About this file

This file is a Scope of Work document for a wildfire fuels reduction project issued by the State of Utah Division of Wildlife Resources through the Division of Purchasing. The project involves hand cutting and piling wildfire fuels across 749 acres in the Big Cottonwood Canyon area, with a completion deadline of November 30, 2026. A mandatory site visit is required for all prospective bidders on August 5, 2026, at 10:00 a.m. at the Days Fork Trailhead, with attendance by an authorized representative of the bidding entity necessary for bid eligibility. Late arrivals after the stated meeting time will result in disqualification, as will failure to attend the entire site visit. An attendance log documenting attendee names, entities represented, contact information, site visit minutes, and distributed documents will be published as an addendum to the solicitation, along with any verbal modifications reduced to writing.

This solicitation is limited to prequalified contractors only, and participation requires current status on the State of Utah's Pre-approved/Pre-qualified Vendor list. Prospective bidders must not submit bids if they are not on this approved vendor list. The file indicates this is an Invitation for Bid (IFB) format, suggesting competitive sealed bidding with emphasis on cost as a primary evaluation factor. Additional details regarding pricing terms, contract duration, specific scope specifications, and technical requirements would be contained in the full solicitation documents referenced in this Scope of Work.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

INSTRUCTIONS: HOW TO USE THIS FORM

Independent Government Estimate (IGE)
No specific format is required for an IGE; however this must be an independent estimate and not a reiteration of a contractor quote. The selected format should generally be in the same level of detail and manner that the Schedule of Items pricing we request from contractors. The estimate should state any underlying assumptions or rationale used in formulating the estimate. Initially the CO will use the IGE to determine the estimated value of the procurement and to identify the appropriate procurement thresholds applicable to the solicitation. Later the IGE is compared to prices received to evaluate an offeror’s understanding of the government requirements and in supporting a price reasonableness determination.

EXPLANATION OF TABS

Stand Alone IGE:Use if the below do not apply to your requirement.
Stand Alone IGE w/options:Use if you have a requirement where you know you have an ongoing/recurring need year after year.
IDIQ:Use if you have a need that is reoccurring or multi-year requirement.
Task Order:Use if you want to issue a order against an existing contract or agreement.

CONTRACT (NO OPTIONS)

SCHEDULE OF ITEMS:

UINTA WASATCH CACHE NATIONAL FOREST, SALT LAKE RANGER DISTRICT

PROJECT TITLE:WASATCH FRONT WATERSHED RESTORATION WRI # 7401/7772

SCHEDULE OF ITEMS
Contract No.Project Location and Year:BIG COTTONWOOD CANYON 26County: SALT LAKE, UT
Contractor Name and Address:Issuing and Billing Office:

Utah DNR: Division of Wildlife Resources

Period of Performance Base Year: 8/01/2026-6/30/2027Project Manager and Inspectors: Agency: Project Manager/Inspector: Utah DNR: Dani Bordeaux Project Inspectors: USFS: Richard Nielson, Skylar Neugebauer, Peter Noble
Unit Physical Description/Name/Special RequirementsUnit NumberPAY UNITEST QTYSlope°/AspectHike-In/UTV/DrivablePiles/ Acre
MINERAL HAND CUT AND PILE 106 TOTAL ACRES
MINERAL HAND CUT AND PILE1ACRES490-25°/NNWHike-In/UTV ≤54”30-50
MINERAL HAND CUT AND PILE2ACRES10-25°/NNWHike-In/UTV ≤54”30-50
MINERAL HAND CUT AND PILE3ACRES280-25°/NNWHike-In/UTV ≤54”30-50
MINERAL HAND CUT AND PILE4ACRES30-25°/NNWHike-In/UTV ≤54”30-50
MINERAL HAND CUT AND PILE5ACRES50-25°/NNWHike-In/UTV ≤54”30-50
MINERAL HAND CUT AND PILE6ACRES160-25°/NNWHike-In/UTV ≤54”30-50
MINERAL HAND CUT AND PILE7ACRES10-25°/NNWHike-In/UTV ≤54”30-50
MINERAL HAND CUT AND PILE8ACRES30-25°/NNWHike-In/UTV ≤54”30-50
MILL D HAND CUT AND PILE 279 TOTAL ACRES
*MILL D HAND CUT AND PILE - Trail Switch Backs*9ACRES1710-25°/SHike-In30-50
MILL D HAND CUT AND PILE10ACRES1110-25°/SHike-In30-50
MILL D HAND CUT AND PILE11ACRES1210-25°/SHike-In30-50
*MILL D HAND CUT AND PILE - Trail Switch Backs*12ACRES1310-25°/SHike-In30-50
MILL D HAND CUT AND PILE13ACRES4515-30°/NNWHike-In30-50
MILL D HAND CUT AND PILE14ACRES210-25°/SHike-In30-50
MILL D HAND CUT AND PILE15ACRES2115-30°/NNWHike-In30-50
MILL D HAND CUT AND PILE16ACRES1415-30°/NNWHike-In30-50
MILL D HAND CUT AND PILE17ACRES310-25°/SHike-In30-50
MILL D HAND CUT AND PILE18ACRES710-25°/SHike-In30-50
**MILL D HAND CUT AND PILE - Cut up to 16" Conifer Encroachment**19ACRES615-30°/NNWHike-In30-50
MILL D HAND CUT AND PILE20ACRES410-25°/SHike-In30-50
MILL D HAND CUT AND PILE21ACRES1010-25°/SHike-In30-50
MILL D HAND CUT AND PILE22ACRES710-25°/SHike-In30-50
MILL D HAND CUT AND PILE23ACRES1415-30°/NNWHike-In30-50
MILL D HAND CUT AND PILE24ACRES1515-30°/NNWHike-In30-50
MILL D HAND CUT AND PILE25ACRES1110-25°/SDrivable30-50
MILL D HAND CUT AND PILE26ACRES1810-25°/SDrivable30-50
MILL D HAND CUT AND PILE27ACRES410-25°/SDrivable30-50
MILL D HAND CUT AND PILE28ACRES3710-25°/SDrivable30-50
CARDIFF HAND CUT AND PILE 121 TOTAL ACRES
CARDIFF HAND CUT AND PILE29ACRES1210-20°/NNEDrivable30-50
CARDIFF HAND CUT AND PILE30ACRES105-20°/NNEDrivable30-50
CARDIFF HAND CUT AND PILE31ACRES15-15°/NNEHike-In30-50
CARDIFF HAND CUT AND PILE32ACRES65-15°/NNEHike-In30-50
CARDIFF HAND CUT AND PILE33ACRES105-15°/NNEDrivable30-50
CARDIFF HAND CUT AND PILE34ACRES610-20°/NNEDrivable30-50
CARDIFF HAND CUT AND PILE35ACRES210-15°/NNEDrivable30-50
*CARDIFF HAND CUT AND PILE - Trail Switch Backs*36ACRES710-15°/NNEDrivable30-50
***CARDIFF HAND CUT AND PILE - Trail Switch Backs*37ACRES140-15°/NNEDrivable30-50
***CARDIFF HAND CUT AND PILE - Goshawk Nest*** Seasonal Cut38ACRES35-15°/NNEDrivable30-50
**CARDIFF HAND CUT AND PILE - Cut All Brush**39ACRES310-20°/NNEDrivable30-50
***CARDIFF HAND CUT AND PILE - Goshawk Nest*** Trail Switch Backs*40ACRES2610-20°/NNEDrivable30-50
*CARDIFF HAND CUT AND PILE - Trail Switch Backs/TR/RD Screening* 4 DBH**41ACRES310-15°/NNEDrivable30-50
*CARDIFF HAND CUT AND PILE - Trail Switch Backs*42ACRES1610-15°/NNEDrivable30-50
DAYS FORK HAND CUT AND PILE 263 TOTAL ACRES
DAYS FORK HAND CUT AND PILE43ACRES1810-20°/NNEDrivable30-50
DAYS FORK HAND CUT AND PILE44ACRES2110-20°/NNEDrivable30-50
*DAYS FORK HAND CUT AND PILE Trail Switch Backs*45ACRES1210-20°/NNEHike-In30-50
*DAYS FORK HAND CUT AND PILE - Trail Switch Backs*46ACRES1510-20°/NNEHike-In30-50
DAYS FORK HAND CUT AND PILE47ACRES290-15°/NNEHike-In30-50
DAYS FORK HAND CUT AND PILE48ACRES3910-25°/NNEHike-In30-50
DAYS FORK HAND CUT AND PILE49ACRES4815-30°/NNEHike-In30-50
DAYS FORK HAND CUT AND PILE50ACRES1110-25°/NNEHike-In30-50
DAYS FORK HAND CUT AND PILE51ACRES1010-25°/NNEHike-In30-50
DAYS FORK HAND CUT AND PILE52ACRES4810-25°/NNEHike-In30-50
DAYS FORK HAND CUT AND PILE53ACRES410-25°/NNEHike-In30-50
WASATCH FRONT WATERSHED RESTORATION WRI # 7401/7772 Totals53TOTAL ACRES7490-30°/S/NNE/NNWHike-In/UTV/Drivable30-50
* Special Trail Switch Backs Requirements**** Special Goshawk Requirements***
** Special Thinning/Diameter/Piling Requirements******Special Waterline Requirements****
*/**/***/**** Units May Hold Multiple Special Requirements */**/***/****

CONTRACT (WITH OPTION YRS)

FILL OUT THE AREAS IN RED BELOW

SCHEDULE OF ITEMS

(NAME) DISTRICT/FOREST/STATION/ACTIVITY

PROJECT TITLE: (NAME) WORKPLAN ACQUISITION PLAN/REQUISITION NO: (NUMBER)

SCHEDULE OF ITEMS
Period of Performance Base Year: MM/DD/YR – MM/DD/YR
PARENT CONTRACT WORK ITEMTASK ORDER WORK ITEMDESCRIPTIONPAY UNITEST QTY
Base:

Optional Items:

Period of Performance Option Year 1: MM/DD/YR – MM/DD/YR
PARENT CONTRACT WORK ITEMTASK ORDER WORK ITEMDESCRIPTIONPAY UNITEST QTY
Period of Performance Option Year 2: MM/DD/YR – MM/DD/YR
PARENT CONTRACT WORK ITEMTASK ORDER WORK ITEMDESCRIPTIONPAY UNITEST QTY
Period of Performance Option Year 3: MM/DD/YR – MM/DD/YR
PARENT CONTRACT WORK ITEMTASK ORDER WORK ITEMDESCRIPTIONPAY UNITEST QTY
Period of Performance Option Year 4: MM/DD/YR – MM/DD/YR
PARENT CONTRACT WORK ITEMTASK ORDER WORK ITEMDESCRIPTIONPAY UNITEST QTY

EA - EACH

MO - MONTH Award anticipated to be a firm fixed price contract.