10. Cost_Summary_Format_FINAL.xls
XLS spreadsheet 42 KB Posted
- Attached to
- PHNSY& IMF: Mobile At-sea Sensor System Support Services Federal contract opportunity
- Solicitation number
- N32253-22-R-0015
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N3225322R0015 0002.pdf | ||
| 15. Additional Questions and Answers MATSS.pdf | ||
| 10. Ship Repair Labor Rate Table.pdf | ||
| N3225322R0015 U0001.pdf | ||
| Questions and Answers for MATSS.pdf | ||
| 8.E. EXAMPLE UNDERWAY STORES LISTING.pdf | ||
| 16. VESSEL MODIFICATION LABOR RATE TABLE.pdf | ||
| 11. LABOR RATE SUBSTANTIATION TABLE.pdf | ||
| 13. MATSS HME Preventative Maintenance Listing v1.pdf | ||
| 14. QASP - FINAL.pdf | ||
| N3225322R0015.8 RFP.pdf | ||
| 9. MM-03 Sample MATSS Mission Expenditures Diagram and Costs_21day.xlsx | XLSX spreadsheet | |
| 8.D. EXAMPLE 21 DAY MENU.pdf | ||
| 12. SF1408-14e.pdf | ||
| 15. OPSEC Contract Requirements 03-21-22.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CPFF - CLIN 0002, 1002
| SOLICITATION NO. N32253-22-R-0015 - ATTACHMENT | ||||||||||||
| COST SUMMARY FORMAT FOR CLIN 0002, 1002 - In-Port Operations | ||||||||||||
| Prime Offeror Name: | ||||||||||||
| Subcontractor Name (if applicable): | ||||||||||||
| DCAA Point of Contact Information: | ||||||||||||
| Total for All Years | Base Period - First Year | Base Period - Second Year | Option Six Month | |||||||||
| Cost Elements | Labor Category | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount |
| Prime Contractor Labor Cost | ||||||||||||
| Prime Contractor Direct Labor | ||||||||||||
| Employee Name 1 | ||||||||||||
| Employee Name 2 | ||||||||||||
| Etc. | ||||||||||||
| Total Direct Labor Cost | ||||||||||||
| Prime Contractor Indirect Labor Cost | ||||||||||||
| Overhead | ||||||||||||
| Fringe Benefits | ||||||||||||
| G&A | ||||||||||||
| Total Indirect Labor Cost | ||||||||||||
| Total Direct and Indirect Labor cost | ||||||||||||
| COM | ||||||||||||
| Total Prime Contractor Labor Cost | ||||||||||||
| Subcontractor Labor Cost | ||||||||||||
| Subcontractor proposed cost and fee | ||||||||||||
| Subcontractor 1 | ||||||||||||
| Subcontractor 2 | ||||||||||||
| Etc. | ||||||||||||
| Total proposed subcontractor labor cost and fee | ||||||||||||
| Prime contractor pass through (not including fee) | ||||||||||||
| Handling | ||||||||||||
| G&A | ||||||||||||
| Other (if any) | ||||||||||||
| Total pass through (not including fee) | ||||||||||||
| Total Subcontractor Cost including pass through | ||||||||||||
| Total Labor Cost (Prime and Subcontractor Labor) | ||||||||||||
| Fixed Fee | ||||||||||||
| Prime Contractor Fee for Prime Contractor Labor | ||||||||||||
| Prime Contractor Fee for Subcontractor Labor * | ||||||||||||
| Total Fee (for Prime and Subcontractor Labor) | ||||||||||||
| Total Labor Cost Plus Fixed Fee (CPFF) | ||||||||||||
| Other Direct Costs | ||||||||||||
| Other Direct Costs (ODCs) | ||||||||||||
| Any adders to ODCs such as G&A (cost only - no fee) | ||||||||||||
| Total ODCs | ||||||||||||
| Total CPFF (Labor and ODCs) | ||||||||||||
| Pass Through Analysis - Total for All Years | Amount | Percent | ||||||||||
| Subcontractor proposed cost and fee | ||||||||||||
| Pass Through Amount (not including fee) | ||||||||||||
| Prime Contractor Fee for Subcontractor Labor * | ||||||||||||
| Total Pass Through Amount (including fee) | 0% | |||||||||||
| Maximum Pass Through Allowed | 8% | |||||||||||
| Fee Analysis - Total for All Years | Amount | Percent | ||||||||||
| Prime Contractor Labor Cost | ||||||||||||
| Fixed Fee for Labor Performed by Prime Contractor | 0% | |||||||||||
| Maximum Fixed Fee Allowed | ||||||||||||
| * When analyzing pass through costs, the Government will consider prime offeror fee on subcontractor price as an element of pass through as explained in the Section H Savings. In Section B, however, prime offeror fee on subcontractor price is a fee element rather than a cost element. Prime offeror fee on subcontractor price should be included in the fee column (rather than the cost column) of Section B. |
CPFF - CLIN 0003, 1003
| SOLICITATION NO. N32253-22-R-0015 - ATTACHMENT | ||||||||||||
| COST SUMMARY FORMAT FOR CLIN 0003, 1003 - At-Sea Mission | ||||||||||||
| Prime Offeror Name: | ||||||||||||
| Subcontractor Name (if applicable): | ||||||||||||
| DCAA Point of Contact Information: | ||||||||||||
| Total for All Years | One Mission for Base Period - 1st year | One Mission for Base Period - 2nd Year | One Mission for Option Six Month | |||||||||
| Cost Elements | Labor Category | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount |
| Prime Contractor Labor Cost | ||||||||||||
| Prime Contractor Direct Labor | ||||||||||||
| Employee Name 1 | ||||||||||||
| Employee Name 2 | ||||||||||||
| Etc. | ||||||||||||
| Total Direct Labor Cost | ||||||||||||
| Prime Contractor Indirect Labor Cost | ||||||||||||
| Overhead | ||||||||||||
| Fringe Benefits | ||||||||||||
| G&A | ||||||||||||
| Total Indirect Labor Cost | ||||||||||||
| Total Direct and Indirect Labor cost | ||||||||||||
| COM | ||||||||||||
| Total Prime Contractor Labor Cost | ||||||||||||
| Subcontractor Labor Cost | ||||||||||||
| Subcontractor proposed cost and fee | ||||||||||||
| Subcontractor 1 | ||||||||||||
| Subcontractor 2 | ||||||||||||
| Etc. | ||||||||||||
| Total proposed subcontractor labor cost and fee | ||||||||||||
| Prime contractor pass through (not including fee) | ||||||||||||
| Handling | ||||||||||||
| G&A | ||||||||||||
| Other (if any) | ||||||||||||
| Total pass through (not including fee) | ||||||||||||
| Total Subcontractor Cost including pass through | ||||||||||||
| Total Labor Cost (Prime and Subcontractor Labor) | ||||||||||||
| Fixed Fee | ||||||||||||
| Prime Contractor Fee for Prime Contractor Labor | ||||||||||||
| Prime Contractor Fee for Subcontractor Labor * | ||||||||||||
| Total Fee (for Prime and Subcontractor Labor) | ||||||||||||
| Total Labor Cost Plus Fixed Fee (CPFF) | ||||||||||||
| Other Direct Costs | ||||||||||||
| Other Direct Costs (ODCs) | ||||||||||||
| Any adders to ODCs such as G&A (cost only - no fee) | ||||||||||||
| Total ODCs | ||||||||||||
| Total CPFF (Labor and ODCs) for 1 mission | ||||||||||||
| Total CPFF (Labor and ODCs) for 7 missions each year | ||||||||||||
| Pass Through Analysis - Total for All Years | Amount | Percent | ||||||||||
| Subcontractor proposed cost and fee | ||||||||||||
| Pass Through Amount (not including fee) | ||||||||||||
| Prime Contractor Fee for Subcontractor Labor * | ||||||||||||
| Total Pass Through Amount (including fee) | 0% | |||||||||||
| Maximum Pass Through Allowed | 8% | |||||||||||
| Fee Analysis - Total for All Years | Amount | Percent | ||||||||||
| Prime Contractor Labor Cost | ||||||||||||
| Fixed Fee for Labor Performed by Prime Contractor | 0% | |||||||||||
| Maximum Fixed Fee Allowed | ||||||||||||
| * When analyzing pass through costs, the Government will consider prime offeror fee on subcontractor price as an element of pass through as explained in the Section H Savings. In Section B, however, prime offeror fee on subcontractor price is a fee element rather than a cost element. Prime offeror fee on subcontractor price should be included in the fee column (rather than the cost column) of Section B. |