This federal contract opportunity notice describes a solicitation for the modernization of the Agricultural Research Service Technology Center in Salinas, California. The project involves demolishing outdated buildings and constructing new research facilities in two phases, including a West and East Lab/Office building and a Headhouse/Greenhouse. Construction services will be provided through a design-bid-build project delivery method using completed design drawings and specifications. The estimated period of performance is 1440 calendar days. The North American Industry Classification System code is 236220 and the small business set-aside size standard is $36.5 million. The contract will be awarded using best value tradeoff including past performance, team experience, and project approach, with all factors other than cost being approximately equal to price. Bid bonds are required and performance and payment bonds will be required of the successful offeror. The solicitation is anticipated to be posted on August 28, 2019 with a pre-bid walkthrough on September 12 and proposals due on October 11.

Volume 2

View the file

Other files

Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SYMBOLS, ABBREVIATIONS,

LEGEND, AND INDEX OF

DRAWINGS VOL. 2

G001

A B C D E F G H J K L M N O P Q R S T U V W X Y

SANITARY BASIN

PROVIDE COVER OVER

THE SANITARY BASIN

PHASE 2 ALTERNATE

NO. 3001

HEADHOUSE / GREENHOUSE PLAN VIEW

SCALE 1/8" = 1'-0"

FLOOR SLAB

EL 0' - 0"

TOP OF KNEEWALL

EL 2' - 6"

TOP OF KNEEWALL

EL 2' - 6"

FLOOR SLAB

EL 0' - 0"

PEA GRAVEL

GS-100

GS-100

GS-100

GS-100

TOP OF CONCRETE AT EL. 2'-6" FOR

ALL GREENHOUSE KNEEWALLS,

TYP. UNO

TOP OF CONCRETE

AT EL. 4'-0"

TWO WALLS ONLY

TOP OF CONCRETE

AT EL. 4'-0" FOR

SCREENBOX, TYP.

DOOR DOOR DOOR

DOOR

DOOR

DOOR

DOOR

SLAB ON GRADE

SLAB ON GRADESLAB ON GRADE

SLAB ON GRADE

EL. 0

HH.15

HH.13

HH.10

HH.03

HH.01

HH.17 HH.18

SLAB ON GRADE

PEA

GRAVEL

INSIDE

PEA

GRAVEL

INSIDE

FOC

DOOR

OPENING

FOC

FUNNEL

DRAIN

DOOR

KNEEWALL ON GRID 1

THIS PART FOR BLOCKS "A" AND "B" ONLY

(SCREEN BOX)

DOOR OPENING

DOOR

OPENING

10'-0" X 10'-0"

EXT. SLAB

10'-0" X 10'-0"

EXT. SLAB

10'-0" X 10'-0"

EXT. SLAB

ACTUAL FLOOR ELEVATION: REFER TO CIVIL DWG

FLOOR SLAB

EL 0' - 0"

TOP OF KNEEWALL

EL 4' - 0"

DOOR

OPENING

TOP OF KNEEWALL

EL 2' - 6"

4'-0" HIGH WALL ON GRID 12

AT THAT LOCATION

4' HIGH WALL. DOWN TO

2'-6" NORTH OF GRID 12.

BLOCK "A" LINK SECTION

SCALE 1/4" = 1'-0"

GS-100GS-100GS-100GS-100

GS-100GS-100

GS-100

GS-100

GS-100 GS-100

GS-100GS-100

FLOOR SLAB

EL 0' - 0"

SLAB ON

GRADE

FLOOR SLAB

EL 0' - 0"

SANITARY PIT FLOOR

EL -4' - 10"

SANITARY BASIN PIT

SCALE 1/4" = 1'-0"

GS-100GS-100

GS-100

GS-100

HH.04

HH.11

HH.12

SOLID

INTERCEPTOR

FUNNEL

DRAIN

TYPICAL SLAB-ON-GRADE

JOINT PATTERN, SEE

DWG. S301

DOOR

BOLLARD

TOP OF KNEEWALL

EL 0' - 8"

TYPICAL SLAB-ON-GRADE

JOINT PATTERN, SEE

DWG. S301

FOOTING

SEE

GS-106GS-100

TYP.

SEE 2/GS-106

GS-106

TYP

GS-106

TYP

GS-106

TYP

G S

T Y

P

VOLUME 1

F O

C

GS-106

TYP

Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:24:52 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\1312 GS-100 FOUNDATION.dwg Save Date: 04/12/2019 09:16 AM

HEADHOUSE GREENHOUSE

FOUNDATION PLAN

GS-100

TOP OF CONCRETE

AT EL. 8'-4"

NEW UNCOMPACTED SANDY

LOAM TOPSOIL

1'-6" DEEP

SLAB ON GRADE

COMPACTED LOCAL

SOIL

COMPACTED LOCAL

SOIL

NEW UNCOMPACTED SANDY

LOAM TOPSOIL

1'-6" DEEP

NEW UNCOMPACTED SANDY

LOAM TOPSOIL

SLAB ON GRADE

UNDISTURBED

SOIL

UNDISTURBED

SOIL

FOOTING

UNDISTURBED

SOIL

G16G15G14G13G12G11G10G9G8G7G6G5G4G3G2G1

GA

GB

GC

GD

GD

FINISH INTERIOR

ELEVATION AND

GRADE OUTSIDE

EL 0' - 0"

TOP OF KNEEWALL

EL 1' - 6"

ISOLATION UNIT PLAN VIEW

SCALE 1/4" = 1'-0"

GS-105 GS-105

ISOLATION UNIT TYPICAL SECTION

SCALE: 1 1/4" = 1'-0"GS-105

GS-105

GA

GC

GB

SOIL SURFACE

DOOR

TOP OF KNEEWALL

EL 1' - 6"

ISOLATION UNIT TYPICAL ELEVATION

SCALE 1 1/4" = 1'-0"GS-105

GS-105

SOIL SURFACE

AIR EXHAUST SLEEVE

AT ODD GRIDS, Ø7"

FRENCH DRAIN

GS-105

GS-105

AIR EXHAUST SLEEVE

AT ODD GRIDS Ø7"

INTERIOR KNEEWALL

WHERE REQUIRED

10" x 28" HVAC DUCT

SEE GM-145 FOR AIR

DISTRIBUTION SYSTEMS

AIR SUPPLY SLEEVE

AT EVEN GRIDS 12" x 30"

ADDITIONAL CORE DRILLING

WILL BE REQUIRED FOR WATER

SERVICES, TYPE Ø1" MAX HOLES

ACTUAL FLOOR ELEVATION: REFER TO CIVIL DWG

AIR EXHAUST SLEEVE

AT ODD GRIDS, Ø7"

INTERIOR KNEEWALL

WHERE REQUIRED

AIR EXHAUST SLEEVE

AT ODD GRIDS, Ø7"

COLLECTOR

TO POND AT SOUTH

FINISH INTERIOR

ELEVATION AND

GRADE OUTSIDE

EL 0' - 0"

BOTTOM FILLED SOIL /

TOP OF DUCT OPENING

EL -1' - 6"

TOP OF FOOTING

EL -2' - 6"

INVERT AT GRID G1

EL = SEE CIVIL

Ø 4" FRENCH DRAIN.

DRAIN TO POND ON SOUTH, SEE CIVIL

INVERT AT GRID G1

EL = SEE CIVIL

INVERT - SEE CIVIL

SLAB STARTS AT ± 20'-4"

WEST OF BUILDING 22.

FIELD VERIFY

BOTTOM FILLED SOIL /

TOP OF DUCT OPENING

EL -1' - 6"

TOP OF FOOTING

EL -2' - 6"

5" CONCRETE SLAB ON GRADE

WITH 1/4" X 1/4"-W 1/8" X 1/8" WWF

LOCATED 1" FROM TOP OF SLAB

CLR

Ø4" FRENCH DRAIN.

DRAIN TO RETENTION

BASIN ON SOUTH.

SEE PLUMBING FOR PIPE

LAYOUT

FOOTING TYP

SLAB ENDS AT MINIMUM 4'-11" EAST

OF BUILDING 39C. FIELD VERIFY

BOTTOM OF WALL

GS-106GS-105

PROVIDE 1" GAP

OPEN OPEN

AIR SUPPLY SLEEVE

AT EVEN GRIDS 12" X 30"

OPEN

GS-106GS-105

TYP.

OPEN OPEN OPEN

PROVIDE 1" GAP

BELOW GRADE

DUCTWORK, SEE

MECH.

GS-105 GS-105

TYP

TYP

T Y

P

G13G12G11G10

TYP

Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:24:58 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\1312 GS-105 ISOLATION UNIT FOUNDATION.dwg Save Date: 04/12/2019 09:16 AM

ISOLATION UNIT

FOUNDATION PLAN

GS-105

ADDITIONAL REBAR AT SLEEVES

SCALE: 1 1/2"=1'-0"

PILASTER REINF. DETAIL AT HEADHOUSE

SCALE: 1 1/2"=1'-0"

TYPICAL SECTION AT HEADHOUSE

SCALE: 1 1/2"=1'-0"

TYPICAL SECTION AT ISOLATION UNIT

SCALE: 1 1/2"=1'-0"

TYPICAL SECTION AT GREENHOUSE

SCALE: 1 1/2"=1'-0"

SECTION

SCALE: 1 1/2"=1'-0"

TYPICAL FOOTING AT GREENHOUSE

SCALE: 1 1/2"=1'-0"

Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:25:01 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\1312 GS-106 FOUNDATION SECTIONS.dwg Save Date: 04/12/2019 09:17 AM

GREENHOUSE-HEADHOUSE

FOUNDATION SECTIONS

AND DETAILS

GS-106

ROOF ACCESS ASSEMBLY

SCALE 1/8" = 1'-0"GS-110

GS-110

GLASS

TRUSS LINE

TYPICAL

FOR A-8, A-10 AND

B-10 ONLY

SEE DETAILS

ON GM-140

"X" BRACE

0.5" STEEL

ROD, TYPICAL

UNASSIGNED

PLANT PATH.PLANT PATH.

PLANT PATH.PLANT PATH.

PLANT PATH.PLANT PATH.

PLANT PATH.PLANT PATH.

PLANT PATH.

PLANT

BRDG

CROPCROPBIOLOGY

BIOLOGY

BIOLOGY

BIOLOGY

BIOLOGY

CROPCROP

CROP

CROP

CROP

PLANT

BRDG

PLANT

BRDG

UNASSIGNED UNASSIGNED

PLANT

BRDG

PLANT

BRDG

C09

C07

C05

C03

C01

C08

C10

C06

C04

C02

B09

B07

B05

B03

B01

B11

B08

B06

B04

B02

A09

A07

A05

A03

A01

A11

A10

A08

A06

A04

A02

B10

CORRIDOR CORRIDOR CORRIDOR

A B C D E F G H J K L M N O P Q R S T U V W X Y

PHASE 2 ALTERNATE

NO. 3001

GS-110

GS-140

GS-110

GS-140

GS-110

GS-140

GS-140

GS-110

GS-140

GS-110

GS-110

GS-140

GS-110

GS-140

GS-110GS-130

GS-110 GS-130

GS-110

GS-130

GS-130

GS-110

GS-110

GS-110

GS-110

GS-120

GS-110

GS-150

GS-110

GS-120

GS-110

GS-150

GS-110

GS-110

GS-110

GS-110

PEAK

EL ± 14' - 11"

FLOOR SLAB

EL 0' - 0"

TOP OF KNEEWALL

EL 2' - 6"

UNDER GUTTER

EL 12' - 0"

U/S OF PERIMETER GIRT

EL 11' 6"

U/S OF GIRT

EL 7' - 2"

FLOOR SLAB

EL 0' - 0"

TOP OF KNEEWALL

EL 2' - 6"

UNDER GUTTER

EL 12' - 0"

U/S OF PERIMETER GIRT

EL 11' - 7"

U/S OF GIRT

EL 7' - 2"

GREENHOUSE PLAN VIEW

SCALE 1/8"=1'-0"

0.1% BUILDING SLOPE0.1% BUILDING SLOPE

PEA GRAVEL

6" THICK

GS-110 GS-120

GS-110

GM-140

SEE GM-110 FOR VENT INFORMATION

SEE GM-110 FOR

SASH INFORMATION

SEE PLAN VIEW FOR EXTEND

OF SCREENBOX

SPECIAL CONCRETE

HEIGHT ON THIS WALL

SEE STRUCTURAL

GS-100 AND GS-106

GS-110

GS-130

A07 A08

A09 A10

A05 A06

A03 A04

A01 A02

A11A

A11B

B09 B10

B11A

B07 B08

B05 B06

B03 B04

B01 B02

B11B

C09

C08

C10A

C07

C05 C06

C03 C04

C01 C02

C10B

PEAK

EL ± 19' - 10"

FLOOR SLAB

EL 0' - 0"

TOP OF KNEEWALL

EL 2' - 6"

TOP OF GIRT

EL 3' - 6"

U/S OF GIRT

EL 7' - 2"

UNDER GUTTER

EL 12' - 0"

U/S OF PERIMETER GIRT

EL 11' - 7"

26¡0'0"

ABOVE 4'-0"

GS-110

GS-140

GS-140

GS-110

BETWEEN

2'-6" & 4'-0"

GS-110

GS-140

26¡ 0' 0"

GS-110

GS-110

TOP VIEW

HORIZONTAL

DIMENSIONS

ALUMINUM SAFETY

GRATING WELDED ON

RAFTERS

PRE CAMBERED

ALUMINUM RAFTER

PLASTIC CAP AT EACH LEGS.

ADAPT SHADE TO SIT ON

LOWER VENT EXTRUSION

QTY: 2 ASSEMBLIES REQUIRED FOR THE PROJECT

ALUMINUM SAFETY GRATING

"X" BRACE

0.5" STEEL ROD

TYPICAL

GS-110

GS-140

TRUSS TYPICAL

TRUSS TYPICAL

0.5" STEEL ROD

TYPICAL

GS-110GS-110

PEAK

EL ± 14' - 11"

FLOOR SLAB

EL 0' - 0"

UNDER GUTTER

EL 12' - 0"

U/S OF PERIMETER GIRT

EL 11' - 7"

U/S OF GIRT

EL 7' - 2"

OFF

TRUSS

"X" BRACE ON GRID

OFFSET "X" BRACE

ROOF "X" BRACE

XXX COMPARTMENT NUMBER

XXX DOOR NUMBER (GS-150)

LEGEND

TOP OF KNEEWALL

EL 4' - 0"

TOP OF KNEEWALL

EL 2'-6"

4'-0" HIGH WALL.

DOWN TO 2'-6" NORTH OF GRID 12.

U/S OF PERIMETER GIRT

EL 11' - 7"

TOP OF KNEEWALL

EL 2' - 6"

FLOOR SLAB

EL 0' - 0"

PROVIDE ALUMINUM

SHEET PANEL ABOVE DOOR

SASH

SERVICES ENTRY / ALL DOORS

SCALE 1" = 2'-0"GS-110

GS-110 TYPICAL

GS-110 GS-110

LOWER END TO FIT

SAFELY IN GUTTER

SEE GM-140

SEE GM-140

PEAK

EL ± 15' - 0"

ROOF "X" BRACE

TYP.

ROOF "X" BRACE

TYP.

ROOF "X" BRACE

TYP.

PROVIDE ALUMINUM

SHEET PANEL ABOVE DOOR

PROVIDE ALUMINUM

SHEET PANEL ABOVE DOOR

Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:25:08 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\1312 GS-110 STRUCTURE.dwg Save Date: 04/12/2019 09:17 AM

GREENHOUSE STRUCTURE

GS-110

FLOOR SLAB

EL 0' - 0"

U/S OF GUTTER

EL 12' - 0"

PEAK

EL ± 19' - 10"

TOP OF KNEEWALL

EL 2' - 6"

Q JKLMNOPY RSTVWX H ABCDEFG

GREENHOUSE NORTH ELEVATION

SCALE 1/8"=1'-0"GS-110

GS-120

GREENHOUSE EAST ELEVATION

SCALE 3/16"=1'-0"GS-110

GS-120

PEAK

EL ± 19' - 10"

FLOOR SLAB

EL 0' - 0"

U/S OF GUTTER

EL 12' - 0"

TOP OF KNEEWALL

EL 2' - 6"

GLAZING SEE SCHEDULE ON GS-110

WHITE ACRYLIC

SEE SCHEDULE ON GS-110

UNIT HEATER

POWER VENTS

PEAK

EL 13' - 4"

13 12 11 10 9 8 7 6 5 4 3 2 114

GREENHOUSE WEST ELEVATION

SCALE 3/16"=1'-0"GS-110

GS-120

PEAK

EL ± 19' - 10"

FLOOR SLAB

EL 0' - 0"

U/S OF GUTTER

EL 12' - 0"

TOP OF KNEEWALL

EL 2' - 6"

GLAZING SEE SCHEDULE ON GS-110

WHITE ACRYLIC

SEE SCHEDULE ON GS-110

UNIT HEATER POWER VENTS.

PROVIDE GALVANIZED STEEL SHEET AROUND

UNIT HEATER FLUE PIPE (TYPICAL)

PEAK

EL 13' - 4"

13121110987654321 14

TOP OF KNEEWALL

EL 4' - 0"

SEE HA-200

SEE HA-200

SPECIAL CONCRETE CONDITION

ON GRIDS "12" AND "D" IN THIS AREA.

SEE GS-100 AND GS-110

U

CAPPED GUTTER

CAPPED GUTTER

Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:25:14 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\1312 GS-120 ELEVATIONS.dwg Save Date: 04/12/2019 09:18 AM

GREENHOUSE ELEVATIONS

GS-120

INTERIOREXTERIOR

INTERIOR EXTERIOR

REPLACE GLASS WITH GALVANIZED STEEL SHEET

FOR POWER VENT PIPE WHERE INDICATED.

SEE GS-120 AND GM-210

REPLACE GLASS WITH GALVANIZED STEEL SHEET

FOR POWER VENT PIPE WHERE INDICATED.

SEE GS-120 AND GM-210

GUTTER

ALUMINUM FLASHING

ALUMINUM FLASHING

ALUMINUM FLASHING

CAULKING

CAULKING

CORRIDOR

SIDE

GREENHOUSE

SIDE

PERIMETER GIRT

GLASS

RAIL

DRIVE SHAFT

RACK

SASH

GLASS

U/S OF GUTTER

EL 12' - 0"

U/S OF PERIMETER GIRT / TRUSS

EL 11' - 7"

ALUMINUM EXTRUSION

2¡

CORRIDOR WALL SECT.

SCALE 1"=1'-0"GS-110

GS-130

ALUMINUM FLASHING.

SEAL THOROUGHLY BETWEEN

COMPARTMENTS

CAULKING

CAULKING

GIRT

PARTITION WALL SECT.

SCALE 1"=1'-0"GS-110

GS-130

GLASS

RAFTER

ALUMINUM EXTRUSION

PERIMETER GIRT

PERIMETER GIRT

ALUMINUM EXTRUSION

'Z' BAR

BUTT

JOINTS

BOTTOM SILL

GROUT UNDER FLASHING

CAULKING ON

BOTH SIDES

GLASS

TOP OF KNEEWALL

EL 2' - 6"

FLOOR SLAB

EL 0' - 0"

U/S OF GIRT

EL 7' - 2"

U/S OF GUTTER

EL 12' - 0"

U/S OF PERIMETER GIRT / TRUSS

EL 11' - 7"

GRID

SIDE WALL SECT.

SCALE 1"=1'-0"GS-110

GS-130

GROUT UNDER FLASHING

ALUMINUM FLASHING

CAULKING ON

BOTH SIDES

ALUMINUM TOP EXTRUSION

FLOOR SLAB

EL 0' - 0"

TOP OF KNEEWALL

EL 2' - 6"

U/S OF GUTTER

EL 12' - 0"

U/S OF PERIMETER GIRT / TRUSS

EL 11' - 7"

U/S OF GIRT

EL 7' - 2"

GIRT

BOTTOM SILL

EXHAUST FAN

SEE GM-130

CAULKING

ALUMINUM FLASHING

CAULKING

GLASS

DRIP GUTTER

TOP OF GIRT

EL 3' 6 3/8"

GLASS

PERIMETER GIRT

ALUMINUM FLASHING

ALUMINUM FLASHING

GABLE END

PERIMETER GIRT

GIRT

GABLE END SECT.

SCALE 1"=1'-0"

GS-110

GS-130

ROOF PURLIN

ALUMINUM EXTRUSION

GUTTER (BEYOND)

ALUMINUM

EXTRUSION

'Z' BAR

BUTT

JOINTS

BOTTOM SILL

U/S OF GUTTER

EL 12' - 0"

U/S OF PERIMETER GIRT /TRUSS

EL 11' - 7"

INSECT SCREEN

LINK WALL SECT.

SCALE 1"=1'-0"GS-110

GS-130

GROUT UNDER FLASHING

ALUMINUM FLASHING

CAULKING ON

BOTH SIDES

TOP OF KNEEWALL

EL 2' - 6"

U/S OF GUTTER

EL 12' - 0"

U/S OF PERIMETER GIRT / TRUSS

EL 11' - 7"

CAULKING

GRID

5/8" WHITE ACRYLIC

ALUMINUM FLASHING

U/S OF GIRT

EL 7' - 2"

BOTTOM SILL

CAULKING

NEOPRENE WASHER

OR ALUMINUM EXTRUSION

INSULATED SPANDREL

PANEL BELOW EXHAUST FANS

SASH.

REFER TO GM-120

HALF-CAP GUTTERS

AT NORTH END

ALUMINUM FLASHING

TO SEAL COMPARTMENT

FULLCAP GUTTERS

AT SOUTH END

GLASS

GLASS

GLASS

GLASS

GLASS

GRIDGRID

FLOOR SLAB

EL 0' - 0"

TOP OF KNEEWALL

EL 2' - 6"

FLOOR SLAB

EL 0' - 0"

U/S OF GIRT

EL 7' - 2"

TOP OF KNEEWALL

EL 2' - 6"

FLOOR SLAB

EL 0' - 0"

U/S OF GIRT

EL 7' - 2"

GENERAL NOTE

1) PERIMETER GIRTS ARE REQUIRED AND

MANDATORY WHERE INDICATED REGARDLESS

OF STRUCTURAL IMPORTANCE IN

GREENHOUSE SYSTEM

2) ALL KNEEWALLS TO BE COVERED WITH

FLASHING. REFER TO SPECIFICATIONS

3) GLASS ON INTERIOR WALLS MUST BE ENTIRELY

WITHIN POST DEPTH, INCLUDING GLASS BARS

AND BAR CAPS

INTERIOR EXTERIOR

1" MIN., 2" MAX. 1" MIN., 2" MAX. 1" MIN., 2" MAX. 1" MIN., 2" MAX. 1" MIN., 2" MAX.

CAULKING ON

BOTH SIDES

CAULKING ON

BOTH SIDES

Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:25:18 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\1312 GS-130 WALL SECTIONS.dwg Save Date: 04/12/2019 09:18 AM

GREENHOUSE WALL

SECTIONS

GS-130

PARTITION WALL

SCALE 1 1/2"=1'-0"GS-110

GS-140

EXTERIOR COLUMN VS PARTITION WALL

SCALE 1 1/2"=1'-0"GS-110

GS-140

GLASS

CONCRETE KNEEWALL 2' 6" HIGH

ALUMINUM EXTRUSION

ALUMINUM FLASHING

A

NOTE:

1 - ON PARTITION WALLS: GLAZING SHALL CLEAR

FACE OF COLUMN AS SHOWN ON THIS SHEET

2 - REFER TO GLAZING SCHEDULE ON GS-110

FOR DETAILED MATERIAL AND LOCATIONS

INTERIOR COLUMN AT PLANT PATH.

ROOM AND HEADHOUSE CORRIDOR

SCALE 1 1/2"=1'-0"

GS-110

GS-140

EXTERIOR COLUMN

SCALE 1 1/2"=1'-0"GS-110

GS-140

EXTERIOR COLUMN VS CORRIDOR

SCALE 1 1/2"=1'-0"GS-110

GS-140

GLASS

CONCRETE

KNEEWALL

ALUMINUM EXTRUSION

STEEL POST

4" X 4"

GRID

GRID

GLASS. MUST CLEAR

FACE OF COLUMN FOR

PERIMETER GIRT INSTALLATION

STEEL POST

4" X 4"

CONCRETE KNEEWALL

GRID

GRID

GLASS

ALUMINUM EXTRUSION

GRID

GRID

STEEL POST

4" X 4"

CONCRETE KNEEWALL

GLASS

ALUMINUM EXTRUSION

CONCRETE KNEEWALL

ALUMINUM EXTRUSION

STEEL POST

4" X 4"

GRID

GRID

GRID

GRID

ALUMINUM EXTRUSION

STEEL POST

4" X 4"

CONCRETE KNEEWALL

SPACER

CAULKING

ALUMINUM FLASHING

CORRIDOR VS PARTITION WALL

SCALE 1 1/2"=1'-0"GS-110

GS-140

CONCRETE KNEEWALL

STEEL POST

4" X 4"

GRID

GLASS

11Ga GALVANIZED STEEL STRUCTURAL

PLATE SECURED TO POST

VERTICAL ALUMINUM EXTRUSION

ALUMINUM FLASHING

0.5" WHITE ACRYLIC

OFFSET "X" BRACE

WHERE INDICATED

OFFSET "X" BRACES WHERE

INDICATED ON FLOOR PLAN

"X" BRACE 0.5" STEEL ROD

LOCATE "X" BRACES ON GRID

WHERE INDICATED ON FLOOR PLAN

LOCATE "X" BRACES ON GRID

WHERE INDICATED ON FLOOR PLAN

GLASS

CONCRETE KNEEWALL

ALUMINUM EXTRUSION

STEEL POST

4" X 4"

ALUMINUM FLASHING

GRID

GRID

"X" BRACE 0.5" STEEL ROD

STEEL POST

4" X 4"

EXTERIOR CORNER COLUMN

SCALE 1 1/2"=1'-0"

GS-110

GS-140

"X" BRACE

GLASS

CONCRETE KNEEWALL 2' 6" HIGH

ALUMINUM EXTRUSION

STEEL POST

4" X 4"

ALUMINUM FLASHING

A

"X" BRACE 0.5" STEEL ROD

"X" BRACE 0.5" STEEL ROD

EXTERIOR CORNER COLUMN

SCALE 1 1/2"=1'-0"

GS-110

GS-140

BETWEEN 2' 6" & 4'

EXTERIOR CORNER COLUMN

SCALE 1 1/2"=1'-0"

GS-110

GS-140

ABOVE 4'

ALUMINUM EXTRUSION

OFFSET "X" BRACE

WHERE INDICATED

0.5" STEEL ROD

KNEEWALL 4' HIGH

INSULATE, FLASH AND SEAL AGAINST

CONCRETE KNEEWALL OF GRID 12

CONCRETE KNEEWALL 4' HIGH

GLASS

GLASS. MUST CLEAR

FACE OF COLUMN FOR

PERIMETER GIRT INSTALLATION

- FLASHING OVER ALL KNEEWALLS IS MANDATORY

BUT NOT SHOWN ON THIS SHEET FOR CLARITY

GENERAL NOTE

GLASS. MUST CLEAR

FACE OF COLUMN FOR

PERIMETER GIRT INSTALLATION

DOOR TO GREENHOUSE COMPARTMENT

DOOR FRAME.

SEAL TO CONCRETE AND SPACER

GLASS. MUST CLEAR

FACE OF COLUMN FOR

PERIMETER GIRT INSTALLATION

OFFSET "X" BRACE

WHERE INDICATED

0.5" STEEL ROD

OFFSET "X" BRACE

WHERE INDICATED

0.5" STEEL ROD

JX HEADHOUSE GREENHOUSE LINKS

SCALE 1 1/2"=1'-0"GS-110

GS-140 BETWEEN 762 AND 3856 LEVEL

STEEL POST

4" X 4"

CONCRETE KNEEWALL

ALUMINUM

EXTRUSION

0.5" WHITE ACRYLIC

HEADHOUSE WALL

B Y

G

R E

E H

O U

S E

C

O N

T R

A C

T O

R

Y

G

R E

E H

O U

S

C

N

T R

A C

T O

R

Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:25:22 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\1312 GS-140 STR AND GLAZ.dwg Save Date: 04/12/2019 09:32 AM

GREENHOUSE -

STRUCTURAL & GLAZING

DETAILS

GS-140

EXTEND FRAME FOR

DOUBLE DOORS

F1D5

DOOR TYPES : FRAME TYPES :

3.5' X 7' (INTERIOR)

ALUMINUM

D7

INSULATED

GLASS

7' X 8' (EXTERIOR)

ALUMINUM

D8

7' X 8' (INTERIOR)

ALUMINUM

SCHEDULED

DOOR

WIDTH

FRAME DETAIL

AA

SECTION A-A

GLASS

ALUMINUM DOOR FRAME

CONCRETE KNEEWALL

GLASS

ALUMINUM EXTRUSION

STEEL POST

CAULKING ON

BOTH SIDE

GLASS

ALUMINUM EXTRUSION

ALUMINUM FLASHING

COMPARTMENT DOOR

SCALE 1 1/2"=1'-0"GS-110

GS-150

TYPICAL

GRID

SPACER

CAULKING ON

BOTH SIDES

ALUMINUM FLASHING

DOOR FRAME.

SEAL TO CONCRETE AND SPACER

CAULKING ON BOTH SIDES

STEEL POST

GLASS

Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:25:26 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\1312 GS-150 DOORS & SCHED.dwg Save Date: 04/12/2019 09:33 AM

GREENHOUSE - DOORS &

SCHEDULES

GS-150

SIDE VIEWFRONT VIEW

GS-160

GS-160

M/E AREA

G16G15G14G13G12G11G10G9G8G7G6G5G4G3G2G1

GA

GB

GC

GD

ISOLATION UNIT PLAN VIEW

SCALE 1/4"=1'-0"

GRADE

EL 0' - 0"

TOP OF KNEEWALL

EL 1' - 6"

GS-160 GS-160

GS-160

GS-160

GB GA

26¡0'0"

ISOLATION UNIT SOUTH ELEVATION

SCALE 1/2"=1'-0"

GS-160

GS-160

G16G15G14G13G12G11G10G9G8G7G6G5G4G3G2G1

GRADE

EL 0' - 0"

TOP OF KNEEWALL

EL 1' - 6"

ISOLATION UNIT TYPICAL SECTION

SCALE 1"=1'-0"GS-160

GS-160

GS-160

GS-160

ISOLATION UNIT WEST ELEVATION

SCALE 1/4"=1'-0"

GS-160

GS-160

EAVE

EL 8' - 0"

TOP OF DOOR FRAME

EL 6' - 7"

PEAK

EL ± 10' - 6"

GS-160

GS-170

GS-160

GS-170

NO INTERIOR LONGITUDINAL WALL IN THIS AREA. (EAST WING ONLY)

SHELVES

COUNTER

MAKE-UP AIR

EAVE

EL 8' - 0"

1/8" TEMPERED GLASS

1" X 2" RIDGE VENT

ALUMINUM RIDGE EXTRUSION

STANDARD ALUMINUM

GLASS BARS AND CAPS

1/8" TEMPERED GLASS

2" T.S. SIDE POST

2" T.S. SIDE POST

1" X 2" GIRT

STANDARD BOTTOM SILL

STANDARD TOP SILL

1" X 2"

ROOF PURLIN

1" X 2"

ROOF PURLIN

STANDARD ALUMINUM

GLASS BARS AND CAPS

WHERE REQUIRED

GD GC

26¡0'0"

PEAK

EL ± 10' - 6"

GS-160GS-160

GRADE

EL 0' - 0"

U/S TRUSS

EL 8' - 4"

PEAK

EL 11' - 10"

PRE-ENGINEERED BUILDING

SCALE 1/2"=1'-0"GS-160

GS-160

GS-160

GS-160

COUNTER ELEVATION

SCALE 1/2"=1'-0"GS-160

GS-160

FINISHED

FLOOR

EL 0' - 4"

GRID GRID

26¡ 0' 0"

PARTITION WALL ELEVATION

SCALE 1/2"=1'-0"

GS-160

GS-160

1/8" ALUMINUM SHEET

IN LIEU OF GLASS AT EVERY PARTITION WALL

GS-160 GS-160

2" T.S. CENTER POST

GRADE

EL 0' - 0"

TOP OF KNEEWALL

EL 1' - 6"

EAVE

EL 8' - 0"

PEAK

EL ± 10' - 6"

3'-0" X 7'-0" ALUMINUM DOOR WITH

SINGLE PANE ANNEALED GLASS.

WINDOW 2'-0" X 3'-0".

ALUMINUM FRAME WITH THRESHOLD

COLOR WHITE.

2'-0" X 4'-0" OPERABLE WINDOW

WITH ALUMINUM FRAME.

SINGLE ANNEALED GLASS.

COLOR WHITE.

PROVIDE INSECT SCREEN.

PRE-ENGINEERED NON-INSULATED SHED.

DIMENSIONS ON DRAWING. MATCH COLOR AND

FINISH OF EXISTING NEARBY BUILDINGS.

ROOF GLAZING 1 PANE

ONLY PER SIDE (TYP.)

PROVIDE ISOLATION FLASHING

BETWEEN INDIVIDUAL UNITS

EPOXY COATED STEEL SHELVING SYSTEM,

DEPTH 2'-0", CAPACITY 100LBS

SEE SPECS 10675G

FLASHING REQUIRED ON ALL

KNEEWALLS

USE 20GA ALUMINUM

PROVIDE ISOLATION FLASHING

BETWEEN INDIVIDUAL UNITS

GA GB

FINISH

INTERIOR

ELEVATION

AND

OUTSIDE

GRADE

EL 0' - 0"

TOP OF

KNEEWALL

EL 1' - 6"

BOTTOM OF

FILLED SOIL

EL -1' - 5"

UNDER

FOOTING

EL -2' - 5"

EAVE

EL 8' - 0"

SLAB

9'-10" X 26'-3"

WATER SPRAY LINE

SEE GM-145

NOTES

- ALL GLAZING OF ISOLATION UNITS TO BE 1/8" TEMPERED

CLEAR FLOAT GLASS UNLESS OTHERWISE INDICATED.

REFER TO 08800G. PANES TO BE 2'-6" WIDE

- ALL ISOLATION UNITS STRUCTURAL COMPONENTS TO BE

ALUMINUM OR GALVANIZED STEEL.

Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:25:32 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\1312 GS-160 I.U.STR&GLAZ.dwg Save Date: 04/12/2019 09:33 AM

ISOLATION UNITS -

STRUCTURE & GLAZING

GS-160

TYPICAL ISOLATION UNIT-FLOOR PLAN

SCALE 1"=1'-0"GS-160

GS-170

GRADE

EL 0' - 0"

TOP OF KNEEWALL

EL 1' - 6"

TYPICAL ISOLATION UNIT-FRONT VIEW

SCALE 1"=1'-0"GS-160

GS-170

FLAT ACRYLIC SHEET CLEAR,

" THICK OVER DOOR

PROVIDE WEATHER STRIPPING

ON 4 SIDES

HINGE TYP. OF 3

HANDLE

MANUAL

LOCKING DEVICE

1" X 2" GIRT1" X 2" INTERMEDIATE POST

2" X 2" GRID POST

TOP OF DOOR RAME

EL 6' - 7"

G4

GLASS

GLASS

CENTER LONGITUDINAL WALL NOT

REQUIRED IN SOME AREAS.

SEE PLAN VIEW ON GS-160

1"X2" INTERMEDIATE POST

2"X2"GRID POST

Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:25:36 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\1312 GS-170 I.U.DETAILS.dwg Save Date: 04/12/2019 09:34 AM

ISOLATION UNITS - DETAILS

GS-170

PLAN VIEW

SECTION VIEW

ANGLE DRIVE

VENT MOTOR MOUNTED ON KING STRUT

GALVANIZED STEEL DRIVE SHAFT

TRUSS CHORD

ANGLE DRIVE

ANGLE DRIVE

VENT MOTOR MOUNTED ON KING STRUT

30°

A B C D E F G H J K L M N O P Q R S T U V W X Y

UNASSIGNED

PLANT PATH.PLANT PATH.

PLANT PATH.PLANT PATH.

PLANT PATH.PLANT PATH.

PLANT PATH.PLANT PATH.

PLANT PATH.

PLANT

BRDG

CROPCROPBIOLOGY

BIOLOGY

BIOLOGY

BIOLOGY

BIOLOGY

CROPCROP

CROP

CROP

CROP

PLANT

BRDG

PLANT

BRDG

UNASSIGNED UNASSIGNED

PLANT

BRDG

PLANT

BRDG

C09

C07

C05

C03

C01

C08

C10

C06

C04

C02

B09

B07

B05

B03

B01

B11

B08

B06

B04

B02

A09

A07

A05

A03

A01

A11

A10

A08

A06

A04

A02

B10

CORRIDOR CORRIDOR CORRIDOR

PEAK

EL ± 19' - 10"

FLOOR SLAB

EL 0' - 0"

TOP OF KNEEWALL

EL 2' - 6"

TOP OF GIRT

EL 3' - 6"

U/S OF GIRT

EL 7' - 2"

C.O. DRIVE SHAFT

EL 17' - 3"

UNDER GUTTER

EL 12' - 0"

U/S OF PERIMETER GIRT

EL 11' - 7"

GM-110

GM-110

VENT

MOTOR

DRIVE

SHAFT

TYP

GM-110

GM-110

GM-110

GM-110

VERTICAL SASH

RIDGE VENT OPENING

VERTICAL

SASH

GM-110

GM-110

GM-110

GM-110

GALVANIZED STEEL

CURVED RACKS

RIDGE VENT MOTOR

GALVANIZED STEEL

DRIVE SHAFT

INSECT SCREEN

C.O. DRIVE SHAFT

EL 17' - 3"

PEAK

EL ± 19' - 10"

GALVANIZED STEEL

CURVED RACKS

RIDGE VENT MOTOR

GALVANIZED STEEL

DRIVE SHAFT

REMOVABLE

INSECT SCREEN,

SEAL COMPLETELY

AT TRUSSES AND

ENDS. PROVIDE

1' 11

" X 1' 11

ACCESS

DOOR AT EACH

VENT MOTOR

C.O. DRIVE SHAFT

EL 17' - 3"

PEAK

EL ± 19' - 10"

GALVANIZED STEEL

CURVED RACKS

RIDGE VENT MOTOR

GALVANIZED STEEL

DRIVE SHAFT

INSECT SCREEN

VERTICAL SASH

SCALE 1" = 1'-0"GM-110 GM-110

CORRIDOR

SIDE

GREENHOUSE

SIDE

PERIMETER GIRT

DRIVE SHAFT

GLASS

U/S OF GUTTER

EL 12' - 0"

U/S OF PERIMETER GIRT

EL 11' - 7"

2°

GRID

TOP OF KNEEWALL

EL 2' - 6"

FLOOR SLAB

EL 0' - 0"

U/S OF GIRT

EL 7' - 2"

WEATHERSTRIP AROUND

PERIMETER OF SASH

GLASS IN SASH

INSECT SCREEN SEE SCHEDULE.

WEATHERSTRIPPED PANELS OF

INSECT SCREEN, REMOVABLE

FROM GREENHOUSE SIDE.

RIVETS ARE NOT ACCEPTABLE

DRIVE SHAFT LOCATE MOTORS

WHERE INDICATED ON PLAN.

ENSURE HARDWARE CLEARS DOOR

GIRT

ALUMINUM EXTRUSION

SASH RAIL

GREENHOUSE PLAN VIEW

SCALE 1/8" = 1'-0"

LOCATE MOTORS WHERE

INDICATED ON THIS SHEET

GALVANIZED TS

BETWEEN TRUSSES.

ATTACH TO TRUSS

REMOVABLE

INSECT SCREEN

SPRING LOCK

ALUMINUM EXTRUSION

CURVED RACK

SEAL BETWEEN TS

AND "C" CHANNEL

ALUMINUM FRAME

INSECT SCREEN

REMOVABLE PANELS

ALUMINUM FLAT BAR

MOHAIR SEAL

RACK

MOHAIR SEAL

SCALE 1 1/2" = 1'-0"GM-110

GM-110

RIDGE DETAIL

SCALE 3" = 1'-0"GM-110

GM-110

REMOVABLE INSECT SCREEN

WITH MOHAIR SEAL

REMOVABLE PANEL FRAME

PEAK

EL ± 19' - 10"

SCREEN DETAIL

SCALE 3" = 1'-0"GM-110

GM-110

ADDITIONAL GALVANIZED

STEEL ANGLE 2" X 2" X 1/8"

BOLTED TO TRUSS

ALUMINUM SHEET

16 GAUGE, NOTCH AT TRUSS

AND SEAL AGAINST TRUSS

SPRING LOCK

ALUMINUM EXTRUSION

SEAL AGAINST TRUSS

INSECT SCREEN

MATERIAL

GM-110

GM-110

GM-110

GM-110

GM-110

GM-110

STEEL RACK INSTALLATION

VENT SIZE MAX. RACK SPACING

MAX DISTANCE

FROM END

36"

48"

48"

36"

30"

16"

C.O. DRIVE SHAFT

EL 7' - 6"

SCALE 1/2"=1'-0"

PANEL FRAME

INSECT SCREEN

IN PANEL

GALVANIZED STEEL RACK.

PROVIDE RACK EACH SIDE OF DOOR AND

NO MORE THAN 11 3/4" FROM EACH END

GLASS

VERTICAL

SASH MOTOR

GM-110

GM-110

SEE INSECT SCREEN

SCHEDULE ON GM-130

GALVANIZED STEEL

CURVED RACKS

GALVANIZED STEEL DRIVE SHAFT

INSECT SCREEN

GM-110

GM-110

ACTUAL FLOOR ELEVATION

REFER TO CIVIL DRAWINGS

GLASS

GLASS

PHASE 2 ALTERNATE

NO. 3001

Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:25:44 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\1312 GM-110 NVENT.dwg Save Date: 04/12/2019 09:34 AM

GREENHOUSE NATURAL

VENTILATION

GM-110

UNASSIGNED

PLANT PATH.PLANT PATH.

PLANT PATH.PLANT PATH.

PLANT PATH.PLANT PATH.

PLANT PATH.PLANT PATH.

PLANT PATH.

PLANT

BRDG

CROPCROPBIOLOGY

BIOLOGY

BIOLOGY

BIOLOGY

BIOLOGY

CROPCROP

CROP

CROP

CROP

PLANT

BRDG

PLANT

BRDG

UNASSIGNED UNASSIGNED

PLANT

BRDG

PLANT

BRDG

C09

C07

C05

C03

C01

C08

C10

C06

C04

C02

B09

B07

B05

B03

B01

B11

B08

B06

B04

B02

A09

A07

A05

A03

A01

A11

A10

A08

A06

A04

A02

B10

CORRIDOR CORRIDOR CORRIDOR

GM-130

GM-130

HAF

FAN

EXHAUST FAN

HAF FAN

EXHAUST FAN

GM-130

GM-130

GM-130 GM-130

TEFC MOTOR

MOUNTING BRACKET

GALVANIZED STEEL

ALUMINUM BLADE

WHITE PVC COATED STEEL GUARD

TRUSS OUTLINE

HAF FAN

SCALE 1 1/2"=1'-0"GM-130

GM-130

EL 10' - 0" C.O. HAF FAN

GREENHOUSE PLAN VIEW

SCALE 1/8"=1'-0"

NOTE

ALL EXHAUST FANS TO BE

CENTERED BETWEEN POSTS

VERTICAL SASH

PEAK

EL ± 19' - 10"

FLOOR SLAB

EL 0' - 0"

TOP OF KNEEWALL

EL 2' - 6"

TOP OF GIRT

EL 3' - 6"

U/S OF GIRT

EL 7' - 2"

UNDER GUTTER

EL 12' - 0"

U/S OF PERIMETER GIRT

EL 11' - 7"

PHASE 2 ALTERNATE

NO. 3001

U/S OF GIRT

EL 7' - 2"

TOP OF GIRT

EL 3' - 6"

GM-130

EXHAUST FAN 3' - 0"

SCALE 1"=1'-0"

GM-130

EXTERIOR

INTERIOR

EXHAUST FAN

PROPELLER

ALUMINUM INSULATED

MOTORIZED DAMPER.

SEE SPECS 23 31 13.00 40

15°

ALUMINUM GUARD

0.039" X 0.039" HOLE.

DIAMOND EXPANDED METAL

NOT ACCEPTABLE

DAMPER ACTUATOR. LOCATE ON SAME SIDE AS

FAN MOTOR, WITHIN HOUSING

ACCESS DOOR 12" X 24" LOCATE ON MOTOR SIDE

APPROPRIATELY FOR SERVICING FAN AND DAMPER

ACTUATOR

ALUMINUM GUARD

0.039" X 0.039" HOLE.

DIAMOND EXPANDED

METAL NOT ACCEPTABLE

STRUCTURAL FRAME AROUND FULL

HOUSING. MULLIONS NOT ACCEPTABLE.

SECURE HOUSING AT LEAST TWICE

PER SIDE.

MOTOR

REQUIREMENTS

SEE SPECS

Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:25:52 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\1312 GM-130 FVENT.dwg Save Date: 04/12/2019 09:35 AM

GREENHOUSE FORCED

VENTILATION

GM-130

FOR A-8, A-10 AND

B-10 ONLY

EDA I

INSECT SCREEN MATERIAL

- REFER TO INSECT SCREEN

SCHEDULE ON GM-130

GM-140

GM-140

ALUMINUM FRAME AND LOCKABLE ALUMINUM

DOOR COVERED WITH

INSECT SCREEN (TYPICAL OF 4)

PROVIDE 3 HINGES, OVERHEAD

STOP, TRESHOLD, WEATHER STRIPPING

PEA GRAVEL

PEAK

EL ± 19' - 10"

FLOOR SLAB

EL 0' - 0"

TOP OF KNEEWALL

EL 2' - 6"

TOP OF GIRT

EL 3' - 6"

U/S OF GIRT

EL 7' - 2"

UNDER GUTTER

EL 12' - 0"

U/S OF PERIMETER GIRT

EL 11' - 7"

TYPICAL GREENHOUSE SECTION

SCALE 1/4"=1'-0"GS-110

GM-140

NOTES ON SCREEN BOX:

1 - ENDS TO BE CLOSED INSECT

PROOF, GLAZED WITH INSECT

SCREEN

2 - PROVIDE DOOR AT EACH END

SCALE 1:5

SCALE 1:5

SILICONE SEAL

ALUMINUM FLASHING.

PROVIDE LEAK, INSECT AND WATER

PROOF JOINT. MAKE WEEP HOLES TOWARD

GUTTER

ALUMINUM EXTRUSION

CLEAR ACRYLIC 0.3"

GALVANIZED STEEL PLATE

12" X 2" X 0.12" THICK.

SECURE TO GUTTER

GLAZE ROOF WITH CLEAR

ACRYLIC DOUBLE-WALL

SHEETS, 0.3" THICK.

MAKE AIR AND WATER TIGHT

CLEAR ACRYLIC 0.3"

ALUMINUM EXTRUSION

ALUMINUM

FLASHING

3" X 3" X 0.8" THICK

INSECT SCREEN

GALVANIZED STEEL

TUBING FRAME

2" X 2" X 0.25" THICK

INSECT SCREEN ON FRONT AND BOTH ENDS

STRETCH SCREEN TIGHT WHEN INSTALLING.

NO BILLOWING TOLERATED.

GALVANIZED STEEL

2" X 2" X 0.25" THICK

INSECT SCREEN

BOTTOM

ALUMINUM

FLASHING

ADAPT TO FINAL

GRADE ELEVATION

SEE CONCRETE DWGS

PEA GRAVEL

6" THICK

PROVIDE INTERMEDIATE

PURLINS AS NECESSARY

TO REINFORCE STRUCTURE.

REFER TO SPEC SECTION

13120-G FOR DESIGN LOADS

PROVIDE CONTINUOUS ANGLE FIXED

TO GRNH POST AT BOTH ENDS

TO SECURE SCREEN EXTRUSION

SCALE 1:5

CONCRETE KNEEWALLS AT ENDS

SCREEN BOX

SCALE 1"=1'-0"GS-110

GS-110

Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:25:57 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\1312 GM-140 INSECT SCREEN.dwg Save Date: 04/12/2019 09:35 AM

GREENHOUSE INSECT

SCREEN BOX

GM-140

FRESH AIR INTAKE

1"

1"

1"

1"

1"

1"

1"

1.5"

1.5"

CWW

CWW

CWW

CWW

CWW

CWW

UNDERGROUND PVC PIPING

C/W OUTLET AT EACH CUBICULE. SEE DETAILS

C W

W

CWW

CWW

CWW

CWW

CWW

CWW

1.5"

CONNECT TO EXISTING GAS PIPING IN BUILDING #43

0.75"

CONNECT TO EXISTING SERVICES

COORDINATE WITH FACILITY USERS

CONNECT TO EXISTING WELL WATER SERVICE OF BUILDING #43.

USE PVC SCH 80 FOR ALL WATER SERVICE

PROVIDE STOP GATE VALVE.

SET IN PLASTIC VALVE BOX.

TYPICAL OF 4.

ALL PIPING

UNDERGROUND

SOLENOID

VALVE

BOTTOM OF

DUCT AT

EL. -4' 5"

PROVIDE DRAINAGE

GATE VALVE

FROM UNDER DUCT.

PROVIDE ACCESS WELL

FROM SURFACE WITH

11.8" THICK CRUSHED

STONE UNDER VALVE.

BOTTOM OF DUCT

AT EL. -0.060"

1"

G16G15G14G13G12G11G10G9G8G7G6G5G4G3G2G1

GA

GB

GC

GD

ISOLATION UNIT PLAN VIEW

SCALE 1/4" = 1'-0"

GM-145 GM-145

28" x 10" ALUMINUM

TYPICAL

Ø40"

MAKE-UP AIR

ISU-MAU-1

Ø 8"

TYPICAL

Ø32" Ø22"

G

GM-145 GM-145

GM-145

GM-145

GM-145 GM-145

G G

C A

GM-145GM-145

SEE DRAWING

HM-105

ISOLATION UNIT TYPICAL SECTION

SCALE 1" = 1'-0"GM-145

GM-145

GA GB

GALVANIZED STEEL

AIR EXHAUST PIPE

SUPPORT

SCALE 1:5

SHEET METAL SCREWS

AT 6" O.C.

WATERPROOF MASTIC

SOUTH END DUCT

NORTH END DUCT

ADAPT BRANCH-OFF

TO MAIN DUCT SIZE

SAND BACKFILL

1" PVC PIPING

0.75" PVC PIPING

PROVIDE WHITE NYLON INSECT SCREEN MATERIAL,

30 MESH, SHAPE INTO A BAG, COVER PVC PIPE AND SECURE WITH

A STAINLESS STEEL COVER. TYPICAL FOR ALL EXHAUST PIPE.

PVC BALL VALVE

TYPICAL

PVC BALL

VALVE TYPICAL

FINISH

INTERIOR

ELEVATION

AND

OUTSIDE

GRADE

EL 0' - 0"

TOP OF

KNEEWALL

EL 1' - 6"

BOTTOM OF FILLED SOIL /

TOP OF DUCT OPENING

EL -1' - 6"

UNDER

FOOTING

EL -2' - 6"

EAVE

EL 8'-0"

AIR EXHAUST PIPE PVC SCH 80,

150 Ø SECURED TO FRAMING.

TERMINATE AT EL. 6' 7" SECURE TO

STRUCTURE AS NEEDED.

AIR SUPPLY

10" x 28" ALUMINUM

AREA FOR IRRIGATION

PIPING

MANUAL BALANCING

DAMPER

BALANCING

SLIDE GATE

(TYPICAL)

GALVANIZED STEEL

AIR EXHAUST PIPE

SUPPORT

SEAL WATERTIGHT.

AT ALL CONNECTION POINT

SEAL

ELECTRICAL

U/S OF DUC T (NORTH END)

EL -4' - 6"

DRAIN AT NORTH END

EL -5' - 10"

FRENCH DRAINS 3.9". REFER TO GS-105

GALVANIZED STEEL AIR

EXHAUST PIPE SUPPORT

0.75" PVC SCH 80 WATER SPRAY LINE.

SUPPORT FROM STRUCTURE. PROVIDE GROMMETS

WHERE PIPE CROSSES ALUMINUM SHEET.

COMPACTED LOCAL

SOIL

NEW UNCOMPACTED SANDY

LOAM TOPSOIL

Ø 0.75"

CA

QUICK

COUPLING

MANUAL BALL VALVE

Ø 0.5"

PROVIDE AIR TIGHT CONNECTION

GAS SOLENOID VALVE

SEE PLAN VIEW

0.75"

PVC SCH 80 SPRAY LINE.

CAP AT SOUTH END.

PROVIDE STOP BALL VALVE AT NORTH END (OUTSIDE)

Ø 0.75"

FLOOD IRRIGATION

PERFORED PIPE 5 HOLES,

0.02", EQUALLY SPACED.

Ø 0.5"

QUICK CONNECT FOR

FUTURE DRIP SYSTEM

Ø 1"

UNDERGROUND

OUTSIDE INSIDE

MECHANICAL PLAN VIEW

SCALE 1" = 1'-0"GM-145

GM-145

G5

FINISH INTERIOR

ELEVATION AND OUTSIDE GRADE

EL 0' - 0"

TOP OF KNEEWALL

EL 1' - 6"

MECHANICAL ELEVATION VIEW

SCALE 1" = 1'-0"GM-145

GM-145

AIR EXHAUST PIPE PVC SCH 80,

6" Ø SECURED TO FRAMING.

TERMINATE AT EL. 6' 9"

AIR OUTLET

AIR SUPPLY WITH MANUAL

BALANCING DAMPER

DRIP IRRIGATION

OUTLET

FLOOD IRRIGATION

OUTLET.CENTER FED.

DRIP IRRIGATION

OUTLET

FLOOD IRRIGATION

(CENTER FED)

GM-145

GM-145

FINISH INTERIOR

ELEVATION AND

OUTSIDE GRADE

EL 0

TOP OF

KNEEWALL

EL 1' 5"

ISOLATION UNIT TYPICAL ELEVATION

SCALE 1"=1'-0"GM-145

GM-145

SOIL SURFACE

BOTTOM OF FILLED

SOIL / TOP OF DUCT

OPENING

EL -1' 5"

UNDER

FOOTING

EL -2' - 6"

10 11 12 13

AIR SUPPLY SLEEVE

1' x 2'-6" AT EVEN GRIDS

AIR EXHAUST SLEEVE

AT ODD GRIDS, Ø 7"

AIR EXHAUST SLEEVE

AT ODD GRIDS, Ø 7"

INTERIOR KNEEWALL

WHERE REQUIRED

28" x 10" UNDERGROUND

ALUMINUM DUCT SUPPLY

HOSE QUICK

COUPLING

UNDERGROUND PIPING

PVC BALL VALVE

CA OUTLET IN MAKE-UP AIR UNIT

SCALE 1" = 1'-0"GM-145

GM-145

SEAL SPACE BETWEEN

DUCT AND SLEEVE

0.75"

0.5"

INVERT WATER LINE

EL 8' - 8"

WATER SERVICE DIAGRAM

NTS TYPICAL OF 60 CUBICULES

ISOLATION UNIT TYPICAL SECTION

SCALE 1" = 1'-0"GM-145

GM-145

PVC BALL VALVE

TYPICAL

FINISH

INTERIOR

ELEVATION

AND

OUTSIDE

GRADE

EL 0' - 0"

TOP OF

KNEEWALL

EL 1' - 6"

BOTTOM OF FILLED SOIL /

TOP OF DUCT OPENING

EL -1' - 6"

UNDER

FOOTING

EL -2' - 6"

10" x 28" ALUMINUM

AREA FOR IRRIGATION

PIPING

MANUAL BALANCING

DAMPER

SEAL WATERTIGHT.

AT ALL CONNECTION POINT

U/S OF DUC T (NORTH END)

EL -4' - 6"

DRAIN AT NORTH END

EL -5' - 10"

FRENCH DRAINS 3.9". REFER TO GS-105

GALVANIZED STEEL AIR

EXHAUST PIPE SUPPORT

SEAL WATERTIGHT

AT ALL CONNECTION POINT

ANCHOR SPACING BASED

ON DUCT DIAMETER

SLOPE

STRAPS

CONCRETE PIERS DESIGNED AND SPACE

PER DUCT MANUFACTURER'S RECOMMANDATIONS

TOTAL OF 6"

ON LENGTH OF DUCT

BACKFILL WITH SAND. FOLLOW DUCT

MANUFACTURER'S RECOMMANDATIONS.

USE OFFSET COUPLERS

PROVIDE MINIMUM 6" EARTH COVER.

USE EXISTING SOIL.

FOLLOW MFG'S

RECOMMENDATIONS

GRADE

EL 0' - 0"

UNDERGROUD DUCT DETAIL

SCALE 1:SCALE 1/2" = 1'-0"GM-145

GM-145

Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:26:05 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\1312 GM-145 I.U.VENT.dwg Save Date: 04/12/2019 09:36 AM

ISOLATION UNITS

VENTILATION AND

PLUMBING DETAILS

GM-145

UNASSIGNED

PLANT PATH.PLANT PATH.

PLANT PATH.PLANT PATH.

PLANT PATH.PLANT PATH.

PLANT PATH.PLANT PATH.

PLANT PATH.

PLANT

BRDG

CROPCROPBIOLOGY

BIOLOGY

BIOLOGY

BIOLOGY

BIOLOGY

CROPCROP

CROP

CROP

CROP

PLANT

BRDG

PLANT

BRDG

UNASSIGNED UNASSIGNED

PLANT

BRDG

PLANT

BRDG

C09

C07

C05

C03

C01

C08

C10

C06

C04

C02

B09

B07

B05

B03

B01

B11

B08

B06

B04

B02

A09

A07

A05

A03

A01

A11

A10

A08

A06

A04

A02

B10

CORRIDOR CORRIDOR CORRIDOR

GM-150

GM-150

GM-150 GM-160

BLACKOUT

SYSTEM

IN A09 ONLY

HORIZONTAL

SHADE CURTAIN

SHADING SYSTEM

IN A-09 ONLY

IN A-09, PROVIDE FULL COMPARTMENT BLACKOUT SYSTEM.

SYSTEM INSTALLED ABOVE TRUSS LOWER CHORD TO AVOID

INTERFERENCE WITH HID LIGHTING AND OTHER SYSTEMS.

PROVIDE ONE (1) MOTOR FOR EACH WALL AND ONE (1) FOR ROOF.

MINIMIZE PERMANENT STRIPS OF BLACKOUT MATERIAL.

PROVIDE DOOR STRIP HELD IN PLACE WITH SEWN VELCRO BANDS.

INSTALL BLACKOUT SYSTEM BELOW SHADING SYSTEM. VERTICAL

BLACKOUT TO BE ROLL-UP TYPE.

BLACKOUT MATERIAL

PERMANENT STRIPS OF

BLACKOUT MATERIAL

BLACKOUT

MOTOR

PHASE 2 ALTERNATE

NO. 3001

TYPICAL GREENHOUSE SECTION

SCLAE 1/4" = 1'-0"GM-150

GM-150

GM-150

GM-150

SHADE

MOTOR

DRIVE

CABLE

PULLEY

DRIVE

SHAFT

NYLON SUPPORT CABLE

HORIZONTAL SHADE CURTAIN

SHOWN AT 50% DEPLOYED

HORIZONTAL SHADE CURTAIN

SHOWN AT 25% DEPLOYED

HORIZONTAL SHADE CURTAIN

SHOWN AT 75% DEPLOYED

GM-150 GM-150

NO SHADE PARTS BELOW

UNDERSIDE OF TRUSS

HORIZONTAL SHADE CURTAIN

DRIVE CABLE WITH

PULLEY AT EVERY TRUSS

HORIZONTAL SHADE CURTAIN

SCLAE 1/8" = 1'-0"GM-150

GM-150

GREENHOUSE PLAN VIEW

SCALE 1/8" = 1'-0"

BLACKOUT COMPARTMENT (A-09)

SCLAE 1/8" = 1'-0"GM-150

GM-150

INSTALL ALL MOTORS

WHERE INDICATED

A-10A-09

BLACKOUT DETAIL IN COMPARTMENT A-09

SCLAE 1/8" = 1'-0"GM-150

GM-150

GM-150

GM-150

NOTE:

1 - LOCATE ALL MOTORS WHERE INDICATED ON SHEET

2 - HORIZONTAL SHADE TO BE SLIDING TYPE SYSTEM

3 - ALL SHADE PARTS MUST BE ABOVE UNDERSIDE OF

TRUSS LOWER CHORD. PROVIDE SPACER CABLES

AS NECESSARY TO AVOID CONTACT BETWEEN

SHADING MATERIAL AND DRIVE CABLE.

4 - ALL SHADING MATERIALS TO PROVIDE

50% SHADE FACTOR.

5- SHADING MATERIAL BUNDLES ON SOUTH END

WHEN NOT IN USE

PEAK

EL ± 19' - 10"

FLOOR SLAB

EL 0' - 0"

TOP OF KNEEWALL

EL 2' - 6"

TOP OF GIRT

EL 3' - 6"

U/S OF GIRT

EL 7' - 2"

UNDER GUTTER

EL 12' - 0"

U/S OF PERIMETER GIRT

EL 3531

BLACKOUT CORNER DETAIL

SCLAE 1/8" = 1'-0"GM-150

GM-150 (A-09 ONLY)

SHADING SYSTEM ABOVE

ALL BLACKOUT ELEMENTS

PERMANENT BLACK OUT

MATERIAL STRIP. SIZE AS

NECESSARY TO PROVIDE

OVERLAP FOR BLACKOUT

PERMANENT STRIPS

OF BLACKOUT MATERIAL

SEAL AT EDGES

MOTORIZED

ROOF BLACKOUT

ABOVE UNDERSIDE

OF TRUSS

TRUSS LOWER CHORD

PROVIDE BRACKETS TO FORCE

ROOL-UP BLACKOUT OVER TOP OF KNEEWALL

ROOL-UP BLACKOUT

MATERIAL ON 4 SIDES

FLOOR SLAB

EL 0' - 0"

TOP OF KNEEWALL

EL 2' - 6"

TOP OF GIRT

EL 3' - 6"

U/S OF GIRT

EL 7' - 2"

UNDER GUTTER

EL 12' - 0"

U/S OF PERIMETER GIRT

EL 11' - 7"

GM-150

GM-150

GEAR

MOTOR

VERTICAL ROLL-UP

BLACKOUT CURTAIN

VERTICAL FIXED

BLACKOUT

MATERIAL

HORIZONTAL FIXED

BLACKOUT MATERIAL

PERIMETER PURLIN

HORIZONTAL

BLACKOUT CURTAIN

DRIVE SHAFT

SUPPORT CABLE

DRIVE CABLE

PULLEY

HORIZONTAL UNIT HEATER VENT

IN THIS CORNER. TAILOR PERMANENT

STRIP AROND PIPE.

W A

L L S

POST

R O

O F

TRUSS LINE

PIPING AT KNEEWALL

TAILOR TO MAINTAIN

BLACKOUT WITH

PERMANENT STRIPS

U/S OF PERIMETER GIRT

EL 11' - 7"

UNDER GUTTER

EL 12' - 0"

GUTTER

GLAZING

CLIP

DRIVE CABLE

SHADE MATERIAL

CURTAIN DRAWBAR PERFORATED TO LET

NYLON SUPPORT CABLE PASS THROUGH

RATCHET TIGHTENER

PULLEY AT EVERY TRUSS EXCEPT WHERE

THE DRIVE SHAFT AND GEAR MOTOR ARE SUPPORTED

POST

NYLON SUPPORT CABLE

AT 1' 3

" c/c MAX

DRIVE SHAFT

CHAIN COUPLING

POST

GREENHOUSE

GEAR MOTOR

GREENHOUSE

INSTALL MOTORS AT LOCATIONS SHOWN ON FLOOR PLAN

GLAZING

TRUSS

SYSTEM MUST CLEAR

UNDERSIDE OF TRUSS

Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:26:11 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\1312 GM-150 SHADING SYST.dwg Save Date: 04/12/2019 09:36 AM

GREENHOUSE SHADING

SYSTEMS

GM-150

GROWING BENCH

GREENHOUSE PLAN VIEW

SCALE 1/8" = 1'-0"

GM-170

GM-170

LIGHT SUPPORT RAIL

SCALE 1:10

NOTES FOR ALTERNATE

1. THIS SHEET DESCRIBES THE SUPPLY AND INSTALLATION OF HPS FIXTURES

AND RAIL SYSTEM IN GREENHOUSE. FOR ELECTRICAL WORK PERTAINING TO FIXTURES,

REFER TO ELECTRICAL DRAWINGS. ALL ELECTRICAL IS IN BASE BID.

2. ONLY HPS FIXTURES WITH CHORD AND CHAIN ARE IN ALTERNATE.

3. ALL SUPPORT ELEMENTS ARE IN BASE BID.

SPACER

SECURE TO PERIMETER GIRT

PEAK

EL ± 19' - 10"

FLOOR SLAB

EL 0' - 0"

TOP OF KNEEWALL

EL 2' - 6"

TOP OF GIRT

EL 3' - 6"

U/S OF GIRT

EL 7" - 2"

UNDER GUTTER

EL 12' - 0"

U/S OF PERIMETER GIRT

EL 11' - 7"

ALL 600 W HPS FIXTURES

ARE BID ALTERNATE

STEEL "TS" 1.5" X 1.5"

BY THIS CONTRACTOR

STEEL "TS" 1.5" X 1.5" TYPICAL

GM-170

GM-170

HPS LIGHT SUPPORT RAIL SECURE TO

T.S. 1.5" X 1.5" AND PERIMETER GIRT

ALL DIMENSIONS ARE TYPICAL

GALVANIZED T.S. 1.5" x 1.5" x 0.2" BY MECHANICAL

CONTRACTOR ATTACH TO UNDERSIDE

OF TRUSS AND PERIMETER GIRT

A B C D E F G H J K L M N O P Q R S T U V W X Y

UNASSIGNED

PLANT PATH.PLANT PATH.

PLANT PATH.PLANT PATH.

PLANT PATH.PLANT PATH.

PLANT PATH.PLANT PATH.

PLANT PATH.

PLANT

BRDG

CROPCROPBIOLOGY

BIOLOGY

BIOLOGY

BIOLOGY

BIOLOGY

CROPCROP

CROP

CROP

CROP

PLANT

BRDG

PLANT

BRDG

UNASSIGNED UNASSIGNED

PLANT

BRDG

PLANT

BRDG

C09

C07

C05

C03

C01

C08

C10

C06

C04

C02

B09

B07

B05

B03

B01

B11

B08

B06

B04

B02

A09

A07

A05

A03

A01

A11

A10

A08

A06

A04

A02

B10

CORRIDOR CORRIDOR CORRIDOR

PHASE 2 ALTERNATE

NO. 3001

U/S OF TRUSS

EL 11' - 7"

U/S OF SUPPORT RAIL

EL 11' - 3"

U/S OF BULB

EL 'VARY'

HOOK

CONNECT SOW TYPE WIRE IN BOX AND LEAVE

6' LONG OF ELECTRICAL CORD FOR EACH

FIXTURE. SOW TYPE. DO NOT PROVIDE

CONNECTORS.

WATERPROOF ELECTRICAL

BOX AND CONNECTOR

HPS FIXTURE 600W TOTALLY

ENCLOSED BALLAST HOUSING

WATERPROOF ELECTRICAL BOX

AND CONNECTORS

277V/1¯/ 60HZ

HPS LIGHT SUPPORT RAIL

BY MECHANICAL CONTRACTOR

GALV. STEEL OR ALUM. CHAIN 5' 2" LONG

SLIDING BRACKETS

GALVANIZED T.S. 1.5" x 1.5" x 0.2" BY MECHANICAL

CONTRACTOR ATTACH TO UNDERSIDE

OF TRUSS AND PERIMETER GIRT

TRUSS LOWER

CHORD

Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:26:21 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\1312 GM-170 SUPP.LIGHTING.dwg Save Date: 04/12/2019 09:38 AM

GREENHOUSE

SUPPLEMENTAL LIGHTING

GM-170

GM-190

GM-190

GM-190 GM-190

GM-190 GM-190

GREENHOUSE PLAN VIEW

SCALE 1/8"=1'-0"

NEOPRENE SHEET

UNDER BENCH FOOT

PEAK

EL ± 19' - 10"

FLOOR SLAB

EL 0' - 0"

TOP OF KNEEWALL

EL 2' - 6"

TOP OF GIRT

EL 3' - 6"

U/S OF GIRT

EL 7' - 2"

UNDER GUTTER

EL 12' - 0"

U/S OF PERIMETER GIRT

EL 11' - 7"

PROVIDE 2"

CONTINUOUS

ADJUSTMENT

ON THE LEG

LEG

BENCH

FOOT

"X" BRACING AS

NECESSARY TO

PROVIDE STABILITY

GALVANIZED EXPANDED

STEEL BENCH TOPS.

ALUMINUM ANGLES ON

ALL SIDES AND ENDS

NEOPRENE SHEET

UNDER BENCH FOOT

PROVIDE 6" PVC PIPE PIECE

AT BOTTOM OF EACH LEG FACING

MAIN WALKWAY (TYPICAL)

GROWING BENCH

"X" BRACING AS

NECESSARY TO

PROVIDE STABILITY

LEG

ALUMINUM ANGLE.

PROVIDE ON ALL SIDES

AND BENCH ENDS

GALVANIZED FLAT EXPANDED METAL /

ANTI-FLIP DEVICE

ROLLING TUBES

A

A

BEARING

SECTION A-A

SCALE 1:5

GALVANIZED EXPANDED

STEEL BENCH TOPS

PROVIDE 2"

CONTINOUS ADJUSTMENT

ON THE LEG

GM-190

GM-190

TYPICAL FIXED BENCH

SCALE 1":1'-0"

TYPICAL ROLL-TOP BENCH

SCALE 1":1'-0"

GM-190

GM-190

A B C D E F G H J K L M N O P Q R S T U V W X Y

UNASSIGNED

PLANT PATH.PLANT PATH.

PLANT PATH.PLANT PATH.

PLANT PATH.PLANT PATH.

PLANT PATH.PLANT PATH.

PLANT PATH.

PLANT

BRDG

CROPCROPBIOLOGY

BIOLOGY

BIOLOGY

BIOLOGY

BIOLOGY

CROPCROP

CROP

CROP

CROP

PLANT

BRDG

PLANT

BRDG

UNASSIGNED UNASSIGNED

PLANT

BRDG

PLANT

BRDG

C09

C07

C05

C03

C01

C08

C10

C06

C04

C02

B09

B07

B05

B03

B01

B11

B08

B06

B04

B02

A09

A07

A05

A03

A01

A11

A10

A08

A06

A04

A02

B10

CORRIDOR CORRIDOR CORRIDOR

PHASE 2 ALTERNATE

NO. 3001

Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:26:28 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\1312 GM-190 GROW.BENCHES.dwg Save Date: 04/12/2019 09:39 AM

GREENHOUSE GROWING

BENCHES

GM-190

UNASSIGNED

PLANT PATH.PLANT PATH.

PLANT PATH.PLANT PATH.

PLANT PATH.PLANT PATH.

PLANT PATH.PLANT PATH.

PLANT PATH.

PLANT

BRDG

CROPCROPBIOLOGY

BIOLOGY

BIOLOGY

BIOLOGY

BIOLOGY

CROPCROP

CROP

CROP

CROP

PLANT

BRDG

PLANT

BRDG

UNASSIGNED UNASSIGNED

PLANT

BRDG

PLANT

BRDG

C09

C07

C05

C03

C01

C08

C10

C06

C04

C02

B09

B07

B05

B03

B01

B11

B08

B06

B04

B02

A09

A07

A05

A03

A01

A11

A10

A08

A06

A04

A02

B10

CORRIDOR CORRIDOR CORRIDOR

GAS UNIT HEATER

FLUE POWER VENT

TYPICAL

GALVANIZED STEEL NATURAL GAS PIPING

RUN ALONG CONCRETE KNEEWALL

SEE HM-110

FOR CONTINUATION

SEE HM-110

FOR CONTINUATION

SEE HM-110

FOR CONTINUATION

G

GG

G G

G

G G

G

G

G

GG

G G

G

G

G

G

G

GG

G G

G

G

G

G G

NATURAL GAS MAIN LINE ENTRY

SEE HM-110 FOR CONTINUATION

GALVANIZED PIPE AND FITTINGS

FROM GRID 13 GOING NORTH.

LEGEND

GAS PIPING

FLUE POWER VENT

SEE UNIT HEATER SCHEDULE ON HM-500

MECHANICAL

SERVICES

GALVANIZED TS TO SPAN

FROM PERIMETER GIRT TYPICAL.

GALVANIZED TS TO SPAN

FROM PERIMETER GIRT

C

PHASE 2 ALTERNATE

NO. 3001

SPACE FOR OVERHEAD ELECTRICAL CONDUITS

(COORDINATE EXACT LOCATIONS WITH ELECTRICAL)

FROM

POWER VENTER

REPLACE GLASS BY A

GALV. STEEL PLATE

AROUND EACH FLUE PIPE

VENT TERMINATION SUPPORT

BRACKET MAKE FROM

GALV. STEEL FLAT BAR TERMINATE

BY ATTACHING TO STRUCTURE

TEE WITH DRIP LEG AND

CLEANOUT CAP AT LOW

POINT OF VENT SYSTEM

GUTTER

8Ø METAL SLEEVE

SECURE AROUND GLAZING

WITH ALUMINUM EXTRUSIONS

WITH METAL FACE PLATE

FLUE PIPE SIZE PER

MANUFACTURER'S RECOMMENDATIONS

PITCH VENT PIPE DOWNWARD

FROM UNIT 3/4" PER FOOT

2" HIGH TEMPERATURE

WATERPROOF INSULATION

PERIMETER GIRT

GALVANIZED TS TO SPAN FROM

PERIMETER GIRTS

NATURAL GAS SUPPLY

0.5" (TYP.)

GALVANIZED THREADED ROD

TRIM FLUSH WITH NUT

ADJUST BLADES

TO THROW WITH

10° ANGLE UPWARD

AND LOCK IN PLACE

FLUE PIPE SIZE PER

MANUFACTURER 'S

RECOMMENDATIONS

GM-210

GM-210

U/S OF GUTTER

EL 12' - 0"

U/S OF PERIMETER GIRT

EL 11' - 7"

GRID

GREENHOUSE PLAN VIEW

SCALE 1/8"=1'0"

GAS UNIT HEATER

SCALE 1 1/2"=1'-0"GM-210

GM-210

TYPICAL

(TYPICAL)

EL 1' - 8"

(TYPICAL)

EL 19.75"

(TYPICAL)

EL 19.75"

1.25"1.25"

0.5"

TYP.

0.75"

2"

1.25"1.25"

0.5"

TYP.

1.5"

1.25"1.25"

0.5"

TYP.

0.5"

1.5"

0.5"0.5"0.5"

INSTALL FLUE ABOVE BLACKOUT

SYSTEM IN THIS ROOM ONLY.SEE GM-150

PEAK

EL ± 19' - 10"

FLOOR SLAB

EL 0' - 0"

TOP OF KNEEWALL

EL 2' - 6"

TOP OF GIRT

EL 3' - 6"

U/S OF GIRT

EL 7' - 2"

UNDER GUTTER

EL 12' - 0"

U/S OF PERIMETER GIRT

EL 11' - 7"

0.5"

(TYPICAL)

EL ± 127"

(TYPICAL)

EL ± 127"

(TYPICAL)

EL ± 127"

GM-210

GM-210

U/S OF PERIMETER GIRT

EL 11' - 7"

TOP OF KNEEWALL

EL 2' - 6"

FLOOR SLAB

EL 0' - 0"

AREA FOR PIPE SERVICES.

PROVIDE GROMMETS WHERE PIPE

CROSSES ALUMINUM SHEET.

SASH

GM-210GM-210

GM-210 GM-210

NATURAL GAS PIPING

SCALE 1 1/2"=1'-0"

GRID

FLOOR SLAB

EL 0' - 0"

TOP OF KNEEWALL

EL 2' - 6"

BENCH

OUTLINE

GALVANIZED STEEL

NATURAL GAS PIPING

GALVANIZED STEEL

SUPPORT, ANCHOR

TO WALL

GM-210

GM-210

GLASS

Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:26:36 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\1312 GM-210 PERIM. HEATING.dwg Save Date: 04/12/2019 09:40 AM

PERIM. HEATING

GM-210

S S

S S

S S

S S

S S

S S

S S

S S

S S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S S

S S

S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S

S

S

S

S

TYPICAL GREENHOUSE SECTION

GREENHOUSE PLAN - WATER SYSTEMS

FERTILIZER INJECTION CONNECTION PORTS

PIPING LAYOUT IN CORRIDORTYPICAL OUTLET ELEVATION

IN COMPARTMENT

GRID

TWW IRRIGATION SOLENOID VALVE

LEGEND

GREENHOUSE

SIDE

CORRIDOR

SIDE

SCREEN BOX

SCREEN BOX

TRUSS LINE

A B C D E F G H J K L M N O P Q R S T U V W X Y

CONCRETE SLAB

ROOT WASHINGROOT WASHING

S C

R E

N

X

S C

R E

X

TYPICAL THRU COORIDOR WALL

IN COMPARTMENT

Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:26:42 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\1312 GP-100 PLUMBING WATER SYSTEMS.dwg Save Date: 04/12/2019 09:41 AM

GREENHOUSE PLUMBING

SERVICES

GP-100

TRUSS LINE

A B C D E F G H J K L M N O P Q R S T U V W X Y

CONCRETE SLAB

ROOT WASHINGROOT WASHING

S C

R E

X

S C

R E

X

GUTTER DOWNSPOUT

VENT PIPE

TYPICAL GREENHOUSE SECTION

GUTTER DOWNSPOUT

GRID

GREENHOUSE PLAN - STORM AND SANITARY SYSTEM

VC1 SANITARY PIT

FLOOR DRAIN (F-D1 TYPE)

GRID

Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:26:48 PM Saved By: DEJAN.TADIC File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\1312 GP-110 STORM & SANI.dwg Save Date: 04/22/2019 11:50 AM

GREENHOUSE STORM &

SANITARY DRAINAGE

GP-110

M

ZONE VALVE SCHEMATIC

TYPICAL GREENHOUSE SECTION

FOG NOZZLE

TYP. FOG NOZZLES

GRID

GREENHOUSE PLAN - FOG SYSTEM & LAB GASES PLAN

FOG PUMPING SYSTEM SCHEMATIC

SERVICES ENTRY / ALL DOORS

SCREEN BOX

SCREEN BOX

TRUSS LINE

A B C D E F G H J K L M N O P Q R S T U V W X Y

CONCRETE SLAB

ROOT WASHINGROOT WASHING

S C

R E

X

S C

R E

X

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

CA OUTLET

GRID

Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:26:53 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\1312 GP-120 FOG SYSTEM & LAB GASES.dwg Save Date: 04/12/2019 09:44 AM

GREENHOUSE FOG SYSTEM

& LAB GASES

GP-120

Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:26:58 PM Saved By: NICOLE.SERAFIN File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\05302 GE-100.dwg Save Date: 04/15/2019 04:15 PM

GREENHOUSE & ISOLATION

UNITS - LEGENDS &

SCHEDULES

GE-100

ELECTRICAL SHEET LIST

SHEET DRAWING TITLE

1 GE-100 GREENHOUSE & ISOLATION UNITS - LEGENDS & SCHEDULES

2 GE-300 GREENHOUSE-LIGHTING LOCATIONS

3 GE-400 GREENHOUSE-PANEL LOCATIONS

4 GE-401 GREENHOUSE-COMPONENTS LOCATIONS

5 GE-402 GREENHOUSE-VOICE DATA & POWER OUTLETS LOCATIONS

6 GE-403 GREENHOUSE-GENERAL CONDUITS ROUTING

7 GE-404 ISOLATION UNITS-ELECTRICAL SYSTEMS

8 GE-500 GREENHOUSE-FIRE ALARM AND SECURITY LOCATIONS

9 GE-501 GREENHOUSE-VOICE DATA FIRE ALARM AND SECURITY DIAGRAMS (MSC)

10 GE-600 GREENHOUSE-POWER CONTROL DIAGRAMS (MSC)

11 GE-601 GREENHOUSE-GENERAL CONTROL DIAGRAMS AND SENSORS TABLE

12 GE-700 GREENHOUSE-POWER DISTRIBUTION

13 GE-701 GREENHOUSE-PANEL SCHEDULES

14 GE-800 GREENHOUSE-LIGHTING DETAILS

15 GE-801 GREENHOUSE-INSTALLATION DETAILS

16 GE-802 GREENHOUSE-INSTALLATION DETAILS

PLANT

BRDG

PLANT

BRDG

PLANT

BRDG

PLANT

BRDG

PLANT

BRDG

B07

TRUSS LINE

A B C D E F G H J K L M N O P Q R S T U V W X Y

CONCRETE SLAB

ROOT WASHINGROOT WASHING

PHASE 2 ALTERNATE No 3001

Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:27:05 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\05302 GE-300.dwg Save Date: 04/12/2019 11:53 AM

GREENHOUSE-LIGHTING

LOCATIONS

GE-300

PLANT

BRDG

PLANT

BRDG

PLANT

BRDG

PLANT

BRDG

PLANT

BRDG

B07

TRUSS LINE

A B C D E F G H J K L M N O P Q R S T U V W X Y

CONCRETE SLAB

ROOT WASHINGROOT WASHING

Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:27:08 PM Saved By: NICOLE.SERAFIN File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\05302 GE-400.dwg Save Date: 04/15/2019 01:58 PM

GREENHOUSE-PANEL

GE-400

PLANT

BRDG

PLANT

BRDG

PLANT

BRDG

PLANT

BRDG

PLANT

BRDG

B07

TRUSS LINE

A B C D E F G H J K L M N O P Q R S T U V W X Y

CONCRETE SLAB

ROOT WASHINGROOT WASHING

Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:27:12 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\05302 GE-401.dwg Save Date: 04/12/2019 11:54 AM

GREENHOUSE-COMPONENTS

GE-401

PLANT

BRDG

PLANT

BRDG

PLANT

BRDG

PLANT

BRDG

PLANT

BRDG

B07

TRUSS LINE

A B C D E F G H J K L M N O P Q R S T U V W X Y

CONCRETE SLAB

ROOT WASHINGROOT WASHING

Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:27:15 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\05302 GE-402.dwg Save Date: 04/12/2019 11:55 AM

GREENHOUSE-VOICE DATA

& POWER OUTLETS

GE-402

PLANT

BRDG

PLANT

BRDG

PLANT

BRDG

PLANT

BRDG

PLANT

BRDG

B07

TRUSS LINE

A B C D E F G H J K L M N O P Q R S T U V W X Y

CONCRETE SLAB

ROOT WASHINGROOT WASHING

Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:27:22 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\05302 GE-403.dwg Save Date: 04/12/2019 11:55 AM

GREENHOUSE-GENERAL

CONDUITS ROUTING

GE-403

FRESH AIR INTAKE

G16G15G14G13G12G11G10G9G8G7G6G5G4G3G2G1

GA

GB

GC

GD

MAKE-UP AIR

ISU-MAU-1

SEE DRAWING

HM-105

GA GB

GC GD

Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:27:28 PM Saved By: NICOLE.SERAFIN File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\05302 GE-404.dwg Save Date: 04/15/2019 01:58 PM

ISOLATION

UNITS-ELECTRICAL

SYSTEMS

GE-404

PLANT

BRDG

PLANT

BRDG

PLANT

BRDG

PLANT

BRDG

PLANT

BRDG

B07

TRUSS LINE

A B C D E F G H J K L M N O P Q R S T U V W X Y

CONCRETE SLAB

ROOT WASHINGROOT WASHING

Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:27:31 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\05302 GE-500.dwg Save Date: 04/12/2019 11:57 AM

GREENHOUSE-FIRE ALARM

AND SECURITY LOCATIONS

GE-500

Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:27:36 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\05302 GE-501.dwg Save Date: 04/12/2019 11:57 AM

GREENHOUSE-VOICE DATA

FIRE ALARM AND SECURITY

DIAGRAMS (MSC)

GE-501

Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:27:39 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\05302 GE-600.dwg Save Date: 04/12/2019 11:58 AM

GREENHOUSE-POWER

CONTROL DIAGRAMS (MSC)

GE-600

Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:27:42 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\05302 GE-601.dwg Save Date: 04/12/2019 11:58 AM

GREENHOUSE-GENERAL

CONTROL DIAGRAMS AND

SENSORS TABLE

GE-601

Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:27:45 PM Saved By: NICOLE.SERAFIN File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\05302 GE-700.dwg Save Date: 04/15/2019 03:54 PM

GREENHOUSE-POWER

DISTRIBUTION

GE-700

Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:28:06 PM Saved By: NICOLE.SERAFIN File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\05302 GE-701.dwg Save Date: 04/15/2019 01:58 PM

GREENHOUSE-PANEL

GE-701

Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:28:16 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\05302 GE-800.dwg Save Date: 04/12/2019 01:29 PM

GREENHOUSE-LIGHTING

GE-800

Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:28:21 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\05302 GE-801.dwg Save Date: 04/12/2019 01:29 PM

GREENHOUSE-INSTALLATION

GE-801

A

Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:28:25 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\05302 GE-802.dwg Save Date: 04/12/2019 01:30 PM

GREENHOUSE-INSTALLATION

GE-802

CONCRETE SLAB

USED SOIL

DUMP AREA

CONCRETE SLAB

MOBILE BENCH

RELOCATE 4 EXISTING

INCUBATORS STORED ON SITE

TO THIS LOCATION

RELOCATE 1 EXISTING

UPRIGHT FREEZER

STORED ON SITE

TO THIS LOCATION

FIXED COUNTER/SINK

CONCRETE SLAB

EXISTING NITROGEN GENERATOR

AND STORAGE EQUIPMENT STORED ON SITE

TO MOVE TO THIS LOCATION

RELOCATE 3 EXISTING

REFRIGERATORS

STORED ON SITE

TO THIS LOCATION

RELOCATE 2 EXISTING

COLD ROOMS STORE

ON SITE TO THIS LOCATION

RELOCATE 2 EXISTING COLD ROOMS

STORED ON SITE TO THIS LOCATION

HEADHOUSE / GREENHOUSE PLAN VIEW

SCALE 1/8" = 1'-0"

HA-100

HA-200

HA-100

HA-200

HA-100

HA-200

HA-100 HA-200

HA-100

HA-105

HA-100

HA-300

HA-100

HA-300

HA-100

HA-300

HA-100

HA-300

HA-100

HA-105

HA-100 HA-300

CONTAINER

BOLLARD

HA-100 HA-400

HA-100

HA-300

MECHANICAL / ELECTRICAL

ROOM

HH.03

GENERAL STORAGE

POTS & MEDIA

TELECOM

JANITOR

CHEMICAL

SPRAY

ROOM

INOCULATION

SPRAY

ROOM

PHOTO/

LAUNDRY

HH.01

HH.02

CORRIDOR

HH.04

HH.05

HH.06

HH.07

HH.08 HH.09

MANAGER'S

OFFICE

SOIL

WORK AREA

VIROLOGY

INSECTARY #2

VIROLOGY

INSECTARY #1

INSECTARY

TRANSFER

STEAM

AUTOCLAVE

ROOM

COLD ROOMS

POTTING/SOIL MIXING AREA

POST HARVEST

ENTOMOLOGY

CORRIDOR

HH.10

HH.11

HH.12

HH.13

HH.14

HH.15

HH.16

HH.17 HH.18

HH.19

HH.20

CART

SPACE

W/ LIGHTING

EXISTING

COLD ROOM

EXISTING

COLD

ROOM

FUTURE

COLD ROOM

CONCRETE SLAB

A B C D E F G H J K L M N O P Q R S T U V W X Y

UNASSIGNED

PLANT PATH.PLANT PATH.

PLANT PATH.PLANT PATH.

PLANT PATH.PLANT PATH.

PLANT PATH.PLANT PATH.

PLANT PATH.

PLANT

BRDG

CROPCROPBIOLOGY

BIOLOGY

BIOLOGY

BIOLOGY

BIOLOGY

CROPCROP

CROP

CROP

CROP

PLANT

BRDG

PLANT

BRDG

UNASSIGNED UNASSIGNED

PLANT

BRDG

PLANT

BRDG

C09

C07

C05

C03

C01

C08

C10

C06

C04

C02

B09

B07

B05

B03

B01

B11

B08

B06

B04

B02

A09

A07

A05

A03

A01

A11

A10

A08

A06

A04

A02

B10

CORRIDOR CORRIDOR CORRIDOR

PHASE 2 ALTERNATE

NO. 3001

RESTROOM

& SHOWER

RESTROOM

& SHOWER

Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:28:29 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\1312 HA-100 OVERALL FLOOR.dwg Save Date: 04/12/2019 01:30 PM

HEADHOUSE GREENHOUSE

EGRESS AND OVERALL

FLOOR PLAN

HA-100

PARTIAL HEADHOUSE / EAST PLAN VIEW

SCALE 1/4"1'-0"HA-100

HA-105

HH.01A

H H

B

H H

A

H H

B

HH.02D

H H

C

H H

A

H H

A

H H

B

HH.07

H H

H H

H H

H H

H H

H H

B

H H

C

HH.11A HH.11B

HH.12

HH.13

HH.14

HH.15

H H

A

H H

B

HH.20

HH.19

H H

H H

HA-105

HA-400

HA.105 HA.400

HA.105 HA.400

HA.105 HA.400

HA.105 HA.400

HA.105 HA.400

HA-105

HA-400

HA.105 HA.400

HA-105

HA-400

HA-105

HA-400

HA-105

HA-400

HA-105

13B

HA-400

HA-105

HA-400

HA-105

HA-400

W/ 6" METAL STUD

ACCOUSTICAL INSULATION ON ALL

PERIMETER FOR THIS ROOM ONLY

HA-105

HA-310

HA.105 HA.400

HA-105

HA-400

PARTIAL HEADHOUSE / WEST PLAN VIEW

SCALE 1/4"1'-0"HA-100

HA-105

A

A

A

HA-105

HA-305

HA-105

HA-305

WALL BUMPER

WALL BUMPER

WALL BUMPER

HA-105

HA-310

HA-105

HA-400

HA.105

4A

HA.400

WALL BUMPER

LOCKERS

SEE DETAIL 1, HA-400

WALL BUMPER

SHELF STORAGE SYSTEM

SEE HA-400

OVERHEAD

DOOR

SEE…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .