ATTACHMENT 1 Schedule of Items.docx

DOCX document 27 KB Posted

Attached to
Forest Service Wildland Fire Tent System Rentals
Solicitation number
1202RZ25Q0002
Issued by

About this file

Attachment 1 Schedule of Items is a detailed pricing and specification document for the US Forest Service Wildland Fire Tent System Rentals solicitation. The document outlines four tent system types ranging from 200-1300 square feet, generator packages from 11-150 kW, and optional supplemental items like vestibule connectors, divider walls, and additional climate control systems. The solicitation is a total small business set-aside with NAICS code 115310 and a small business size standard of $34M, anticipating multiple Incident Blanket Purchase Agreements (I-BPAs).

The document provides comprehensive pricing guidance, including requirements for daily rates, mileage fees, and relocation fees for tent systems and generators. Tent systems must be fully enclosed, multi-use facilities with insulated walls, ceiling, flooring, lighting, and temperature control. The systems are intended for wildland fire suppression, all-hazard incidents, and RX Project Work, with equipment potentially subjected to extreme environmental conditions like unimproved roads, rocky terrain, heat, and smoky environments. The government will provide re-fueling, water stabilization, and potentially on-site amenities. The solicitation anticipates posting within 5-10 days of synopsis publication, with a vendor pre-quote meeting planned for the last week of March.

View the file

Other files

File Type Posted
1202RZ25Q0002 Tent RFQ.pdf PDF
1202RZ25Q0002 Tent RFQ.pdf PDF
ATTACHMENT 1 Schedule of Items.docx DOCX document
ATTACHMENT 2 DDP Table.docx DOCX document
ATTACHMENT 1 Schedule of Items.docx DOCX document
ATTACHMENT 2 DDP Table.docx DOCX document
1202RZ25Q0002 Tent RFQ.pdf PDF
1202RZ25Q0002 Tent Solicitation Questions 2nd Round 4-10-2025.pdf PDF
1202RZ25Q0002 Tent Solicitation Questions.pdf PDF
1202RZ25Q0002 Tent RFQ.pdf PDF
ATTACHMENT 2 DDP Table.docx DOCX document
ATTACHMENT 1 Schedule of Items.docx DOCX document
Tent prequote 3-28-2025.pdf PDF
ATTACHMENT 1 Schedule of Items.docx DOCX document
ATTACHMENT 2 DDP Table.docx DOCX document
1202RZ25Q0002 Tent RFQ.pdf PDF
1202RZ25Q0002 Tent Solicitation Questions.pdf PDF
1202RZ25Q0002 Tent RFQ.pdf PDF
Tents RFQ Performance Based.docx DOCX document
ATTACHMENT 1 Schedule of Items.docx DOCX document
ATTACHMENT 1 Schedule of Items.docx DOCX document
ATTACHMENT 3 Performance Requirements Summary.docx DOCX document
Tents RFQ Performance Based.docx DOCX document
ATTACHMENT 2 DDP Table.docx DOCX document
ATTACHMENT 4 Wage Determination 1995-0221 rev 69.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 1

SCHEDULE OF ITEMS

INSTRUCTIONS:

· Using the provided worksheet, provide daily rates in the table, as appropriate. Attaching company price list to quote by requested line item/optional item is allowed.

· Mileage & Relocation Fees must be quoted to be considered for award.

· Submitting rates for all Line Item & Optional Items is not required. Prices for Line Item & Optional items will be static across all Geographic Areas/Host Dispatch Centers and included in the overall fair and reasonable price determination for initial I-BPA Award. The quoter warrants that rates submitted are for comparable quantities under similar terms and conditions.

Applicable Definitions:

TENT SYSTEMS - The term tent system is synonymous with yurt. Dimensions provided are nominal and other dimensions are acceptable as long as the space falls within the square footage stated for the resource type. The operational intent of this tent system is to obtain a fully enclosed area that can be used as a multi-use facility, including but not limited to office spaces, meeting rooms, storage for supplies, electronics, food, and accommodation for personnel and first aid/medical facilities. A tent System requires a complete package including all equipment to provide an operational contained space with insulated walls, insulated ceiling, flooring, lighting, temperature control system and an adequate power and distribution system to meet the requirement provided in this document. Tent System quoted daily rate will reflect the full package as defined minus power generation, which is a separate line item. Tent Systems & generators fall within the below configurations:

ITEM NO
0001Type 1 Tent System - 1001-1300 square feet (example 23' x 60')
0002Type 2 Tent System - 701-1000 square feet (example 23' x 42')
0003Type 3 Tent System - 501-700 square feet (example 19' x 35')
0004Type 4 Tent System - 200-500 square feet (example 20' x 20', 20' octagon)
0005126-150 kW generator package*. Package includes 10 each power distribution (spider boxes) & 10 each electrical 50-amp cord.
000671-125 kW generator package*. Package includes 10 each power distribution (spider boxes) & 10 each electrical 50-amp cord.
000750-70 kW generator package*. Package includes 10 each power distribution (spider boxes) & 10 each electrical 50-amp cord.
000825-45 kW generator package*. Package includes 10 each power distribution (spider boxes) & 10 each electrical 50-amp cord.
000911-20 kW generator* (stand-alone).

*Quiet Type - The generator shall have a manufacturer's decibel rating of no greater than 68 dBA at a 50-foot distance OPTIONAL ITEMS – Optional items may be ordered by the incident as needed to meet operational needs. If optional items are ordered after the vendor has begun mobilization and transporting the items required, the mileage rate may apply. Contractors shall not install and will not be paid for any optional items that have not been ordered by the Government with appropriate documentation and approvals. Authorized Optional Items to supplement the tent systems ordered are listed below:

OPT ITEM NO

0010Vestibule Connector - completely enclosed with floor, walls and ceiling & mounts.
0011Divider (Internal) Walls - including zipper doorways and mounting brackets
0012Additional external doors with required mounting brackets.
0013Screen (External) Walls - mesh screen wall panel replacing standard side walls.
0014Additional climate control/temperature control systems outside of tent system package as defined.
0015Water Barrels ILO staking, if necessary, based on ground conditions and weather conditions at time of order/performance.

MILEAGE - A mileage payment is based on the rate per mile in the agreement multiplied by the number of round-trip miles from the Designated Dispatch Point (DDP) to the incident (mobilization) and from the incident to the DDP (demobilization). For every increment of 5 resources mobilized/demobilized a mileage payment may be paid.

Example: Government orders seven (7) Type 1 Tent Systems, which qualifies for two mileage payments. The example mileage rate in the agreement is $1.50/mile and the number of miles from the DDP to the incident is 225 miles (450 miles round trip). The mileage payment in this example will be calculated as: ($1.50 * 450) * 2 trips = $1,350.00).

Mileage payment for mobilization will be paid if the resources ordered are setup within the timeframes specified in the agreement. If all resources are not setup within the timeframes specified, then mobilization mileage will not be paid. There will be no proration of the mileage payment. (Example: In the scenario above the contractor setup 6 of the 7 resources within the timeframe specified in the agreement. As such, the contractor is eligible for only 1 of the 2 possible mobilization mileage payments and the calculation would be: ($1.50 * 450) * 1 trip = $775.00).

Mileage payment for demobilization will be paid if the resources were accepted and supported the incident, regardless of the duration of the assignment. (Example: Following onto the scenario above the contractor went on to setup all resources and all 7 resources were assigned to the incident for 7 days. As such, the contractor will be paid for two demobilization mileage payments and this example will be calculated as: ($1.50 * 450) * 2 trips = $1,350.00).

RELOCATION FEE - Relocation means moving an entire tent system from one physical location to another, moving panels or doors does not constitute relocation. Relocation includes round trip mileage and the relocation fee to compensate for additional required travel outside of original mobilization. If, after initially agreeing on the placement of the generators, the incident requires the generators to be moved to accommodate more distance between occupied structures (carbon monoxide exposure mitigation), the incident will pay the generator relocation fee and mileage rate to compensate the contractor for the travel to site and additional power distribution and cabling required to facilitate the added distance.

RATE INCLUSIONS - Proposed rates shall include, but are not limited to, labor (as required), equipment, operating supplies, materials, State and Federal taxes (including workers compensation costs), insurance coverage, transportation costs, overhead, and profit, and any costs/fees necessary to ensure equipment/operators/crews meet(s) the specified standards. As required by the agreement, maintenance, and operator transportation, delivery/setup/takedown, mobilization/demobilization, and a Contractor's representative attendance at the operational period briefings should also be included.

GOVERNMENT PROVIDED – Government will provide re-fueling of generators to include DEF (Diesel Exhaust Fluid), if necessary for continued operations. If water barrels are required for stabilization of tent systems, the Government will provide water. Amenities on site may be available (sack lunches, etc.) through coordination at the incident with the Logistics Section.

NOTE: Resources furnished under this agreement may be operated and subjected to extreme environmental and/or strenuous operating conditions which could include but is not limited to unimproved roads, steep, rocky, hilly terrain, dust, heat, and smoky conditions. As a result, by entering into this agreement, the contractor agrees that what is considered wear and tear under this agreement is in excess of what the resource is subjected to under normal operations and is reflected in the rates paid for the resource.

SCHEDULE OF ITEMS (SOI)

ITEM NO

Daily Rate
Mileage per 5 Resources
Relocation Fee
0001
Tent System Type 1- 1001-1300 square feet (example 23' x 60')
0002
Tent System Type 2- 701-1000 square feet (example 23' x 42')
0003
Tent System Type 3- 501-700 square feet (example 19' x 35')
0004
Tent System Type 4- 200-500 square feet (example 20' x 20', 20' octagon)
0005
126-150 kW generator package
0006
71-125 kW generator package
0007
50-70 kW generator package
0008
25-45 kW generator package
0009
11-20 kW generator* (stand-alone)
0010
Vestibule Connector
0011
Divider (Internal)
0012
Additional External Doors
0013
External Screen Walls
0014
Additional climate control/temperature control systems

3-5 Ton HVAC Units (Heating & Cooling)

Air Conditioner (12,000 - 25,000 BTUs)

Electric Heater - Indoor Use

Propane Heater - Outdoor Use

0015
Water Barrels ILO Staking

File details come from the government source that posted it. Updated .