10-ATTACHMENT I - GEYSER PEAK LIST OF UCA PROVIDED PARTS.pdf
PDF 535 KB Posted
- Solicitation number
- GJ26-149
- Issued by
- Tooele County, Utah
About this file
This is an attachment listing UCA-provided parts for the GJ26-149 Geyser Peak Tower Construction and Equipment Shelter Installation project managed by the Utah Communications Authority. The project involves the construction and installation of communications infrastructure near Geyser Peak in Sevier County, Utah on USFS land at coordinates 38.511960, -111.460180. The materials to be picked up from the UCA Warehouse and UDOT Road Shed near Fish Lake include one assembled 6-foot high performance microwave antenna with radios, two Sinclair SE419 directional panel antennas, one Combilent tower top amplifier, one 23'1" x 11'1-1/2" x 9'8" skid-mounted equipment shelter, generator intake and exhaust ducting, one 1000-gallon propane tank, two prefabricated propane tank pads, one primary fuel regulator (MEC Type MEGR-1622H-JGJ), 36 solar panels with aluminum mounting bracket kits, three PV junction boxes, two 20-inch ground bus bars, and a complete tower assembly including steel and hardware, climbing ladders, waveguide support components, and lightning protection equipment. Questions regarding the solicitation are due by May 19, 2026 at noon MT, with submissions due by May 22, 2026 at 10:00 AM MT via the U3P system.
This attachment does not contain pricing terms, set-aside information, incumbent details, funding sources, or contract award amounts. The document serves solely as an inventory of materials that bidders must account for during the construction and installation project and should be referenced in conjunction with the complete solicitation documents issued by the Utah Communications Authority.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT I
LIST OF UCA PROVIDED PARTS TO BE PICKED UP FROM UCA WAREHOUSE
GEYSER
• Qty. 1 assembled 6' High Performance Microwave antenna with radios attached
• LMR, connectors, ground kits, polyphasers and mounting cushions / hardware for microwave install
• Qty. 2 Sinclair SE419 directional panel antennas
• Qty. 1 Combilent tower top amplifier
• Qty. 1 23'1" X 11'1-1/2" X 9'8" skid mounted equipment shelter, complete.
• Generator intake and exhaust ducting
• Qty. 1 1000 gallon propane tank
• Qty. 2 prefabricated propane tank pads
• Qty. 1 Primary fuel regulator;
• MEC Type: MEGR-1622H-JGJ
• Body: FPOL X ¾” NPT
• Orifice: 7/32”
• SPG Range: 8.0-12.0 PSI
• Qty. 36 solar panels
• Aluminum mounting bracket kits for three sectors
• Pipe and support brackets for three sectors
• Qty. 3 PV Junction boxes
• USFS Issued ROW
• Qty. 2, 20" ground bus bars
• Tower
Complete tower steel and hardware Construction step bolts (see notes) Inside climbing ladder (16") Waveguide support ladder (to support twelve (12) initial lines) One (1) flush mount with 2-3/8" O.D. pipe @ the 96' elevation One (1) flush mount with 2-3/8" O.D. pipe @ the 86' elevation One (1) 4-1/2" O.D. leg dish mount @ the 40' elevation One (1) 6' parabolic ice shield Tuf-Tug 100' Safety Climb without Harness Waveguide Bridge 2-Leg 2' x 10' (15' Direct Burial) with three (3) 1 level trapeze kits Three (3) Weld-on Grounding Tabs 10' x 3/4" lightning rod copper clad and stiffener 2-7/8" x 15' lightning rod extension Three (3) Tinned Buss Bar 1/4" X 2" x 12", 26 holes Anchor bolts and templates, leg-to-leg templates
• Final erection drawings
File details come from the government source that posted it. Updated .