20190827_USDA_Greenhouse_Drawings_Bid_Set.pdf
PDF 28 MB Posted
- Solicitation number
- 1232SA19R0033
About this file
This federal contract opportunity notice describes a solicitation for the modernization of the Agricultural Research Service Technology Center in Salinas, California. The project involves demolishing outdated buildings and constructing new research facilities in two phases, including a West and East Lab/Office building and a Headhouse/Greenhouse. Construction services will be provided through a design-bid-build project delivery method using completed design drawings and specifications. The estimated period of performance is 1440 calendar days. The North American Industry Classification System code is 236220 and the small business set-aside size standard is $36.5 million. The contract will be awarded using best value tradeoff including past performance, team experience, and project approach, with all factors other than cost being approximately equal to price. Bid bonds are required and performance and payment bonds will be required of the successful offeror. The solicitation is anticipated to be posted on August 28, 2019 with a pre-bid walkthrough on September 12 and proposals due on October 11.
Volume 2
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SYMBOLS, ABBREVIATIONS,
LEGEND, AND INDEX OF
DRAWINGS VOL. 2
G001
A B C D E F G H J K L M N O P Q R S T U V W X Y
SANITARY BASIN
PROVIDE COVER OVER
THE SANITARY BASIN
PHASE 2 ALTERNATE
NO. 3001
HEADHOUSE / GREENHOUSE PLAN VIEW
SCALE 1/8" = 1'-0"
FLOOR SLAB
EL 0' - 0"
TOP OF KNEEWALL
EL 2' - 6"
TOP OF KNEEWALL
EL 2' - 6"
FLOOR SLAB
EL 0' - 0"
PEA GRAVEL
GS-100
GS-100
GS-100
GS-100
TOP OF CONCRETE AT EL. 2'-6" FOR
ALL GREENHOUSE KNEEWALLS,
TYP. UNO
TOP OF CONCRETE
AT EL. 4'-0"
TWO WALLS ONLY
TOP OF CONCRETE
AT EL. 4'-0" FOR
SCREENBOX, TYP.
DOOR DOOR DOOR
DOOR
DOOR
DOOR
DOOR
SLAB ON GRADE
SLAB ON GRADESLAB ON GRADE
SLAB ON GRADE
EL. 0
HH.15
HH.13
HH.10
HH.03
HH.01
HH.17 HH.18
SLAB ON GRADE
PEA
GRAVEL
INSIDE
PEA
GRAVEL
INSIDE
FOC
DOOR
OPENING
FOC
FUNNEL
DRAIN
DOOR
KNEEWALL ON GRID 1
THIS PART FOR BLOCKS "A" AND "B" ONLY
(SCREEN BOX)
DOOR OPENING
DOOR
OPENING
10'-0" X 10'-0"
EXT. SLAB
10'-0" X 10'-0"
EXT. SLAB
10'-0" X 10'-0"
EXT. SLAB
ACTUAL FLOOR ELEVATION: REFER TO CIVIL DWG
FLOOR SLAB
EL 0' - 0"
TOP OF KNEEWALL
EL 4' - 0"
DOOR
OPENING
TOP OF KNEEWALL
EL 2' - 6"
4'-0" HIGH WALL ON GRID 12
AT THAT LOCATION
4' HIGH WALL. DOWN TO
2'-6" NORTH OF GRID 12.
BLOCK "A" LINK SECTION
SCALE 1/4" = 1'-0"
GS-100GS-100GS-100GS-100
GS-100GS-100
GS-100
GS-100
GS-100 GS-100
GS-100GS-100
FLOOR SLAB
EL 0' - 0"
SLAB ON
GRADE
FLOOR SLAB
EL 0' - 0"
SANITARY PIT FLOOR
EL -4' - 10"
SANITARY BASIN PIT
SCALE 1/4" = 1'-0"
GS-100GS-100
GS-100
GS-100
HH.04
HH.11
HH.12
SOLID
INTERCEPTOR
FUNNEL
DRAIN
TYPICAL SLAB-ON-GRADE
JOINT PATTERN, SEE
DWG. S301
DOOR
BOLLARD
TOP OF KNEEWALL
EL 0' - 8"
TYPICAL SLAB-ON-GRADE
JOINT PATTERN, SEE
DWG. S301
FOOTING
SEE
GS-106GS-100
TYP.
SEE 2/GS-106
GS-106
TYP
GS-106
TYP
GS-106
TYP
G S
T Y
P
VOLUME 1
F O
C
GS-106
TYP
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:24:52 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\1312 GS-100 FOUNDATION.dwg Save Date: 04/12/2019 09:16 AM
HEADHOUSE GREENHOUSE
FOUNDATION PLAN
GS-100
TOP OF CONCRETE
AT EL. 8'-4"
NEW UNCOMPACTED SANDY
LOAM TOPSOIL
1'-6" DEEP
SLAB ON GRADE
COMPACTED LOCAL
SOIL
COMPACTED LOCAL
SOIL
NEW UNCOMPACTED SANDY
LOAM TOPSOIL
1'-6" DEEP
NEW UNCOMPACTED SANDY
LOAM TOPSOIL
SLAB ON GRADE
UNDISTURBED
SOIL
UNDISTURBED
SOIL
FOOTING
UNDISTURBED
SOIL
G16G15G14G13G12G11G10G9G8G7G6G5G4G3G2G1
GA
GB
GC
GD
GD
FINISH INTERIOR
ELEVATION AND
GRADE OUTSIDE
EL 0' - 0"
TOP OF KNEEWALL
EL 1' - 6"
ISOLATION UNIT PLAN VIEW
SCALE 1/4" = 1'-0"
GS-105 GS-105
ISOLATION UNIT TYPICAL SECTION
SCALE: 1 1/4" = 1'-0"GS-105
GS-105
GA
GC
GB
SOIL SURFACE
DOOR
TOP OF KNEEWALL
EL 1' - 6"
ISOLATION UNIT TYPICAL ELEVATION
SCALE 1 1/4" = 1'-0"GS-105
GS-105
SOIL SURFACE
AIR EXHAUST SLEEVE
AT ODD GRIDS, Ø7"
FRENCH DRAIN
GS-105
GS-105
AIR EXHAUST SLEEVE
AT ODD GRIDS Ø7"
INTERIOR KNEEWALL
WHERE REQUIRED
10" x 28" HVAC DUCT
SEE GM-145 FOR AIR
DISTRIBUTION SYSTEMS
AIR SUPPLY SLEEVE
AT EVEN GRIDS 12" x 30"
ADDITIONAL CORE DRILLING
WILL BE REQUIRED FOR WATER
SERVICES, TYPE Ø1" MAX HOLES
ACTUAL FLOOR ELEVATION: REFER TO CIVIL DWG
AIR EXHAUST SLEEVE
AT ODD GRIDS, Ø7"
INTERIOR KNEEWALL
WHERE REQUIRED
AIR EXHAUST SLEEVE
AT ODD GRIDS, Ø7"
COLLECTOR
TO POND AT SOUTH
FINISH INTERIOR
ELEVATION AND
GRADE OUTSIDE
EL 0' - 0"
BOTTOM FILLED SOIL /
TOP OF DUCT OPENING
EL -1' - 6"
TOP OF FOOTING
EL -2' - 6"
INVERT AT GRID G1
EL = SEE CIVIL
Ø 4" FRENCH DRAIN.
DRAIN TO POND ON SOUTH, SEE CIVIL
INVERT AT GRID G1
EL = SEE CIVIL
INVERT - SEE CIVIL
SLAB STARTS AT ± 20'-4"
WEST OF BUILDING 22.
FIELD VERIFY
BOTTOM FILLED SOIL /
TOP OF DUCT OPENING
EL -1' - 6"
TOP OF FOOTING
EL -2' - 6"
5" CONCRETE SLAB ON GRADE
WITH 1/4" X 1/4"-W 1/8" X 1/8" WWF
LOCATED 1" FROM TOP OF SLAB
CLR
Ø4" FRENCH DRAIN.
DRAIN TO RETENTION
BASIN ON SOUTH.
SEE PLUMBING FOR PIPE
LAYOUT
FOOTING TYP
SLAB ENDS AT MINIMUM 4'-11" EAST
OF BUILDING 39C. FIELD VERIFY
BOTTOM OF WALL
GS-106GS-105
PROVIDE 1" GAP
OPEN OPEN
AIR SUPPLY SLEEVE
AT EVEN GRIDS 12" X 30"
OPEN
GS-106GS-105
TYP.
OPEN OPEN OPEN
PROVIDE 1" GAP
BELOW GRADE
DUCTWORK, SEE
MECH.
GS-105 GS-105
TYP
TYP
T Y
P
G13G12G11G10
TYP
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:24:58 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\1312 GS-105 ISOLATION UNIT FOUNDATION.dwg Save Date: 04/12/2019 09:16 AM
ISOLATION UNIT
FOUNDATION PLAN
GS-105
ADDITIONAL REBAR AT SLEEVES
SCALE: 1 1/2"=1'-0"
PILASTER REINF. DETAIL AT HEADHOUSE
SCALE: 1 1/2"=1'-0"
TYPICAL SECTION AT HEADHOUSE
SCALE: 1 1/2"=1'-0"
TYPICAL SECTION AT ISOLATION UNIT
SCALE: 1 1/2"=1'-0"
TYPICAL SECTION AT GREENHOUSE
SCALE: 1 1/2"=1'-0"
SECTION
SCALE: 1 1/2"=1'-0"
TYPICAL FOOTING AT GREENHOUSE
SCALE: 1 1/2"=1'-0"
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:25:01 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\1312 GS-106 FOUNDATION SECTIONS.dwg Save Date: 04/12/2019 09:17 AM
GREENHOUSE-HEADHOUSE
FOUNDATION SECTIONS
AND DETAILS
GS-106
ROOF ACCESS ASSEMBLY
SCALE 1/8" = 1'-0"GS-110
GS-110
GLASS
TRUSS LINE
TYPICAL
FOR A-8, A-10 AND
B-10 ONLY
SEE DETAILS
ON GM-140
"X" BRACE
0.5" STEEL
ROD, TYPICAL
UNASSIGNED
PLANT PATH.PLANT PATH.
PLANT PATH.PLANT PATH.
PLANT PATH.PLANT PATH.
PLANT PATH.PLANT PATH.
PLANT PATH.
PLANT
BRDG
CROPCROPBIOLOGY
BIOLOGY
BIOLOGY
BIOLOGY
BIOLOGY
CROPCROP
CROP
CROP
CROP
PLANT
BRDG
PLANT
BRDG
UNASSIGNED UNASSIGNED
PLANT
BRDG
PLANT
BRDG
C09
C07
C05
C03
C01
C08
C10
C06
C04
C02
B09
B07
B05
B03
B01
B11
B08
B06
B04
B02
A09
A07
A05
A03
A01
A11
A10
A08
A06
A04
A02
B10
CORRIDOR CORRIDOR CORRIDOR
A B C D E F G H J K L M N O P Q R S T U V W X Y
PHASE 2 ALTERNATE
NO. 3001
GS-110
GS-140
GS-110
GS-140
GS-110
GS-140
GS-140
GS-110
GS-140
GS-110
GS-110
GS-140
GS-110
GS-140
GS-110GS-130
GS-110 GS-130
GS-110
GS-130
GS-130
GS-110
GS-110
GS-110
GS-110
GS-120
GS-110
GS-150
GS-110
GS-120
GS-110
GS-150
GS-110
GS-110
GS-110
GS-110
PEAK
EL ± 14' - 11"
FLOOR SLAB
EL 0' - 0"
TOP OF KNEEWALL
EL 2' - 6"
UNDER GUTTER
EL 12' - 0"
U/S OF PERIMETER GIRT
EL 11' 6"
U/S OF GIRT
EL 7' - 2"
FLOOR SLAB
EL 0' - 0"
TOP OF KNEEWALL
EL 2' - 6"
UNDER GUTTER
EL 12' - 0"
U/S OF PERIMETER GIRT
EL 11' - 7"
U/S OF GIRT
EL 7' - 2"
GREENHOUSE PLAN VIEW
SCALE 1/8"=1'-0"
0.1% BUILDING SLOPE0.1% BUILDING SLOPE
PEA GRAVEL
6" THICK
GS-110 GS-120
GS-110
GM-140
SEE GM-110 FOR VENT INFORMATION
SEE GM-110 FOR
SASH INFORMATION
SEE PLAN VIEW FOR EXTEND
OF SCREENBOX
SPECIAL CONCRETE
HEIGHT ON THIS WALL
SEE STRUCTURAL
GS-100 AND GS-106
GS-110
GS-130
A07 A08
A09 A10
A05 A06
A03 A04
A01 A02
A11A
A11B
B09 B10
B11A
B07 B08
B05 B06
B03 B04
B01 B02
B11B
C09
C08
C10A
C07
C05 C06
C03 C04
C01 C02
C10B
PEAK
EL ± 19' - 10"
FLOOR SLAB
EL 0' - 0"
TOP OF KNEEWALL
EL 2' - 6"
TOP OF GIRT
EL 3' - 6"
U/S OF GIRT
EL 7' - 2"
UNDER GUTTER
EL 12' - 0"
U/S OF PERIMETER GIRT
EL 11' - 7"
26¡0'0"
ABOVE 4'-0"
GS-110
GS-140
GS-140
GS-110
BETWEEN
2'-6" & 4'-0"
GS-110
GS-140
26¡ 0' 0"
GS-110
GS-110
TOP VIEW
HORIZONTAL
DIMENSIONS
ALUMINUM SAFETY
GRATING WELDED ON
RAFTERS
PRE CAMBERED
ALUMINUM RAFTER
PLASTIC CAP AT EACH LEGS.
ADAPT SHADE TO SIT ON
LOWER VENT EXTRUSION
QTY: 2 ASSEMBLIES REQUIRED FOR THE PROJECT
ALUMINUM SAFETY GRATING
"X" BRACE
0.5" STEEL ROD
TYPICAL
GS-110
GS-140
TRUSS TYPICAL
TRUSS TYPICAL
0.5" STEEL ROD
TYPICAL
GS-110GS-110
PEAK
EL ± 14' - 11"
FLOOR SLAB
EL 0' - 0"
UNDER GUTTER
EL 12' - 0"
U/S OF PERIMETER GIRT
EL 11' - 7"
U/S OF GIRT
EL 7' - 2"
OFF
TRUSS
"X" BRACE ON GRID
OFFSET "X" BRACE
ROOF "X" BRACE
XXX COMPARTMENT NUMBER
XXX DOOR NUMBER (GS-150)
LEGEND
TOP OF KNEEWALL
EL 4' - 0"
TOP OF KNEEWALL
EL 2'-6"
4'-0" HIGH WALL.
DOWN TO 2'-6" NORTH OF GRID 12.
U/S OF PERIMETER GIRT
EL 11' - 7"
TOP OF KNEEWALL
EL 2' - 6"
FLOOR SLAB
EL 0' - 0"
PROVIDE ALUMINUM
SHEET PANEL ABOVE DOOR
SASH
SERVICES ENTRY / ALL DOORS
SCALE 1" = 2'-0"GS-110
GS-110 TYPICAL
GS-110 GS-110
LOWER END TO FIT
SAFELY IN GUTTER
SEE GM-140
SEE GM-140
PEAK
EL ± 15' - 0"
ROOF "X" BRACE
TYP.
ROOF "X" BRACE
TYP.
ROOF "X" BRACE
TYP.
PROVIDE ALUMINUM
SHEET PANEL ABOVE DOOR
PROVIDE ALUMINUM
SHEET PANEL ABOVE DOOR
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:25:08 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\1312 GS-110 STRUCTURE.dwg Save Date: 04/12/2019 09:17 AM
GREENHOUSE STRUCTURE
GS-110
FLOOR SLAB
EL 0' - 0"
U/S OF GUTTER
EL 12' - 0"
PEAK
EL ± 19' - 10"
TOP OF KNEEWALL
EL 2' - 6"
Q JKLMNOPY RSTVWX H ABCDEFG
GREENHOUSE NORTH ELEVATION
SCALE 1/8"=1'-0"GS-110
GS-120
GREENHOUSE EAST ELEVATION
SCALE 3/16"=1'-0"GS-110
GS-120
PEAK
EL ± 19' - 10"
FLOOR SLAB
EL 0' - 0"
U/S OF GUTTER
EL 12' - 0"
TOP OF KNEEWALL
EL 2' - 6"
GLAZING SEE SCHEDULE ON GS-110
WHITE ACRYLIC
SEE SCHEDULE ON GS-110
UNIT HEATER
POWER VENTS
PEAK
EL 13' - 4"
13 12 11 10 9 8 7 6 5 4 3 2 114
GREENHOUSE WEST ELEVATION
SCALE 3/16"=1'-0"GS-110
GS-120
PEAK
EL ± 19' - 10"
FLOOR SLAB
EL 0' - 0"
U/S OF GUTTER
EL 12' - 0"
TOP OF KNEEWALL
EL 2' - 6"
GLAZING SEE SCHEDULE ON GS-110
WHITE ACRYLIC
SEE SCHEDULE ON GS-110
UNIT HEATER POWER VENTS.
PROVIDE GALVANIZED STEEL SHEET AROUND
UNIT HEATER FLUE PIPE (TYPICAL)
PEAK
EL 13' - 4"
13121110987654321 14
TOP OF KNEEWALL
EL 4' - 0"
SEE HA-200
SEE HA-200
SPECIAL CONCRETE CONDITION
ON GRIDS "12" AND "D" IN THIS AREA.
SEE GS-100 AND GS-110
U
CAPPED GUTTER
CAPPED GUTTER
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:25:14 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\1312 GS-120 ELEVATIONS.dwg Save Date: 04/12/2019 09:18 AM
GREENHOUSE ELEVATIONS
GS-120
INTERIOREXTERIOR
INTERIOR EXTERIOR
REPLACE GLASS WITH GALVANIZED STEEL SHEET
FOR POWER VENT PIPE WHERE INDICATED.
SEE GS-120 AND GM-210
REPLACE GLASS WITH GALVANIZED STEEL SHEET
FOR POWER VENT PIPE WHERE INDICATED.
SEE GS-120 AND GM-210
GUTTER
ALUMINUM FLASHING
ALUMINUM FLASHING
ALUMINUM FLASHING
CAULKING
CAULKING
CORRIDOR
SIDE
GREENHOUSE
SIDE
PERIMETER GIRT
GLASS
RAIL
DRIVE SHAFT
RACK
SASH
GLASS
U/S OF GUTTER
EL 12' - 0"
U/S OF PERIMETER GIRT / TRUSS
EL 11' - 7"
ALUMINUM EXTRUSION
2¡
CORRIDOR WALL SECT.
SCALE 1"=1'-0"GS-110
GS-130
ALUMINUM FLASHING.
SEAL THOROUGHLY BETWEEN
COMPARTMENTS
CAULKING
CAULKING
GIRT
PARTITION WALL SECT.
SCALE 1"=1'-0"GS-110
GS-130
GLASS
RAFTER
ALUMINUM EXTRUSION
PERIMETER GIRT
PERIMETER GIRT
ALUMINUM EXTRUSION
'Z' BAR
BUTT
JOINTS
BOTTOM SILL
GROUT UNDER FLASHING
CAULKING ON
BOTH SIDES
GLASS
TOP OF KNEEWALL
EL 2' - 6"
FLOOR SLAB
EL 0' - 0"
U/S OF GIRT
EL 7' - 2"
U/S OF GUTTER
EL 12' - 0"
U/S OF PERIMETER GIRT / TRUSS
EL 11' - 7"
GRID
SIDE WALL SECT.
SCALE 1"=1'-0"GS-110
GS-130
GROUT UNDER FLASHING
ALUMINUM FLASHING
CAULKING ON
BOTH SIDES
ALUMINUM TOP EXTRUSION
FLOOR SLAB
EL 0' - 0"
TOP OF KNEEWALL
EL 2' - 6"
U/S OF GUTTER
EL 12' - 0"
U/S OF PERIMETER GIRT / TRUSS
EL 11' - 7"
U/S OF GIRT
EL 7' - 2"
GIRT
BOTTOM SILL
EXHAUST FAN
SEE GM-130
CAULKING
ALUMINUM FLASHING
CAULKING
GLASS
DRIP GUTTER
TOP OF GIRT
EL 3' 6 3/8"
GLASS
PERIMETER GIRT
ALUMINUM FLASHING
ALUMINUM FLASHING
GABLE END
PERIMETER GIRT
GIRT
GABLE END SECT.
SCALE 1"=1'-0"
GS-110
GS-130
ROOF PURLIN
ALUMINUM EXTRUSION
GUTTER (BEYOND)
ALUMINUM
EXTRUSION
'Z' BAR
BUTT
JOINTS
BOTTOM SILL
U/S OF GUTTER
EL 12' - 0"
U/S OF PERIMETER GIRT /TRUSS
EL 11' - 7"
INSECT SCREEN
LINK WALL SECT.
SCALE 1"=1'-0"GS-110
GS-130
GROUT UNDER FLASHING
ALUMINUM FLASHING
CAULKING ON
BOTH SIDES
TOP OF KNEEWALL
EL 2' - 6"
U/S OF GUTTER
EL 12' - 0"
U/S OF PERIMETER GIRT / TRUSS
EL 11' - 7"
CAULKING
GRID
5/8" WHITE ACRYLIC
ALUMINUM FLASHING
U/S OF GIRT
EL 7' - 2"
BOTTOM SILL
CAULKING
NEOPRENE WASHER
OR ALUMINUM EXTRUSION
INSULATED SPANDREL
PANEL BELOW EXHAUST FANS
SASH.
REFER TO GM-120
HALF-CAP GUTTERS
AT NORTH END
ALUMINUM FLASHING
TO SEAL COMPARTMENT
FULLCAP GUTTERS
AT SOUTH END
GLASS
GLASS
GLASS
GLASS
GLASS
GRIDGRID
FLOOR SLAB
EL 0' - 0"
TOP OF KNEEWALL
EL 2' - 6"
FLOOR SLAB
EL 0' - 0"
U/S OF GIRT
EL 7' - 2"
TOP OF KNEEWALL
EL 2' - 6"
FLOOR SLAB
EL 0' - 0"
U/S OF GIRT
EL 7' - 2"
GENERAL NOTE
1) PERIMETER GIRTS ARE REQUIRED AND
MANDATORY WHERE INDICATED REGARDLESS
OF STRUCTURAL IMPORTANCE IN
GREENHOUSE SYSTEM
2) ALL KNEEWALLS TO BE COVERED WITH
FLASHING. REFER TO SPECIFICATIONS
3) GLASS ON INTERIOR WALLS MUST BE ENTIRELY
WITHIN POST DEPTH, INCLUDING GLASS BARS
AND BAR CAPS
INTERIOR EXTERIOR
1" MIN., 2" MAX. 1" MIN., 2" MAX. 1" MIN., 2" MAX. 1" MIN., 2" MAX. 1" MIN., 2" MAX.
CAULKING ON
BOTH SIDES
CAULKING ON
BOTH SIDES
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:25:18 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\1312 GS-130 WALL SECTIONS.dwg Save Date: 04/12/2019 09:18 AM
GREENHOUSE WALL
SECTIONS
GS-130
PARTITION WALL
SCALE 1 1/2"=1'-0"GS-110
GS-140
EXTERIOR COLUMN VS PARTITION WALL
SCALE 1 1/2"=1'-0"GS-110
GS-140
GLASS
CONCRETE KNEEWALL 2' 6" HIGH
ALUMINUM EXTRUSION
ALUMINUM FLASHING
A
NOTE:
1 - ON PARTITION WALLS: GLAZING SHALL CLEAR
FACE OF COLUMN AS SHOWN ON THIS SHEET
2 - REFER TO GLAZING SCHEDULE ON GS-110
FOR DETAILED MATERIAL AND LOCATIONS
INTERIOR COLUMN AT PLANT PATH.
ROOM AND HEADHOUSE CORRIDOR
SCALE 1 1/2"=1'-0"
GS-110
GS-140
EXTERIOR COLUMN
SCALE 1 1/2"=1'-0"GS-110
GS-140
EXTERIOR COLUMN VS CORRIDOR
SCALE 1 1/2"=1'-0"GS-110
GS-140
GLASS
CONCRETE
KNEEWALL
ALUMINUM EXTRUSION
STEEL POST
4" X 4"
GRID
GRID
GLASS. MUST CLEAR
FACE OF COLUMN FOR
PERIMETER GIRT INSTALLATION
STEEL POST
4" X 4"
CONCRETE KNEEWALL
GRID
GRID
GLASS
ALUMINUM EXTRUSION
GRID
GRID
STEEL POST
4" X 4"
CONCRETE KNEEWALL
GLASS
ALUMINUM EXTRUSION
CONCRETE KNEEWALL
ALUMINUM EXTRUSION
STEEL POST
4" X 4"
GRID
GRID
GRID
GRID
ALUMINUM EXTRUSION
STEEL POST
4" X 4"
CONCRETE KNEEWALL
SPACER
CAULKING
ALUMINUM FLASHING
CORRIDOR VS PARTITION WALL
SCALE 1 1/2"=1'-0"GS-110
GS-140
CONCRETE KNEEWALL
STEEL POST
4" X 4"
GRID
GLASS
11Ga GALVANIZED STEEL STRUCTURAL
PLATE SECURED TO POST
VERTICAL ALUMINUM EXTRUSION
ALUMINUM FLASHING
0.5" WHITE ACRYLIC
OFFSET "X" BRACE
WHERE INDICATED
OFFSET "X" BRACES WHERE
INDICATED ON FLOOR PLAN
"X" BRACE 0.5" STEEL ROD
LOCATE "X" BRACES ON GRID
WHERE INDICATED ON FLOOR PLAN
LOCATE "X" BRACES ON GRID
WHERE INDICATED ON FLOOR PLAN
GLASS
CONCRETE KNEEWALL
ALUMINUM EXTRUSION
STEEL POST
4" X 4"
ALUMINUM FLASHING
GRID
GRID
"X" BRACE 0.5" STEEL ROD
STEEL POST
4" X 4"
EXTERIOR CORNER COLUMN
SCALE 1 1/2"=1'-0"
GS-110
GS-140
"X" BRACE
GLASS
CONCRETE KNEEWALL 2' 6" HIGH
ALUMINUM EXTRUSION
STEEL POST
4" X 4"
ALUMINUM FLASHING
A
"X" BRACE 0.5" STEEL ROD
"X" BRACE 0.5" STEEL ROD
EXTERIOR CORNER COLUMN
SCALE 1 1/2"=1'-0"
GS-110
GS-140
BETWEEN 2' 6" & 4'
EXTERIOR CORNER COLUMN
SCALE 1 1/2"=1'-0"
GS-110
GS-140
ABOVE 4'
ALUMINUM EXTRUSION
OFFSET "X" BRACE
WHERE INDICATED
0.5" STEEL ROD
KNEEWALL 4' HIGH
INSULATE, FLASH AND SEAL AGAINST
CONCRETE KNEEWALL OF GRID 12
CONCRETE KNEEWALL 4' HIGH
GLASS
GLASS. MUST CLEAR
FACE OF COLUMN FOR
PERIMETER GIRT INSTALLATION
- FLASHING OVER ALL KNEEWALLS IS MANDATORY
BUT NOT SHOWN ON THIS SHEET FOR CLARITY
GENERAL NOTE
GLASS. MUST CLEAR
FACE OF COLUMN FOR
PERIMETER GIRT INSTALLATION
DOOR TO GREENHOUSE COMPARTMENT
DOOR FRAME.
SEAL TO CONCRETE AND SPACER
GLASS. MUST CLEAR
FACE OF COLUMN FOR
PERIMETER GIRT INSTALLATION
OFFSET "X" BRACE
WHERE INDICATED
0.5" STEEL ROD
OFFSET "X" BRACE
WHERE INDICATED
0.5" STEEL ROD
JX HEADHOUSE GREENHOUSE LINKS
SCALE 1 1/2"=1'-0"GS-110
GS-140 BETWEEN 762 AND 3856 LEVEL
STEEL POST
4" X 4"
CONCRETE KNEEWALL
ALUMINUM
EXTRUSION
0.5" WHITE ACRYLIC
HEADHOUSE WALL
B Y
G
R E
E H
O U
S E
C
O N
T R
A C
T O
R
Y
G
R E
E H
O U
S
C
N
T R
A C
T O
R
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:25:22 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\1312 GS-140 STR AND GLAZ.dwg Save Date: 04/12/2019 09:32 AM
GREENHOUSE -
STRUCTURAL & GLAZING
DETAILS
GS-140
EXTEND FRAME FOR
DOUBLE DOORS
F1D5
DOOR TYPES : FRAME TYPES :
3.5' X 7' (INTERIOR)
ALUMINUM
D7
INSULATED
GLASS
7' X 8' (EXTERIOR)
ALUMINUM
D8
7' X 8' (INTERIOR)
ALUMINUM
SCHEDULED
DOOR
WIDTH
FRAME DETAIL
AA
SECTION A-A
GLASS
ALUMINUM DOOR FRAME
CONCRETE KNEEWALL
GLASS
ALUMINUM EXTRUSION
STEEL POST
CAULKING ON
BOTH SIDE
GLASS
ALUMINUM EXTRUSION
ALUMINUM FLASHING
COMPARTMENT DOOR
SCALE 1 1/2"=1'-0"GS-110
GS-150
TYPICAL
GRID
SPACER
CAULKING ON
BOTH SIDES
ALUMINUM FLASHING
DOOR FRAME.
SEAL TO CONCRETE AND SPACER
CAULKING ON BOTH SIDES
STEEL POST
GLASS
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:25:26 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\1312 GS-150 DOORS & SCHED.dwg Save Date: 04/12/2019 09:33 AM
GREENHOUSE - DOORS &
SCHEDULES
GS-150
SIDE VIEWFRONT VIEW
GS-160
GS-160
M/E AREA
G16G15G14G13G12G11G10G9G8G7G6G5G4G3G2G1
GA
GB
GC
GD
ISOLATION UNIT PLAN VIEW
SCALE 1/4"=1'-0"
GRADE
EL 0' - 0"
TOP OF KNEEWALL
EL 1' - 6"
GS-160 GS-160
GS-160
GS-160
GB GA
26¡0'0"
ISOLATION UNIT SOUTH ELEVATION
SCALE 1/2"=1'-0"
GS-160
GS-160
G16G15G14G13G12G11G10G9G8G7G6G5G4G3G2G1
GRADE
EL 0' - 0"
TOP OF KNEEWALL
EL 1' - 6"
ISOLATION UNIT TYPICAL SECTION
SCALE 1"=1'-0"GS-160
GS-160
GS-160
GS-160
ISOLATION UNIT WEST ELEVATION
SCALE 1/4"=1'-0"
GS-160
GS-160
EAVE
EL 8' - 0"
TOP OF DOOR FRAME
EL 6' - 7"
PEAK
EL ± 10' - 6"
GS-160
GS-170
GS-160
GS-170
NO INTERIOR LONGITUDINAL WALL IN THIS AREA. (EAST WING ONLY)
SHELVES
COUNTER
MAKE-UP AIR
EAVE
EL 8' - 0"
1/8" TEMPERED GLASS
1" X 2" RIDGE VENT
ALUMINUM RIDGE EXTRUSION
STANDARD ALUMINUM
GLASS BARS AND CAPS
1/8" TEMPERED GLASS
2" T.S. SIDE POST
2" T.S. SIDE POST
1" X 2" GIRT
STANDARD BOTTOM SILL
STANDARD TOP SILL
1" X 2"
ROOF PURLIN
1" X 2"
ROOF PURLIN
STANDARD ALUMINUM
GLASS BARS AND CAPS
WHERE REQUIRED
GD GC
26¡0'0"
PEAK
EL ± 10' - 6"
GS-160GS-160
GRADE
EL 0' - 0"
U/S TRUSS
EL 8' - 4"
PEAK
EL 11' - 10"
PRE-ENGINEERED BUILDING
SCALE 1/2"=1'-0"GS-160
GS-160
GS-160
GS-160
COUNTER ELEVATION
SCALE 1/2"=1'-0"GS-160
GS-160
FINISHED
FLOOR
EL 0' - 4"
GRID GRID
26¡ 0' 0"
PARTITION WALL ELEVATION
SCALE 1/2"=1'-0"
GS-160
GS-160
1/8" ALUMINUM SHEET
IN LIEU OF GLASS AT EVERY PARTITION WALL
GS-160 GS-160
2" T.S. CENTER POST
GRADE
EL 0' - 0"
TOP OF KNEEWALL
EL 1' - 6"
EAVE
EL 8' - 0"
PEAK
EL ± 10' - 6"
3'-0" X 7'-0" ALUMINUM DOOR WITH
SINGLE PANE ANNEALED GLASS.
WINDOW 2'-0" X 3'-0".
ALUMINUM FRAME WITH THRESHOLD
COLOR WHITE.
2'-0" X 4'-0" OPERABLE WINDOW
WITH ALUMINUM FRAME.
SINGLE ANNEALED GLASS.
COLOR WHITE.
PROVIDE INSECT SCREEN.
PRE-ENGINEERED NON-INSULATED SHED.
DIMENSIONS ON DRAWING. MATCH COLOR AND
FINISH OF EXISTING NEARBY BUILDINGS.
ROOF GLAZING 1 PANE
ONLY PER SIDE (TYP.)
PROVIDE ISOLATION FLASHING
BETWEEN INDIVIDUAL UNITS
EPOXY COATED STEEL SHELVING SYSTEM,
DEPTH 2'-0", CAPACITY 100LBS
SEE SPECS 10675G
FLASHING REQUIRED ON ALL
KNEEWALLS
USE 20GA ALUMINUM
PROVIDE ISOLATION FLASHING
BETWEEN INDIVIDUAL UNITS
GA GB
FINISH
INTERIOR
ELEVATION
AND
OUTSIDE
GRADE
EL 0' - 0"
TOP OF
KNEEWALL
EL 1' - 6"
BOTTOM OF
FILLED SOIL
EL -1' - 5"
UNDER
FOOTING
EL -2' - 5"
EAVE
EL 8' - 0"
SLAB
9'-10" X 26'-3"
WATER SPRAY LINE
SEE GM-145
NOTES
- ALL GLAZING OF ISOLATION UNITS TO BE 1/8" TEMPERED
CLEAR FLOAT GLASS UNLESS OTHERWISE INDICATED.
REFER TO 08800G. PANES TO BE 2'-6" WIDE
- ALL ISOLATION UNITS STRUCTURAL COMPONENTS TO BE
ALUMINUM OR GALVANIZED STEEL.
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:25:32 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\1312 GS-160 I.U.STR&GLAZ.dwg Save Date: 04/12/2019 09:33 AM
ISOLATION UNITS -
STRUCTURE & GLAZING
GS-160
TYPICAL ISOLATION UNIT-FLOOR PLAN
SCALE 1"=1'-0"GS-160
GS-170
GRADE
EL 0' - 0"
TOP OF KNEEWALL
EL 1' - 6"
TYPICAL ISOLATION UNIT-FRONT VIEW
SCALE 1"=1'-0"GS-160
GS-170
FLAT ACRYLIC SHEET CLEAR,
" THICK OVER DOOR
PROVIDE WEATHER STRIPPING
ON 4 SIDES
HINGE TYP. OF 3
HANDLE
MANUAL
LOCKING DEVICE
1" X 2" GIRT1" X 2" INTERMEDIATE POST
2" X 2" GRID POST
TOP OF DOOR RAME
EL 6' - 7"
G4
GLASS
GLASS
CENTER LONGITUDINAL WALL NOT
REQUIRED IN SOME AREAS.
SEE PLAN VIEW ON GS-160
1"X2" INTERMEDIATE POST
2"X2"GRID POST
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:25:36 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\1312 GS-170 I.U.DETAILS.dwg Save Date: 04/12/2019 09:34 AM
ISOLATION UNITS - DETAILS
GS-170
PLAN VIEW
SECTION VIEW
ANGLE DRIVE
VENT MOTOR MOUNTED ON KING STRUT
GALVANIZED STEEL DRIVE SHAFT
TRUSS CHORD
ANGLE DRIVE
ANGLE DRIVE
VENT MOTOR MOUNTED ON KING STRUT
30°
A B C D E F G H J K L M N O P Q R S T U V W X Y
UNASSIGNED
PLANT PATH.PLANT PATH.
PLANT PATH.PLANT PATH.
PLANT PATH.PLANT PATH.
PLANT PATH.PLANT PATH.
PLANT PATH.
PLANT
BRDG
CROPCROPBIOLOGY
BIOLOGY
BIOLOGY
BIOLOGY
BIOLOGY
CROPCROP
CROP
CROP
CROP
PLANT
BRDG
PLANT
BRDG
UNASSIGNED UNASSIGNED
PLANT
BRDG
PLANT
BRDG
C09
C07
C05
C03
C01
C08
C10
C06
C04
C02
B09
B07
B05
B03
B01
B11
B08
B06
B04
B02
A09
A07
A05
A03
A01
A11
A10
A08
A06
A04
A02
B10
CORRIDOR CORRIDOR CORRIDOR
PEAK
EL ± 19' - 10"
FLOOR SLAB
EL 0' - 0"
TOP OF KNEEWALL
EL 2' - 6"
TOP OF GIRT
EL 3' - 6"
U/S OF GIRT
EL 7' - 2"
C.O. DRIVE SHAFT
EL 17' - 3"
UNDER GUTTER
EL 12' - 0"
U/S OF PERIMETER GIRT
EL 11' - 7"
GM-110
GM-110
VENT
MOTOR
DRIVE
SHAFT
TYP
GM-110
GM-110
GM-110
GM-110
VERTICAL SASH
RIDGE VENT OPENING
VERTICAL
SASH
GM-110
GM-110
GM-110
GM-110
GALVANIZED STEEL
CURVED RACKS
RIDGE VENT MOTOR
GALVANIZED STEEL
DRIVE SHAFT
INSECT SCREEN
C.O. DRIVE SHAFT
EL 17' - 3"
PEAK
EL ± 19' - 10"
GALVANIZED STEEL
CURVED RACKS
RIDGE VENT MOTOR
GALVANIZED STEEL
DRIVE SHAFT
REMOVABLE
INSECT SCREEN,
SEAL COMPLETELY
AT TRUSSES AND
ENDS. PROVIDE
1' 11
" X 1' 11
ACCESS
DOOR AT EACH
VENT MOTOR
C.O. DRIVE SHAFT
EL 17' - 3"
PEAK
EL ± 19' - 10"
GALVANIZED STEEL
CURVED RACKS
RIDGE VENT MOTOR
GALVANIZED STEEL
DRIVE SHAFT
INSECT SCREEN
VERTICAL SASH
SCALE 1" = 1'-0"GM-110 GM-110
CORRIDOR
SIDE
GREENHOUSE
SIDE
PERIMETER GIRT
DRIVE SHAFT
GLASS
U/S OF GUTTER
EL 12' - 0"
U/S OF PERIMETER GIRT
EL 11' - 7"
2°
GRID
TOP OF KNEEWALL
EL 2' - 6"
FLOOR SLAB
EL 0' - 0"
U/S OF GIRT
EL 7' - 2"
WEATHERSTRIP AROUND
PERIMETER OF SASH
GLASS IN SASH
INSECT SCREEN SEE SCHEDULE.
WEATHERSTRIPPED PANELS OF
INSECT SCREEN, REMOVABLE
FROM GREENHOUSE SIDE.
RIVETS ARE NOT ACCEPTABLE
DRIVE SHAFT LOCATE MOTORS
WHERE INDICATED ON PLAN.
ENSURE HARDWARE CLEARS DOOR
GIRT
ALUMINUM EXTRUSION
SASH RAIL
GREENHOUSE PLAN VIEW
SCALE 1/8" = 1'-0"
LOCATE MOTORS WHERE
INDICATED ON THIS SHEET
GALVANIZED TS
BETWEEN TRUSSES.
ATTACH TO TRUSS
REMOVABLE
INSECT SCREEN
SPRING LOCK
ALUMINUM EXTRUSION
CURVED RACK
SEAL BETWEEN TS
AND "C" CHANNEL
ALUMINUM FRAME
INSECT SCREEN
REMOVABLE PANELS
ALUMINUM FLAT BAR
MOHAIR SEAL
RACK
MOHAIR SEAL
SCALE 1 1/2" = 1'-0"GM-110
GM-110
RIDGE DETAIL
SCALE 3" = 1'-0"GM-110
GM-110
REMOVABLE INSECT SCREEN
WITH MOHAIR SEAL
REMOVABLE PANEL FRAME
PEAK
EL ± 19' - 10"
SCREEN DETAIL
SCALE 3" = 1'-0"GM-110
GM-110
ADDITIONAL GALVANIZED
STEEL ANGLE 2" X 2" X 1/8"
BOLTED TO TRUSS
ALUMINUM SHEET
16 GAUGE, NOTCH AT TRUSS
AND SEAL AGAINST TRUSS
SPRING LOCK
ALUMINUM EXTRUSION
SEAL AGAINST TRUSS
INSECT SCREEN
MATERIAL
GM-110
GM-110
GM-110
GM-110
GM-110
GM-110
STEEL RACK INSTALLATION
VENT SIZE MAX. RACK SPACING
MAX DISTANCE
FROM END
36"
48"
48"
36"
30"
16"
C.O. DRIVE SHAFT
EL 7' - 6"
SCALE 1/2"=1'-0"
PANEL FRAME
INSECT SCREEN
IN PANEL
GALVANIZED STEEL RACK.
PROVIDE RACK EACH SIDE OF DOOR AND
NO MORE THAN 11 3/4" FROM EACH END
GLASS
VERTICAL
SASH MOTOR
GM-110
GM-110
SEE INSECT SCREEN
SCHEDULE ON GM-130
GALVANIZED STEEL
CURVED RACKS
GALVANIZED STEEL DRIVE SHAFT
INSECT SCREEN
GM-110
GM-110
ACTUAL FLOOR ELEVATION
REFER TO CIVIL DRAWINGS
GLASS
GLASS
PHASE 2 ALTERNATE
NO. 3001
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:25:44 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\1312 GM-110 NVENT.dwg Save Date: 04/12/2019 09:34 AM
GREENHOUSE NATURAL
VENTILATION
GM-110
UNASSIGNED
PLANT PATH.PLANT PATH.
PLANT PATH.PLANT PATH.
PLANT PATH.PLANT PATH.
PLANT PATH.PLANT PATH.
PLANT PATH.
PLANT
BRDG
CROPCROPBIOLOGY
BIOLOGY
BIOLOGY
BIOLOGY
BIOLOGY
CROPCROP
CROP
CROP
CROP
PLANT
BRDG
PLANT
BRDG
UNASSIGNED UNASSIGNED
PLANT
BRDG
PLANT
BRDG
C09
C07
C05
C03
C01
C08
C10
C06
C04
C02
B09
B07
B05
B03
B01
B11
B08
B06
B04
B02
A09
A07
A05
A03
A01
A11
A10
A08
A06
A04
A02
B10
CORRIDOR CORRIDOR CORRIDOR
GM-130
GM-130
HAF
FAN
EXHAUST FAN
HAF FAN
EXHAUST FAN
GM-130
GM-130
GM-130 GM-130
TEFC MOTOR
MOUNTING BRACKET
GALVANIZED STEEL
ALUMINUM BLADE
WHITE PVC COATED STEEL GUARD
TRUSS OUTLINE
HAF FAN
SCALE 1 1/2"=1'-0"GM-130
GM-130
EL 10' - 0" C.O. HAF FAN
GREENHOUSE PLAN VIEW
SCALE 1/8"=1'-0"
NOTE
ALL EXHAUST FANS TO BE
CENTERED BETWEEN POSTS
VERTICAL SASH
PEAK
EL ± 19' - 10"
FLOOR SLAB
EL 0' - 0"
TOP OF KNEEWALL
EL 2' - 6"
TOP OF GIRT
EL 3' - 6"
U/S OF GIRT
EL 7' - 2"
UNDER GUTTER
EL 12' - 0"
U/S OF PERIMETER GIRT
EL 11' - 7"
PHASE 2 ALTERNATE
NO. 3001
U/S OF GIRT
EL 7' - 2"
TOP OF GIRT
EL 3' - 6"
GM-130
EXHAUST FAN 3' - 0"
SCALE 1"=1'-0"
GM-130
EXTERIOR
INTERIOR
EXHAUST FAN
PROPELLER
ALUMINUM INSULATED
MOTORIZED DAMPER.
SEE SPECS 23 31 13.00 40
15°
ALUMINUM GUARD
0.039" X 0.039" HOLE.
DIAMOND EXPANDED METAL
NOT ACCEPTABLE
DAMPER ACTUATOR. LOCATE ON SAME SIDE AS
FAN MOTOR, WITHIN HOUSING
ACCESS DOOR 12" X 24" LOCATE ON MOTOR SIDE
APPROPRIATELY FOR SERVICING FAN AND DAMPER
ACTUATOR
ALUMINUM GUARD
0.039" X 0.039" HOLE.
DIAMOND EXPANDED
METAL NOT ACCEPTABLE
STRUCTURAL FRAME AROUND FULL
HOUSING. MULLIONS NOT ACCEPTABLE.
SECURE HOUSING AT LEAST TWICE
PER SIDE.
MOTOR
REQUIREMENTS
SEE SPECS
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:25:52 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\1312 GM-130 FVENT.dwg Save Date: 04/12/2019 09:35 AM
GREENHOUSE FORCED
VENTILATION
GM-130
FOR A-8, A-10 AND
B-10 ONLY
EDA I
INSECT SCREEN MATERIAL
- REFER TO INSECT SCREEN
SCHEDULE ON GM-130
GM-140
GM-140
ALUMINUM FRAME AND LOCKABLE ALUMINUM
DOOR COVERED WITH
INSECT SCREEN (TYPICAL OF 4)
PROVIDE 3 HINGES, OVERHEAD
STOP, TRESHOLD, WEATHER STRIPPING
PEA GRAVEL
PEAK
EL ± 19' - 10"
FLOOR SLAB
EL 0' - 0"
TOP OF KNEEWALL
EL 2' - 6"
TOP OF GIRT
EL 3' - 6"
U/S OF GIRT
EL 7' - 2"
UNDER GUTTER
EL 12' - 0"
U/S OF PERIMETER GIRT
EL 11' - 7"
TYPICAL GREENHOUSE SECTION
SCALE 1/4"=1'-0"GS-110
GM-140
NOTES ON SCREEN BOX:
1 - ENDS TO BE CLOSED INSECT
PROOF, GLAZED WITH INSECT
SCREEN
2 - PROVIDE DOOR AT EACH END
SCALE 1:5
SCALE 1:5
SILICONE SEAL
ALUMINUM FLASHING.
PROVIDE LEAK, INSECT AND WATER
PROOF JOINT. MAKE WEEP HOLES TOWARD
GUTTER
ALUMINUM EXTRUSION
CLEAR ACRYLIC 0.3"
GALVANIZED STEEL PLATE
12" X 2" X 0.12" THICK.
SECURE TO GUTTER
GLAZE ROOF WITH CLEAR
ACRYLIC DOUBLE-WALL
SHEETS, 0.3" THICK.
MAKE AIR AND WATER TIGHT
CLEAR ACRYLIC 0.3"
ALUMINUM EXTRUSION
ALUMINUM
FLASHING
3" X 3" X 0.8" THICK
INSECT SCREEN
GALVANIZED STEEL
TUBING FRAME
2" X 2" X 0.25" THICK
INSECT SCREEN ON FRONT AND BOTH ENDS
STRETCH SCREEN TIGHT WHEN INSTALLING.
NO BILLOWING TOLERATED.
GALVANIZED STEEL
2" X 2" X 0.25" THICK
INSECT SCREEN
BOTTOM
ALUMINUM
FLASHING
ADAPT TO FINAL
GRADE ELEVATION
SEE CONCRETE DWGS
PEA GRAVEL
6" THICK
PROVIDE INTERMEDIATE
PURLINS AS NECESSARY
TO REINFORCE STRUCTURE.
REFER TO SPEC SECTION
13120-G FOR DESIGN LOADS
PROVIDE CONTINUOUS ANGLE FIXED
TO GRNH POST AT BOTH ENDS
TO SECURE SCREEN EXTRUSION
SCALE 1:5
CONCRETE KNEEWALLS AT ENDS
SCREEN BOX
SCALE 1"=1'-0"GS-110
GS-110
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:25:57 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\1312 GM-140 INSECT SCREEN.dwg Save Date: 04/12/2019 09:35 AM
GREENHOUSE INSECT
SCREEN BOX
GM-140
FRESH AIR INTAKE
1"
1"
1"
1"
1"
1"
1"
1.5"
1.5"
CWW
CWW
CWW
CWW
CWW
CWW
UNDERGROUND PVC PIPING
C/W OUTLET AT EACH CUBICULE. SEE DETAILS
C W
W
CWW
CWW
CWW
CWW
CWW
CWW
1.5"
CONNECT TO EXISTING GAS PIPING IN BUILDING #43
0.75"
CONNECT TO EXISTING SERVICES
COORDINATE WITH FACILITY USERS
CONNECT TO EXISTING WELL WATER SERVICE OF BUILDING #43.
USE PVC SCH 80 FOR ALL WATER SERVICE
PROVIDE STOP GATE VALVE.
SET IN PLASTIC VALVE BOX.
TYPICAL OF 4.
ALL PIPING
UNDERGROUND
SOLENOID
VALVE
BOTTOM OF
DUCT AT
EL. -4' 5"
PROVIDE DRAINAGE
GATE VALVE
FROM UNDER DUCT.
PROVIDE ACCESS WELL
FROM SURFACE WITH
11.8" THICK CRUSHED
STONE UNDER VALVE.
BOTTOM OF DUCT
AT EL. -0.060"
1"
G16G15G14G13G12G11G10G9G8G7G6G5G4G3G2G1
GA
GB
GC
GD
ISOLATION UNIT PLAN VIEW
SCALE 1/4" = 1'-0"
GM-145 GM-145
28" x 10" ALUMINUM
TYPICAL
Ø40"
MAKE-UP AIR
ISU-MAU-1
Ø 8"
TYPICAL
Ø32" Ø22"
G
GM-145 GM-145
GM-145
GM-145
GM-145 GM-145
G G
C A
GM-145GM-145
SEE DRAWING
HM-105
ISOLATION UNIT TYPICAL SECTION
SCALE 1" = 1'-0"GM-145
GM-145
GA GB
GALVANIZED STEEL
AIR EXHAUST PIPE
SUPPORT
SCALE 1:5
SHEET METAL SCREWS
AT 6" O.C.
WATERPROOF MASTIC
SOUTH END DUCT
NORTH END DUCT
ADAPT BRANCH-OFF
TO MAIN DUCT SIZE
SAND BACKFILL
1" PVC PIPING
0.75" PVC PIPING
PROVIDE WHITE NYLON INSECT SCREEN MATERIAL,
30 MESH, SHAPE INTO A BAG, COVER PVC PIPE AND SECURE WITH
A STAINLESS STEEL COVER. TYPICAL FOR ALL EXHAUST PIPE.
PVC BALL VALVE
TYPICAL
PVC BALL
VALVE TYPICAL
FINISH
INTERIOR
ELEVATION
AND
OUTSIDE
GRADE
EL 0' - 0"
TOP OF
KNEEWALL
EL 1' - 6"
BOTTOM OF FILLED SOIL /
TOP OF DUCT OPENING
EL -1' - 6"
UNDER
FOOTING
EL -2' - 6"
EAVE
EL 8'-0"
AIR EXHAUST PIPE PVC SCH 80,
150 Ø SECURED TO FRAMING.
TERMINATE AT EL. 6' 7" SECURE TO
STRUCTURE AS NEEDED.
AIR SUPPLY
10" x 28" ALUMINUM
AREA FOR IRRIGATION
PIPING
MANUAL BALANCING
DAMPER
BALANCING
SLIDE GATE
(TYPICAL)
GALVANIZED STEEL
AIR EXHAUST PIPE
SUPPORT
SEAL WATERTIGHT.
AT ALL CONNECTION POINT
SEAL
ELECTRICAL
U/S OF DUC T (NORTH END)
EL -4' - 6"
DRAIN AT NORTH END
EL -5' - 10"
FRENCH DRAINS 3.9". REFER TO GS-105
GALVANIZED STEEL AIR
EXHAUST PIPE SUPPORT
0.75" PVC SCH 80 WATER SPRAY LINE.
SUPPORT FROM STRUCTURE. PROVIDE GROMMETS
WHERE PIPE CROSSES ALUMINUM SHEET.
COMPACTED LOCAL
SOIL
NEW UNCOMPACTED SANDY
LOAM TOPSOIL
Ø 0.75"
CA
QUICK
COUPLING
MANUAL BALL VALVE
Ø 0.5"
PROVIDE AIR TIGHT CONNECTION
GAS SOLENOID VALVE
SEE PLAN VIEW
0.75"
PVC SCH 80 SPRAY LINE.
CAP AT SOUTH END.
PROVIDE STOP BALL VALVE AT NORTH END (OUTSIDE)
Ø 0.75"
FLOOD IRRIGATION
PERFORED PIPE 5 HOLES,
0.02", EQUALLY SPACED.
Ø 0.5"
QUICK CONNECT FOR
FUTURE DRIP SYSTEM
Ø 1"
UNDERGROUND
OUTSIDE INSIDE
MECHANICAL PLAN VIEW
SCALE 1" = 1'-0"GM-145
GM-145
G5
FINISH INTERIOR
ELEVATION AND OUTSIDE GRADE
EL 0' - 0"
TOP OF KNEEWALL
EL 1' - 6"
MECHANICAL ELEVATION VIEW
SCALE 1" = 1'-0"GM-145
GM-145
AIR EXHAUST PIPE PVC SCH 80,
6" Ø SECURED TO FRAMING.
TERMINATE AT EL. 6' 9"
AIR OUTLET
AIR SUPPLY WITH MANUAL
BALANCING DAMPER
DRIP IRRIGATION
OUTLET
FLOOD IRRIGATION
OUTLET.CENTER FED.
DRIP IRRIGATION
OUTLET
FLOOD IRRIGATION
(CENTER FED)
GM-145
GM-145
FINISH INTERIOR
ELEVATION AND
OUTSIDE GRADE
EL 0
TOP OF
KNEEWALL
EL 1' 5"
ISOLATION UNIT TYPICAL ELEVATION
SCALE 1"=1'-0"GM-145
GM-145
SOIL SURFACE
BOTTOM OF FILLED
SOIL / TOP OF DUCT
OPENING
EL -1' 5"
UNDER
FOOTING
EL -2' - 6"
10 11 12 13
AIR SUPPLY SLEEVE
1' x 2'-6" AT EVEN GRIDS
AIR EXHAUST SLEEVE
AT ODD GRIDS, Ø 7"
AIR EXHAUST SLEEVE
AT ODD GRIDS, Ø 7"
INTERIOR KNEEWALL
WHERE REQUIRED
28" x 10" UNDERGROUND
ALUMINUM DUCT SUPPLY
HOSE QUICK
COUPLING
UNDERGROUND PIPING
PVC BALL VALVE
CA OUTLET IN MAKE-UP AIR UNIT
SCALE 1" = 1'-0"GM-145
GM-145
SEAL SPACE BETWEEN
DUCT AND SLEEVE
0.75"
0.5"
INVERT WATER LINE
EL 8' - 8"
WATER SERVICE DIAGRAM
NTS TYPICAL OF 60 CUBICULES
ISOLATION UNIT TYPICAL SECTION
SCALE 1" = 1'-0"GM-145
GM-145
PVC BALL VALVE
TYPICAL
FINISH
INTERIOR
ELEVATION
AND
OUTSIDE
GRADE
EL 0' - 0"
TOP OF
KNEEWALL
EL 1' - 6"
BOTTOM OF FILLED SOIL /
TOP OF DUCT OPENING
EL -1' - 6"
UNDER
FOOTING
EL -2' - 6"
10" x 28" ALUMINUM
AREA FOR IRRIGATION
PIPING
MANUAL BALANCING
DAMPER
SEAL WATERTIGHT.
AT ALL CONNECTION POINT
U/S OF DUC T (NORTH END)
EL -4' - 6"
DRAIN AT NORTH END
EL -5' - 10"
FRENCH DRAINS 3.9". REFER TO GS-105
GALVANIZED STEEL AIR
EXHAUST PIPE SUPPORT
SEAL WATERTIGHT
AT ALL CONNECTION POINT
ANCHOR SPACING BASED
ON DUCT DIAMETER
SLOPE
STRAPS
CONCRETE PIERS DESIGNED AND SPACE
PER DUCT MANUFACTURER'S RECOMMANDATIONS
TOTAL OF 6"
ON LENGTH OF DUCT
BACKFILL WITH SAND. FOLLOW DUCT
MANUFACTURER'S RECOMMANDATIONS.
USE OFFSET COUPLERS
PROVIDE MINIMUM 6" EARTH COVER.
USE EXISTING SOIL.
FOLLOW MFG'S
RECOMMENDATIONS
GRADE
EL 0' - 0"
UNDERGROUD DUCT DETAIL
SCALE 1:SCALE 1/2" = 1'-0"GM-145
GM-145
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:26:05 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\1312 GM-145 I.U.VENT.dwg Save Date: 04/12/2019 09:36 AM
ISOLATION UNITS
VENTILATION AND
PLUMBING DETAILS
GM-145
UNASSIGNED
PLANT PATH.PLANT PATH.
PLANT PATH.PLANT PATH.
PLANT PATH.PLANT PATH.
PLANT PATH.PLANT PATH.
PLANT PATH.
PLANT
BRDG
CROPCROPBIOLOGY
BIOLOGY
BIOLOGY
BIOLOGY
BIOLOGY
CROPCROP
CROP
CROP
CROP
PLANT
BRDG
PLANT
BRDG
UNASSIGNED UNASSIGNED
PLANT
BRDG
PLANT
BRDG
C09
C07
C05
C03
C01
C08
C10
C06
C04
C02
B09
B07
B05
B03
B01
B11
B08
B06
B04
B02
A09
A07
A05
A03
A01
A11
A10
A08
A06
A04
A02
B10
CORRIDOR CORRIDOR CORRIDOR
GM-150
GM-150
GM-150 GM-160
BLACKOUT
SYSTEM
IN A09 ONLY
HORIZONTAL
SHADE CURTAIN
SHADING SYSTEM
IN A-09 ONLY
IN A-09, PROVIDE FULL COMPARTMENT BLACKOUT SYSTEM.
SYSTEM INSTALLED ABOVE TRUSS LOWER CHORD TO AVOID
INTERFERENCE WITH HID LIGHTING AND OTHER SYSTEMS.
PROVIDE ONE (1) MOTOR FOR EACH WALL AND ONE (1) FOR ROOF.
MINIMIZE PERMANENT STRIPS OF BLACKOUT MATERIAL.
PROVIDE DOOR STRIP HELD IN PLACE WITH SEWN VELCRO BANDS.
INSTALL BLACKOUT SYSTEM BELOW SHADING SYSTEM. VERTICAL
BLACKOUT TO BE ROLL-UP TYPE.
BLACKOUT MATERIAL
PERMANENT STRIPS OF
BLACKOUT MATERIAL
BLACKOUT
MOTOR
PHASE 2 ALTERNATE
NO. 3001
TYPICAL GREENHOUSE SECTION
SCLAE 1/4" = 1'-0"GM-150
GM-150
GM-150
GM-150
SHADE
MOTOR
DRIVE
CABLE
PULLEY
DRIVE
SHAFT
NYLON SUPPORT CABLE
HORIZONTAL SHADE CURTAIN
SHOWN AT 50% DEPLOYED
HORIZONTAL SHADE CURTAIN
SHOWN AT 25% DEPLOYED
HORIZONTAL SHADE CURTAIN
SHOWN AT 75% DEPLOYED
GM-150 GM-150
NO SHADE PARTS BELOW
UNDERSIDE OF TRUSS
HORIZONTAL SHADE CURTAIN
DRIVE CABLE WITH
PULLEY AT EVERY TRUSS
HORIZONTAL SHADE CURTAIN
SCLAE 1/8" = 1'-0"GM-150
GM-150
GREENHOUSE PLAN VIEW
SCALE 1/8" = 1'-0"
BLACKOUT COMPARTMENT (A-09)
SCLAE 1/8" = 1'-0"GM-150
GM-150
INSTALL ALL MOTORS
WHERE INDICATED
A-10A-09
BLACKOUT DETAIL IN COMPARTMENT A-09
SCLAE 1/8" = 1'-0"GM-150
GM-150
GM-150
GM-150
NOTE:
1 - LOCATE ALL MOTORS WHERE INDICATED ON SHEET
2 - HORIZONTAL SHADE TO BE SLIDING TYPE SYSTEM
3 - ALL SHADE PARTS MUST BE ABOVE UNDERSIDE OF
TRUSS LOWER CHORD. PROVIDE SPACER CABLES
AS NECESSARY TO AVOID CONTACT BETWEEN
SHADING MATERIAL AND DRIVE CABLE.
4 - ALL SHADING MATERIALS TO PROVIDE
50% SHADE FACTOR.
5- SHADING MATERIAL BUNDLES ON SOUTH END
WHEN NOT IN USE
PEAK
EL ± 19' - 10"
FLOOR SLAB
EL 0' - 0"
TOP OF KNEEWALL
EL 2' - 6"
TOP OF GIRT
EL 3' - 6"
U/S OF GIRT
EL 7' - 2"
UNDER GUTTER
EL 12' - 0"
U/S OF PERIMETER GIRT
EL 3531
BLACKOUT CORNER DETAIL
SCLAE 1/8" = 1'-0"GM-150
GM-150 (A-09 ONLY)
SHADING SYSTEM ABOVE
ALL BLACKOUT ELEMENTS
PERMANENT BLACK OUT
MATERIAL STRIP. SIZE AS
NECESSARY TO PROVIDE
OVERLAP FOR BLACKOUT
PERMANENT STRIPS
OF BLACKOUT MATERIAL
SEAL AT EDGES
MOTORIZED
ROOF BLACKOUT
ABOVE UNDERSIDE
OF TRUSS
TRUSS LOWER CHORD
PROVIDE BRACKETS TO FORCE
ROOL-UP BLACKOUT OVER TOP OF KNEEWALL
ROOL-UP BLACKOUT
MATERIAL ON 4 SIDES
FLOOR SLAB
EL 0' - 0"
TOP OF KNEEWALL
EL 2' - 6"
TOP OF GIRT
EL 3' - 6"
U/S OF GIRT
EL 7' - 2"
UNDER GUTTER
EL 12' - 0"
U/S OF PERIMETER GIRT
EL 11' - 7"
GM-150
GM-150
GEAR
MOTOR
VERTICAL ROLL-UP
BLACKOUT CURTAIN
VERTICAL FIXED
BLACKOUT
MATERIAL
HORIZONTAL FIXED
BLACKOUT MATERIAL
PERIMETER PURLIN
HORIZONTAL
BLACKOUT CURTAIN
DRIVE SHAFT
SUPPORT CABLE
DRIVE CABLE
PULLEY
HORIZONTAL UNIT HEATER VENT
IN THIS CORNER. TAILOR PERMANENT
STRIP AROND PIPE.
W A
L L S
POST
R O
O F
TRUSS LINE
PIPING AT KNEEWALL
TAILOR TO MAINTAIN
BLACKOUT WITH
PERMANENT STRIPS
U/S OF PERIMETER GIRT
EL 11' - 7"
UNDER GUTTER
EL 12' - 0"
GUTTER
GLAZING
CLIP
DRIVE CABLE
SHADE MATERIAL
CURTAIN DRAWBAR PERFORATED TO LET
NYLON SUPPORT CABLE PASS THROUGH
RATCHET TIGHTENER
PULLEY AT EVERY TRUSS EXCEPT WHERE
THE DRIVE SHAFT AND GEAR MOTOR ARE SUPPORTED
POST
NYLON SUPPORT CABLE
AT 1' 3
" c/c MAX
DRIVE SHAFT
CHAIN COUPLING
POST
GREENHOUSE
GEAR MOTOR
GREENHOUSE
INSTALL MOTORS AT LOCATIONS SHOWN ON FLOOR PLAN
GLAZING
TRUSS
SYSTEM MUST CLEAR
UNDERSIDE OF TRUSS
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:26:11 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\1312 GM-150 SHADING SYST.dwg Save Date: 04/12/2019 09:36 AM
GREENHOUSE SHADING
SYSTEMS
GM-150
GROWING BENCH
GREENHOUSE PLAN VIEW
SCALE 1/8" = 1'-0"
GM-170
GM-170
LIGHT SUPPORT RAIL
SCALE 1:10
NOTES FOR ALTERNATE
1. THIS SHEET DESCRIBES THE SUPPLY AND INSTALLATION OF HPS FIXTURES
AND RAIL SYSTEM IN GREENHOUSE. FOR ELECTRICAL WORK PERTAINING TO FIXTURES,
REFER TO ELECTRICAL DRAWINGS. ALL ELECTRICAL IS IN BASE BID.
2. ONLY HPS FIXTURES WITH CHORD AND CHAIN ARE IN ALTERNATE.
3. ALL SUPPORT ELEMENTS ARE IN BASE BID.
SPACER
SECURE TO PERIMETER GIRT
PEAK
EL ± 19' - 10"
FLOOR SLAB
EL 0' - 0"
TOP OF KNEEWALL
EL 2' - 6"
TOP OF GIRT
EL 3' - 6"
U/S OF GIRT
EL 7" - 2"
UNDER GUTTER
EL 12' - 0"
U/S OF PERIMETER GIRT
EL 11' - 7"
ALL 600 W HPS FIXTURES
ARE BID ALTERNATE
STEEL "TS" 1.5" X 1.5"
BY THIS CONTRACTOR
STEEL "TS" 1.5" X 1.5" TYPICAL
GM-170
GM-170
HPS LIGHT SUPPORT RAIL SECURE TO
T.S. 1.5" X 1.5" AND PERIMETER GIRT
ALL DIMENSIONS ARE TYPICAL
GALVANIZED T.S. 1.5" x 1.5" x 0.2" BY MECHANICAL
CONTRACTOR ATTACH TO UNDERSIDE
OF TRUSS AND PERIMETER GIRT
A B C D E F G H J K L M N O P Q R S T U V W X Y
UNASSIGNED
PLANT PATH.PLANT PATH.
PLANT PATH.PLANT PATH.
PLANT PATH.PLANT PATH.
PLANT PATH.PLANT PATH.
PLANT PATH.
PLANT
BRDG
CROPCROPBIOLOGY
BIOLOGY
BIOLOGY
BIOLOGY
BIOLOGY
CROPCROP
CROP
CROP
CROP
PLANT
BRDG
PLANT
BRDG
UNASSIGNED UNASSIGNED
PLANT
BRDG
PLANT
BRDG
C09
C07
C05
C03
C01
C08
C10
C06
C04
C02
B09
B07
B05
B03
B01
B11
B08
B06
B04
B02
A09
A07
A05
A03
A01
A11
A10
A08
A06
A04
A02
B10
CORRIDOR CORRIDOR CORRIDOR
PHASE 2 ALTERNATE
NO. 3001
U/S OF TRUSS
EL 11' - 7"
U/S OF SUPPORT RAIL
EL 11' - 3"
U/S OF BULB
EL 'VARY'
HOOK
CONNECT SOW TYPE WIRE IN BOX AND LEAVE
6' LONG OF ELECTRICAL CORD FOR EACH
FIXTURE. SOW TYPE. DO NOT PROVIDE
CONNECTORS.
WATERPROOF ELECTRICAL
BOX AND CONNECTOR
HPS FIXTURE 600W TOTALLY
ENCLOSED BALLAST HOUSING
WATERPROOF ELECTRICAL BOX
AND CONNECTORS
277V/1¯/ 60HZ
HPS LIGHT SUPPORT RAIL
BY MECHANICAL CONTRACTOR
GALV. STEEL OR ALUM. CHAIN 5' 2" LONG
SLIDING BRACKETS
GALVANIZED T.S. 1.5" x 1.5" x 0.2" BY MECHANICAL
CONTRACTOR ATTACH TO UNDERSIDE
OF TRUSS AND PERIMETER GIRT
TRUSS LOWER
CHORD
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:26:21 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\1312 GM-170 SUPP.LIGHTING.dwg Save Date: 04/12/2019 09:38 AM
GREENHOUSE
SUPPLEMENTAL LIGHTING
GM-170
GM-190
GM-190
GM-190 GM-190
GM-190 GM-190
GREENHOUSE PLAN VIEW
SCALE 1/8"=1'-0"
NEOPRENE SHEET
UNDER BENCH FOOT
PEAK
EL ± 19' - 10"
FLOOR SLAB
EL 0' - 0"
TOP OF KNEEWALL
EL 2' - 6"
TOP OF GIRT
EL 3' - 6"
U/S OF GIRT
EL 7' - 2"
UNDER GUTTER
EL 12' - 0"
U/S OF PERIMETER GIRT
EL 11' - 7"
PROVIDE 2"
CONTINUOUS
ADJUSTMENT
ON THE LEG
LEG
BENCH
FOOT
"X" BRACING AS
NECESSARY TO
PROVIDE STABILITY
GALVANIZED EXPANDED
STEEL BENCH TOPS.
ALUMINUM ANGLES ON
ALL SIDES AND ENDS
NEOPRENE SHEET
UNDER BENCH FOOT
PROVIDE 6" PVC PIPE PIECE
AT BOTTOM OF EACH LEG FACING
MAIN WALKWAY (TYPICAL)
GROWING BENCH
"X" BRACING AS
NECESSARY TO
PROVIDE STABILITY
LEG
ALUMINUM ANGLE.
PROVIDE ON ALL SIDES
AND BENCH ENDS
GALVANIZED FLAT EXPANDED METAL /
ANTI-FLIP DEVICE
ROLLING TUBES
A
A
BEARING
SECTION A-A
SCALE 1:5
GALVANIZED EXPANDED
STEEL BENCH TOPS
PROVIDE 2"
CONTINOUS ADJUSTMENT
ON THE LEG
GM-190
GM-190
TYPICAL FIXED BENCH
SCALE 1":1'-0"
TYPICAL ROLL-TOP BENCH
SCALE 1":1'-0"
GM-190
GM-190
A B C D E F G H J K L M N O P Q R S T U V W X Y
UNASSIGNED
PLANT PATH.PLANT PATH.
PLANT PATH.PLANT PATH.
PLANT PATH.PLANT PATH.
PLANT PATH.PLANT PATH.
PLANT PATH.
PLANT
BRDG
CROPCROPBIOLOGY
BIOLOGY
BIOLOGY
BIOLOGY
BIOLOGY
CROPCROP
CROP
CROP
CROP
PLANT
BRDG
PLANT
BRDG
UNASSIGNED UNASSIGNED
PLANT
BRDG
PLANT
BRDG
C09
C07
C05
C03
C01
C08
C10
C06
C04
C02
B09
B07
B05
B03
B01
B11
B08
B06
B04
B02
A09
A07
A05
A03
A01
A11
A10
A08
A06
A04
A02
B10
CORRIDOR CORRIDOR CORRIDOR
PHASE 2 ALTERNATE
NO. 3001
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:26:28 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\1312 GM-190 GROW.BENCHES.dwg Save Date: 04/12/2019 09:39 AM
GREENHOUSE GROWING
BENCHES
GM-190
UNASSIGNED
PLANT PATH.PLANT PATH.
PLANT PATH.PLANT PATH.
PLANT PATH.PLANT PATH.
PLANT PATH.PLANT PATH.
PLANT PATH.
PLANT
BRDG
CROPCROPBIOLOGY
BIOLOGY
BIOLOGY
BIOLOGY
BIOLOGY
CROPCROP
CROP
CROP
CROP
PLANT
BRDG
PLANT
BRDG
UNASSIGNED UNASSIGNED
PLANT
BRDG
PLANT
BRDG
C09
C07
C05
C03
C01
C08
C10
C06
C04
C02
B09
B07
B05
B03
B01
B11
B08
B06
B04
B02
A09
A07
A05
A03
A01
A11
A10
A08
A06
A04
A02
B10
CORRIDOR CORRIDOR CORRIDOR
GAS UNIT HEATER
FLUE POWER VENT
TYPICAL
GALVANIZED STEEL NATURAL GAS PIPING
RUN ALONG CONCRETE KNEEWALL
SEE HM-110
FOR CONTINUATION
SEE HM-110
FOR CONTINUATION
SEE HM-110
FOR CONTINUATION
G
GG
G G
G
G G
G
G
G
GG
G G
G
G
G
G
G
GG
G G
G
G
G
G G
NATURAL GAS MAIN LINE ENTRY
SEE HM-110 FOR CONTINUATION
GALVANIZED PIPE AND FITTINGS
FROM GRID 13 GOING NORTH.
LEGEND
GAS PIPING
FLUE POWER VENT
SEE UNIT HEATER SCHEDULE ON HM-500
MECHANICAL
SERVICES
GALVANIZED TS TO SPAN
FROM PERIMETER GIRT TYPICAL.
GALVANIZED TS TO SPAN
FROM PERIMETER GIRT
C
PHASE 2 ALTERNATE
NO. 3001
SPACE FOR OVERHEAD ELECTRICAL CONDUITS
(COORDINATE EXACT LOCATIONS WITH ELECTRICAL)
FROM
POWER VENTER
REPLACE GLASS BY A
GALV. STEEL PLATE
AROUND EACH FLUE PIPE
VENT TERMINATION SUPPORT
BRACKET MAKE FROM
GALV. STEEL FLAT BAR TERMINATE
BY ATTACHING TO STRUCTURE
TEE WITH DRIP LEG AND
CLEANOUT CAP AT LOW
POINT OF VENT SYSTEM
GUTTER
8Ø METAL SLEEVE
SECURE AROUND GLAZING
WITH ALUMINUM EXTRUSIONS
WITH METAL FACE PLATE
FLUE PIPE SIZE PER
MANUFACTURER'S RECOMMENDATIONS
PITCH VENT PIPE DOWNWARD
FROM UNIT 3/4" PER FOOT
2" HIGH TEMPERATURE
WATERPROOF INSULATION
PERIMETER GIRT
GALVANIZED TS TO SPAN FROM
PERIMETER GIRTS
NATURAL GAS SUPPLY
0.5" (TYP.)
GALVANIZED THREADED ROD
TRIM FLUSH WITH NUT
ADJUST BLADES
TO THROW WITH
10° ANGLE UPWARD
AND LOCK IN PLACE
FLUE PIPE SIZE PER
MANUFACTURER 'S
RECOMMENDATIONS
GM-210
GM-210
U/S OF GUTTER
EL 12' - 0"
U/S OF PERIMETER GIRT
EL 11' - 7"
GRID
GREENHOUSE PLAN VIEW
SCALE 1/8"=1'0"
GAS UNIT HEATER
SCALE 1 1/2"=1'-0"GM-210
GM-210
TYPICAL
(TYPICAL)
EL 1' - 8"
(TYPICAL)
EL 19.75"
(TYPICAL)
EL 19.75"
1.25"1.25"
0.5"
TYP.
0.75"
2"
1.25"1.25"
0.5"
TYP.
1.5"
1.25"1.25"
0.5"
TYP.
0.5"
1.5"
0.5"0.5"0.5"
INSTALL FLUE ABOVE BLACKOUT
SYSTEM IN THIS ROOM ONLY.SEE GM-150
PEAK
EL ± 19' - 10"
FLOOR SLAB
EL 0' - 0"
TOP OF KNEEWALL
EL 2' - 6"
TOP OF GIRT
EL 3' - 6"
U/S OF GIRT
EL 7' - 2"
UNDER GUTTER
EL 12' - 0"
U/S OF PERIMETER GIRT
EL 11' - 7"
0.5"
(TYPICAL)
EL ± 127"
(TYPICAL)
EL ± 127"
(TYPICAL)
EL ± 127"
GM-210
GM-210
U/S OF PERIMETER GIRT
EL 11' - 7"
TOP OF KNEEWALL
EL 2' - 6"
FLOOR SLAB
EL 0' - 0"
AREA FOR PIPE SERVICES.
PROVIDE GROMMETS WHERE PIPE
CROSSES ALUMINUM SHEET.
SASH
GM-210GM-210
GM-210 GM-210
NATURAL GAS PIPING
SCALE 1 1/2"=1'-0"
GRID
FLOOR SLAB
EL 0' - 0"
TOP OF KNEEWALL
EL 2' - 6"
BENCH
OUTLINE
GALVANIZED STEEL
NATURAL GAS PIPING
GALVANIZED STEEL
SUPPORT, ANCHOR
TO WALL
GM-210
GM-210
GLASS
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:26:36 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\1312 GM-210 PERIM. HEATING.dwg Save Date: 04/12/2019 09:40 AM
PERIM. HEATING
GM-210
S S
S S
S S
S S
S S
S S
S S
S S
S S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S S
S S
S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S
S
S
S
S
TYPICAL GREENHOUSE SECTION
GREENHOUSE PLAN - WATER SYSTEMS
FERTILIZER INJECTION CONNECTION PORTS
PIPING LAYOUT IN CORRIDORTYPICAL OUTLET ELEVATION
IN COMPARTMENT
GRID
TWW IRRIGATION SOLENOID VALVE
LEGEND
GREENHOUSE
SIDE
CORRIDOR
SIDE
SCREEN BOX
SCREEN BOX
TRUSS LINE
A B C D E F G H J K L M N O P Q R S T U V W X Y
CONCRETE SLAB
ROOT WASHINGROOT WASHING
S C
R E
N
X
S C
R E
X
TYPICAL THRU COORIDOR WALL
IN COMPARTMENT
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:26:42 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\1312 GP-100 PLUMBING WATER SYSTEMS.dwg Save Date: 04/12/2019 09:41 AM
GREENHOUSE PLUMBING
SERVICES
GP-100
TRUSS LINE
A B C D E F G H J K L M N O P Q R S T U V W X Y
CONCRETE SLAB
ROOT WASHINGROOT WASHING
S C
R E
X
S C
R E
X
GUTTER DOWNSPOUT
VENT PIPE
TYPICAL GREENHOUSE SECTION
GUTTER DOWNSPOUT
GRID
GREENHOUSE PLAN - STORM AND SANITARY SYSTEM
VC1 SANITARY PIT
FLOOR DRAIN (F-D1 TYPE)
GRID
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:26:48 PM Saved By: DEJAN.TADIC File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\1312 GP-110 STORM & SANI.dwg Save Date: 04/22/2019 11:50 AM
GREENHOUSE STORM &
SANITARY DRAINAGE
GP-110
M
ZONE VALVE SCHEMATIC
TYPICAL GREENHOUSE SECTION
FOG NOZZLE
TYP. FOG NOZZLES
GRID
GREENHOUSE PLAN - FOG SYSTEM & LAB GASES PLAN
FOG PUMPING SYSTEM SCHEMATIC
SERVICES ENTRY / ALL DOORS
SCREEN BOX
SCREEN BOX
TRUSS LINE
A B C D E F G H J K L M N O P Q R S T U V W X Y
CONCRETE SLAB
ROOT WASHINGROOT WASHING
S C
R E
X
S C
R E
X
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
CA OUTLET
GRID
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:26:53 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\1312 GP-120 FOG SYSTEM & LAB GASES.dwg Save Date: 04/12/2019 09:44 AM
GREENHOUSE FOG SYSTEM
& LAB GASES
GP-120
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:26:58 PM Saved By: NICOLE.SERAFIN File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\05302 GE-100.dwg Save Date: 04/15/2019 04:15 PM
GREENHOUSE & ISOLATION
UNITS - LEGENDS &
SCHEDULES
GE-100
ELECTRICAL SHEET LIST
SHEET DRAWING TITLE
1 GE-100 GREENHOUSE & ISOLATION UNITS - LEGENDS & SCHEDULES
2 GE-300 GREENHOUSE-LIGHTING LOCATIONS
3 GE-400 GREENHOUSE-PANEL LOCATIONS
4 GE-401 GREENHOUSE-COMPONENTS LOCATIONS
5 GE-402 GREENHOUSE-VOICE DATA & POWER OUTLETS LOCATIONS
6 GE-403 GREENHOUSE-GENERAL CONDUITS ROUTING
7 GE-404 ISOLATION UNITS-ELECTRICAL SYSTEMS
8 GE-500 GREENHOUSE-FIRE ALARM AND SECURITY LOCATIONS
9 GE-501 GREENHOUSE-VOICE DATA FIRE ALARM AND SECURITY DIAGRAMS (MSC)
10 GE-600 GREENHOUSE-POWER CONTROL DIAGRAMS (MSC)
11 GE-601 GREENHOUSE-GENERAL CONTROL DIAGRAMS AND SENSORS TABLE
12 GE-700 GREENHOUSE-POWER DISTRIBUTION
13 GE-701 GREENHOUSE-PANEL SCHEDULES
14 GE-800 GREENHOUSE-LIGHTING DETAILS
15 GE-801 GREENHOUSE-INSTALLATION DETAILS
16 GE-802 GREENHOUSE-INSTALLATION DETAILS
PLANT
BRDG
PLANT
BRDG
PLANT
BRDG
PLANT
BRDG
PLANT
BRDG
B07
TRUSS LINE
A B C D E F G H J K L M N O P Q R S T U V W X Y
CONCRETE SLAB
ROOT WASHINGROOT WASHING
PHASE 2 ALTERNATE No 3001
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:27:05 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\05302 GE-300.dwg Save Date: 04/12/2019 11:53 AM
GREENHOUSE-LIGHTING
LOCATIONS
GE-300
PLANT
BRDG
PLANT
BRDG
PLANT
BRDG
PLANT
BRDG
PLANT
BRDG
B07
TRUSS LINE
A B C D E F G H J K L M N O P Q R S T U V W X Y
CONCRETE SLAB
ROOT WASHINGROOT WASHING
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:27:08 PM Saved By: NICOLE.SERAFIN File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\05302 GE-400.dwg Save Date: 04/15/2019 01:58 PM
GREENHOUSE-PANEL
GE-400
PLANT
BRDG
PLANT
BRDG
PLANT
BRDG
PLANT
BRDG
PLANT
BRDG
B07
TRUSS LINE
A B C D E F G H J K L M N O P Q R S T U V W X Y
CONCRETE SLAB
ROOT WASHINGROOT WASHING
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:27:12 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\05302 GE-401.dwg Save Date: 04/12/2019 11:54 AM
GREENHOUSE-COMPONENTS
GE-401
PLANT
BRDG
PLANT
BRDG
PLANT
BRDG
PLANT
BRDG
PLANT
BRDG
B07
TRUSS LINE
A B C D E F G H J K L M N O P Q R S T U V W X Y
CONCRETE SLAB
ROOT WASHINGROOT WASHING
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:27:15 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\05302 GE-402.dwg Save Date: 04/12/2019 11:55 AM
GREENHOUSE-VOICE DATA
& POWER OUTLETS
GE-402
PLANT
BRDG
PLANT
BRDG
PLANT
BRDG
PLANT
BRDG
PLANT
BRDG
B07
TRUSS LINE
A B C D E F G H J K L M N O P Q R S T U V W X Y
CONCRETE SLAB
ROOT WASHINGROOT WASHING
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:27:22 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\05302 GE-403.dwg Save Date: 04/12/2019 11:55 AM
GREENHOUSE-GENERAL
CONDUITS ROUTING
GE-403
FRESH AIR INTAKE
G16G15G14G13G12G11G10G9G8G7G6G5G4G3G2G1
GA
GB
GC
GD
MAKE-UP AIR
ISU-MAU-1
SEE DRAWING
HM-105
GA GB
GC GD
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:27:28 PM Saved By: NICOLE.SERAFIN File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\05302 GE-404.dwg Save Date: 04/15/2019 01:58 PM
ISOLATION
UNITS-ELECTRICAL
SYSTEMS
GE-404
PLANT
BRDG
PLANT
BRDG
PLANT
BRDG
PLANT
BRDG
PLANT
BRDG
B07
TRUSS LINE
A B C D E F G H J K L M N O P Q R S T U V W X Y
CONCRETE SLAB
ROOT WASHINGROOT WASHING
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:27:31 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\05302 GE-500.dwg Save Date: 04/12/2019 11:57 AM
GREENHOUSE-FIRE ALARM
AND SECURITY LOCATIONS
GE-500
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:27:36 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\05302 GE-501.dwg Save Date: 04/12/2019 11:57 AM
GREENHOUSE-VOICE DATA
FIRE ALARM AND SECURITY
DIAGRAMS (MSC)
GE-501
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:27:39 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\05302 GE-600.dwg Save Date: 04/12/2019 11:58 AM
GREENHOUSE-POWER
CONTROL DIAGRAMS (MSC)
GE-600
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:27:42 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\05302 GE-601.dwg Save Date: 04/12/2019 11:58 AM
GREENHOUSE-GENERAL
CONTROL DIAGRAMS AND
SENSORS TABLE
GE-601
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:27:45 PM Saved By: NICOLE.SERAFIN File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\05302 GE-700.dwg Save Date: 04/15/2019 03:54 PM
GREENHOUSE-POWER
DISTRIBUTION
GE-700
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:28:06 PM Saved By: NICOLE.SERAFIN File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\05302 GE-701.dwg Save Date: 04/15/2019 01:58 PM
GREENHOUSE-PANEL
GE-701
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:28:16 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\05302 GE-800.dwg Save Date: 04/12/2019 01:29 PM
GREENHOUSE-LIGHTING
GE-800
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:28:21 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\05302 GE-801.dwg Save Date: 04/12/2019 01:29 PM
GREENHOUSE-INSTALLATION
GE-801
A
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:28:25 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\05302 GE-802.dwg Save Date: 04/12/2019 01:30 PM
GREENHOUSE-INSTALLATION
GE-802
CONCRETE SLAB
USED SOIL
DUMP AREA
CONCRETE SLAB
MOBILE BENCH
RELOCATE 4 EXISTING
INCUBATORS STORED ON SITE
TO THIS LOCATION
RELOCATE 1 EXISTING
UPRIGHT FREEZER
STORED ON SITE
TO THIS LOCATION
FIXED COUNTER/SINK
CONCRETE SLAB
EXISTING NITROGEN GENERATOR
AND STORAGE EQUIPMENT STORED ON SITE
TO MOVE TO THIS LOCATION
RELOCATE 3 EXISTING
REFRIGERATORS
STORED ON SITE
TO THIS LOCATION
RELOCATE 2 EXISTING
COLD ROOMS STORE
ON SITE TO THIS LOCATION
RELOCATE 2 EXISTING COLD ROOMS
STORED ON SITE TO THIS LOCATION
HEADHOUSE / GREENHOUSE PLAN VIEW
SCALE 1/8" = 1'-0"
HA-100
HA-200
HA-100
HA-200
HA-100
HA-200
HA-100 HA-200
HA-100
HA-105
HA-100
HA-300
HA-100
HA-300
HA-100
HA-300
HA-100
HA-300
HA-100
HA-105
HA-100 HA-300
CONTAINER
BOLLARD
HA-100 HA-400
HA-100
HA-300
MECHANICAL / ELECTRICAL
ROOM
HH.03
GENERAL STORAGE
POTS & MEDIA
TELECOM
JANITOR
CHEMICAL
SPRAY
ROOM
INOCULATION
SPRAY
ROOM
PHOTO/
LAUNDRY
HH.01
HH.02
CORRIDOR
HH.04
HH.05
HH.06
HH.07
HH.08 HH.09
MANAGER'S
OFFICE
SOIL
WORK AREA
VIROLOGY
INSECTARY #2
VIROLOGY
INSECTARY #1
INSECTARY
TRANSFER
STEAM
AUTOCLAVE
ROOM
COLD ROOMS
POTTING/SOIL MIXING AREA
POST HARVEST
ENTOMOLOGY
CORRIDOR
HH.10
HH.11
HH.12
HH.13
HH.14
HH.15
HH.16
HH.17 HH.18
HH.19
HH.20
CART
SPACE
W/ LIGHTING
EXISTING
COLD ROOM
EXISTING
COLD
ROOM
FUTURE
COLD ROOM
CONCRETE SLAB
A B C D E F G H J K L M N O P Q R S T U V W X Y
UNASSIGNED
PLANT PATH.PLANT PATH.
PLANT PATH.PLANT PATH.
PLANT PATH.PLANT PATH.
PLANT PATH.PLANT PATH.
PLANT PATH.
PLANT
BRDG
CROPCROPBIOLOGY
BIOLOGY
BIOLOGY
BIOLOGY
BIOLOGY
CROPCROP
CROP
CROP
CROP
PLANT
BRDG
PLANT
BRDG
UNASSIGNED UNASSIGNED
PLANT
BRDG
PLANT
BRDG
C09
C07
C05
C03
C01
C08
C10
C06
C04
C02
B09
B07
B05
B03
B01
B11
B08
B06
B04
B02
A09
A07
A05
A03
A01
A11
A10
A08
A06
A04
A02
B10
CORRIDOR CORRIDOR CORRIDOR
PHASE 2 ALTERNATE
NO. 3001
RESTROOM
& SHOWER
RESTROOM
& SHOWER
Plotted By: BRUCE MCINTOSH Plot Date: 8/20/2019 1:28:29 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\10-SAG16056.01_ASC\Greenhouse\1312 HA-100 OVERALL FLOOR.dwg Save Date: 04/12/2019 01:30 PM
HEADHOUSE GREENHOUSE
EGRESS AND OVERALL
FLOOR PLAN
HA-100
PARTIAL HEADHOUSE / EAST PLAN VIEW
SCALE 1/4"1'-0"HA-100
HA-105
HH.01A
H H
B
H H
A
H H
B
HH.02D
H H
C
H H
A
H H
A
H H
B
HH.07
H H
H H
H H
H H
H H
H H
B
H H
C
HH.11A HH.11B
HH.12
HH.13
HH.14
HH.15
H H
A
H H
B
HH.20
HH.19
H H
H H
HA-105
HA-400
HA.105 HA.400
HA.105 HA.400
HA.105 HA.400
HA.105 HA.400
HA.105 HA.400
HA-105
HA-400
HA.105 HA.400
HA-105
HA-400
HA-105
HA-400
HA-105
HA-400
HA-105
13B
HA-400
HA-105
HA-400
HA-105
HA-400
W/ 6" METAL STUD
ACCOUSTICAL INSULATION ON ALL
PERIMETER FOR THIS ROOM ONLY
HA-105
HA-310
HA.105 HA.400
HA-105
HA-400
PARTIAL HEADHOUSE / WEST PLAN VIEW
SCALE 1/4"1'-0"HA-100
HA-105
A
A
A
HA-105
HA-305
HA-105
HA-305
WALL BUMPER
WALL BUMPER
WALL BUMPER
HA-105
HA-310
HA-105
HA-400
HA.105
4A
HA.400
WALL BUMPER
LOCKERS
SEE DETAIL 1, HA-400
WALL BUMPER
SHELF STORAGE SYSTEM
SEE HA-400
OVERHEAD
DOOR
SEE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .