This document is a Contract Surveillance Plan (CSP) for Counter Uncrewed Systems (CUXS) Support Services issued by the Naval Air Warfare Center Aircraft Division (NAWCAD). The contract is a five-year, Cost-Plus-Fixed-Fee (CPFF) Indefinite Delivery Indefinite Quantity (IDIQ) procurement with a six-month extension option, supporting system integration, production, engineering, training, logistics, testing, operations, and technical management for CUXS platforms. Services include detection, characterization, identification, mitigation, and assessment of friendly and adversarial uncrewed systems.
The CSP outlines comprehensive government surveillance methods, including quarterly and annual performance assessments using the Contractor Performance Assessment Reporting System (CPARS). Surveillance will be conducted by the Contracting Officer, Contracting Officer's Representative, and Government Project Leads, with 100% inspection of contract deliverables across multiple technical areas. Performance will be evaluated on quality, schedule, cost control, business relations, management, and small business utilization, with potential ratings ranging from Exceptional to Unsatisfactory, which can impact future contract awards.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CUXS Draft RFP_QA.pdf | ||
| CIIDS CSWF Attachment 08.xlsx | XLSX spreadsheet | |
| Attachment 3 Locator Form.pdf | ||
| Attachment P3 - SBPCD.docx | DOCX document | |
| 10. CUXS_OCI List V2.docx | DOCX document | |
| Professional Engineering Positions_0800_Attachment 07.pdf | ||
| 8. CUXS_DD Form 254_June 2025 Expiration_Bidding_.pdf | ||
| 7. CUXS_CDRL_rev5.docx | DOCX document | |
| Attachment P2 - Annual Fully Burdened Rates.xlsx | XLSX spreadsheet | |
| Attachment P1 - Cost Summary Spreadsheet.xlsx | XLSX spreadsheet | |
| WD 2015-4279_Rev 27.pdf | ||
| Attachment 5 Data Item Transmittal Form.docx | DOCX document | |
| DRAFT_N0042125R0025.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N00421-18-R-0018 Enclosure (3) Enclosure (3)
Contract Surveillance Plan for Combat Integration & Identification Systems Counter Uncrewed Systems Support Services
1. Purpose
This Contract Surveillance Plan (CSP) is a Government developed and applied document used to ensure systematic Quality Assurance (QA) methods are used in the administration and surveillance of tasking under the Contract. The intent is to ensure the Contractor performs In Accordance With (IAW) the Statement of Work (SOW) and the Government receives the quality of services called for in the Single Award (SA) Indefinite Delivery Indefinite Quantity (IDIQ) contract.
The Naval Air Warfare Center Aircraft Division (NAWCAD) Webster Outlying Field (WOLF) Combat Integration & Identification Systems (CI&IDS) Division, operating under the organic Lead Systems Integrator® (oLSI®) model, has requirements for the support and sustainment of Counter Uncrewed Systems (CUXS) including, but not limited to, systems that provide detection, characterization, identification, mitigation, and assessment of friendly or adversarial platforms. Services procured under this Contract include providing support for system integration, production and fabrication, in-service engineering, training, logistics engineering, supply and material control, testing, CUXS operations, laboratory and test bed maintenance, CUXS engineering, frequency management and spectrum authorization, and technical management.
This Contract will have Cost-Plus-Fixed-Fee (CPFF) term Contract Line Item Numbers (CLINs) for labor and corresponding cost reimbursable CLINs for Other Direct Costs (ODCs). The Contract will have a five-year ordering period with an option to extend six months IAW FAR Clause 52.217-8, Option to Extend Services. A properly executed CSP will assist the Government in achieving the objectives of this procurement.
2. Authority
Authority for issuance of this CSP is provided under Contract Section E – Inspection and Acceptance, which provides for inspections and acceptance of the services, products, and documentation called for in the Contract that will be executed by the Contracting Officer (KO) or a duly authorized representative.
3. Scope
To fully understand the roles and responsibilities of the parties, it is important to first define the distinction in terminology between Quality Control Plan (QCP) and the CSP. The Contractor, and not the Government, is responsible for the QCP, which defines the management and quality control actions necessary to meet the quality standards set forth in the Contract.
The CSP provides Government surveillance oversight of the Contractor’s efforts to assure they are timely, effective, and delivering the results specified in the Contract.
4. Government Resources
The following definitions for Government resources are applicable to this plan:
KO: A person duly appointed with the authority to enter into a contract (Procuring Contracting Officer (PCO)), or a person with the authority to administer contracts (Administrative Contracting Officer (ACO)) and make related determinations and findings on behalf of the Government. The PCO for this Contract is Jennifer Lauren Lundburg. The ACO will be designated in the resulting Contract. KOs are designated via a written warrant that sets forth limitations of authority.
Contracting Officer’s Representative (COR): An individual appointed in writing by the PCO to act as their authorized representative to assist in administering the Contract. The COR will be appointed in the resulting Contract. The limitations of authority are contained in the letter of appointment.
Alternate Contracting Officer’s Representative (ACOR): An individual appointed in writing by the PCO to act as their authorized representative, in the absence of the COR, to assist in administering the Contract. The ACOR will be appointed in the resulting Contract. The limitations of authority are contained in a written letter of appointment.
Government Project Lead (GPL): The COR designates individual GPLs to assist in administering specific efforts under the Contract.
5. Responsibilities
The following Government resources will have responsibility for the implementation of this CSP:
KO: The KO (PCO or ACO) ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the Contract, and safeguards the interests of the United States in the contractual relationship. The KO assures that the Contractor receives impartial, fair, and equitable treatment under the Contract. The KO is ultimately responsible for the final determination of the adequacy of the Contractor’s performance.
COR: The COR is responsible for technical administration of the Contract and assures proper Government surveillance of the Contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf. Any changes that the Contractor deems may affect the Contract price, terms, or conditions shall be referred to the KO for action.
ACOR: The ACOR assists the COR for technical administration of the Contract and assures proper Government surveillance of the Contractor’s performance. The ACOR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf. Any changes that the Contractor deems may affect the contract price, terms, or conditions shall be referred to the KO for action.
GPL: The GPL is responsible for assisting in administering specific efforts under the Contract. A GPL cannot, in any manner, alter the scope of the Contract, make commitments, or authorize any changes on the Government’s behalf.
6. Methods of QA Surveillance
a. Contractor Performance Assessment Reporting System (CPARS): The marketplace for CUXS sustainment and support services is competitive. As such, the successful Offeror has a vested interest in the Government generated CPARS under this Contract. Additionally, an evaluation using the CPARS format will be performed at the end of each ordering period/base or option year. This evaluation will be one determinant in the award of future contracts/TOs or option exercises. The Government will address the quality of product or service, schedule, cost control, business relations, management, utilization of Small Business (SB), and other important areas for this procurement. Some of the monitoring methods to be used will be Government observation, review of reports, customer feedback, and review of Contract Data Requirements Lists (CDRLs). As this information may affect future source selections throughout the Department of Defense (DoD), as well as the continuation of this tasking, the annual Government assessment will be used appropriately as an additional performance oversight and communication tool within the policies of this CSP.
b. CSP: This document will be used by the COR, ACOR, and GPLs in the technical administration of this Contract. In addition to the below instructions, the form to be used for documentation of QA surveillance is the Surveillance Activity Checklist (SAC).
7. Surveillance
Enclosure (2) sets forth the performance standards, incentives, and surveillance methods for the Contractor, COR, ACOR, and GPLs while Enclosures (1) and (3) provide the checklist and means for the COR to document the results of the surveillance and will be provided to the KO.
8. Documentation
In addition to providing reports to the KO, the COR will maintain a complete QA file. The file will contain copies of all reports, evaluations, recommendations, and any actions related to the Government’s performance of the QA function, including the originals of the QA Checklists. All such records will be maintained for the life of the Contract. The COR shall forward these records to the KO at termination or completion of the Contract.
9. Enclosures
Enclosure (1): Surveillance Activity Checklist (SAC) Enclosure (2): Quarterly Evaluation by Contract Data Requirements List (CDRL) Enclosure (3): Annual Surveillance Summary
ENCLOSURE (1): SURVEILLANCE ACTIVITY CHECKLIST (SAC)
Quarterly Surveillance:
The Contracting Officer’s Representative (COR) will perform a quarterly assessment of quality, schedule, cost control, business relations, management, utilization of Small Business (SB), and other areas as applicable utilizing the Contractor Performance Assessment Reporting System (CPARS) evaluation rating definitions listed in Enclosure (3).
QUARTERLY EVALUATION BY SOW PARAGRAPH
| Description |
| Surveillance Method/Measure |
| Dates |
| Quality Assessment |
| Schedule Assessment |
| Cost Control Assessment |
| Business Relations Assessment |
| Management Assessment |
| Utilization of SB Assessment |
| Other Areas Assessment |
| Provide system integration IAW SOW paragraph 3.3.1 |
| 100% Inspection by COR, ACOR, and/or GPLs. |
| Provide production and fabrication IAW SOW paragraph 3.3.2 |
| 100% Inspection by COR, ACOR, and/or GPLs. |
| Provide in-service engineering support IAW SOW paragraph 3.3.3 |
| 100% Inspection by COR, ACOR, and/or GPLs. |
| Provide training IAW SOW paragraph 3.3.4 |
| 100% Inspection by COR, ACOR, and/or GPLs. |
| Provide logistics engineering IAW SOW paragraph 3.3.5 |
| 100% Inspection by COR, ACOR, and/or GPLs. |
| Provide supply and material control IAW SOW paragraph 3.3.6 |
| 100% Inspection by COR, ACOR, and/or GPLs. |
| Provide testing IAW SOW paragraph 3.3.7 |
| 100% Inspection by COR, ACOR, and/or GPLs. |
| Provide Counter Uncrewed Systems (CUXS) operation support IAW SOW paragraph 3.3.8 |
| 100% Inspection by COR, ACOR, and/or GPLs. |
| Provide laboratory and test bed maintenance IAW SOW paragraph 3.3.9 |
| 100% Inspection by COR, ACOR, and/or GPLs. |
| Provide CUXS engineering support IAW SOW paragraph 3.3.10 |
| 100% Inspection by COR, ACOR, and/or GPLs. |
| Provide frequency management and spectrum authorization IAW SOW paragraph 3.3.11 |
| 100% Inspection by COR, ACOR, and/or GPLs. |
| Provide technical management IAW SOW paragraph 3.3.12 |
| 100% Inspection by COR, ACOR, and/or GPLs. |
Enclosure (1) Enclosure (1)
ENCLOSURE (2): QUARTERLY EVALUATION BY CONTRACT DATA REQUIREMENTS LIST (CDRL)
| Description |
| Surveillance Method/Measure |
| Dates Due |
| Dates Completed |
| No. Submittals |
| No. of Req’d Rework |
| Percentage On Time |
| Comments |
| A001: Contracting Officer’s Representative (COR) Management Report for Technical Direction Letters (TDLs) |
| 100% Inspection by COR, ACOR, and/or GPLs. |
| A002: Management Plan |
| 100% Inspection by COR, ACOR, and/or GPLs. |
| A004: Contractor Performance Assessment Report |
| 100% Inspection by COR, ACOR, and/or GPLs. |
| A005: Trip/Travel Report |
| 100% Inspection by COR, ACOR, and/or GPLs. |
| A011: Installation Control Drawings |
| 100% Inspection by COR, ACOR, and/or GPLs. |
| A012: Schematic Block Diagram |
| 100% Inspection by COR, ACOR, and/or GPLs. |
| A013: Technical Data Packages |
| 100% Inspection by COR, ACOR, and/or GPLs. |
| A014: Site Preparation Requirements and Installation Plan |
| 100% Inspection by COR, ACOR, and/or GPLs. |
| A015: Software User Manual (SUM) |
| 100% Inspection by COR, ACOR, and/or GPLs. |
| A016: Scientific and Technical Reports |
| 100% Inspection by COR, ACOR, and/or GPLs. |
| A017: Contractor’s Standard Operating Procedures |
| 100% Inspection by COR, ACOR, and/or GPLs. |
| A018: Quality Management System (QMS) |
| 100% Inspection by COR, ACOR, and/or GPLs. |
| A019: Technical Data Report |
| 100% Inspection by COR, ACOR, and/or GPLs. |
| A020: Critical Defect Investigation Report |
| 100% Inspection by COR, ACOR, and/or GPLs. |
| A021: Technical Report - Study/Services |
| 100% Inspection by COR, ACOR, and/or GPLs. |
| A022: Failure Summary and Analysis Report |
| 100% Inspection by COR, ACOR, and/or GPLs. |
| A023: Engineering Change Proposal (ECP) |
| 100% Inspection by COR, ACOR, and/or GPLs. |
| A024: Test Plan |
| 100% Inspection by COR, ACOR, and/or GPLs. |
| A025: Test Plans/Test Procedures |
| 100% Inspection by COR, ACOR, and/or GPLs. |
| A026: System Safety Program Plan (SSPP) |
| 100% Inspection by COR, ACOR, and/or GPLs. |
| A027: Safety Assessment Report (SAR) |
| 100% Inspection by COR, ACOR, and/or GPLs. |
| A028: Requirements Traceability Verification Matrix (RTVM) |
| 100% Inspection by COR, ACOR, and/or GPLs. |
| A029: System/Subsystem Specification (SSS) |
| 100% Inspection by COR, ACOR, and/or GPLs. |
| A030: Reliability-Centered Maintenance (RCM) Procedure Validation Report |
| 100% Inspection by COR, ACOR, and/or GPLs. |
| A031: Training Program Structure Document |
| 100% Inspection by COR, ACOR, and/or GPLs. |
| A032: Training Materials |
| 100% Inspection by COR, ACOR, and/or GPLs. |
| A033: Student Guide |
| 100% Inspection by COR, ACOR, and/or GPLs. |
| A034: Logistics Product Data |
| 100% Inspection by COR, ACOR, and/or GPLs. |
| A035: Diminishing Manufacturing Sources and Material Shortages (DMSMS) Management Plan |
| 100% Inspection by COR, ACOR, and/or GPLs. |
| A036: Provisioning Parts Lists (PPLs) |
| 100% Inspection by COR, ACOR, and/or GPLs. |
| A037: AS Built Configuration List - Common (ABCL-C) |
| 100% Inspection by COR, ACOR, and/or GPLs. |
| A038: Configuration Audit Plan |
| 100% Inspection by COR, ACOR, and/or GPLs. |
| A039: Report of Receipts, Inventory, Adjustments, and Shipments of Government Property |
| 100% Inspection by COR, ACOR, and/or GPLs. |
| A040: Status Report |
| 100% Inspection by COR, ACOR, and/or GPLs. |
| A041: Phased Support Plan |
| 100% Inspection by COR, ACOR, and/or GPLs. |
| A042: Test/Inspection Report |
| 100% Inspection by COR, ACOR, and/or GPLs. |
| A043: System Integration Lab (SIL) Development and Management Plan |
| 100% Inspection by COR, ACOR, and/or GPLs. |
| A044: Presentation Material |
| 100% Inspection by COR, ACOR, and/or GPLs. |
Metric Summary:
Current Period
Cumulative
Total Number of Deliverables Submitted:
Total Number of Deliverables Submitted Late:
Total Number of Deliverables Requiring Revision:
Percentage of Deliverables Submitted Late:
Percentage of Deliverables Requiring Revision:
Enclosure (2) Enclosure (2)
ENCLOSURE (3): ANNUAL SURVEILLANCE SUMMARY
The Contracting Officer’s Representative (COR) will perform an assessment of overall contract performance utilizing the Contractor Performance Assessment Reporting System (CPARS) evaluation rating definitions listed in Enclosure (3) below. This assessment will be completed annually covering the previous 12 months.
| Description |
| Surveillance Method/Measure |
| Date Planned |
| Date Completed |
| Summary Rating/Results |
| Quality of Product or Service |
| Review of Quarterly Ratings |
| Schedule |
| Review of Quarterly Ratings |
| Cost Control |
| Review of Quarterly Ratings |
| Business Relations |
| Review of Quarterly Ratings |
| Management |
| Review of Quarterly Ratings |
| Utilization of Small Business (SB) |
| Review of Quarterly Ratings |
| Other Areas |
| Review of Quarterly Ratings |
Annual Surveillance Completed By: _______________________
Date Completed: ________________
All Statement of Work (SOW) and Contract Data Requirements List (CDRL) tasks, including sub-tasks, will be assessed focusing on the following.
Quality of product or service: Assess the Contractor’s effort to transform operational needs and requirements into an integrated solution. Areas of focus may include the planning and management of program tasks, the quality of support provided throughout all phases of contract execution, the integration of program management specialties, management of interfaces and the management of a totally integrated effort of all program management concerns to meet cost, performance and schedule objectives. Assess how successfully the Contractor meets program quality.
Schedule: Assess the Contractor’s adherence to the required delivery schedule by assessing the Contractor’s efforts during the assessment period that contribute to or effect the schedule variance. Also address significance of scheduled events (e.g., design reviews), discuss causes, and assess the effectiveness of Contractor corrective actions.
Cost control: Assess the Contractor’s effectiveness in forecasting, managing, and controlling contract cost. Is the Contractor experiencing cost growth or under-run? If so, discuss the causes and contractor-proposed solutions for the cost overruns. For contracts/TOs where task or contract sizing is based upon contractor-provided person hour estimates, the relationship of these estimates to ultimate cost should be assessed. In addition, the extent to which the Contractor demonstrates a sense of cost responsibility through the efficient use of resources in each work effort will be assessed.
Business relations: Assess the timeliness, completeness, and quality of problem identification, corrective action plans, proposal submittals, the Contractor’s reasonable and cooperative behavior, effective business relations, and customer satisfaction.
Management: Assess the Contractor’s success with timely award and management of subcontracts. Discuss the extent to which the Contractor discharges its responsibility for integration and coordination of all activity needed to execute the Contract; identifies and applies resources required to meet schedule requirements; assigns responsibility for tasks/actions required by the Contract; and communicates appropriate information to affected program elements in a timely manner. Assess the Contractor’s risk mitigation plans.
Utilization of Small Business (SB): The Request for Proposal (RFP) and FAR Subpart 19.7 and 15 U.S.C. 637 contains statutory requirements for complying with the SB Subcontracting Program. Assess whether the Contractor provided maximum practicable opportunity for SB (including Alaska Native Corporations (ANCs) and Indian Tribes) (including Small-Disadvantaged Businesses (SDBs) (which also includes ANCs and Indian Tribes), Women-Owned SBs (WOSBs), HUBZone, Veteran-Owned SBs (VOSBs), Service-Disabled Veteran Owned SBs (SDVOSBs), and ANCs and Indian Tribes that are not SDBs or SBs to participate in contract performance consistent with efficient performance of the Contract. Evaluation will focus on the metrics of actual SB utilization as compared to the contract required targets and the Contractor’s submitted SB plan.
Other areas: Assess additional evaluation areas unique to the Contract or that cannot be captured elsewhere.
The evaluation ratings are as follows:
Exceptional Performance: Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the Contractor were highly effective.
Very Good Performance: Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the Contractor were effective.
Satisfactory Performance: Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the Contractor appear or were satisfactory.
Marginal Performance: Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the Contractor has not yet identified corrective actions. The Contractor’s proposed actions appear only marginally effective or were not fully implemented.
Unsatisfactory Performance: Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the Contractor’s corrective actions appear or were ineffective.
File details come from the government source that posted it. Updated .