About this file
This is a Highway Occupancy Permit (HOP) issued by the Pennsylvania Department of Transportation (PennDOT) District Office 5-0 to Pocono Township for sidewalk and related infrastructure work on State Route 0611 in Monroe County. The permit authorizes construction of curb ramps, curbs, sidewalks, and highway lighting facilities at segment 0220, offset 0956. The permit was issued on December 9, 2025, and expires on December 9, 2026. Associated permits for this project include a medium volume driveway installation (Permit 05065524) and a storm water facility installation (Permit 05065527), with all security, insurance, work, and inspection fees charged to Ertle Development, LLC. The work must comply with all PennDOT regulations and standards outlined in 67 Pa. Code Chapters 212, 441, and 459, and the State Highway Law. No work may commence until all right-of-way documents are executed and recorded, and the contractor must provide a work schedule three days before starting work along with emergency contact information.
The contractor must submit a Certificate of Insurance 30 days prior to work commencement and post restoration security at least 30 days before beginning work. All inspection costs will be charged to the permittee, and temporary and permanent pavement restoration must comply with specific PennDOT standards using hot or warm mix materials. Sidewalk construction must provide accommodations for persons with disabilities consistent with ADA standards. The contractor must contact PennDOT's District Press Office at least five work days before any lane closure and notify the Traffic Management Center prior to setting up restrictions. Lane closures are prohibited during peak commuting hours (6:00 AM to 9:00 AM and 3:00 PM to 6:00 PM) and major holiday periods. Final completion documentation, including CS-4401 forms with installation photographs and RMS forms, must be submitted before permit closeout.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Name and Address of Permittee:
Pocono Township 112 Township Drive Tannersville, PA 18372
County: Monroe
County Contact No.: (570) 424-3024 Ext.
Issuing District Office: 5-0
District Contact No.: (610) 871-4167
Municipalities: Pocono Township
Issue Date: 12/9/2025
Expiration Date: 12/9/2026
Application No.: 358496
Account No.:
Permit Fee: $ 0.00
Immediately upon completion of the work Permittee shall notify the permit office where application was made. Subject to all the conditions, agreements, restrictions, and regulations prescribed by the Pennsylvania Department of Transportation, (see in particular 67 Pa. Code, Chapter 212, 441 and 459 and State Highway Law, 36 P.S. Section 670 - 411, 420 and 421 ) and subject to the plans, special conditions, or restrictions herein set forth or attached hereto. This permit shall be located at the work site and shall be available for inspection by any police officer or Department representative.
Location and Description of Work Permit No.: 05065526
1 of 2 State Route #: 0611 Segment(s): From 0220 To 0220 Offset(s): From 0956 To 0956
101: CONSTRUCT CURB RAMP
131: Construct Curb 840: Install Highway Lighting Facility
2 of 2 State Route #: 0611 Segment(s): From 0220 To 0220 Offset(s): From 0956 To 0956
132: Construct Sidewalk
Permit Conditions Permit No.: 05065526
1 of 33 THE FOLLOWING PERMITS WERE ISSUED IN ASSOCIATION WITH THIS PROJECT:
- 05065524 - INSTALL MEDIUM VOLUME DRIVEWAY - ERTLE DEVELOPMENT, LLC.
- 05065527 - INSTALL STORM WATER FACILITY - POCONO TOWNSHIP
SECURITY, INSURANCE, WORK AND ALL INSPECTION FEES ASSOCIATED WITH THESE
PERMITS WILL BE IN THE NAME OF OR CHARGED TO ERTLE DEVELOPMENT, LLC. (OR
ASSIGNS). NO WORK MAY BEGIN UNTIL THE PERMIT FOR THIS APPLICATION HAS BEEN
ISSUED.
2 of 33 FINAL, COMPLETED CS-4401 FORMS, IN A FORM ACCEPTABLE TO THE DEPARTMENT, WITH PICTURES OF THE INSTALLATION, AND FINAL RMS FORMS ARE REQUIRED TO BE
SUBMITTED BY SUPPLEMENT PRIOR TO THE CLOSE OUT OF THE PERMIT.
3 of 33 NO WORK MAY BEGIN UNTIL ALL OF THE REQUIRED RIGHT-OF-WAY DOCUMENTS AND
CONVEYANCE OF RIGHT-OF-WAY TO THE DEPARTMENT HAS BEEN FULLY EXECUTED
AND RECORDED.
4 of 33 CONTRACTOR MUST CONTACT PENNDOT'S DISTRICT PRESS OFFICE AT 610-871-4555 AT
LEAST 5 WORK DAYS PRIOR TO ANY LANE CLOSURE AND 10 WORK DAYS PRIOR TO ANY
FULL CLOSURE.
5 of 33 NOTIFY THE TRAFFIC MANAGEMENT CENTER AT 610-871-4600 PRIOR TO SETTING UP ANY
LANE CLOSURES OR RESTRICTIONS, AND WHEN THE CLOSURE/RESTRICTION IS
REMOVED.
6 of 33 PERMITTEE'S CONTRACTOR MUST PROVIDE PROPOSED WORK SCHEDULE 3 DAYS
BEFORE START OF WORK. ALSO, PROVIDE AN EMERGENCY PHONE CONTACT NUMBER
TO THE DEPARTMENT.
M-945P (6/12)
Highway Occupancy Permit Permit No.: 05065526
Page 1 of Permit # 05065526
Permit Conditions Permit No.: 05065526
7 of 33 CONTACT COUNTY PERMIT INSPECTOR AT LEAST 3 WORK DAYS PRIOR TO START OF
WORK AT 610-657-5201 AND/OR LEWALLEN@PA.GOV.
8 of 33 A CERTIFICATE OF INSURANCE SHALL BE SUBMITTED TO THE DEPT. BY THE PERMITTEE
OR ITS CONTRACTOR 30 DAYS PRIOR TO START OF WORK.
9 of 33 RESTORATION SECURITY SHALL BE SUBMITTED TO THE DEPARTMENT AT LEAST 30
DAYS PRIOR TO START OF WORK. NO WORK MAY BE PERFORMED UNTIL SECURITY IS
APPROVED.
10 of 33 AN INSPECTOR, WHEN AVAILABLE, WILL BE ASSIGNED ON MORE THAN A SPOT
INSPECTION BASIS. PERMITTEE WILL BE CHARGED ALL INSPECTION COSTS INCURRED
BY THE DEPARTMENT.
11 of 33 FACILITY MAY BE PLACED IN PAVEMENT OR SHOULDER, AS PER PLANS, PROVIDED
BASE AND WEARING COURSES ARE OPENED BY SAW CUT METHOD.
12 of 33 THIS PERMIT AUTHORIZES WORK ONLY IN DEPARTMENT HIGHWAY RIGHT OF WAY.
13 of 33 2A COARSE AGGREGATE BACKFILL MATERIAL IS REQUIRED UNDER 67 PA CODE, SECTION 459.8 (G)(2) AND SECTION 703.2 OF PUBLICATION 408.
14 of 33 DEPARTMENT MUST BE NOTIFIED IN WRITING TWO WEEKS IN ADVANCE OF PRE-
CONSTRUCTION MEETING.
15 of 33 DEPARTMENT MUST BE NOTIFIED IN WRITING UPON COMPLETION OF WORK.
16 of 33 TEMPORARY PAVEMENT RESTORATION AUTHORIZED CONSISTENT WITH SECTION
459.8(K) 17 of 33 COMPLETE PERMANENT PAVEMENT RESTORATION IN ACCORDANCE WITH SECTION
459.8 PRIOR TO THE CLOSE OUT OF THE PERMIT. EACH PATCH MUST BE PAINTED IN
ACCORDANCE WITH SECTION 459.8(L).
18 of 33 THE PERMITTEE IS REQUIRED TO USE HOT MIX OR WARM MIX MATERIAL FOR
TEMPORARY RESTORATION. COLD MIX WILL BE PERMITTED AT THE DISCRETION OF
THE DEPARTMENT. PERMITTEE MUST MAINTAIN A SMOOTH PAVEMENT SURFACE
SUITABLE FOR DRIVING FOR THE DURATION OF THE TEMPORARY PAVEMENT.
19 of 33 COMPLETE TRENCH BACKFILL IN ACCORDANCE WITH SECTION 459.8, & THE NEWEST
VERSION OF THE PUBLICATION 408 SPECIFICALLY SECTION 601.3 (F) AND (Q). A
PROCTOR FOR CERTIFIED STONE MUST BE PROVIDED PRIOR TO THE START OF
CONSTRUCTION. FOR MATERIALS WITH MORE THAN 20% RETAINED ON THE 3/4 SIEVE,
OR IF A VIABLE PROCTOR COULD NOT BE OBTAINED, COMPACTION BY NON-MOVEMENT
IS ACCEPTABLE USING THE EQUIPMENT OUTLINED IN PUB 408, SECTION 108.05(c) AND TESTED IN ACCORDANCE WITH PUB 408, SECTION 210.3(b); FORM TR-478A AND FORM CS-
6 ARE TO BE COMPLETED. FOR MATERIALS WITH LESS THAN 20% RETAINED ON THE 3/4
SIEVE, NUCLEAR DENSITY TESTING MUST BE PERFORMED; FORM TR-4276A AND FORM
CS-6 ARE TO BE COMPLETED. FORMS CS-6 AND TR-478A ARE TO BE COMPLETED BY THE
AUTHORIZED INSPECTOR. FORM TR-4276A IS TO BE COMPLETED BY THE NUCLEAR
TECHNICIAN. INSPECTION OF THE COMPACTION OF THE TRENCH BACKFILL IS
REQUIRED; FAILURE TO NOTIFY THE DEPARTMENT WILL RESULT IN REMOVAL OF THE
MATERIAL AND REPLACEMENT UNDER DEPARTMENT SUPERVISION.
20 of 33 CURB MUST BE INSTALLED IN ACCORDANCE WITH PENNDOT ROADWAY STANDARDS
RC-64M AND RC-67M.
M-945P (6/12)
Highway Occupancy Permit Permit No.: 05065526
Page 2 of
21 of 33 SIDEWALK CONSTRUCTION OR REPLACEMENT SHALL PROVIDE ACCOMMODATIONS
FOR PERSONS WITH DISABILITIES CONSISTENT WITH ADA AND PENNDOT STANDARDS.
22 of 33 IT IS THE PERMITTEE'S RESPONSIBILITY TO IDENTIFY ALL PENNDOT OWNED/OPERATED
FACILITIES WITHIN THE LIMITS OF PERMITTED WORK. IF DAMAGED BY THE PERMITTED
WORK, IT IS PERMITTEES RESPONSIBILITY TO CONTACT THE DEPARTMENT
IMMEDIATELY AND RESTORE THE FACILITY TO ITS ORIGINAL CONDITION OR AS
DIRECTED BY THE DEPARTMENT.
23 of 33 ALL DISTURBED AREAS OUTSIDE THE PAVEMENT OR SHOULDER SHALL BE RESTORED
TO A CONDITION AT LEAST EQUAL TO THAT WHICH EXISTED BEFORE THE START OF
WORK.
24 of 33 MINIMUM WORK ZONE TRAFFIC CONTROL TO BE IN ACCORDANCE WITH PUB. 213. SEE
PUB 212 FOR ADDITIONAL DETAILS.
25 of 33 NO LANES MAY BE RESTRICTED BETWEEN THE HOURS OF 6:00 AM TO 9:00 AM OR
BETWEEN THE HOURS OF 3:00 PM TO 6:00 PM.
26 of 33 LANE CLOSURES WILL NOT BE PERMITTED DURING THE FOLLOWING PERIODS: EASTER
WEEKEND - FRIDAY 6:00AM TO TUESDAY 9:00AM; MEMORIAL DAY WEEKEND - FRIDAY
6:00AM TO TUESDAY 9:00AM; FOURTH OF JULY HOLIDAY - REQUEST INFORMATION
FROM DISTRICT OR COUNTY PERMIT OFFICE; LABOR DAY WEEKEND - FRIDAY 6:00AM
TO TUESDAY 9:00AM; COLUMBUS DAY/INDIGENOUS PEOPLE'S DAY WEEKEND - FRIDAY
6:00AM TO TUESDAY 9:00AM; THANKSGIVING WEEKEND - WEDNESDAY 6:00AM TO
MONDAY 9:00AM; CHRISTMAS HOLIDAY-DECEMBER REQUEST INFORMATION FROM
DISTRICT OR COUNTY PERMIT OFFICE; NEW YEAR'S HOLIDAY - REQUEST INFORMATION
FROM DISTRICT OR COUNTY PERMIT OFFICE. THERE MAY BE ADDITIONAL TRAFFIC
RESTRICTIONS FOR SPECIAL EVENTS THAT ATTRACT LARGE VOLUMES OF TRAFFIC IN
THE AREA OF THE HOP.
27 of 33 THIS PERMIT SHALL, PRIOR TO ISSUANCE, BE RECORDED IN THE COUNTY RECORDER OF
DEEDS OFFICE.
28 of 33 PERMITTEE IS RESPONSIBLE FOR ENSURING THAT MUD, SILT AND OTHER DEBRIS IS
REMOVED FROM VEHICLES AND TIRES (BY POWER WASH, ETC.) BEFORE ENTERING
ONTO THE HIGHWAY.
29 of 33 PERMITTEE MAY BE REQUIRED TO PROVIDE DAILY VIRTUAL INSPECTION VIA
ELECTRONIC DOCUMENTATION. THIS DOCUMENTATION SHOULD INCLUDE, BUT IS NOT
LIMITED TO, PHOTO DOCUMENTATION OF WORK PERFORMED, DAILY LOG OF WORK
ACTIVITIES, MATERIAL CERTIFICATIONS, TEST RESULTS, AND OTHER PERTINENT
INFORMATION THAT DOCUMENTS PROPER RESTORATION OF THE HIGHWAY. PRIOR TO
THE START OF WORK, CONTACT THE DISTRICT PERMIT MANAGER OR COUNTY PERMIT
SUPERVISOR FOR SPECIFIC REQUIREMENTS. FAILURE TO PROVIDE THE
DOCUMENTATION MAY RESULT IN PENNDOT STOPPING THE WORK, PHYSICALLY
CLOSING ACCESS TO THE STATE HIGHWAY, AND/OR REMOVAL AND REPLACEMENT OF
WORK.
30 of 33 IF AN OPENING IS MADE WITHIN A BITUMINOUS OR CONCRETE PAVEMENT WITHIN 3
FEET FROM THE EDGE OF PAVEMENT OR OTHER LONGITUDINAL JOINT OR OPENING,
THE SURFACE RESTORATION SHALL BE EXTENDED TO THE EDGE OF PAVEMENT OR
OTHER LONGITUDINAL JOINT OR OPENING. (67 PA. CODE, CHAPTER 459.8)
31 of 33 ALL PERMANENT SIGNS ERECTED MUST BE FABRICATED BY AN APPROVED SIGN
MANUFACTURER LISTED IN THE DEPARTMENTS PUBLICATION 35, BULLETIN 15.
M-945P (6/12)
Highway Occupancy Permit Permit No.: 05065526
Page 3 of
32 of 33 MATERIAL CERTIFICATIONS MUST BE PROVIDED, BY AN APPROVED MANUFACTURER
LISTED IN THE DEPARTMENTS PUBLICATION 35 BULLETIN 15, FOR ALL MATERIALS AND
STRUCTURES WITHIN PENN DOT R/W.
33 of 33 AS-BUILT PLANS, IN A .PDF FORMAT, MAY BE REQUIRED PRIOR TO THE CLOSE OUT OF
THIS PERMIT, IF ANY CHANGES ARE MADE TO THE APPROVED DESIGN.
Acknowledgement of Completion
Permit work has been completed:
Date:
By:
Michael B. Carroll
Secretary of Transportation
Christopher J. Kufro, P.E.
District Executive
M-945P (6/12)
Highway Occupancy Permit Permit No.: 05065526
Page 4 of
File details come from the government source that posted it. Updated .