN OFFICES 7984 1 16206 25 - 6 1 14047 10 2.3 561 493 44 56 97 78.6/62.8 50.9/50.6 428 150 120 23.8 28 52 16206 0.35 45 462 / 3 / 60 48.4 60.4 100 13010 ALL
AHU-4
WEST WING
PENTHOUSE/ROOF LABS 100% 1 14068 25 3.66 7.1 - - - - 666 520 44 56 111 82/65 48.4/48.3 489 150 120 31.7 28 60 14068 0.35 45 463 / 3 / 60 34.2 42.7 70 10240 ALL
AHU-5
WEST WING
PENTHOUSE/ROOF LABS 100% 1 15778 25 4.03 7.3 - - - - 747 584 44 56 125.2 82/65 48.4/48.3 548 150 120 36.5 28 60 15778 0.35 45 464 / 3 / 60 34.2 42.7 70 10770 ALL
AHU-6
WEST WING
PENTHOUSE/ROOF ADMIN OFFICES 2525 1 9167 15 - 6 1 8369 7.5 2.5 273 255 44 56 47.5 76.3/61.3 50.9/50.6 218 150 120 12.7 28 50 9167 0.35 45 465 / 3 / 60 32.4 40.5 65 7800 ALL
NOTES:
1. SELECTION BASED ON TRANE CLIMATE CHANGER MODEL.
2. SUMMER INDOOR TEMPERATURE OF 73°F DB / 61°F WB.
3. WINTER INDOOR AIR TEMPERATURE OF 70°F DB / 30% RH.
4. FANS SHALL BE INTERNALLY ISOLATED DIRECT DRIVE PLENUM TYPE.
5. PROVIDE SINGLE POINT POWER CONNECTION.
6. PROVIDE VFDs WITH BYPASS FOR BOTH SA AND RA FANS.
7. PROVIDE MERV 8 PRE-FILTER.
8. PROVIDE MERV 13 FINAL FILTER.
9. PROVIDE NEMA RATED DISCONNECT SWITCH.
10. PROVIDE OUTDOOR AIRFLOW MONITORING STATION.
11. PROVIDE ENTHALPY ECONOMIZER.
12. 5 FT SILENCER INTEGRAL TO AHU, DISSIPATIVE OR FILM-LINED TYPE.
BOILER SCHEDULE
UNIT NO LOCATION SERVICE TYPE
RATED PRESSURE
(PSI)
MAXIMUM
PD (PSI)
INPUT
(MBH)
OUTPUT
(MBH)
MIN / MAX
NG PRESSURE
(IN WC)
FLOW RATE
(GPM) EWT (°F) LWT (°F)
MIN EFFICIENCY
ELECTRICAL DATA UNIT
WEIGHT
(LBS) REMARKSV/PH/HZ HP
B-1A EAST BOILER RM AHUs & ATUs FLEXIBLE WATER TUBE 30 1.3 1500 1200 7 / 14 95.1 120 150 80 120/1/60 1/2 3000 ALL
B-1B EAST BOILER RM AHUs & ATUs FLEXIBLE WATER TUBE 30 1.3 1500 1200 7 / 14 95.1 120 150 80 120/1/60 1/2 3000 ALL
B-2A WEST BOILER RM AHUs & ATUs FLEXIBLE WATER TUBE 30 1.3 1500 1200 7 / 14 95.1 120 150 80 120/1/60 1/2 3000 ALL
B-2B WEST BOILER RM AHUs & ATUs FLEXIBLE WATER TUBE 30 1.3 1500 1200 7 / 14 95.1 120 150 80 120/1/60 1/2 3000 ALL
NOTES:
1. MODULATING GAS BURNER (MIN 3 POSITION, LOW/MED/HI) WITH PILOT OR ELECTRONIC IGNITION.
2. PRV SET TO 31 PSI.
3. CAT. III APPLIANCE. FORCED DRAFT.
4. SELECTION BASED ON BRYAN AB 150.
5. BOILER SHALL BE A SELF CONTAINED PACKAGE WITH ALL ACCESSORIES.
AIR DEVICE SCHEDULE
UNIT MARK NO MOUNTING MAX SP (IN H20) MAX NC FINISH COLOR ACCESSORIES REMARKS
CD-1 CEILING 0.1 30 WHITE VOLUME DAMPER 24x24 FACE
LD-1 WALL, CEILING 0.1 30 WHITE DIRECTIONAL BLADES AND VOLUME DAMPER 3.5 IN HEIGHT LENGTH AS NOTED
LD-2 CEILING 0.1 30 WHITE PATTERN CONTROLLERS & PLENUM 0.1-1 IN SLOT 48 IN LENGTH
SR-1 WALL, DUCT, CLG 0.1 30 WHITE VOLUME DAMPER SIZE AS NOTED
R-1 CEILING 0.1 30 WHITE VOLUME DAMPER 24x24 FACE
R-2 CEILING/WALL 0.1 30 WHITE VOLUME DAMPER SIZE AS NOTED
NOTES:
1. SELECTION BASED ON TITUS
SOUND ATTENUATOR SCHEDULE
UNIT MARK LOCATION/SERVES
AIR FLOW
(CFM)
MAX SDP (IN
H2O)
MINIMUM DYNAMIC INSERTION LOSS (dB)
REMARKS63 125 250 500 1000 2000 4000 8000
SA-1 HOOD EXHAUST 5280 0.12 5 7 11 16 14 11 10 9 STAINLESS STEEL
SA-2 HOOD EXHAUST 5280 0.12 5 7 11 16 14 11 10 9 STAINLESS STEEL
SA-4 HOOD EXHAUST 5280 0.33 5 7 11 16 14 11 10 9 STAINLESS STEEL
SA-6 HOOD EXHAUST 5280 0.33 5 7 11 16 14 11 10 9 STAINLESS STEEL
SA-8 SAV-12/VVR-12 953 0.12 6 8 11 21 16 11 13 11 -
SA-10 SAV-12/VVR-12 1377 0.12 6 8 11 21 16 11 13 11 -
SA-12 SAV-12/VVR-12 1100 0.12 6 8 11 21 16 11 13 11 -
SA-14 SAV 2-10/VVR-1 1350 0.1 6 8 11 21 16 11 13 11 -
SA-16 SAV 2-12/VVR-1 2400 0.15 6 8 11 21 16 11 13 11 -
SA-18 SAV 3-12/VVR-1 6357 0.15 5 7 11 16 14 11 10 9 -
NOTES:
1. SELECTION SA-1 THRU 6 BASED ON VIBRO ACOUSTICS, AND SA-8 THRU 18 BASED ON IAC 3HS.
AIR TERMINAL UNIT SCHEDULE
UNIT MARK MAX CFM DP (IN.H2O)
NOISE CRITERIA (NC) REHEAT COIL AT MAX L/s CONNECTION
REMARKSDISCH RADIATED MBH DT F GPM ROW DUCT INLET (IN) PIPE (IN)
VVR1 - 5 250 0.18 31 30 4.7 95 0.7 1 5 0.6 * AT DPS=3 IN PER ARI 880-94
VVR2 - 6 350 0.31 31 34 7.5 95 0.5 2 6 0.6
VVR2 - 7 450 0.23 30 31 9.4 95 0.5 2 7 0.8
VVR2 - 8 650 0.3 27 31 12.3 95 0.7 2 8 0.8
VVR2 - 10 800 0.32 25 34 15.1 95 1.2 2 10 0.8
VVR2 - 12 1100 0.37 25 36 20.8 95 1.2 2 12 1 W/ SA-12
VVR2 - 14 1350 0.4 23 39 25.5 95 1.1 2 14 1 W/ SA-14
VVR2 - 16 2400 0.46 24 39 45.3 95 1.5 2 16 1.25 W/ SA-16
NOTES:
1. SELECTION BASED ON TITUS DESV
FAN COIL UNIT SCHEDULE
UNIT MARK CFM
COOLING DATA HEATING DATA FAN MOTOR
REMARKS
EAT (DEG F)
EWT (DEG
F)
TOTAL
CAPACITY
(MBH)
SENSIBLE
CAPACITY
(MBH) FLOW (GPM) PD (FT) EAT EWT
HEATING
(MBH) MAX GPM EXT. SP (Pa) RPM HP VOLT PHDB WB
FCU-1 922 80.6 66.2 44.6 31.5 23.7 6 5 55.4 149 38 2.73 0 1092 0.22 115 1 ALL
FCU-2 922 80.6 66.2 44.6 31.5 23.7 6 5 55.4 149 38 2.73 0 1092 0.22 115 1 ALL
FCU-3 339 80.6 66.2 44.6 10.7 8.2 1.75 3.5 55.4 149 12.6 0.95 0 1092 0.13 115 1 ALL
NOTES:
1. SEE DWGS FOR QUANTITY
FAN SCHEDULE
UNIT MARK LOCATION SERVES TYPE AIR FLOW (CFM) SP (IN H20) RPM
MOTOR
REMARKSHP VOLT PH
SF-7 EAST MECH ROOM PROPELLER 6498 0.3 793 1 460 3 2 - SPEED MOTOR
SF-8 WEST MECH ROOM PROPELLER 6498 0.3 793 1 460 3 2 - SPEED MOTOR
EF-1 2ND FL EAST HOODS CENTRIFUGAL 3960 2.5 1431 5 460 3 (FUTURE 5280 CFM) NOTE 1-4
EF-2 2ND FL EAST HOODS CENTRIFUGAL 3960 2.5 1431 5 460 3 (FUTURE 5280 CFM) (STAND BY),SEE NOTE 1-4
EF-3 2ND FL EAST LABS CENTRIFUGAL 9814 2.4 826 7.5 460 3
EF-4 1ST FL EAST HOODS CENTRIFUGAL 3960 2.5 1431 5 460 3 (FUTURE 5280 CFM) NOTE 1-4
EF-5 1ST FL EAST HOODS CENTRIFUGAL 3960 2.5 1431 5 460 3 (FUTURE 5280 CFM) (STAND BY),SEE NOTE 1-4
EF-6 1ST FL EAST LABS CENTRIFUGAL 9855 2.4 827 7.5 460 3
EF-7 EAST JAN. CLOSET PRV 80 0.5 1249 0.2 110 1
EF-8 EAST TOILETS PRV 1100 0.9 1482 0.3 110 1
EF-9 EAST MAILROOM PRV 261 0.5 1703 0.2 110 1
EF-10 1ST FL WEST HOODS CENTRIFUGAL 4619 2.5 1533 5 460 3 (FUTURE 5280 CFM) NOTE 1-4
EF-11 1ST FL WEST HOODS CENTRIFUGAL 4619 2.5 1533 5 460 3 (FUTURE 5280 CFM) (STAND BY),SEE NOTE 1-4
EF-12 2ND FL WEST HOODS CENTRIFUGAL 3579 2.5 1385 5 460 3 (FUTURE 5280 CFM) NOTE 1-4
EF-13 2ND FL WEST HOODS CENTRIFUGAL 3579 2.5 1385 5 460 3 (FUTURE 5280 CFM) (STAND BY),SEE NOTE 1-4
EF-14 2ND FL WEST LABS CENTRIFUGAL 10895 2.4 856 7.5 460 3
EF-15 1ST FL WEST LABS CENTRIFUGAL 10616 2.4 847 7.5 460 3
EF-16 WEST TOILETS PRV 934 0.7 1430 0.3 110 1
EF-17 EAST PERCHLORIC HOOD FRP CENTRIFUGAL 780 0.5 1800 3 460 3 4, 5
NOTES:
1. FAN CONNECTED TO EMERGENCY POWER
2. FAN SELECTED BASED ON FUTURE CFM INDICATE IN REMARKS COLUMN WITH STATIC PRESSURE AS INDICATED IN SCHEDULE. FAN WILL INITIALLY OPERATE AT CFM LISTED UNDER THE AIR FLOW COLUMN
3. FAN IS EPOXY COATED
4. PROVIDE FAN VFD FOR VAV OPERATION
5. CFM VALUE IS THE INDUCED DRAFT CFM FROM THE VENTURI BLOWER
6. SF-7,8 BASED ON COOK XMW, EF-1 THRU 6 AND EF-10 THRU 15 BASED ON TWIN CITY BAF-SW, EF-7 THRU 9, 16 BASED ON COOK ACEB, AND EF-17 BASED ON M.K. PLASTICS
PUMP SCHEDULE
UNIT MARK LOCATION FLUID
FLOW HEAD
EFF (%) RPM
MOTOR
REMARKSGPM FT OF HEAD HP VOLT PH
P-1A,B PENTHOUSE EAST CHS 269.9 118 68 1750 15 460 3 W/ VFD, SEE NOTE 1
P-2A,B PENTHOUSE EAST SCHS 190 75 73 1750 7.5 460 3 W/ VFD, SEE NOTE 1
P-3A,B PENTHOUSE EAST HWS 95 83 61 1750 5 460 3 W/ VFD
P-4A,B PENTHOUSE WEST CHS 238.8 110 74 1750 15 460 3 W/ VFD, SEE NOTE 1
P-5A,B PENTHOUSE WEST SCHS 174 67 74 1750 7.5 460 3 W/ VFD, SEE NOTE 1
P-6A,B PENTHOUSE WEST HWS 95 80 61 1750 5 460 3 W/ VFD
CP-1 AHU-1 HWS 31.7 12 --- 3300 0.17 120 3 -
CP-2 AHU-2 HWS 31.7 12 --- 3300 0.17 120 3 -
CP-3 AHU-3 HWS 23.8 12 --- 3300 0.17 120 3 -
CP-4 AHU-4 HWS 31.7 12 --- 3300 0.17 120 3 -
CP-5 AHU-5 HWS 36.5 12 --- 3300 0.17 120 3 -
CP-6 AHU-6 HWS 12.7 12 --- 3300 0.17 120 3 -
NOTES:
1. PUMPS BASED ON USE OF 30% ETHYLENE GLYCOL
2. SELECTIONS BASED ON B&G MODEL 1510, AND CIRCULATOR PUMPS B&G PL-50
UNIT HEATER SCHEDULE
UNIT MARK LOCATION
HEATING
MEDIA
AIR FLOW
(CFM)
CAPACITY
(MBH) HWS (GPM)
MAX WPD (FT
OF HEAD)
EWT (DEG
C) EAT (DEG C) RPM
MOTOR
REMARKSHP VOLT PH
UH-1 SEE PLANS HWS 280 21 1.4 0.25 149.9 55 1075 1/50 110 1
CUH-1 STAIR S103 HWS 210 13.9 0.95 4.25 149.9 55 976 1/20 115 1 HIGH SPEED
NOTES:
1. SELECTION BASED ON TRANE
TANK SCHEDULE
UNIT MARK LOCATION SYSTEM
SYSTEM VOLUME
(GAL) MIN TEMP (DEG F)
MAX TEMP (DEG
F)
MIN PRESSURE (FT
OF HEAD)
MAX PRESSURE (FT
OF HEAD)
TANK SIZE (IN)
REMARKSDIA LENGTH
T-1 EAST MECH RM CWS 1074 23 89.6 5 288 20 29 EXPANSION TANK
T-2 EAST MECH RM HWS 1083 44.6 149 5 288 20 29 EXPANSION TANK
T-3 WEST MECH RM CWS 1213 23 89.6 5 288 20 29 EXPANSION TANK
T-4 WEST MECH RM HWS 1083 44.6 149 5 288 20 29 EXPANSION TANK
T-7 EAST MECH RM CWS 600 23 89.6 5 288 48 79 STORAGE TANK
T-8 WEST MECH RM CWS 600 23 89.6 5 288 48 79 STORAGE TANK
AS-1 EAST MECH RM HWS 13 44.6 149 5 288 13 31 AIR SEPARATOR
AS-2 EAST MECH RM HWS 13 44.6 149 5 288 13 31 AIR SEPARATOR
NOTES:
1. TANK SELECTIONS BASED ON TACO, AND AIR SEPARATORS BASED ON B&G
ICE STORAGE TANK SCHEDULE
UNIT MARK LOCATION APPLICATION NET USABLE MBH EACH TANK
SIZE
MOUNTING REMARKSDIAMETER (FT) HEIGHT (FT)
T-5 EAST WING SOUTH ICE STORAGE/CHWS 1945 7.5 8.5 ON GRADE ALL
T-6 WEST WING SOUTH ICE STORAGE/CHWS 1945 7.5 8.5 ON GRADE ALL
NOTES:
1. PROVIDE THREE TANKS, 30% ETHYLENE GLYCOL COILS. DILUTED GLYCOL IN TANKS
2. SEE SPECIFICATIONS FOR LISTED MANUFACTURERS AND SPECIFIC SIZING REQUIREMENTS
3. SELECTION BASED ON CALMAC 1190 C2F
AIR COOLED CHILLER SCHEDULE
UNIT MARK TYPE CAP (MBH)
CHILLED WATER CONDENSER COMPRESSORS
REMARKSEWT (DEG F) LWT (DEG F) GPM PD (FT OF HEAD) EAT (DEG F) FANS (EA) TOTAL KW KW VOLT PH
CH-1 SCROLL
1177 53.6 44 269.6 18.4 90 8 9.75 95.5 460 3 CHILLED WATER
849 30 23 265.9 18.4 75 8 10.1 74.5 460 3 ICE MAKING
CH-2 SCROLL
1177 53.6 44 269.6 18.4 90 8 9.75 95.5 460 3 CHILLED WATER
849 30 23 265.9 18.4 75 8 10.1 74.5 460 3 ICE MAKING
CH-3 SCROLL
1181 54.9 44 238.8 14.6 90 8 9.75 95.4 460 3 CHILLED WATER
851 31 23 236.2 14.6 75 8 10.1 74.6 460 3 ICE MAKING
CH-4 SCROLL
1181 54.9 44 238.8 14.6 90 8 9.75 95.4 460 3
CHILLED WATER
851 31 23 236.2 14.6 75 8 10.1 74.6 460 3
NOTES:
1. CHILLER INFORMATION IS PROVIDED FOR CHILLERS IN BOTH THE NORMAL CHILLED WATER MAKING MODE AND ICE MAKING MODE AS INDICATED SCHEDULE BASED ON 30% ETHYLENE GLYCOL
2. WEIGHT OF CH-1 THROUGH CH-4 APPROXIMATELY 5838 LBS EACH
3. SELECTION BASED ON TRANE CGAM 100
PRESSURE REDUCING VALVE SCHEDULE
UNIT MARK LOCATION MEDIA
PRESSURE
GPM REMARKSIN (PSI) OUT (PSI)
PRV-1 EAST MECH ROOM HWS 30 25 6 -
PRV-2 WEST MECH ROOM HWS 30 25 6 -
NOTES:
1. SELECTION BASED ON SPENCE MODEL E
EAST WING LAB AND LAB SUPPORT AIR VALVES
ROOM NO.
AIR VALVE
(SERVICE-SIZE)
OCCUPIED
(CFM)
UNOCCUPIED
(CFM)
ROOM TRANSFER
(CFM) (1)
115 SAV-24-12 1720 860 -100
115 EV-20-10 1620 760
115 HEV-12 670 100
115 HEV-12 670 100
112 SAV-12 785 200
112 EV-12 785 200
115A SAV-8 275 135
115A EV-8 275 135
120/122 SAV-12 860 430 -100
120/122 EV-12 860 430
120/122 HEV-12 670 100
120A SAV-8 210 105
120A EV-8 210 105
126 SAV-20-10 1260 630 -200
126 SAV-20-10 1260 630
126 EV-12 1260 630
126 EV-12 1260 630
126 HEV-12 670 100
126 HEV-12 670 100
122A SAV-8 210 105
122A EV-8 210 105
126A SAV-8 215 110
126A EV-8 215 110
133 SAV-8 300 300 400
133 SAV-8 300 300
133 SAV-8 300 300
113 SAV-8 350 115
113 EV-8 350 115
126B SAV-8 215 110
126B EV-8 215 110
126C SAV-8 295 150
126C EV-8 295 150
126E SAV-8 400 200
126E EV-8 400 200
117 SAV-24-12 2160 1080 -100
117 EV-20-10 845 425
117 EV-20-10 1315 655
208/210 SAV-12 1020 510 -100
208/210 EV-12 1020 510
208/210 HEV-12 670 100
208A SAV-8 230 115
208A EV-8 230 115
210A SAV-8 280 140
210A EV-8 280 140
212 SAV-36-12 2600 1300
212 EV-36-12 2600 1300
212A SAV-8 230 115
212A EV-8 330 115
214 SAV-24-12 1960 980 -200
214 SAV-24-12 1960 980
214 EV-24-12 1910 930
214 EV-24-12 1910 930
214 HEV-12 670 100
214 HEV-12 670 100
214 HEV-12 670 100
214 HEV-12 670 100
214A SAV-8 310 155
214A EV-8 310 155
214B SAV-8 310 155
214B EV-8 310 155
214C SAV-8 370 185 100
214C EV-8 270 135
214D SAV-8 230 115
214D EV-8 230 115
222 SAV-12 1020 510 -100
222 EV-12 1120 610
222 - 780 0
222A SAV-10 510 255
222A EV-8 255 130
222A EV-8 255 130
227 SAV-10 600 600 400
227 SAV-8 300 300
NOTES:
1. (-) IS TRANSFER INTO THE SPACE, (+) IS TRANSFER OUT OF THE SPACE, AND NO VALUE IS
NEUTRAL
WEST WING LAB AND LAB SUPPORT AIR VALVES
ROOM NO.
AIR VALVE
(SERVICE-SIZE)
OCCUPIED
DESIGN (CFM)
UNOCCUPIED
DESIGN (CFM)
ROOM TRANSFER
(CFM) (1)
163 SAV-12 940 470 -100
163 EV-12 940 470
163 HEV-12 670 100
163A SAV-8 200 100
163A EV-8 200 100
161 SAV-12 1100 550 -100
161 EV-12 1100 550
161 HEV-12 670 100
161A SAV-8 200 100
161A EV-8 200 100
157 SAV-8 380 190
157 EV-8 380 190
159 SAV-12 1100 550 -100
159 EV-12 1100 550
159 HEV-12 670 100
159A SAV-8 200 100
159A EV-8 200 100
155 SAV-20-10 1475 735 -100
155 EV-20-10 1475 735
155 HEV-12 670 100
145 SAV-12 900 450 -100
145 EV-12 950 500
145 HEV-12 670 100
145A SAV-8 250 150 50
145A EV-8 200 100
149 SAV-36-12 2520 1260 -100
149 EV-20-10 1200 600
149 EV-20-10 1315 655
149A SAV-8 265 130
149A EV-8 265 130
149B SAV-6 85 50
149B EV-6 85 50
147 SAV-8 300 125 -50
147 EV-8 350 175
143 SAV-12 900 450 -100
143 EV-12 900 450
143 HEV-12 670 100
143A SAV-8 225 110
143A EV-8 225 110
141 SAV-12 900 450 -100
141 EV-12 900 450
141 HEV-12 670 100
141A SAV-8 220 110
141A EV-8 220 110
139 SAV-8 420 250
139 EV-8 420 250
164 SAV-8 320 320 530
164 SAV-8 320 320
164 SAV-8 320 320
164 SAV-8 320 320
136 SAV-12 785 200
136 EV-12 785 200
253 SAV-24-12 2060 1030 -100
253 EV-20-10 1960 930
253 HEV-12 670 100
253 HEV-12 670 100
253A SAV-10 235 120
253A EV-10 235 120
253B SAV-10 275 150
253B EV-10 275 150
245 SAV-24-12 2060 1030 -100
245 EV-20-10 1960 930
245 HEV-12 670 100
245 HEV-12 670 100
245A SAV-10 275 150
245A EV-10 275 150
245B SAV-10 285 150
245B EV-10 285 150
243 SAV-24-12 2280 1140 -100
243 EV-24-12 2380 1240
238 SAV-24-12 2220 1110
238 EV-24-12 2220 1110
236 SAV-12 1080 540 -100
236 EV-12 1080 540
236 HEV-12 670 100
236A SAV-8 235 115
236A EV-8 235 115
250 SAV-10 600 600 600
250 SAV-8 300 300
250 SAV-8 300 300
234 SAV-12 1080 540 -100
234 EV-12 1080 540
234 HEV-12 670 100
234A SAV-8 235 115
234A EV-8 235 115
NOTES:
1. (-) IS TRANSFER INTO THE SPACE, (+) IS TRANSFER OUT OF THE SPACE, AND NO VALUE IS
NEUTRAL
SUPPLY AIR VALVE (SAV), HOOD EXHAUST AIR VALVE (HEV), AND GENERAL EXHAUST AIR VALVE (EAV) SCHEDULE
AIR VALVE
SERVICE MARK
AIR VALVE
SIZE MIN CFM MAX CFM
VALVE APD
MAX (IWC)
HEATING COIL
FLOW (CFM)
AIR VALVE HEAT COIL
APD MAX
(IWC)
WPD MAX
(IWC)
CONNECTIONS
REMARKS
TOTAL CAPACITY
(MBH) EA (DEG F) LAT (DEG F) EWT (DEG F) GPM ROWS
DUCT INLET
(IN)
COIL PIPE
(IN)
SAV 6 50 290 0.003 230 8 55.4 80 150 0.5 0.14 2 6 0.5
SAV 8 300 600 0.003 500 10 55.4 82.4 150 0.79 2 0.14 2.4 8 0.5
SAV 10 300 800 0.003 800 17.3 55.4 82.4 150 1.29 2 0.17 6.1 10 0.75
SAV 12 400 1200 0.003 1200 23 55.4 80.6 150 1.6 1 0.07 4.6 12 0.75
SAV 20x10 600 1800 0.003 1800 32 55.4 82.4 150 2.38 1 0.1 8.6 20x10 1
SAV 24x12 1200 2400 0.003 2400 41.19 55.4 80.6 150 3.64 1 0.1 9.3 24x12 1
SAV 36x12 1800 4200 0.003 4200 50 55.4 80.6 150 5 1 0.25 10 36x12 1
EAV 6 50 290 0.003 6
EAV 8 300 600 0.003 8
EAV 10 300 800 0.003 10
EAV 20x10 600 1800 0.003 20x10
EAV 24x12 1200 2400 0.003 24x12
HEV 12 400 1200 0.003 12 1
NOTES:
1. STAINLESS STEEL
Plotted By: BRUCE MCINTOSH Plot Date: 8/27/2019 4:30:47 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\23-SAG16056.01_M\redone drawings\18759M-601.dwg Save Date: 08/27/2019 04:29 PM
SCHEDULES
M-601
CHILLED WATER ICE STORAGE PIPING SCHEMATIC - EAST WINGHEATING WATER PIPING SCHEMATIC - EAST WING
HEATING WATER PIPING SCHEMATIC - WEST WING CHILLED WATER ICE STORAGE PIPING SCHEMATIC - WEST WING
Plotted By: BRUCE MCINTOSH Plot Date: 8/27/2019 4:30:50 PM Saved By: MATTHEW.HAMER File: B:\SAG\2016\SAG16056.01\23-SAG16056.01_M\redone drawings\18759M-701.dwg Save Date: 08/27/2019 06:40 AM
FLOW DIAGRAM
M-701
Plotted By: BRUCE MCINTOSH Plot Date: 8/27/2019 4:30:53 PM Saved By: MATTHEW.HAMER File: B:\SAG\2016\SAG16056.01\23-SAG16056.01_M\redone drawings\18759M-801.dwg Save Date: 08/26/2019 06:54 PM
CONTROL DIAGRAMS
M-801
Plotted By: BRUCE MCINTOSH Plot Date: 8/27/2019 4:30:57 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\23-SAG16056.01_M\redone drawings\18759M-802.dwg Save Date: 08/27/2019 02:17 PM
CONTROL DIAGRAMS
M-802
P-3A/6A
3/4"Ø
SEE PLAN SHEETS
FOR LOCATION
TO AHU'S AND AIR
TERMINAL UNIT
VFD
P-3B/6B
VFD
H W
S
H W
R
DPS-1
4"Ø
HWR
HWS
4"Ø
T
C
CHEMICAL
FEEDER
3/4"Ø
HWS
4"Ø
TO FLOOR
DRAIN
3/4"Ø
T-2/4
B&G 87 AIR VENT
B&G 87 AIR VENT
PRV-1/2 1"Ø
CW
AIR SEPARATOR
AS-1/2
TO DRAIN
HWS
4"Ø
4"Ø
4"Ø
3"Ø
3"Ø
BOILER DRAIN LINE TO
NEAREST FLOOR DRAIN
TO FLOOR DRAIN
B-1B/2A
B-1A/2A
TO FLOOR
DRAIN
4"Ø
4"Ø
T-5/6 T-5/6 T-5/6
T cws
4"Ø
4"Ø
4"Ø
CWR
T-7/8
FLEXIBLE
CONNECTIONDPS-1
DRAIN
DIFFERENTIAL
PRESSURE
SWITCH
DIFFERENTIAL
PRESSURE
GAUGE TYPCH-1/4
4"Ø
C
FLEXIBLE
CONNECTIONDPS-2
DRAIN
DIFFERENTIAL
PRESSURE
SWITCH
DIFFERENTIAL
PRESSURE
GAUGE TYPCH-2/3
4"Ø
4"Ø
PRESSURE SWITCH
1"Ø
3/4"Ø
T-1
GLYCOL-WATER
MAKE-UP SYSTEM
PACKAGE
PLAIN OUTLET
FAUCET
LCW LEVEL
SWITCH
CCLD WATER
MAKE-UP BY
PLUMBING3/4"Ø
P-2A/5A
THERMAL ENERGY FLOW METER
6"Ø
C W
R
SCWR
6"Ø
6"Ø
6"Ø
SCWS
SCWR
SEE PLAN SHEET
FOR LOCATION
P-2B/5B
6"Ø TO BLDG.
TC DDC SYSTEM
VFD-4
VFD-3
T
P-1A/4A
P-1B/4B
3/4"Ø
3/4"Ø
1"Ø
TO GLYCOL
MAKEUP TANK
CHEMICAL
FEEDER
DPS-3
C
S
HEATING WATER PIPING CHILLED WATER ICE STORAGE PIPING SCHEMATIC - EAST & WEST WING
HEATING WATER SYSTEM SEQUENCE OF OPERATION:
BOILER MANUFACTURER SHALL PROVIDE BOILERS WITH A FULL-MODULATION SEQUENCING CONTROLLER (SC). ALL PROGRAMS AND LOGIC REQUIRED FOR TEMPERATURE CONTROL, TEMPERATURE RESET, FIRING RATE MODULATION AND SEQUENCING OF BOILERS SHALL BE CONTAINED IN THE SC OF THE CORRESPONDING BOILER AND SHALL BE COMPLETE WITH ALL REQUIRED PROGRAMMING. EACH SC AND ITS ASSOCIATED PROGRAMS SHALL BE CAPABLE OF OPERATING COMPLETELY INDEPENDENTLY AND SHALL BE CONNECTED TO INTEROPERABLE WITH THE BUILDING AUTOMATED SYSTEM (BAS), AS INDICATED. EACH SC SHALL BE WALL MOUNTED BY CONTRACTOR PER
MANUFACTURER RECOMMENDATION.
HOT WATER SYSTEM CONSISTS OF TWO BOILERS (B-1A &B-1B) & TWO HOT WATER PUMPS (P-3A & P-3B) WITH VARIABLE FREQUENCY DRIVE AND ASSOCIATED APPURTENANCES SERVING BUILDING AIR HANDLING UNITS/ROOF
TOP UNITS PRE HEAT COILS & REHEAT VAV'S.
THE HOT WATER SYSTEM SHALL BE ENABLED BY THE HOT WATER SYSTEM CONTROLLER WHEN ANY ONE OF THE
FOLLOWING OCCUR:
1. AMBIENT TEMPERATURE IS BELOW 60°F (ADJ).
2. ONE (ADJ) CALL FOR HEATING.
3. ONE (ADJ) CALL FOR DEHUMIDIFICATION.
1. BOILER START/STOP:
HOT WATER SYSTEM SHALL START AND STOP THROUGH THE BAS OR THROUGH MANUAL OVERRIDE LOCATED ON BAS CONTROLLER. WHEN DESIRED, HOT WATER PUMP SHALL BE ENERGIZED ON AN ADJUSTABLE LEAD LAG SEQUENCE AS PROGRAMMED AT THE BAS AND, AFTER AN ADJUSTABLE DELAY OF 1 MINUTE AND PROOF STATUS OF WATER FLOW, AS SENSED BY DIFFERENTIAL PRESSURE SENSORS, SEQUENCING CONTROLLER SHALL BE ENABLED.
IF PRIMARY PUMP FAILS TO START, OR FAILS DURING NORMAL OPERATION, STAND-BY PUMP SHALL BE ENERGIZED AND OPERATE AS INDICATED BELOW AND AN AUDIBLE ALARM SHALL BE SENT TO CONTROLLER AND BAS WORK
STATION.
2. PUMP ALTERNATION:
PUMPS ALTERNATE TO EQUALIZE RUNTIME. SELECTION OF THE LEAD PUMP IS EVALUATED ON A WEEKLY BASIS.
THE PUMP WITH THE LEAST RUNTIME IS THE LEAD PUMP. THE ISOLATION VALVE FOR THE LEAD PUMP SHALL BE OPEN AND THE ISOLATION VALVE FOR THE LAG PUMP SHALL BE CLOSED. ONLY ONE HOT WATER PUMP WILL RUN AT A TIME. THE BAS USES CURRENT SWITCHES TO CONFIRM THE PUMPS ARE IN THE DESIRED STATE (ON OR OFF) AND GENERATES AN ALARM IF STATUS DEVIATES FROM BAS START/STOP CONTROL AFTER A DEFINED "PROOFING"
PERIOD (1 MIN ADJ). IF THE LEAD PUMP GOES INTO ALARM, THE LAG PUMP STARTS.
PUMP VARIABLE SPEED CONTROL: BAS CONTROLLER SHALL COMPARE DIFFERENTIAL PRESSURE (DPS-2 & 3), AS SENSED BY DIFFERENTIAL PRESSURE SENSOR (DPS-1), TO THE DESIRED DIFFERENTIAL PRESSURE SET POINT (ADJ), AS DETERMINED BY THE TAB CONTRACTOR, AND MODULATE PUMP OPERATING SPEED TO MAINTAIN SET POINT.
TAB CONTRACTOR SHALL MEASURE AND PROVIDE CONTRACTOR WITH VFD MINIMUM OUTPUT VECTOR GRAPH (MOVG) SETTINGS FOR EACH PUMP AND PUMP COMBINATION. THE MOVG WILL IDENTIFY MINIMUM PUMP/VFD SPEEDS REQUIRED TO MAINTAIN MINIMUM EQUIPMENT FLOW AT 5 INDIVIDUAL OPERATING DP SETTINGS.
3. BOILER ALTERNATION:
BOILERS ALTERNATE TO EQUALIZE RUNTIME. SELECTION OF THE LEAD BOILER IS EVALUATED ON A WEEKLY BASIS.
THE BOILER WITH THE LEAST RUNTIME IS THE LEAD BOILER. THE ISOLATION VALVE FOR THE LEAD BOILER SHALL BE
OPEN AND THE ISOLATION VALVE FOR THE LAG BOILER SHALL BE CLOSED.
4. BOILER SEQUENCING CONTROLLER (SC) INTERFACE:
EACH BOILER SHALL BE PROVIDED WITH A MANUAL "LOCAL/REMOTE" SWITCH WHICH SHALL BE NORMALLY OPERATED IN ITS "REMOTE" POSITION, WITH SWITCH IN "LOCAL" POSITION, BOILER SHALL BE CONTROLLED BY INTERNAL CONTROLS, WHICH SHALL MODULATE THE BOILER FIRING RATE TO MAINTAIN A FIXED SUPPLY WATER TEMPERATURE, INDEPENDENT OF THE SC. THE SWITCH IN "REMOTE" POSITION, BOILER TEMPERATURE CONTROL, HOT WATER TEMPERATURE RESET, BOILER FIRING RATE MODULATION AND BOILER OPERATIONAL SEQUENCING
SHALL BE CONTROLLED BY SC AS STATED BELOW.
5. BOILER CONTROL:
ON A FALL IN HOT WATER SUPPLY TEMPERATURE (TS-1), THE LEAD BOILER SHALL ENERGIZE AT LOW FIRING RATE.
FIRING RATE SHALL GRADUALLY MODULATE UPWARDS UNTIL BOILER SUPPLY WATER TEMPERATURE SET POINT IS REACHED. WHEN THE LEAD BOILER FIRING RATE REACHES 60% AND THE SYSTEM HOT WATER SUPPLY
TEMPERATURE (TS-1) IS STILL BELOW SET POINT, FOLLOWING AN ADJUSTABLE PERIOD OF 20 MINUTES, THE SECOND BOILER SHALL BE ENERGIZED AND MAINTAIN ALL BOILERS AT LOW FIRING RATE. FIRING RATE SHALL GRADUALLY MODULATE UPWARDS UNTIL BOILER SUPPLY WATER TEMPERATURE SET POINT IS REACHED. THIS SEQUENCE SHALL CONTINUE UNTIL THE BOILER SEQUENCING SYSTEM SHALL ENABLE THE REMAINING STANDBY BOILER. THE STANDBY BOILER'S ISOLATION VALVE SHALL BE INTERLOCKED WITH THE ASSOCIATED BOILER. IF ALL OF THE BOILERS ARE ENABLED & ADDITIONAL HEAT IS REQUIRED, BOILER CONTROLLER SHALL MODULATE ALL BOILERS IN UNISON AND THE FIRING RATE OF ALL BOILERS SHALL BE AT THE SAME PERCENTAGE AT ANY GIVEN TIME WHEN MULTIPLE BOILERS ARE OPERATING, UNTIL THE HOT WATER SUPPLY TEMPERATURE REACHES SET POINT, AS RESET
BY ADJUSTABLE OUTSIDE AIR TEMPERATURE RESET SCHEDULE.
WHEN THE SYSTEM LOAD DECREASES THAT THE DIFFERENTIAL BETWEEN HWS AND HWR TEMPERATURES IS LESS THAN 10°F (ADJ). THE BOILERS SHALL MODULATE DOWNWARDS THEN DE-ENERGIZED, ONE AT A TIME, IN THE SAME SEQUENCE AS THEY WERE ENERGIZED, COMPLETE WITH THE SAME INDEPENDENTLY ADJUSTABLE TIME DELAY BETWEEN BOILER DEACTIVATION. WHEN BOILERS ARE OPERATING, THE FIRING RATE OF EACH BOILER SHALL BE MODULATED IN PARALLEL (PER BOILER SC) TO MAINTAIN HOT WATER SUPPLY TEMPERATURE SET POINT AT TS-1, SUBJECT TO THE HIGH LIMIT SET POINT OF EACH BOILER SUPPLY WATER TEMPERATURE. IF ANY BOILER FAILS TO START, OR FAILS DURING NORMAL OPERATION, THE REMAINING BOILER(S) SHALL BE ENERGIZED AND OPERATE AS INDICATED ABOVE; AND AN AUDIBLE ALARM SHALL BE SENT TO THE CORRESPONDING SC AND TO THE BAS USER TERMINAL. THE BOILERS SHALL ROTATE LEAD LAG POSITION AUTOMATICALLY FROM THE BAS BASED ON A PRESET
ADJUSTABLE SCHEDULE.
9. HOT WATER TEMPERATURE RESET:
HOT WATER SUPPLY TEMPERATURE SET POINT SHALL BE AUTOMATICALLY RESET LINEARLY BASED ON OUTSIDE AIR
TEMPERATURE SENSOR (TS-OA) AND ACCORDING TO FOLLOWING SCHEDULE:
OA TEMP. HWS TEMP.
60°F (ADJ.) 95°F
30°F (ADJ.) 140°F
10. DIFFERENTIAL PRESSURE SET POINT:
10.1. DIFFERENTIAL SET POINT SHALL BE AUTOMATICALLY RESET BETWEEN 25PSI TO 5 PSI (ADJ.)
10.2. BMS SHALL MONITOR THE HEATING COIL CONTROL VALVE POSITION FOR ALL HEATING COILS. THE CRITICAL
ZONE SHALL BE UNIT THAT IS WIDEST OPEN TO THE COIL.
10.3. WHEN THE CRITICAL ZONE IS LESS THAN 85% OPEN, THE DIFFERENTIAL PRESSURE SET POINT SHALL BE
RESET DOWNWARD FROM IT'S MAXIMUM (CZ-1) SETTING AT 1 PSI EVERY 5 MINUTES (ESTABLISHED DURING TAB PROCESS -ADJ.). UNTIL THE CRITICAL ZONE IS GREATER THAN 95% OPEN OR THE MINIMUM DIFFERENTIAL
PRESSURE SET POINT OF 5 PSI IS REACHED. (ADJ.)
10.4. WHEN THE CRITICAL ZONE IS GREATER THAN 97% OPEN, THE REVERSE SHALL OCCUR AT 2 PSI EVERY 5
MINUTES UNTIL THE CRITICAL ZONE DAMPER REACHES 85%.
10.5. THIS SEQUENCE SHALL REQUIRE CONTRACTOR TO TUNE AND DOCUMENT OPERATION TO ENSURE PID
HUNTING AND OVERSHOOT DO NOT OCCUR.
11. GAS PRESSURE MONITORING:
EACH BOILER SC SHALL BE CAPABLE OF MONITORING AND MODULATING THE GAS PRESSURE OF ITS BOILER AND
SHALL DISPLAY THE GAS PRESSURE ON THE BAS WORKSTATION.
12. BOILER PLANT EMERGENCY SHUTDOWN:
THERE SHALL BE HARDWIRED INTERFACE BETWEEN THE BOILERS AND THE MANUAL MUSHROOM TYPE SHUT-OFF SWITCHES LOCATED AT EACH DOORWAY. NO BMS PROGRAMMING SHALL BE REQUIRED FOR THE INTERFACE. UPON DETECTING AN ALARM CONDITION AT ANY OF THE MANUAL SWITCHES, THE HARDWIRE INTERLOCK SHALL ACTIVATE A SAFETY SHUTDOWN OF ALL OF THE BOILERS AND AN ALARM SHALL BE GENERATED AT THE BMS INDICATING
BOILER PLANT EMERGENCY SHUTDOWN.
13. TEMPERATURE SET POINT OVERRIDE:
EACH SC SHALL BE CAPABLE OF BEING SET TO ACCEPT A VARYING HOT WATER SUPPLY TEMPERATURE SET POINT FROM BAS. BAS SHALL BE PROGRAMMED TO SEND HOT WATER SUPPLY TEMPERATURE SET POINT TO SC.
TS-1
TS-2
DDC CONTROLLER INPUT/OUTPUT SUMMARY
DDC CONTROLLER INPUT/OUTPUT LEGEND ANALOG IN ANALOG OUT BINARY IN BINARY OUT TRENDING GENERAL
CA
RB
ON
DI
OX
ID
E
CA
RB
ON
MO
NO
XI
DE
CU
RR
EN
T
FL
OW
HU
MI
DI
TY
MA
SS
-A
IR
F
LO
W
PO
SI
TI
VE
FE
ED
BA
CK
PR
ES
SU
RE
TE
MP
ER
AT
UR
E
VA
LV
E
MO
DU
LA
TI
ON
VA
RI
AB
LE
SP
EE
D
CO
NT
RO
L
CO
NT
RO
L P
OI
NT
AD
JU
ST
ME
NT
PE
RC
EN
T
OP
EN
SP
EE
D/
LE
VE
L/F
L
OW
FL
OW
S W
IT
CH
EN
D
SW
IT
CH
ST
AT
US
/P
RO
OF
AU
XI
LIA
RY
CO
NT
AC
TS
OP
EN
/C
LO
SE
ON
/O
FF
ST
AR
T/
ST
OP
HI
GH
/LO
W
MI
SC
EL
LA
NE
OU
S
TR
EN
D
EV
ER
Y
MI
NU
TE
S
TR
EN
D
EV
ER
Y
HO
UR
TR
EN
D
BY
EX
CE
PT
IO
N
AL
L P
OI
NT
LO
G
AL
AR
M
SU
MM
AR
Y
LO
G
ST
AT
US
SU
MM
AR
Y
LO
G
TI
ME
E
VE
NT
LO
G
AU
DI
BL
E
AL
AR
M
GR
AP
HI
C
DI
SP
LA
Y
EM
AI
L + T
EX
T
ME
SS
AG
E
CONTROL DEVICE
TAG ID DESCRIPTION
DPS-1 DIFFERENTIAL PRESSURE 1
DPS-2 DIFFERENTIAL PRESSURE 2
DPS-3 DIFFERENTIAL PRESSURE 3
CP-1 CHILLER PUMP 1
CP-2 CHILLER PUMP 2
CP-3 CHILLER PUMP 3
CP-4 CHILLER PUMP 4
FM-1 FLOW METER 1
FM-2 FLOW METER 2
VFD-1 VARIABLE FREQUENCY DRIVE 1
VFD-2 VARIABLE FREQUENCY DRIVE 2
VFD-3 VARIABLE FREQUENCY DRIVE 3
VFD-4 VARIABLE FREQUENCY DRIVE 4
TS-1 TEMPERATURE SENSOR 1
TS-2 TEMPERATURE SENSOR 2
TS-3 TEMPERATURE SENSOR 3
TS-4 TEMPERATURE SENSOR 4
TS-5 TEMPERATURE SENSOR 5
TS-6 TEMPERATURE SENSOR 6
TS-7 TEMPERATURE SENSOR 7
TS-8 TEMPERATURE SENSOR 8
V-1 VALVE MODULATION 1
V-2 VALVE MODULATION 2
ENTERING AND LEAVING CHILLED WATER
TEMPERATURE
ENTERING AND LEAVING CHILLED WATER PRESSURE
CHILLED WATER FLOW
SELF DIAGNOSTIC
OPERATION STATUS
OPERATION HOURS
NUMBER OF STARTS
COMPRESSOR STATUS ON/OFF
COMPRESSOR LOAD (%)
REFRIGERANT DISCHARGE & SUCTION PRESSURES
OIL PRESSURE
NUMBER OF PURGE CYCLES OVER THE LAST 7 DAYS
NOTE:
1. LOCKOUT ALARM WHEN UNIT IS DE-ENERGIZED. PROVIDE 15-MINUTE STARTUP DELAY PRIOR TO ENABLING ALARM.
2. NOT ALL VIRTUAL POINTS ARE SHOWN. PROVIDE ALL POINTS REQUIRED FOR SOFTWARE OPERATION.
AIR COOLED CHILLER WITH PRIMARY AND SECONDARY PUMPING POINT LIST TABLE
HOT WATER BOILER POINT LIST TABLE
CHILLED WATER SYSTEM CONTROL SEQUENCE:
a. SEQUENCE OF OPERATION - CHILLED WATER SYSTEM
1. CHILLED WATER SYSTEM IS MANUALLY STARTED AND RUNS CONTINUOUSLY.
2. PRIMARY CHILLED WATER PUMPS
a) WHEN CHILLED WATER SYSTEM IS STARTED, THE LEAD PRIMARY CHILLED WATER PUMP STARTS AND RUNS
CONTINUOUSLY.
(1) LEAD CHILLER IS ACTIVATED.
b) IN EVENT OF FAILURE OF LEAD PUMP, THE SECOND PUMP SHALL BE AUTOMATICALLY STARTED AND AN ALARM ANNUNCIATED AT THE OPERATOR'S WORKSTATION. LEAD PUMP MAY BE MANUALLY ROTATED FROM OPERATOR'S
WORKSTATION AND CAN BE SET TO ROTATE AUTOMATICALLY AT A FIXED TIME INTERVAL.
c) PROVIDE A DIFFERENTIAL PRESSURE SENSOR AT EACH CHILLER. SENSOR SHALL MEASURE PRESSURE DROP
BETWEEN CHILLED WATER SUPPLY AND RETURN TO EVAPORATOR.
d) PRESSURE SIGNAL FROM ACTIVE CHILLER SHALL CONTROL SPEED OF ACTIVE PRIMARY CHILLED WATER PUMP TO
MAINTAIN CONSTANT FLOW THROUGH CHILLER EVAPORATOR.
e) WHEN BOTH CHILLERS ARE OPERATING, PRESSURE SIGNALS FROM BOTH SENSORS SHALL BE AVERAGED, AND
AVERAGE SIGNAL SHALL BE USED TO CONTROL PUMP SPEED.
(1) BOTH PRIMARY PUMPS SHALL OPERATE. SPEED OF BOTH PUMPS SHALL BE CONTROLLED IN TANDEM TO
MAINTAIN CONSTANT FLOW THROUGH BOTH CHILLER EVAPORATORS.
3. CHILLERS
a) WHEN CHILLER IS ACTIVATED, ISOLATION VALVE OPENS FULLY.
b) WHEN FLOW IS VERIFIED BY DIFFERENTIAL PRESSURE SWITCH, CHILLER INTERNAL CONTROLS ARE ACTIVATED.
c) MANUFACTURER-PROVIDED INTERNAL CONTROL SYSTEM OPERATES COMPRESSORS AND CONDENSER FANS TO
MAINTAIN CHILLED WATER SETPOINT.
d) CHILLER PERFORMANCE IS LIMITED BY INTERNAL POWER LIMIT CONTROL. LIMIT CONTROL SETTING MAY BE
ADJUSTED BY THE DDC SYSTEM. SEE ICE STORAGE BELOW.
e) LEAD AND STANDBY CHILLER ARE MANUALLY SELECTED FROM THE OPERATOR'S WORKSTATION AND CAN BE SET
TO ROTATE AUTOMATICALLY AT A FIXED TIME INTERVAL.
4. SECONDARY CHILLED WATER PUMPS
a) WHEN CHILLED WATER SYSTEM IS STARTED, THE LEAD SECONDARY CHILLED WATER PUMP STARTS AND RUNS
CONTINUOUSLY.
(1) DDC PUMP CONTROLLER SHALL INTERFACE WITH EACH ADJUSTABLE FREQUENCY DRIVE BY STARTING AND STOPPING MOTOR AND BY TRANSMITTING A 4 TO 20 MA DC SIGNAL TO MODULATE PUMP SPEED FROM MINIMUM TO
FULL SPEED.
b) DDC CONTROLLER SHALL MODULATE ALL OPERATING PUMPS IN UNISON TO MAINTAIN WATER PRESSURE SETTING
AT DIFFERENTIAL PRESSURE SENSOR.
(1) ON A DECREASE IN SYSTEM DIFFERENTIAL PRESSURE, LEAD PUMP SHALL MODULATE TOWARD FULL SPEED. IF IT IS UNABLE TO MAINTAIN SYSTEM PRESSURED, SECOND PUMP SHALL BE STARTED AND PUMPS SHALL BE MODULATED
TOGETHER TO MAINTAIN SYSTEM PRESSURE.
(2) ON AN INCREASE IN SYSTEM PRESSURE THE REVERSE SHALL OCCUR.
(3) VALVE V-2 IS MODULATED TO MAINTAIN SECONDARY CHILLED WATER TEMPERATURE NO COLDER THAN 5.5 DEGREES C.WHEN BOTH SECONDARY CHILLED WATER PUMPS ARE OFF, V-2 CLOSES FULLY TO SECONDARY CIRCUIT, BYPASSING ALL PRIMARY WATER BACK TO CHILLER.
c) IN EVENT OF FAILURE OF A PUMP, THE NEXT PUMP IN SEQUENCE SHALL BE AUTOMATICALLY STARTED AND AN ALARM ANNUNCIATED AT THE OPERATOR'S WORKSTATION. LEAD PUMP MAY BE A MANUALLY ROTATED FROM
OPERATOR'S WORKSTATION.
d) IN EVENT OF COMMUNICATIONS NETWORK FAILURE, PUMP SPEED WILL BE CONTROLLED AT A FIXED SPEED.
5. BUILDING COOLING LOAD MONITOR
a) DDC SYSTEM MEASURES SECONDARY CHILLED WATER FLOW, CHILLED WATER SUPPLY TEMPERATURE TO
BUILDING, AND CHILLED WATER RETURN TEMPERATURE FROM BUILDING.
b) DDC SYSTEM CALCULATES CHILLED WATER DIFFERENTIAL TEMPERATURE ACCURATE TO ±0.5 DEGREES C, MULTIPLIES THIS BY FLOW RATE, AND DERIVES BUILDING COOLING LOAD ACCURATE TO ±5% OF PEAK CHILLER LOAD.
THIS VALUE MAY BE READ OUT ON THE OPERATOR'S WORKSTATION AND USED AS AN INPUT INTO OTHER
CALCULATIONS.
6. ICE STORAGE
a) ICE STORAGE SYSTEM OPERATES IN ONE OF THREE MODES:
1) MAKE ICE:
(a) MAKE ICE MODE STARTS WHEN ALL THE FOLLOWING CONDITIONS ARE MET:
(1) TIME PROGRAM INDICATES LOW ELECTRICAL DEMAND BILLING RATE IN EFFECT.
(2) ICE INVENTORY SENSOR INDICATES ICE INVENTORY IS NO GREATER THAN 80% OF MAXIMUM.
(b) SYSTEM MAY BE MANUALLY SET TO MAKE ICE MODE AT THE OPERATOR'S WORKSTATION.
2) USE ICE:
(a) USE ICE MODE STARTS WHEN ALL THE FOLLOWING CONDITIONS ARE MET:
(1) TIME PROGRAM INDICATES HIGH ELECTRICAL DEMAND BILLING RATE IN EFFECT.
(2) ICE INVENTORY SENSOR INDICATES ICE INVENTORY IS GREATER THAN 25% OF MAXIMUM.
(3) ONE OR BOTH SECONDARY CHILLED WATER PUMPS RUNNING.
(b) SYSTEM MAY BE MANUALLY SET TO USE ICE MODE AT THE OPERATOR'S WORKSTATION.
3) BYPASS:
(a) IF CONDITIONS ARE NOT MET FOR EITHER MAKE ICE OR USE ICE MODES, THE SYSTEM GOES INTO BYPASS MODE.
(b) SYSTEM MAY BE MANUALLY SET TO BYPASS MODE AT THE OPERATOR'S WORKSTATION.
b) MAKE ICE:
1) LEAD PRIMARY CHILLED WATER PUMP AND LEAD CHILLER RUN.
2) CHILLER CAPACITY CONTROL IS LIMITED ONLY BY POWER LIMITER AND INTERNAL SAFETIES AND IS NOT UNDER CONTROL OF CWS SETPOINT CONTROLLER. POWER LIMIT CONTROLLER IS SET FOR “LOW ELECTRIC DEMAND
RATE” SETPOINT (ADJUSTABLE FROM OPERATOR'S WORKSTATION).
3) ICE STORAGE CONTROL VALVE V-1 IS FULLY OPEN TO STORAGE TANKS.
4) SYSTEM OPERATES IN MAKE ICE MODE UNTIL ICE STORAGE DISCHARGE TEMPERATURE FALLS TO -2.2 DEGREES C.
5) SYSTEM THEN SWITCHES TO USE ICE MODE IF ALL REQUIRED CONDITIONS ARE MET, OTHERWISE IT SWITCHES TO
BYPASS.
c) USE ICE:
1) PRIMARY CHILLED WATER PUMPS AND CHILLERS OPERATE AS INDICATED ABOVE.
2) VALVE V-1 IS CONTROLLED TO MAINTAIN 5.5 DEGREES C PRIMARY CHILLED WATER SUPPLY TEMPERATURE.
3) CHILLER IS CONTROLLED TO MAINTAIN 5.5 DEGREES C CWS TEMPERATURE, AND OPERATION IS LIMITED BY POWER LIMITER. POWER LIMIT CONTROLLER IS SET TO “HIGH ELECTRIC DEMAND” SETPOINT (ADJUSTABLE FROM
OPERATOR'S WORKSTATION).
d) BYPASS:
1) VALVE V-1 REMAINS FULLY CLOSED TO STORAGE TANKS.
2) PRIMARY CHILLED WATER PUMPS AND CHILLERS OPERATE AS INDICATED ABOVE.
3) IF BOTH SECONDARY PUMPS ARE STOPPED, ALL PRIMARY PUMPS AND ALL CHILLERS ARE SHUT DOWN.
TS-3
TS-4
V-3
V-4
V-1
V-2
DPS-2
DPS-3
OA DUCT REFERENCE TEMPERATURE
SENSOR OVER BACNET FOR
OA TEMP
AHU 3/6 OA
TS-1 TS-2
TS-4
TS-3
TS-6
TS-5
V-2
FM-1
VFD-1
VFD-2
TS-7
TS-8
V-1
FM-2
Plotted By: BRUCE MCINTOSH Plot Date: 8/27/2019 4:31:02 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\23-SAG16056.01_M\redone drawings\18759M-803.dwg Save Date: 04/08/2019 03:47 PM
SEQUENCE OF OPERATIONS
M-803
C
SP-1
OA
VP
EXHAUST
AIR
VP
LAB FUME HOOD EXHAUST WITH STANDBY FAN
(EF-1&2, EF-4&5, EF-10&11 EF-12&13)
C
LAB FUME
HOOD EXHAUST
OA
VP
EXHAUST
AIR
RETURN
AIR
FILTER HEATING COOLING
SUPPLY
AIR
SPACE
TEMPERATURE
T
H W
S H
W R
C W
S C
W R
C
FAN COIL UNITS
(FCU-1, 2, & 3)
GENERAL LABORATORY
(EF-3, 6, 14 & 15)
OA TEMP SENSOR
PROVIDE (1) PER
MECH. EQUIPMENT ROOM
LOCATE IN OA
INTAKE PLENUM
TS-1
SD-1
ES
NC
DP-1
FILTER HEATING
NO
TS-1
H W
S H
W R
Fs-1
COOLING DP-2 SUPPLY
FAN
SILENCER
S C
W S
S C
W R
FINAL
FILTER
HS-1
VFD-1 AIR FLOWRATE
SENSOR
TS-4
SD-2
SP-1
DSP-1
SUPPLY
AIR
ES
NC
C C
TS-2
TS-3
NC
C
LABORATORY AIR HANDLING UNIT
NO SCALE AHU - 1,2,4, AND 5
LAB FUME HOOD
EXHAUST
GENERAL LABORATORY SEQUENCE OF OPERATION:
1. GENERAL:
1.1. THE HIGH PLUME EXHAUST FAN SHALL HAVE ITS OWN FACTORY-INSTALLED CONTROL
SYSTEM WITH INDEPENDENT DDC AND ASSOCIATED CONTROLLER CONTAINED IN A FACTORY
INSTALLED UNIT-MOUNTED CONTROL PANEL. ALL PROGRAMS AND LOGIC REQUIRED FOR
THE FUNCTIONS AND SEQUENCES OF OPERATION DESCRIBED IN THE CONTRACT
DOCUMENTS SHALL RESIDE IN THE UNIT-MOUNTED CONTROLLER. THE CONTROLLERS AND
ASSOCIATED PROGRAMS SHALL BE CAPABLE OF OPERATING COMPLETELY INDEPENDENTLY
AND SHALL BE CONNECTED TO AND INTEROPERABLE WITH THE BUILDING AUTOMATION
SYSTEM (BAS) USING DDC.
1.2. ALL SENSORS, CONTROLLER SETTINGS, AND CONTROL MODULE SETTINGS SHALL BE TESTED
AND CALIBRATED IN ACCORDANCE WITH THE SEQUENCE OF OPERATION AS INDICATED.
1.3. ALL SET POINTS SHALL BE FIELD ADJUSTED DURING THE COMMISSIONING PROCESS TO
MEET THE REQUIREMENTS OF ACTUAL FIELD CONDITIONS.
1.4. ALL SET POINTS SHALL BE ADJUSTABLE (ADJ).
1.5. THE BAS SHALL MONITOR AND TREND ALL ANALOG VALUES EVERY 15 MINUTES. ALL
STATUSES SHALL BE TRENDED ON AN CHANGE OF VALUE. THE SYSTEM SHALL ARCHIVE THIS
INFORMATION FOR A MINIMUM OF 60 DAYS.
1.6. ALL POINTS SHALL BE PROVIDED WITH DYNAMIC COLOR DISPLAY.
2. CONTROL OPERATION:
2.1. WHEN THE SELECTOR SWITCH ON THE VFD IS INDEXED INTO THE “AUTO” POSITION, THE
EXHAUST FAN SHOULD BE CONTROLLED BY THE DDC EXHAUST FAN CONTROLLER VIA BAS.
WHEN THE SELECTOR SWITCH IS INDEXED INTO “HAND” POSITION, THE EXHAUST FAN MOTOR
SHALL BE ENERGIZED AND THE FAN SHALL RUN CONTINUOUSLY.
2.2. FANS SHALL BE ALTERNATED DAILY.
2.3. EXHAUST FAN SHALL RUN CONTINUOUSLY. BAS SHALL MONITOR DIFFERENTIAL PRESSURE
SENSORS LOCATED ON EACH FLOOR AND SHALL SELECT DP SENSOR REQUIRING THE
GREATEST DEMAND.
2.4. DISCHARGE AIR VELOCITY CONTROL: EXHAUST FAN CONTROLLER SHALL KEEP MONITORING
THE AIRFLOW RATE OF EACH EXHAUST OUTLET WITH AIRFLOW MEASURING STATION AND
MODULATE OUTSIDE AIR DAMPER(S) TO MAINTAIN THE FAN DISCHARGE VELOCITY AT ITS
MINIMUM 3500FPM. HOWEVER, THE OUTSIDE AIR DAMPER(S) SHALL CLOSE DURING START UP
OF THE FAN SYSTEM AND THEN SHALL MODULATE OPEN AS NEEDED AFTER EXHAUST STATIC
PRESSURE STABILIZES.
3. ALARMS:
3.1. ALARM: IF THE EXHAUST SYSTEM STATIC PRESSURE FALLS BELOW OR EXCEEDS THE SET
POINT FOR A PERIOD OF TIME IN EXCESS OF AN ADJUSTABLE ALARM DELAY PERIOD, A
STATIC PRESSURE ALARM CONDITION SHALL BE INDICATED TO EXHAUST FAN CONTROLLER
AND BAS WORKSTATION.
GENERAL LABORATORY SEQUENCE OF OPERATION:
1. GENERAL:
1.1. THE HIGH PLUME EXHAUST FAN SHALL HAVE ITS OWN FACTORY-INSTALLED CONTROL
SYSTEM WITH INDEPENDENT DDC AND ASSOCIATED CONTROLLER CONTAINED IN A FACTORY
INSTALLED UNIT-MOUNTED CONTROL PANEL. ALL PROGRAMS AND LOGIC REQUIRED FOR
THE FUNCTIONS AND SEQUENCES OF OPERATION DESCRIBED IN THE CONTRACT
DOCUMENTS SHALL RESIDE IN THE UNIT-MOUNTED CONTROLLER. THE CONTROLLERS AND
ASSOCIATED PROGRAMS SHALL BE CAPABLE OF OPERATING COMPLETELY INDEPENDENTLY
AND SHALL BE CONNECTED TO AND INTEROPERABLE WITH THE BUILDING AUTOMATION
SYSTEM (BAS) USING DDC.
1.2. ALL SENSORS, CONTROLLER SETTINGS, AND CONTROL MODULE SETTINGS SHALL BE TESTED
AND CALIBRATED IN ACCORDANCE WITH THE SEQUENCE OF OPERATION AS INDICATED.
1.3. ALL SET POINTS SHALL BE FIELD ADJUSTED DURING THE COMMISSIONING PROCESS TO
MEET THE REQUIREMENTS OF ACTUAL FIELD CONDITIONS.
1.4. ALL SET POINTS SHALL BE ADJUSTABLE (ADJ).
1.5. THE BAS SHALL MONITOR AND TREND ALL ANALOG VALUES EVERY 15 MINUTES. ALL
STATUSES SHALL BE TRENDED ON AN CHANGE OF VALUE. THE SYSTEM SHALL ARCHIVE THIS
INFORMATION FOR A MINIMUM OF 60 DAYS.
1.6. ALL POINTS SHALL BE PROVIDED WITH DYNAMIC COLOR DISPLAY.
2. CONTROL OPERATION:
2.1. WHEN THE SELECTOR SWITCH ON THE VFD IS INDEXED INTO THE “AUTO” POSITION, THE
EXHAUST FAN SHOULD BE CONTROLLED BY THE DDC EXHAUST FAN CONTROLLER VIA BAS.
WHEN THE SELECTOR SWITCH IS INDEXED INTO “HAND” POSITION, THE EXHAUST FAN MOTOR
SHALL BE ENERGIZED AND THE FAN SHALL RUN CONTINUOUSLY.
2.2. FANS SHALL BE ALTERNATED DAILY.
2.3. A MINIMUM OF ONE EXHAUST FAN SHALL RUN CONTINUOUSLY. BAS SHALL MONITOR
DIFFERENTIAL PRESSURE SENSORS LOCATED ON EACH FLOOR AND SHALL SELECT DP
SENSOR REQUIRING THE GREATEST DEMAND.
2.5. FAN CUT-IN: IF THE EXHAUST SYSTEM STATIC PRESSURE SET POINT CANNOT BE MAINTAINED WITH ONE EXHAUST FAN AT MAXIMUM FLOW RATES FOR A TIME INTERVAL OF 1 MINUTE (ADJ), EXHAUST FAN CONTROLLER SHALL START THE SECOND EXHAUST FAN. AFTER A TIME DELAY
OF 15 SECONDS (ADJ) WITH ITS MINIMUM SPEED OF 15 HZ (ADJ), THE FAN CONTROLLER
SHALL OPEN ITS ON-OFF AUTOMATIC AIR DAMPER GRADUALLY. VFD SHOULD NOT RAMP
ABOVE ITS MINIMUM FAN SPEED SET POINT UNTIL THE DAMPER HAS PROVEN OPEN. WHEN
THE DAMPER IS FULLY OPEN AS SENSED BY THE END SWITCH AT THE DAMPER, RECEIVING A
SIGNAL FROM THE EXHAUST SYSTEM STATIC PRESSURE SENSOR(S), THE EXHAUST FAN
CONTROLLER SHALL MODULATE THE FAN MOTOR SPEEDS VIA VFDS IN UNISON TO MAINTAIN
THE STATIC PRESSURE SET POINT.
2.6. FAN CUT-OUT: IF THE STATIC PRESSURE IS AT SET POINT AND TWO FANS ARE ON AND AT
64% SPEED (ADJ) FOR A TIME INTERVAL OF 5 MINUTES, THE EXHAUST FAN CONTROLLER
SHALL STOP THE SECOND EXHAUST FAN.
2.7. DISCHARGE AIR VELOCITY CONTROL: EXHAUST FAN CONTROLLER SHALL KEEP MONITORING
THE AIRFLOW RATE OF EACH EXHAUST OUTLET WITH AIRFLOW MEASURING STATION AND
MODULATE OUTSIDE AIR DAMPER(S) TO MAINTAIN THE FAN DISCHARGE VELOCITY AT ITS
MINIMUM 3500FPM. HOWEVER, THE OUTSIDE AIR DAMPER(S) SHALL CLOSE DURING START UP
OF THE FAN SYSTEM AND THEN SHALL MODULATE OPEN AS NEEDED AFTER EXHAUST STATIC
PRESSURE STABILIZES.
3. ALARMS:
3.1. ALARM: IF THE EXHAUST SYSTEM STATIC PRESSURE FALLS BELOW OR EXCEEDS THE SET
POINT FOR A PERIOD OF TIME IN EXCESS OF AN ADJUSTABLE ALARM DELAY PERIOD, A
STATIC PRESSURE ALARM CONDITION SHALL BE INDICATED TO EXHAUST FAN CONTROLLER
AND BAS WORKSTATION.
LABORATORY AIR HANDLING UNIT SEQUENCE OF OPERATION:
1. GENERAL:
1.1. THE AIR HANDLING UNIT (AHU) SHALL HAVE ITS OWN FACTORY-INSTALLED CONTROL SYSTEM WITH INDEPENDENT DDC AND ASSOCIATED CONTROLLER CONTAINED IN A FACTORY INSTALLED UNIT-MOUNTED CONTROL PANEL. ALL PROGRAMS AND LOGIC REQUIRED FOR THE FUNCTIONS AND SEQUENCES OF OPERATION DESCRIBED IN THE CONTRACT DOCUMENTS SHALL RESIDE IN THE UNIT-MOUNTED CONTROLLER. THE CONTROLLERS AND ASSOCIATED PROGRAMS SHALL BE CAPABLE OF OPERATING COMPLETELY INDEPENDENTLY AND SHALL BE CONNECTED TO AND INTEROPERABLE WITH THE BUILDING AUTOMATION SYSTEM (BAS) USING DDC.
CONTROLLER SHALL BE BACNET COMPLIANT.
1.2. ALL SENSORS, CONTROLLER SETTINGS, AND CONTROL MODULE SETTINGS SHALL BE TESTED AND CALIBRATED IN ACCORDANCE WITH THE SEQUENCE OF OPERATION
AS INDICATED.
1.3. ALL SET POINTS SHALL BE FIELD ADJUSTED DURING THE COMMISSIONING PROCESS TO MEET THE REQUIREMENTS OF ACTUAL FIELD CONDITIONS.
1.4. ALL SET POINTS SHALL BE ADJUSTABLE (ADJ).
1.5. PROVIDE HAND-OFF-AUTO ON ALL MAJOR EQUIPMENT.
1.6. THE BAS SHALL MONITOR AND TREND ALL ANALOG VALUES EVERY 15 MINUTES. ALL STATUSES SHALL BE TRENDED ON AN CHANGE OF VALUE. THE SYSTEM SHALL
ARCHIVE THIS INFORMATION FOR A MINIMUM OF 60 DAYS.
1.7. ALL POINTS SHALL BE PROVIDED WITH DYNAMIC COLOR DISPLAY
2. START/STOP:
2.1. THE UNIT SHALL BE STARTED AND STOPPED, BASED ON A TIME OF DAY SCHEDULE, THROUGH THE PROGRAM LOGIC RESIDING IN THE CONTROL SYSTEM AND AT THE
CONTROLLER, OR THROUGH OVERRIDE LOCATED ON THE CONTROLLER AND AT THE BAS.
3. COOLING AND HEATING:
3.1. THE CHILLED WATER AND HOT WATER CONTROL VALVES SHALL MODULATE TO RESET DISCHARGE AIR TEMPERATURE BETWEEN 55°F - 65°F BASED ON OUTSIDE AIR
TEMPERATURE.
4. SUPPLY FAN:
4.1. THE SUPPLY FANS SHALL OPERATE CONTINUOUSLY.
4.2. BAS SHALL MONITOR DIFFERENTIAL PRESSURE SENSORS LOCATED ON EACH FLOOR AND SHALL SELECT DP SENSOR REQUIRING THE GREATEST DEMAND.
4.3. ALL FOUR SUPPLY FANS IN EACH AHU SHALL OPERATE AT SAME SPEED.
4.4. AHU-1 & AHU-2 SUPPLY AIR FANS SHALL OPERATE AT SAME SPEED. EACH VFD SHALL MODULATE TO MAINTAIN A STATIC PRESSURE SET POINT.
4.5. AHU-3 & AHU-4 SUPPLY AIR FANS SHALL OPERATE AT SAME SPEED. EACH VFD SHALL MODULATE TO MAINTAIN A STATIC PRESSURE SET POINT.
5. SUPPLY AIR DUCT STATIC PRESSURE SET POINT:
5.1. THE BAS SHALL CONTINUOUSLY MONITOR THE DAMPER POSITION OF ALL VAV TERMINAL UNITS FLOOR BY FLOOR. THE SUPPLY AIR DUCT STATIC PRESSURES SHALL BE SENSED BY STATIC PRESSURE SENSORS LOCATED 3/4 DISTANCE DOWN EACH FLOOR RUN. SPECIFIC LOCATIONS OF DIFFERENTIAL SENSORS SHALL BE RECORDED ON AS-BUILTS AND SHOW ON BAS GRAPHICS. RECORD AND CLEARLY LABEL THE STATIC PRESSURE SET POINTS, FROM THE TAB PROCEDURE, FOR FUTURE REFERENCE. INITIAL STATIC PRESSURE SET POINT SHALL BE 1.5" (ADJ). MAXIMUM AND MINIMUM SETTING DEFINED BY TAB CONTRACTOR.
5.2. WHEN ANY VAV TERMINAL UNIT IS MORE THAN 95% (ADJ) OPEN, THE ASSOCIATED SUPPLY AIR DUCT STATIC PRESSURE SET POINT SHALL BE RESET UPWARD BY 5% (ADJ) OF THE MAXIMUM SYSTEM STATIC PRESSURE SET POINT AT A FREQUENCY OF 10 MINUTES (ADJ) UNTIL NO DAMPER IS MORE THAN 95% OPEN OR THE STATIC PRESSURE SET POINT HAS RESET UPWARD TO THE SYSTEM MAXIMUM SETTING OR THE VFD IS AT ITS MAXIMUM SETTING.
5.3. WHEN ALL VAV AIR DAMPERS ARE LESS THAN 85% (ADJ) OPEN, THEN THE ASSOCIATED SUPPLY AIR DUCT STATIC PRESSURE SET POINT SHALL BE RESET DOWNWARD
BY 5% (ADJ) OF THE CURRENT SYSTEM STATIC PRESSURE SET POINT AT A FREQUENCY OF 10 MINUTES (ADJ) UNTIL ANY DAMPER IS MORE THAN 85% OPEN OR THE STATIC PRESSURE SET POINT HAS RESET DOWNWARD TO THE SYSTEM MINIMUM SETTING OR THE VFD IS AT ITS MINIMUM SETTING.
5.4. THE CONTROL BANDS, SET POINT INCREMENT VALUES, SET POINT DECREMENT VALUES AND ADJUSTMENT FREQUENCIES SHALL BE ADJUSTED TO MAINTAIN STATIC PRESSURE OPTIMIZATION SETPOINT WITH STABLE SYSTEM CONTROL AND MAXIMUM COMFORT CONTROL.
6. EXHAUST AIR DUCT STATIC PRESSURE SET POINT:
6.1. THE BAS SHALL CONTINUOUSLY MONITOR THE DAMPER POSITION OF ALL VAV TERMINAL UNITS FLOOR BY FLOOR. THE EXHAUST AIR DUCT STATIC PRESSURES SHALL BE SENSED BY STATIC PRESSURE SENSORS LOCATED 3/4 DISTANCE DOWN EACH FLOOR RUN. SPECIFIC LOCATIONS OF DIFFERENTIAL SENSORS SHALL BE RECORDED ON AS-BUILTS AND SHOW ON BAS GRAPHICS. RECORD AND CLEARLY LABEL THE STATIC PRESSURE SET POINTS, FROM THE TAB PROCEDURE, FOR
FUTURE REFERENCE. INITIAL STATIC PRESSURE SET POINT SHALL BE 1.5" (ADJ).
6.2. WHEN ANY VAV TERMINAL UNIT IS MORE THAN 95% (ADJ) OPEN, THE ASSOCIATED EXHAUST AIR DUCT STATIC PRESSURE SET POINT SHALL BE RESET UPWARD BY 5% (ADJ) OF THE CURRENT SYSTEM STATIC PRESSURE SET POINT AT A FREQUENCY OF 10 MINUTES (ADJ) UNTIL NO DAMPER IS MORE THAN 95% OPEN OR THE STATIC PRESSURE SET POINT HAS RESET UPWARD TO THE SYSTEM MAXIMUM SETTING OR THE VFD IS AT ITS MAXIMUM SETTING.
6.3. WHEN ALL VAV AIR DAMPERS ARE LESS THAN 85% (ADJ) OPEN, THE THE ASSOCIATED EXHAUST AIR DUCT STATIC PRESSURE SET POINT SHALL BE RESET DOWNWARD BY 5% (ADJ) OF THE CURRENT SYSTEM STATIC PRESSURE SET POINT AT A FREQUENCY OF 10 MINUTES (ADJ) UNTIL ANY DAMPER IS MORE THAN 85% OPEN OR THE STATIC PRESSURE SET POINT HAS RESET DOWNWARD TO THE SYSTEM MINIMUM SETTING OR THE VFD IS AT ITS MINIMUM SETTING.
6.4. THE CONTROL BANDS, SET POINT INCREMENT VALUES, SET POINT DECREMENT VALUES AND ADJUSTMENT FREQUENCIES SHALL BE ADJUSTED TO MAINTAIN STATIC PRESSURE OPTIMIZATION SETPOINT WITH STABLE SYSTEM CONTROL AND MAXIMUM COMFORT CONTROL.
7. FREEZE PROTECTION:
7.1. A HARDWIRED, LOW LIMIT TEMPERATURE SWITCH SHALL BE ELECTRICALLY INTERLOCKED WITH THE VARIABLE SPEED DRIVE. IF THE LOW LIMIT TEMPERATURE SWITCH IS TRIPPED 38.0 DEG. F (ADJ.), THE OUTSIDE AIR DAMPER SHALL CLOSE, ALL VALVES SHALL OPEN TO 100% AND AN ALARM SHALL BE ANNUNCIATED AT THE BAS. A MANUAL RESET OF THE LOW LIMIT TEMPERATURE SWITCH SHALL BE REQUIRED TO RESTART THE FAN.
8. ALARMS:
8.1. FREEZE PROTECTION: THE FREEZE PROTECTION SEQUENCE SHALL BE INITIATED AND AN AN ALARM SHALL BE GENERATED UPON RECEIVING A FREEZESTAT STATUS.
8.2. HIGH STATIC PRESSURE SHUTDOWN: THE UNIT SHALL SHUT DOWN AND GENERATE AN ALARM WHEN THE SUPPY AIR STATIC PRESSURE IS ABOVE MAXIMUM STATIC
PRESSURE.
8.3. SMOKE DETECTION: THE UNIT SHALL SHUT DOWN AND GENERATE AN ALARM UPON RECEIVING A AIR SMOKE STATUS AND ISSUE AN ALARM TO THE BUILDING FIRE
ALARM SYSTEM.
8.4. SUPPLY FAN FAILURE: COMMANDED ON BUT THE STATUS IS OFF.
8.5. HIGH SUPPLY AIR STATIC PRESSURE: IF THE SUPPLY AIR STATIC PRESSURE IS 25% (ADJ) GREATER THAN SET POINT.
8.6. LOW SUPPLY AIR STATIC PRESSURE: IF THE SUPPLY AIR STATIC PRESSURE IS 25% (ADJ) LESS THAN SET POINT.
8.7. .EXHAUST FAN FAILURE: COMMANDED ON BUT THE STATUS IS OFF.
8.8. SUPPLY FAN VFD FAULT.
8.9. HIGH SUPPLY AIR TEMPERATURE: IF THE SUPPLY AIR TEMPERATURE IS 5°F (ADJ) GREATER THAN SET POINT.
8.10. LOW SUPPLY AIR TEMPERATURE: IF THE SUPPLY AIR TEMPERATURE IS LESS THAN 45°F (ADJ).
8.11. HIGH RETURN AIR HUMIDITY: IF THE RETURN AIR HUMIDITY IS GREATER THAN 70% (ADJ).
8.12. LOW RETURN AIR HUMIDITY: IF THE RETURN AIR HUMIDITY IS LESS THAN 30% (ADJ).
8.13. ALL FILTERS: FILTER DIFFERENTIAL PRESSURE EXCEEDS A USER DEFINABLE LIMIT (ADJ).
8.14. HIGH PRESSURE WATER HUMIDIFICATION SYSTEM PUMP VFD VAULT.
8.15. GENERAL ALARM FROM HIGH PRESSURE WATER HUMIDIFICATION SYSTEM CONTROL PANEL.
FAN COIL UNIT SEQUENCE OF OPERATION:
THE OPERATION MODE SHALL BE DETERMINED THROUGH BAS WITH MANUAL OVERRIDE.
A. OPERATION MODE:
1. THE UNIT FAN SHALL BE ENERGIZED.
2. THE HEATING COIL VALVE SHALL MODULATE IN SEQUENCE TO MAINTAIN A 70°F SPACE HEATING SET-POINT.
3. THE COOLING COIL VALVE SHALL MODULATE IN SEQUENCE TO MAINTAIN A 75°F SPACE COOLING SET-POINT.
4. THE CONTROLLER SHALL PREVENT:
a. THE HEATING SET-POINT FROM EXCEEDING THE COOLING SET-POINT MINUS 5°F (I.E. THE MINIMUM DEAD-BAND
SHALL BE 5°F).
DDC CONTROLLER INPUT/OUTPUT SUMMARY
DDC CONTROLLER INPUT/OUTPUT LEGEND ANALOG IN ANALOG OUT BINARY IN BINARY OUT TRENDING GENERAL
CA
RB
ON
DI
OX
ID
E
CA
RB
ON
MO
NO
XI
DE
CU
RR
EN
T
FL
OW
HU
MI
DI
TY
MA
SS
-A
IR
F
LO
W
PO
SI
TI
VE
FE
ED
BA
CK
PR
ES
SU
RE
TE
MP
ER
AT
UR
E
VA
LV
E
MO
DU
LA
TI
ON
VA
RI
AB
LE
SP
EE
D
CO
NT
RO
L
CO
NT
RO
L P
OI
NT
AD
JU
ST
ME
NT
PE
RC
EN
T
OP
EN
SP
EE
D/
LE
VE
L/F
L
OW
FL
OW
S W
IT
CH
EN
D
SW
IT
CH
ST
AT
US
/P
RO
OF
AU
XI
LIA
RY
CO
NT
AC
TS
OP
EN
/C
LO
SE
ON
/O
FF
ST
AR
T/
ST
OP
HI
GH
/LO
W
MI
SC
EL
LA
NE
OU
S
TR
EN
D
EV
ER
Y
MI
NU
TE
S
TR
EN
D
EV
ER
Y
HO
UR
TR
EN
D
BY
EX
CE
PT
IO
N
AL
L P
OI
NT
LO
G
AL
AR
M
SU
MM
AR
Y
LO
G
ST
AT
US
SU
MM
AR
Y
LO
G
TI
ME
E
VE
NT
LO
G
AU
DI
BL
E
AL
AR
M
GR
AP
HI
C
DI
SP
LA
Y
EM
AI
L + T
EX
T
ME
SS
AG
E
CONTROL DEVICE
TAG ID DESCRIPTION
AFMS-1 OUTDOOR AIR FLOW MONITORING…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .